Page 1 Municipality of Strathroy- Caradoc Page 1 of 2 Staff Report #:ES-3-2015 Directed to: Mayor Vanderheyden and Members of Council Council Meeting Date: February 2, 2015 Prepared by: Mark Harris Attachment(s): Department: Environmental Services -2014 Annual Report Subject: Mount Brydges Sewage 2014 Annual Report Recommendation: That the 2014 Mount Brydges Sewage Annual Report be received as information and filed. Background: The Certificate of Approval for the Sewage Treatment Plant (STP) requires that an annual report be prepared prior to March 30, 2014 and submitted to the Director of the Ministry of Environment. A copy of this report is attached to this report. In summary, the wastewater treatment plant operated in compliance for the 2014 year except for the following monitoring results: Effluent Ammonia for November 2014 of 10.18mg/L exceeded the compliance limit of 5 mg/L. The non-complaince of ammonia was related to the shaft failure of Rotating Biological Contactor (RBC) #1. Sewage flows were switched to RBC #2 but it did not have biofilm to allow the nitrification of the sewage resulting in an increase in effluent ammonia. The STP has a design capacity of 825 m3/day and had an average day flow of 75 m3/day for the 2014 year. Based on this flow, the plant operated at 9 % of the available capacity and has a current hydraulic reserve capacity of 750 m3/day. Comments: None Consultation: None Financial Implications: None

Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

Page 1

M u n i c i p a l i t y o f S t r a t h r o y - C a r a d o c

Page 1 of 2

Staff Report #:ES-3-2015

Directed to: Mayor Vanderheyden and Members of Council

Council Meeting Date:

February 2, 2015

Prepared by: Mark Harris Attachment(s):

Department: Environmental Services -2014 Annual Report

Subject: Mount Brydges Sewage 2014 Annual Report Recommendation: That

• the 2014 Mount Brydges Sewage Annual Report be received as information and filed.

Background: The Certificate of Approval for the Sewage Treatment Plant (STP) requires that an annual report be prepared prior to March 30, 2014 and submitted to the Director of the Ministry of Environment. A copy of this report is attached to this report. In summary, the wastewater treatment plant operated in compliance for the 2014 year except for the following monitoring results:

• Effluent Ammonia for November 2014 of 10.18mg/L exceeded the compliance limit of 5 mg/L.

The non-complaince of ammonia was related to the shaft failure of Rotating Biological Contactor (RBC) #1. Sewage flows were switched to RBC #2 but it did not have biofilm to allow the nitrification of the sewage resulting in an increase in effluent ammonia. The STP has a design capacity of 825 m3/day and had an average day flow of 75 m3/day for the 2014 year. Based on this flow, the plant operated at 9 % of the available capacity and has a current hydraulic reserve capacity of 750 m3/day. Comments: None Consultation: None Financial Implications: None

Page 2: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

Prepared by: Reviewed by:

________________________ _________________________

Director of Environmental Services Chief Administrative Officer

Page 3: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

MUNICIPALITY OF STRATHROY-CARADOC

MOUNT BRYDGES WASTEWATER TREATMENT PLANT

Works # 110001441

2014 ANNUAL REPORT

For the Period January 1, 2014 to December 31, 2014

Page 4: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

TABLE OF CONTENTS

OVERVIEW OF THE MT. BRYDGES SEWAGE COLLECTION/TREATMENT SYSTEM .........1 1.0 SUMMARY OF MONITORING AND COMPLIANCE DATA .............................................................. 1 2.0 GRAPHICAL REPORT OF TSS PROBE MONITORING RESULTS .................................................. 4 3.0 OPERATING PROBLEMS ......................................................................................................................... 4 4.0 MAINTENANCE .......................................................................................................................................... 5 5.0 EFFLUENT QUALITY ASSURANCE OR CONTROL MEASURES .................................................... 5 6.0 CALIBRATION AND MAINTENANCE EFFLUENT MONITORING EQUIPMENT ....................... 5 7.0 EFFORTS/RESULTS ACHIEVED IN MEETING EFFLUENT OBJECTIVES ................................... 5 8.0 SLUDGE GENERATED .............................................................................................................................. 5 9.0 COMPLAINTS AND ACTIONS TAKEN TO ADDRESS COMPLAINTS ............................................ 5 10.0 SUMMARY OF ALL BY-PASS, SPILL OR ABNORMAL DISCHARGE EVENTS ........................... 6 11.0 OTHER INFORMATION THE DISTRICT MANAGER REQUIRES ................................................... 6

LIST OF TABLES

Table 1 Water Pollution Control Plant – Historical Flow Data ...................................................................... 2 Table 2 Mount Brydges Extraneous Flow Monitoring................................................................................... 3 Table 3 Water Pollution Control Plant – Effluent Quality Summary ............................................................. 4

LIST OF APPENDICES

Appendix A 2014 Daily Flow Data Appendix B 2014 Summarized Influent/Effluent Monitoring Data Appendix C 2014 Maintenance Summary

Page 5: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

MUNICIPALITY STATHROY-CARADOC

MOUNT BRYDGES WASTEWATER TREATMENT AND COLLECTION SYSTEM

YEAR 2014 ANNUAL REPORT Overview of the Mount Brydges Sewage Collection/Treatment System The Mount Brydges Sewage Collection System Consists of two pump stations. The main pump station is known as the Mill Road Pump Station and pumps 100 % of the sewage to the treatment plant via 938 m of forcemain. The collection system consists of 7.5 km of sanitary sewer/forcemain ranging in size from 200 mm to 600 mm. The average age of the collection system is 2010. The Mount Brydges Sewage Treatment Plant was constructed in 2011 and reached substantial completion on December 19, 2011. The treatment plant includes Rotating Biological Contactors, Final Clarifiers, Effluent Filtration and UV Disinfection with a with a rated capacity of 825 m3/day. The Sewage Collection/Treatment System currently provides service to 231 connections located in the Mount Brydges Urban Boundary. In accordance with Certificate of Approval Number 7788-8BJRL8, the Municipality of Strathroy-Caradoc is required to prepare any annual report within 90 calendar days of the completion of the calendar year. The following headings correspond with the reporting requirements per the Certificate of Approval:

