30
Red Bridge Relocation Hawkeye Engineering Structural Analasist: Alexandre Von Rohrbach Trail Design & Restoration Specialist: Adam Tuchscherer Abutment Analysis & Trail Design Specialist: Bryton Meyer

Structural Analasist: Red Bridge Relocation

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Structural Analasist: Red Bridge Relocation

Red Bridge Relocation

Hawkeye EngineeringStructural Analasist:

Alexandre Von Rohrbach

Trail Design & Restoration Specialist:

Adam Tuchscherer

Abutment Analysis & Trail Design Specialist:

Bryton Meyer

Page 2: Structural Analasist: Red Bridge Relocation

Reasnor to Colfax

Page 3: Structural Analasist: Red Bridge Relocation
Page 4: Structural Analasist: Red Bridge Relocation
Page 5: Structural Analasist: Red Bridge Relocation
Page 6: Structural Analasist: Red Bridge Relocation
Page 7: Structural Analasist: Red Bridge Relocation
Page 8: Structural Analasist: Red Bridge Relocation

Design Standards and Software Packages STANDARDS

ACIAISC

IowaDOTAASHTO LRFD

SUDAS

SOFTWARE PACKAGES

AutoCADRevit

Civil 3DINFRAworks

RobotAnsys

Page 9: Structural Analasist: Red Bridge Relocation

Quarry Springs Trail

Page 10: Structural Analasist: Red Bridge Relocation

Sidewalk Link to Downtown

Page 11: Structural Analasist: Red Bridge Relocation

Sidewalk Link to Downtown

Page 12: Structural Analasist: Red Bridge Relocation

Culvert

Page 13: Structural Analasist: Red Bridge Relocation

Red Bridge Abutments

Page 14: Structural Analasist: Red Bridge Relocation

Red Bridge Railing

Page 15: Structural Analasist: Red Bridge Relocation

Red Bridge Restoration

Page 16: Structural Analasist: Red Bridge Relocation

AlternativeRed Bridge Lighting

Page 17: Structural Analasist: Red Bridge Relocation

Bridge Sidewalk ExpansionExpanded from 5ft to 10ft

Required pier expansion

Add a new W24X306 Girder

Moment splice connections

Pier Expansion Bracket

Page 18: Structural Analasist: Red Bridge Relocation

Railing Design

Page 19: Structural Analasist: Red Bridge Relocation

Transportation of Red Bridge Cost Estimate

Page 20: Structural Analasist: Red Bridge Relocation

Sidewalk Construction Cost Estimate

Page 21: Structural Analasist: Red Bridge Relocation

Hwy 117 Bridge Construction Cost Estimate

Page 22: Structural Analasist: Red Bridge Relocation
Page 23: Structural Analasist: Red Bridge Relocation

Construction Cost EstimatePhase 1 Quarry Springs Trail

Page 24: Structural Analasist: Red Bridge Relocation

Abutment Construction Cost Estimate

Page 25: Structural Analasist: Red Bridge Relocation

Refurbishing Cost Estimate

Page 26: Structural Analasist: Red Bridge Relocation

Total Construction Cost Estimate

Page 27: Structural Analasist: Red Bridge Relocation
Page 28: Structural Analasist: Red Bridge Relocation

Remaining Quarry Springs TrailConstruction Cost Estimate

Page 29: Structural Analasist: Red Bridge Relocation

Total Construction Cost Estimate

Page 30: Structural Analasist: Red Bridge Relocation

Thank You