Street Conditions

• Part 1 – State of the Streets• Part 2 – Repairs and Maintenance

Costs• Part 3 – Options for Funding

Page 2: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

Street ConditionsPart 2 - Repair

and Maintenance Costs

Page 3: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

Pothole Repair

• Temporary fix• Clean out loose material• Cold patch asphalt• Larger holes require dig-out

Page 4: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

Crack Sealing

• Blow out crack• Apply asphalt sealer• $ 1/linear foot• Not cost effective for streets• Keeps water out of subgrade

Page 5: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

Slurry Seals

• Clean pavement• Apply thin asphalt emulsion, sand

slurry• $0.20/ft2

• Service life 3-5 years

Page 6: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

Dig-outs

• Dig out hole to base material

• Fill with hot mix• Pavement has

failed structurally• Service life 25

years• $5/ft2

Page 7: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

Overlays

• Grind existing gutter edge

• Pave with 1 ½ - 2” hot asphalt

• $1.10/ft2

• Service life 15-20 years

Page 8: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

AC – asphalt concrete$1.10 /ft2Willow St.

ARHM – asphalt rubber hot mix

$1.80/ft2S. Montgomery St.

Page 9: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

Other: Striping

• Single white line• Yellow and

double-yellow• Crosswalks• Parking spaces• Fog lanes• Bike paths

Page 10: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

Pre-2006 Pavement Management

Program• Emergency repairs only• Limited Caltrans maintenance work

on SR 150 and SR33 in city limits• Maintenance staff positions cut• Minimal preventative maintenance

since 2003

Page 11: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

Pavement Condition Index (PCI)

• What is it? Computerized quality rating 0-100 0 no structural stability, very deteriorated 100 new street

• How is it calculated? Type and percentage of cracks, thickness of pavement, condition

• City has 147 road segments.• Average PCI Citywide is 48• Other Cities Try to Maintain +/- 65

Page 12: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

Current Street Conditions

• 0-20: 21 segments• 21-40: 33 segments• 41-60: 40 segments• 61-80: 39 segments• 81-100: 14 segments

Page 13: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

Identifying NeedScheduling Repairs

• Pavement Condition Index (<20)• Traffic Volume (increased volume

= decreased street life)• Truck traffic• 06-07 $400,000 budget (includes

5 years of STP funding)

Page 14: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

San Francisco/Bay Area Transportation Commission

Page 15: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

Repair Costs

• Estimated repair cost $8 million• Reconstruct or overlay• Assumes PCI=65• Assumes maintenance budget is

provided.

Page 16: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

Five-Year Pavement Improvement Plan

• Repair cost $1.6 M annually for five years plus $80K maintenance

• Some emergency repairs will be needed before five years.

• Assumes City = PCI 65

Page 17: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

RecommendedAnnual & Preventative Maintenance Program

Striping – ½ city/year $15,000Slurry seal – 5 year intervals $50,000Crack sealing – not recommendedPothole Repair – As needed, requires

reinstatement of maintenance personnel plus materials $15,000

(material only)

Page 18: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

Projected Future Costs

(Assumes 5-yr, $8M street repair completed to maintain PCI=65)

Annual Overlay Cost $370,000Annual Maintenance Cost $ 80,000Annual Investment $450,000

Page 19: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

Caltrans Maintenance Contract

• $74,000 contract to perform maintenance on SR 150 and SR 33 in the City limits

• Better knowledge of City needs • Fast response time• Limited by reduction of PW

maintenance staff

Page 20: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

Proposed 06-07 Street Improvements

• Cuyama (SR33-Church) 54250 ft2

• Cuyama (Church-Del Norte) 41040 ft2

• Palomar (Bristol-Cuyama) 26280 ft2

• El Paseo (Bristol-Cuyama) 6520 ft2

• Canada (SR150-McKee) 102160 ft2

• Vista Hermosa (Foothill-Del Oro)19680 ft2

• Fulton (SR150-Grand) 72720 ft2

Page 21: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

Cuyama

Page 22: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

Palomar

Page 23: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

El Paseo

Page 24: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

Canada

Page 25: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

Vista Hermosa

Page 26: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

Fulton

Page 27: Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding

State Transportation Program

Local Funds

$214,629($43,000/year for 5 years)