1. Summary and Interpretation of Monitoring Data (10-6 (a)) Two summary reports have been prepared to document the overall success and adequacy of the sewage treatment program.

a) Table 1: 2014 Daily Flow Report. The average flow for the 2014-year was 75 m3/day. The treatment works is designed for a rated capacity of 825 m3/day, but the design includes provision to expand. The maximum day flow for the 2013-year was 212 m3/day and was experienced during maintenance to a clarifier with the contents being transfer to the treatment plant. The noted maximum day flow is well below the maximum peak design flow for the plant of 1,650 m3/d per the Design Brief. There were also no bypasses experienced at the treatment plant is 2014. The average day flow for all months is below the rated capacity of the treatment plant of 825 m3/day. Appendix A provides detailed flow data for the 2014 year.

1

Page 6: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

TABLE 1

The Municipality of Strathroy-Caradoc Mt Brydges- Water Pollution Control Plant - Historical Flow Data

Average Average Year Total Total Average Maximum Maximum Annual

Flow Monthly Flow Daily Flow Daily Flow Daily Flow Precipitation m3 m3 m3 m3 m3 mm

2012 17,204 1720 58 108 169 861 2013 24,772 2064 68 118 264 1194 2014 27,283 2274 75 108 212 896

Table 2 of this report titled”Mount Brydges Extraneous Flow Monitoring” as detailed on the next page provides a sewage flow comparision with respect to billing flows and precipitation. The Table details a slow increase in sewage flows to the plant and little to no extraneous flows at this point.

b) Table 3: 2014 Summarized Influent/Effluent Parameter Concentrations and Loadings Report.

This table demonstrates that the average BOD, SS, TP, E. Coli and pH all comply with the Certificate of Approval Limits. Appendix B provides detailed monitoring data for the parameters required per the Certificate of Approval. With respect to non-compliance, effluent Ammonia exceeded the limit in November 2014 with a monthly average of 10.18 mg/L. The exceedance was due a failure in the bearing on the active Rotating Biological Contactor (RBC). The back-up RBC was started but did not have the biofilm to establish immediate nitrification.

2

Page 7: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

Table 2: Mount Brydges Extraneous Flow Monitoring

Year Average Flow to STP (m3)

Percentage above/below

average

Average Billable Consumption

(m3)

Average Flow (m3)

Average Flow/Billable

Flow Differential

Precipitation (mm)

Percentage above/below

average

Average Precipitation

(mm)% Differential

2012 58 -13.43% 51 67 1.14 861 -12.47% 945 0.912013 68 1.49% 97 67 0.70 1194 21.38% 945 1.262014 75 11.94% 104 67 0.72 896 -8.91% 945 0.95Avg. 67 84 1 984 1.04

Mount Brydges Average Annual Sewage Flows Mount Brydges Annual Precipitation

0

25

50

75

100

125

150

2012 2013 2014

Average Flow to STP(m3)

Average BillableConsumption (m3)

Long-Term Average Flowto STP (m3)

600650700750800850900950

1000105011001150120012501300

2012 2013 2014

Precipitation (mm)

Average Precipitation(mm)

3

Page 8: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

TABLE 3 Municipality of Strathroy-Caradoc

Water Pollution Control Plant – Effluent Quality Summary

Parameter Average Concentration (mg/L)

Concentration Limit (mg/L)

Average Loading (kg/d)

Limit

BOD 2.1 10 non-freezing 15 freezing

0.2 N/A

SS 2.3 10 non-freezing 15 freezing

0.2 N/A

TP 0.06 0.5 non-freezing 1.0 freezing

0.0 N/A

NH3 1.44 3.0 non-freezing 5.0 freezing

0.1 N/A

DO (min) 6.0 5.0 N/A E. Coli 0.1 200 N/A pH (min) 6.2 6.0 to 9.5 N/A

2. Graphical Report of TSS Probe Monitoring Results (10-6 (b))

This report is included in Appendix B under the title “Total Suspended Solids Probe Daily Wastewater Summary”

3. Operating Problems (10.6(c)) It has been noted by the SCADA integrator along with Instrument Technician that bubbles in the sewage effluent are impacting readings on the total solids analyzer and the effluent flow meter. The effluent flow meter appears to read 15 m3/day higher than the flow entering the plant. It has been noted that the effluent solids meter spikes at times based on bubbles coming from the effluent filters. Discussions have taken place with BM Ross in regards to the bubble issue. There is little that can be done to resolve the problem at the moment. It is felt that as flows increase that the retention time in system will be reduced creating less opportunity for air to come out of the water in the filters. During May of 2014, we did experience problems with the Clarier #1 and #2 as they experienced problems with sprocket and pin failures which required staff switch tanks during for repairs. In October, the bearing on the active RBC failed. Staff switched the flow to RBC #2 for treatment and the ammonia for the month of November failed to meet compliance due to lack of biofilm as required for the nitrification process.

4

Page 9: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

At times during the year, problems were noted with the SCADA radio system as it experienced periodic communication failures. It appears that the problem is more noticeable during summer month as it is believed that tree leaves could be impacting signal transmission at times. In late December, the effluent total solids meter showed an increase in solids concentration which was determined to be caused by a loss of set-point at the main pump station causing higher that design flow rates to the plant.

4. Maintenance (10.6(d)) A monthly summary of maintenance for Mount Brydges and Strathroy STP is detailed in a separate report and may be found in Appendix C.

