Streamlining Offset Analysis through

proper Daily Operation Reports Data

Management

Victor González

Drilling Software Champion – North Sea

[email protected]

ECIM 2009

VGF – 2

© 2009 Schlumberger. All rights reserved.

An asterisk is used throughout this presentation to denote a mark of Schlumberger.

Other company, product, and service names are the properties of their respective

owners.

ECIM 2009

VGF – 3

Integrated Project Management – IPM

Operational Segment of Schlumberger

Well Construction

Field Development

Field Management

Business Process

55 Projects

110 Rigs

ECIM 2009

VGF – 4

IPM Human Resources – 2007

6,200 employees

2,000 specialists

850 engineers

675 GeoScientists

ECIM 2009

VGF – 5

IPM Operational Highlights – 2007

Well Construction Jobs: 2,657

Managed BOEPD: 177,000

Incremental BOE: 4.6 Million

ECIM 2009

VGF – 6

Well Construction

Get the well to produce!

• Drilling

• Completion

• Intervention

Tracked Daily

Daily Operations Report (DOR)

Offset Well Analysis

ECIM 2009

VGF – 7

Well Construction Projects in IPM

Factory Drilling

Diverse Locations

• Clients

• Standards

• Regulations

• Technical Challenges

Schlumberger Add-ons

• Global Monitoring

• Personnel Mobility

ECIM 2009

VGF – 8

Well Construction Projects in IPM

Measure

Improve

Repeat

Share

ECIM 2009

VGF – 9

11.2

47%

ECIM 2009

VGF – 10

Offset Well Analysis

Pick the right wells

Confirm those are the right wells!

Repeat the good, Avoid the bad

ECIM 2009

VGF – 11

Offset Well Analysis

Maps

End of Well Reports

Daily Operations Reports

• Paper Copies

• Legacy Systems

• Current Systems

• MS Excel

• Lost/Destroyed

ECIM 2009

VGF – 12

So what was needed?

Consistency and Transparency in Offset Analysis

• Worldwide Standard

• Aligned with IPM’s Well Engineering Management System

Added value

• Improve work, don’t create more

• Make data available to other workflows and users

ECIM 2009

VGF – 13

How to approach the need?

Build Historical Records

• Electronic

• Available to everybody, anywhere

• Highlighting operational information

Provide a Tool to extract value

• Planning

• Execution

• Evaluation

ECIM 2009

VGF – 14

Build Historical Records – Get the Data

New Operated Projects

• Osprey Reports

Managed Projects

• Use Operator’s system

Legacy Projects

• Progressively load data

ECIM 2009

VGF – 15

Build Historical Records – Aggregate

ECIM 2009

VGF – 16

Build Historical Records – Aggregate

ECIM 2009

VGF – 17

Build Historical Records – Aggregate

ECIM 2009

VGF – 18

Build Historical Records – Aggregate

Storage Standards

Unit Systems

Time zones

Currency

Availability

ECIM 2009

VGF – 19

Extract the Value

ECIM 2009

VGF – 20

Extract the Value – First Iteration

Web based

Aggregated

Single-Well

Excel Export

ECIM 2009

VGF – 21

Extract the Value – Second Iteration

Enhanced UI

Real Offset Analysis

Alarms

Notifications

Project/Field Analysis

End of Well Report

ECIM 2009

VGF – 22

Extract the Value – Third Iteration

Enhanced well selection

Well Group Comparison

Analysis Tools

Statistics

ECIM 2009

VGF – 23

Extract the Value

ECIM 2009

VGF – 24

Lessons Learned

Removing reporting gains you friends

3 man-month

per year

ECIM 2009

VGF – 25

Lessons Learned

Removing reporting gains you friends

Garbage In [remains] Garbage Out

ECIM 2009

VGF – 26

Lessons Learned

Removing reporting gains you friends

Garbage In [remains] Garbage Out

Excel is here to stay

ECIM 2009

VGF – 27

Lessons Learned

Removing reporting gains you friends

Garbage In [remains] Garbage Out

Excel is here to stay

Detection by Exception is powerful

ECIM 2009

VGF – 28

Lessons Learned

Removing reporting gains you friends

Garbage In [remains] Garbage Out

Excel is here to stay

Detection by Exception is powerful

Prepare to measure success

ECIM 2009

VGF – 29

Lessons Learned

Removing reporting gains you friends

Garbage In [remains] Garbage Out

Excel is here to stay

Detection by Exception is powerful

Prepare to measure success

Expect Slow Acceptance

ECIM 2009

VGF – 30

$1.5MM

ECIM 2009

VGF – 31

Conclusions

Don’t do it yourself

ECIM 2009

VGF – 32

Conclusion

Don’t do it yourself

Don’t expect miracles

ECIM 2009

VGF – 33

Conclusions

Don’t do it yourself

Don’t expect miracles

Do it!

ECIM 2009

VGF – 34