5. Effluent Quality Assurance or Control Measures (10.6(e)) Regular monitoring of the treatment process and on site laboratory testing is performed by the operator to ensure effluent quality. The dissolved oxygen meter is calibrated monthly, the pH meter bi-monthly and the flow sensing devices are calibrated annually. Routine analyses are performed by SGS Lakefield Research Laboratories.

6. Calibration and Maintenance Effluent Monitoring Equipment (10.6(f)) The effluent flow meter was calibrated on February 14th, 2014 by R & R Instrumentation.

7. Efforts/Results achieved in meeting Effluent Objectives (10.6(g)) In 2013, a switch from Alum to Clarion 405 was made which has improved effluent solids results and increased effluent pH values. Staff have also improved the mixing in the channel where the Clarion 405 is added to promote floc formation. In 2014, the biggest challenge was dealing with Clarifier Equipment and an RBC Failure. It is difficult to start a new RBC with no biofilm and expect to achieve compliance. It would be considered in the same lines as plant start-up.

8. Sludge Generated (10.6(h)) Waste activated sludge is discharged into the tank located beneath the RBC. The RBC sludge was pumped out and transported to the Strathroy WPCP on two occasions in 2014 per the following:

• May 7th 50 m3 • October 29th 75 m3

9. Complaints and Actions taken to address Complaints (10.6(i)) The Operation Manual has a detailed procedure in regards to complaint response. In 2014, there were no complaints filed in regards to the Sewage Treatment Plant, Collection System or Sewage Pump Station Operation.

5

Page 10: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

10. Summary of all By-pass, spill or abnormal discharge events (10.6(j)) There were no By-pass, spill or abnormal discharges to the natural environment in 2014.

11. Other information the District Manager requires. (10.6(k)) At this time, there has been no request for additional information by the District Manager. Mark Harris Director of Environmental Services

6

Page 11: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

APPENDIX “A”

MOUNT BRYDGES

2014 DAILY FLOW DATA

Page 12: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

W:\Council\Agendas 2015\February 2 2015\Mark's report 3\Sewage MTB TP_DischargeFlow_Final Effluent_2015

Previous MenuThe Municipality of Strathroy-Caradoc - Mt. Brydges Sewage Treatment Plant

2014 Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec.Day m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

1 81.0 72.0 76.0 76.0 86.0 98.0 74.0 58.0 68.0 63.0 57.0 75.02 75.0 78.0 77.0 81.0 87.0 76.0 67.0 62.0 85.0 72.0 88.0 70.03 66.0 81.0 74.0 78.0 98.0 87.0 52.0 56.0 91.0 74.0 56.0 73.04 75.0 82.0 68.0 92.0 91.0 96.0 87.0 64.0 87.0 71.0 92.0 82.05 73.0 69.0 78.0 82.0 44.0 94.0 74.0 71.0 101.0 75.0 70.0 70.06 70.0 87.0 72.0 75.0 0.0 83.0 62.0 66.0 80.0 77.0 80.0 82.07 70.0 78.0 50.0 85.0 15.0 101.0 51.0 58.0 66.0 64.0 69.0 72.08 65.0 90.0 98.0 91.0 96.0 98.0 75.0 53.0 88.0 69.0 72.0 80.09 68.0 74.0 75.0 84.0 87.0 77.0 77.0 64.0 68.0 69.0 86.0 75.010 66.0 77.0 78.0 89.0 87.0 47.0 68.0 63.0 82.0 65.0 83.0 71.011 134.0 69.0 83.0 79.0 67.0 14.0 50.0 70.0 76.0 70.0 68.0 71.012 87.0 71.0 65.0 90.0 60.0 52.0 69.0 66.0 69.0 66.0 67.0 78.013 77.0 67.0 73.0 92.0 88.0 75.0 68.0 75.0 75.0 63.0 69.0 72.014 83.0 85.0 87.0 94.0 38.0 75.0 61.0 56.0 75.0 71.0 70.0 66.015 66.0 81.0 82.0 94.0 51.0 80.0 66.0 77.0 71.0 73.0 77.0 74.016 77.0 78.0 80.0 82.0 86.0 78.0 62.0 69.0 71.0 61.0 62.0 73.017 71.0 73.0 74.0 86.0 100.0 71.0 60.0 57.0 76.0 71.0 73.0 73.018 79.0 76.0 76.0 86.0 94.0 77.0 67.0 61.0 70.0 74.0 64.0 82.019 77.0 77.0 82.0 73.0 72.0 72.0 83.0 69.0 71.0 69.0 76.0 73.020 91.0 87.0 82.0 84.0 103.0 72.0 72.0 66.0 70.0 62.0 75.0 76.021 70.0 121.0 75.0 95.0 99.0 68.0 56.0 68.0 65.0 86.0 63.0 73.022 83.0 87.0 91.0 70.0 97.0 74.0 67.0 66.0 69.0 77.0 72.0 73.023 75.0 80.0 79.0 78.0 92.0 68.0 73.0 67.0 66.0 60.0 80.0 61.024 76.0 71.0 77.0 74.0 95.0 71.0 62.0 61.0 69.0 72.0 80.0 90.025 81.0 83.0 80.0 81.0 78.0 78.0 66.0 66.0 68.0 72.0 70.0 68.026 73.0 88.0 78.0 87.0 212.0 76.0 67.0 68.0 64.0 77.0 71.0 69.027 69.0 70.0 84.0 80.0 94.0 70.0 55.0 67.0 65.0 51.0 71.0 73.028 72.0 81.0 77.0 76.0 81.0 67.0 72.0 78.0 59.0 87.0 77.0 78.029 81.0 80.0 87.0 103.0 70.0 78.0 74.0 71.0 87.0 64.0 72.030 84.0 92.0 77.0 88.0 58.0 59.0 64.0 68.0 77.0 73.0 72.031 76.0 80.0 94.0 63.0 50.0 66.0 72.0 Totals m3

Total m3 2,391 2,233 2,423 2,498 2,583 2,223 2,063 2,010 2,204 2,191 2,175 2,289 27,283 Monthly Ave. m3 77 80 78 83 83 74 67 65 73 71 73 74 75

Max m3 134 121 98 95 212 101 87 78 101 87 92 90 212 Running Ave.m3 77 78 78 80 80 79 77 76 76 75 75 75 75

Table 1 - 2014 Daily Discharge Flows - Limit: Ave. Daily Flow 8,560 m3/day > 1 year and Max. Flow 23,280 m3/day

Page 13: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

APPENDIX “B”

MOUNT BRYDGES

2014 INFLUENT/EFFLUENT

MONITORING DATA

Page 14: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

W:\Council\Agendas 2015\February 2 2015\Mark's report 3\Sewage MTB TP_DischargeFlow_Final Effluent_2015

2

Back To Main Menu

Table 3 - 2014 Summarized Influent/Effluent Parameter Concentrations and Loadings

CBOD5Limit 15(10) mg/L

Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec.Effluent Number of Samples 4 4 4 5 4 4 5 4 5 4 4 5 Average

Monthly Ave. mg/L 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 3.0 2.0 2.1 Annual Ave. mg/L 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.1 2.1 2.1

Loading kg/day 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.2 0.1 0.2Raw Number of Samples 1 1 1 1 1 1 1 1 1 1 1 1

Monthly Raw mg/L 291.0 705.0 14.0 68.0 39.0 46.0 68.0 44.0 92.0 399.0 59.0 44.0 155.8Total Suspended SolidsLimit 15(10) mg/L

Effluent Number of Samples 4 4 4 5 4 4 5 4 5 4 4 5 AverageMonthly Ave. mg/L 2.0 2.8 2.3 2.0 2.8 2.0 2.2 2.0 2.0 2.0 2.3 3.0 2.3

Annual Ave. mg/L 2.0 2.4 2.3 2.2 2.3 2.3 2.3 2.2 2.2 2.2 2.2 2.3 2.3Loading kg/day 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2

Raw Number of Samples 1 1 1 1 1 1 1 1 1 1 1 1Monthly Raw mg/L 638.0 954.0 24.0 196.0 100.0 121.0 186.0 70.0 98.0 413.0 413.0 46.0 271.6

Total PhosphorusLimit 1(0.5) mg/L

Effluent Number of Samples 4 4 4 5 4 4 5 4 5 4 4 5 AverageMonthly Ave. mg/L 0.04 0.09 0.04 0.04 0.04 0.03 0.03 0.04 0.04 0.09 0.14 0.06 0.06

Annual Ave. mg/L 0.04 0.06 0.05 0.05 0.05 0.04 0.04 0.04 0.04 0.05 0.05 0.05 0.05Loading kg/day 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Raw Number of Samples 1 1 1 1 1 1 1 1 1 1 1 1Monthly Raw mg/L 33.90 47.20 1.92 4.01 2.17 3.18 2.64 2.38 2.73 8.04 4.17 2.19 9.5

(A+A) Nitrogen/TKNLimit (M-N) 5(3) mg/L

Objective (DE-AP) 1 mg/L Effluent Number of Samples 4 4 4 5 4 4 5 4 5 4 4 5 Average

Monthly Ave. mg/L 0.25 0.30 0.63 0.20 0.48 0.90 0.60 0.35 0.38 0.78 10.18 2.26 1.44Annual Ave. mg/L 0.25 0.28 0.39 0.34 0.36 0.45 0.47 0.46 0.45 0.48 1.30 1.40 1.40

Loading kg/day 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.1 0.7 0.2 0.1Effluent Number of Samples 0 0 0 0 0 0 0 0 0 0 0 0

TKN Average Final mg/LRaw Number of Samples 1 1 1 1 1 1 1 1 1 1 1 1

TKN Average Raw mg/L 88.20 61.20 5.50 28.70 17.40 15.20 14.20 16.30 24.40 114.00 48.00 20.10 37.8E-coli of EffluentLimit 200 CFU/100 mL Average

Monthly GeoMean CFU/100 mL 0 0 0 0 0 0 0 0 0 0 0 0 0.1

pH of EffluentLimit 6.0 to 9.5 Average

Min. pH 6.9 6.2 6.3 7 6.5 7.2 7.4 6.7 6.7 7.5 6.5 6.5 6.8Max. pH 7.8 8.5 6.8 8.4 8.5 7.8 7.8 7.7 7.8 7.8 8.4 7.9 7.9

.

6

Page 15: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

W:\Council\Agendas 2015\February 2 2015\Mark's report 3\MTB DO PH Temp Monitoring Monthly Data

Day Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1 6.82 6.8 6.8 6.2 6.23 6.84 9.9 6.35 8.4 6.767 6.8 7.18 8.3 6.9 6.69 7.1 6.610 6.511 6.912 6.8 8.2 6.61314 6.8 6.815 8.5 6.7 6.816 6.717 7.018 6.6 6.519 6.2 6.920 7.921 6.8 6.322 6.1 6.823 8.4 6.7 6.724 6.025 7.5 7.026 6.727 7.6 6.928 6.8 6.629 8.4 6.73031

Average 6.8 7.6 6.8 8.1 8.0 6.7 6.6 6.7 6.6 6.8 6.5 6.6Max. 6.8 9.9 7.0 8.5 8.4 7.1 6.9 6.9 6.8 7.1 6.7 6.8Min. 6.8 6.2 6.6 6.8 7.6 6.0 6.1 6.6 6.2 6.3 6.3 6.2

The Municipality of Strathroy-Caradoc - Mt Brydges Sanitary Treatment Plant

2014 EFFLUENT DISSOLVED OXYGEN (mg/l)

Page 16: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

W:\Council\Agendas 2015\February 2 2015\Mark's report 3\MTB DO PH Temp Monitoring Monthly Data

Day Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1 12.902 14.50 16.00 22.50 9.603 17.404 8.40 13.105 12.80 19.0067 8.60 17.408 12.30 15.90 18.609 17.0010 8.3011 18.5012 8.10 12.70 22.1013 11.4014 9.80 18.2015 12.90 16.10 19.1016 7.9017 14.6018 17.10 9.1019 8.20 19.0020 13.2021 9.00 14.6022 22.10 8.1023 13.20 18.40 8.3024 16.2025 8.00 18.3026 19.1027 14.10 13.6028 9.00 18.20 10.1029 13.30 18.203031

Average 9.10 8.18 17.83 12.92 13.20 15.58 17.66 19.80 19.36 15.95 10.48 8.80Max. 9.80 8.40 18.50 13.30 14.10 17.00 22.10 22.10 22.50 18.20 13.10 10.10Min. 8.60 8.00 17.10 12.30 12.70 14.50 15.90 19.00 18.20 13.60 8.30 7.90

The Municipality of Strathroy-Caradoc - Mt Brydges Sanitary Treatment Plant

2014 EFFLUENT TEMPERATURE

Page 17: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

W:\Council\Agendas 2015\February 2 2015\Mark's report 3\MTB DO PH Temp Monitoring Monthly Data

Day Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1 7.102 7.80 7.50 7.80 7.903 6.304 7.00 7.705 8.20 7.7067 7.80 7.808 8.20 7.40 7.709 7.2010 6.5011 6.8012 6.20 6.50 7.1013 8.4014 7.70 7.6015 7.00 7.50 7.4016 6.7017 7.5018 6.70 6.5019 6.50 7.2020 8.1021 7.20 7.5022 7.60 6.8023 8.40 6.70 6.7024 7.2025 8.50 6.8026 6.7027 8.50 7.6028 6.90 7.80 6.6029 8.40 6.703031

Average 7.40 7.05 6.65 7.82 7.83 7.43 7.56 7.18 7.26 7.63 7.33 6.90Max. 7.80 8.50 6.80 8.40 8.50 7.80 7.80 7.70 7.80 7.80 8.40 7.90Min. 6.90 6.20 6.30 7.00 6.50 7.20 7.40 6.70 6.70 7.50 6.50 6.50

The Municipality of Strathroy-Caradoc - Mt Brydges Sanitary Treatment Plant2014 EFFLUENT pH

Page 18: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

W:\Council\Agendas 2015\February 2 2015\Mark's report 3\MTB DO PH Temp Monitoring Monthly Data

Day Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1 0.362 0.65 1.20 0.30 O/R3 0.804 0.42 O/R5 0.41 0.6767 0.28 0.818 0.43 0.49 0.559 0.4610 2.0011 1.9012 0.44 0.59 1.00 O/R1314 0.43 0.8715 0.16 0.44 0.4516 1.3017 2.1018 1.20 O/R19 0.89 0.5320 0.4621 0.41 0.7822 0.36 1.9023 0.30 0.40 O/R24 1.4025 0.56 1.1026 0.2327 0.80 1.0028 0.24 0.48 2.1029 0.21 0.503031

Average 0.34 0.58 1.25 0.29 0.57 1.15 0.59 0.61 0.44 0.87 O/R 1.83Max. 0.43 0.89 1.90 0.43 0.80 2.10 1.20 1.00 0.55 1.00 O/R O/RMin. 0.24 0.42 0.80 0.16 0.41 0.46 0.36 0.23 0.30 0.78 O/R 1.30

O/R - Out of Range on Analyzer

The Municipality of Strathroy-Caradoc - Mt Brydges Sanitary Treatment Plant2014 EFFLUENT - AMMONIA

Page 19: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

W:\Council\Agendas 2015\February 2 2015\Mark's report 3\MTB DO PH Temp Monitoring Monthly Data

Day Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec.

1 0.012 0.02 0.01 0.01 0.013 0.004 0.01 0.095 0.00 0.0267 0.01 0.018 0.02 0.01 0.019 0.0210 0.0211 0.2012 0.02 0.04 0.0313 0.0814 0.02 0.0115 0.02 0.01 0.0116 0.0117 0.0118 0.30 0.0119 0.02 0.0220 0.0421 0.02 0.0122 0.01 0.0123 0.01 0.01 0.0224 0.0125 0.02 0.1026 0.0227 0.02 0.0028 0.02 0.01 0.0129 0.02 0.013031

Average 0.02 0.02 0.15 0.02 0.03 0.02 0.01 0.02 0.01 0.01 0.05 0.01Max. 0.02 0.02 0.30 0.02 0.04 0.02 0.01 0.03 0.01 0.01 0.09 0.02Min. 0.01 0.01 0.00 0.01 0.00 0.01 0.01 0.09 0.05 0.00 0.01 0.01

The Municipality of Strathroy-Caradoc - Mt Brydges Sanitary Treatment Plant 2014 EFFLUENT - PHOSPHORUS

Page 20: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

W:\Council\Agendas 2015\February 2 2015\Mark's report 3\non pdfs and attachments\DAILY MtB Suspended Solids WW Report 2014

SuspendedSolids (mg/L)

Jan. 1 0.892 1.403 1.704 1.605 1.306 0.617 0.678 1.209 1.30

10 1.1011 1.0012 0.9213 0.7814 0.6915 0.6716 0.6117 0.5518 0.5719 0.5520 0.6921 0.5622 0.6123 0.6324 0.6225 0.6526 0.6327 0.7028 0.6429 0.7730 0.9331 0.79

AVERAGE: 0.8 mg/L

Municipality of Strathroy-CaradocMT BRYDGES TOTAL SUSPENDED SOLIDS PROBE

DAILY WASTEWATER SUMMARY REPORT - 2014DATE

0

1

2

3

4

5

6

7

8

9

10

11

12

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31

AVER

AGE

DAI

LY T

OTA

L SU

SPEN

DED

SO

LID

S

(mg/

L)

DAYS

MOUNT BRYDGES EFFLUENT TOTAL SUSPENDED SOLIDS

JANUARY

Page 21: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

W:\Council\Agendas 2015\February 2 2015\Mark's report 3\non pdfs and attachments\DAILY MtB Suspended Solids WW Report 2014

SuspendedSolids (mg/L)

Feb. 1 0.752 0.613 0.524 0.565 0.566 0.607 0.54 6.08 0.609 0.63

10 0.6411 0.6412 0.8713 0.6614 0.6515 0.6816 0.7417 0.7918 0.8019 0.7820 0.8321 1.0022 0.9623 0.7524 0.6325 0.7226 0.8827 0.6428 0.71

AVERAGE: 0.7 mg/L

Municipality of Strathroy-CaradocMT BRYDGES TOTAL SUSPENDED SOLIDS PROBE

DAILY WASTEWATER SUMMARY REPORT - 2014DATE

0

1

2

3

4

5

6

7

8

9

10

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31

AVER

AGE

DAI

LY T

OTA

L SU

SPEN

DED

SO

LID

S

(mg/

L)

DAYS

MOUNT BRYDGES EFFLUENT TOTAL SUSPENDED SOLIDS

FEBRUARY

Page 22: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

w/wastewater\yearWastewater\Mt Brydges\Reports\Daily MtB Suspended Solids WW Report Year - DC43

SuspendedSolids (mg/L)

Mar. 1 0.842 0.823 0.854 0.815 0.796 0.747 0.708 5.209 3.10

10 1.0011 0.9112 0.8213 0.8814 0.8715 0.8216 0.7717 0.7518 0.7419 0.7520 0.7421 0.7322 0.8923 0.9224 0.8225 0.8626 0.8727 0.8828 0.8729 0.9530 1.0031 1.00

AVERAGE: 1.1 mg/L

MT BRYDGES TOTAL SUSPENDED SOLIDS PROBEDAILY WASTEWATER SUMMARY REPORT - 2014

Municipality of Strathroy-Caradoc

DATE

0

1

2

3

4

5

6

7

8

9

10

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31

AVER

AGE

DAI

LY T

OTA

L SU

SPEN

DED

SO

LID

S

(mg/

L)

DAYS

MOUNT BRYDGES EFFLUENT TOTAL SUSPENDED SOLIDS

MARCH

Page 23: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

w/wastewater\yearWastewater\Mt Brydges\Reports\Daily MtB Suspended Solids WW Report Year - DC43

SuspendedSolids (mg/L)

Apr. 1 0.952 0.773 0.774 1.005 0.916 0.897 0.878 0.969 0.65

10 0.6711 0.6712 0.7113 0.7214 0.7815 0.6716 0.5717 0.6118 0.6519 0.5620 0.6321 0.6822 0.5923 0.8024 0.7025 0.9926 1.0027 0.9228 1.0029 0.9830 0.7231

AVERAGE: 0.8 mg/L

Municipality of Strathroy-CaradocMT BRYDGES TOTAL SUSPENDED SOLIDS PROBE

DAILY WASTEWATER SUMMARY REPORT - 2014DATE

0

1

2

3

4

5

6

7

8

9

10

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31

AVE

RAG

E D

AILY

TO

TAL

SUSP

END

ED S

OLI

DS

(mg/

L)

DAYS

MOUNT BRYDGES EFFLUENT TOTAL SUSPENDED SOLIDS

APRIL

Page 24: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

w/wastewater\yearWastewater\Mt Brydges\Reports\Daily MtB Suspended Solids WW Report Year - DC43

SuspendedSolids (mg/L)

May.1 0.852 0.823 0.954 0.885 0.636 0.007 0.058 2.909 1.60

10 1.1011 0.7812 0.7513 0.9414 0.7615 0.8116 0.7317 0.7118 0.7219 0.6420 0.7521 0.6722 0.5823 0.6924 0.6725 0.5926 1.5027 0.6928 1.9029 0.8630 1.1031 0.93

AVERAGE: 0.9 mg/L

Municipality of Strathroy-CaradocMT BRYDGES TOTAL SUSPENDED SOLIDS PROBE

DAILY WASTEWATER SUMMARY REPORT - 2014DATE

0

1

2

3

4

5

6

7

8

9

10

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31

AVE

RAG

E D

AILY

TO

TAL

SUSP

END

ED S

OLI

DS

(mg/

L)

DAYS

MOUNT BRYDGES EFFLUENT TOTAL SUSPENDED SOLIDS

MAY

Page 25: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

w/wastewater\yearWastewater\Mt Brydges\Reports\Daily MtB Suspended Solids WW Report Year - DC43

SuspendedSolids (mg/L)

Jun. 1 0.492 0.543 0.554 0.755 0.546 0.917 0.468 0.749 1.10

10 1.3011 0.2212 0.5313 0.6314 0.5415 0.5916 0.5717 0.5318 0.5719 0.4820 0.5221 0.5122 0.5123 0.5024 0.5025 0.6226 0.6027 0.5828 0.4729 0.4630 0.4731

AVERAGE: 0.6 mg/L

Municipality of Strathroy-CaradocMT BRYDGES TOTAL SUSPENDED SOLIDS PROBE

DAILY WASTEWATER SUMMARY REPORT - 2014DATE

0

1

2

3

4

5

6

7

8

9

10

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31

AVE

RAG

E D

AILY

TO

TAL

SUSP

END

ED S

OLI

DS

(mg/

L)

DAYS

MOUNT BRYDGES EFFLUENT TOTAL SUSPENDED SOLIDS

JUNE

Page 26: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

w/wastewater\yearWastewater\Mt Brydges\Reports\Daily MtB Suspended Solids WW Report Year - DC43

SuspendedSolids (mg/L)

Jul.1 0.512 0.583 0.484 0.985 0.606 0.577 0.568 0.699 0.71

10 0.4211 0.3812 0.5913 0.4214 0.0915 0.2316 0.4917 0.4318 0.4419 0.4620 0.3621 0.2522 0.3423 0.4224 0.4025 0.4426 0.3927 0.3928 0.4829 0.5130 0.5331 0.57

AVERAGE: 0.5 mg/L

Municipality of Strathroy-CaradocMT BRYDGES TOTAL SUSPENDED SOLIDS PROBE

DAILY WASTEWATER SUMMARY REPORT - 2014DATE

0123456789

101112

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31

AVE

RAG

E D

AILY

TO

TAL

SUSP

END

ED S

OLI

DS

(mg/

L)

DAYS

MOUNT BRYDGES EFFLUENT TOTAL SUSPENDED SOLIDS

JULY

Page 27: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

w/wastewater\yearWastewater\Mt Brydges\Reports\Daily MtB Suspended Solids WW Report Year - DC43

SuspendedSolids (mg/L)

Aug. 1 0.602 0.753 0.734 0.735 0.696 0.547 0.588 0.569 0.48

10 0.4611 0.4212 0.5213 1.5014 0.5315 0.5316 0.4417 0.3818 0.3519 0.4420 0.4221 0.4322 0.4123 0.3324 0.2925 0.3026 0.3127 0.3328 0.3529 0.3630 0.4131 0.38

AVERAGE: 0.5 mg/L

Municipality of Strathroy-CaradocMT BRYDGES TOTAL SUSPENDED SOLIDS PROBE

DAILY WASTEWATER SUMMARY REPORT - 2014DATE

0123456789

101112

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31

AVE

RAG

E D

AILY

TO

TAL

SUSP

END

ED S

OLI

DS

(mg/

L)

DAYS

MOUNT BRYDGES EFFLUENT TOTAL SUSPENDED SOLIDS

AUGUST

Page 28: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

w/wastewater\yearWastewater\Mt Brydges\Reports\Daily MtB Suspended Solids WW Report Year - DC43

SuspendedSolids (mg/L)

Sep. 1 0.382 0.443 0.534 0.655 0.656 0.577 0.528 0.549 0.46

10 0.5511 0.4412 0.4213 0.3914 0.4215 0.4616 0.5917 0.5518 0.5819 0.4720 0.4321 0.4422 0.4423 0.4724 0.5525 0.4726 0.4727 0.4028 0.3629 0.3830 0.3731

AVERAGE: 0.5 mg/L

Municipality of Strathroy-CaradocMT BRYDGES TOTAL SUSPENDED SOLIDS PROBE

DAILY WASTEWATER SUMMARY REPORT - 2014DATE

0

1

2

3

4

5

6

7

8

9

10

11

12

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31

AVE

RAG

E D

AILY

TO

TAL

SUSP

END

ED S

OLI

DS

(mg/

L)

DAYS

MOUNT BRYDGES EFFLUENT TOTAL SUSPENDED SOLIDS

SEPTEMBER

Page 29: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

w/wastewater\yearWastewater\Mt Brydges\Reports\Daily MtB Suspended Solids WW Report Year - DC43

SuspendedSolids (mg/L)

Oct. 1 0.352 0.363 0.374 0.365 0.396 0.447 0.748 0.499 0.53

10 0.6011 0.5412 0.5313 0.5214 0.5815 0.5016 0.4817 0.5118 0.5219 0.5120 0.5121 1.8022 0.8523 1.2024 0.6325 0.6126 0.6327 1.0028 1.0029 1.1030 1.8031 2.20

AVERAGE: 0.7 mg/L

Municipality of Strathroy-CaradocMT BRYDGES TOTAL SUSPENDED SOLIDS PROBE

DAILY WASTEWATER SUMMARY REPORT - 2014DATE

0

1

2

3

4

5

6

7

8

9

10

11

12

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31

AVE

RAG

E D

AILY

TO

TAL

SUSP

END

ED S

OLI

DS

(mg/

L)

DAYS

MOUNT BRYDGES EFFLUENT TOTAL SUSPENDED SOLIDS

OCTOBER

Page 30: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

w/wastewater\yearWastewater\Mt Brydges\Reports\Daily MtB Suspended Solids WW Report Year- DC43

SuspendedSolids (mg/L)

Nov. 1 2.502 5.903 8.804 13.305 7.906 4.907 11.708 5.209 5.90

10 7.6011 11.0012 8.0013 6.0014 5.0015 3.0016 2.0017 1.6018 1.4019 2.5020 3.5021 2.7022 1.8023 1.3024 1.1025 1.0026 0.9627 0.9728 1.0029 1.0330 1.1031

AVERAGE: 4.4 mg/L

Municipality of Strathroy-CaradocMT BRYDGES TOTAL SUSPENDED SOLIDS PROBE

DAILY WASTEWATER SUMMARY REPORT - 2014DATE

0

1

2

3

4

5

6

7

8

9

10

11

12

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31

AVE

RAG

E D

AILY

TO

TAL

SUSP

END

ED S

OLI

DS

(mg/

L)

DAYS

MOUNT BRYDGES EFFLUENT TOTAL SUSPENDED SOLIDS

NOVEMBER

Page 31: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

w/wastewater\yearWastewater\Mt Brydges\Reports\Daily MtB Suspended Solids WW Report YearDC43

SuspendedSolids (mg/L)

Dec. 1 0.912 1.303 1.304 1.005 1.206 1.107 0.988 1.209 0.89

10 0.9211 0.9812 1.0013 0.9514 1.1015 1.0016 1.5017 1.6018 1.7019 1.7020 2.0021 2.3022 2.6023 4.3024 3.8025 3.6026 3.5027 4.2028 6.1029 8.2030 8.7031 8.30

AVERAGE: 2.6 mg/L

Municipality of Strathroy-CaradocMT BRYDGES TOTAL SUSPENDED SOLIDS PROBE

DAILY WASTEWATER SUMMARY REPORT - 2014DATE

0

1

2

3

4

5

6

7

8

9

10

11

12

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31

AVE

RAG

E D

AILY

TO

TAL

SUSP

END

ED S

OLI

DS

(mg/

L)

DAYS

MOUNT BRYDGES EFFLUENT TOTAL SUSPENDED SOLIDS

DECEMBER

Page 32: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

APPENDIX “C”

MOUNT BRYDGES

2014 MAINTENANCE SUMMARY

Page 33: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

DATE DESCRIPTION

Jan. 7/14 Replace fuses pump 2, MillpondJan. 7 Replace UPS High St Pump StationJan. 9 Install new ABS RAS Pump #1Jan.14 Replace filter blower 3Jan.22 Adjust chain clarifier #1 Mount BrydgesJan.24 Clean UV lights Strathroy

Feb. 5 Check water backflow preventorsFeb. 6 Check water backflow preventorsFeb.13 Install Pump 1 MillpondFeb.14 Flow calibration Mount Brydges

Mar. 4 Replace lightbulbs at wastewater plantMar.10 Clean clarifiers and actifiersMar.11 Calibrate probeMar.12 Clean and replace bulbs UV bank 1Mar.14 Clean plug intake Metcalfe Pump 2Mar.18 Clean and replace bulbs UV Bank 2Mar.19 New wires UV Bank 2Mar.26 Spring RAS Pump 2, check valveMar.31 Run all gensets Strathroy and Mount Brydges

Apr.2 Grease Mt Brydges Sewage Treatment PlantApr.3 Check vibration & grease blowersApr.9 Clean clarifier 2 Strathroy Sewage Treatment PlantApr.10 Replace RAS PumpApr.11 Grease rake in screen roomApr.14 Clean UV Lights Bank 1Apr.28 Replace RAS Pump 1

May.2 Clean ActiflosMay.7 Repair Clarifier 2 Mount BrydgesMay.13 Repair Clarifier 1 Mount BrydgesMay.14 Work on Pump 2 Main PS Mount BrydgesMay.18 Power flush Dewan sewer mainMay.21 Gensets all 3 Mount BrydgesMay.22 Gensets Strathroy

Jun.4 Check vibration & grease blowers

Maintenance - Wastewater2014 Report

Municipality of Strathroy-Caradoc

Page 34: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

Jun.5 Grease RBC & Claris Mount BrydgesJun.9 Check dead end manholesJun.11 Remove sludge RBC Mount BrydgesJun.16 Check manholesJun.18 Repair sump pump Albert StJun.18 Repair switch in screen room

Jul.2 Repair Stone Aeration PondJul.2 Grease BlowersJul.8 Repair Clarifier Mount BrydgesJul.10 Repair Clarifier Mount BrydgesJul.14 Repair Stone Aeration PondJul.22 Air Probe in Aeration BasinJul.28 Replace switch in screen roomJul.29 Clean Actiflos and UV lights

Aug.1 Clean Clari 1Aug.6 Repair Main Kittridge AvAug.13 Repair PDC Kittridge AvAug.28 Clean Main M.H. 392 and 393Aug.29 Camera Main 392 and 393

Sep.3 Work on Clarifiers Mount BrydgesSep.8 Maintenance, Grease Albert St Pumping StationSep.11 Emerson Data Work at Albert StSep.12 Camera Sewer at 81 Scott StSep.15 Check Blowers and greaseSep.17 Run Genset at Park St Sep.18 Maintenance UV Lights Mount BrydgesSep.18 Calibrate Gas MonitorsSep.19 UV Maintenance StrathroySep.23 Clean Sewer Maitland M.H. 508 and 504Sep.26 Check Mains

Oct.3 Flush High and RichmondOct.4 Flush ClarenceOct.15 Replace wear ring RAS Pump 2Oct.16 Check Sewer MainsOct.17 Sewer FlushingOct.20 Adjust variable speed Main Pump Statio, Pump 2Oct.23 Screen Repairs StrathroyOct.27 Drain RBC 1 Mount BrydgesOct.28 Grease RBC 2Oct.29 Clean RBC 1

Page 35: Strathroy-Caradoc€¦ · Municipality of Strathroy- Caradoc . Page 1 of 2 Staff Report #:ES -3 2015: Directed to: Mayor Vanderheyden and Members of Council . Council Meeting Date:

Oct.31 Shut down RBC

Nov.3 Grease RBC 2Nov.3 Pull Pump 1 Main Pumping StationNov.6 Grease Albert Blowers and Screen RoomNov.12 Nagy clean wet wells Albert St & Metcalfe StNov.12 Grease RBC 2Nov.17 Repair Alum Pump 1 StrathroyNov.19 Maintenance on Clarifier 2 Mount BrydgesNov.28 Grease RBC 2

Dec.3 Clean de-sludge pumps and grease RBC 2Dec.4 Adjust chains and sprockets Clarifier 2Dec.11 Grease RBC 2Dec.11 Nagy Flush SewersDec.15 Clean grates screen room and grease blowers Dec.16 Arm repairs Clarifier 2 StrathroyDec.19 Check pumps and floats EwartDec.22 Grease RBC 2Dec.30 Grease RBC 2Dec.31 Check Filters Mount Brydges