St Thomas of Aquin’s Draft School Improvement plan 2017-18
Strategic Priorities for Schools 2016-2019
St Thomas of Aquin’s RC High School
School Improvement Plan 2017-18
There will be four progress reports on the school improvement plan in which colleagues are invited to take part in
1. End of October
2. Mid December
3. End of March
The following 4 key priorities reflect those of the National Improvement Framework (NIF) and are for all schools and establishments 2016-2019.
1. Improvement in children and young people’s attainment/achievement, particularly in literacy and numeracy.
Analysis and evaluation of intelligence and data, 1.2 Children and young people leading learning, and 1.3 Strategic planning for continuous improvement
2.3 Quality of teaching, Effective use of assessment, and Planning, tracking and monitoring
3.2 Attainment in literacy and numeracy and Attainment over time
2. Closing the attainment gap between the most and least disadvantaged children and young people.
1.3 Developing a shared vision, values & aims relevant to the school & its community
2.3 Quality of teaching, 2.4 Targeted & universal support, and Removal of potential barriers to learning
3.1 Ensuring Wellbeing, Equality and inclusion, 3.2 Equity for all learners, and Attainment over time
St Thomas of Aquin’s Draft School Improvement plan 2017-18
3. Improvement in children and young people’s health and wellbeing.
1.1 Ensuring impact on learners’ successes and achievements, 1.2 Children and young people leading learning, and 1.3 Strategic planning for continuous improvement
2.1 Arrangements to ensure wellbeing, 2.4 Targeted & universal support, and 2.3 Planning, tracking and monitoring
3.1 Wellbeing
4. Improvement in employability skills and sustained, positive school leaver destinations for all young people.
1.1 Analysis and evaluation of intelligence and data &1.3 Strategic planning for continuous improvement
2.2 Skills for learning, life and work, 2.3 Quality of teaching, and 2.6 Collaborative planning and delivery
3.3 Increasing employability skills
CEC priority- All schools and establishments should engage in professional learning programmes for all staff in relation to promoting accessibility and equalities, with
particular regard to children and young people with autism - (Authority led)
Priority: National Improvement Framework Priorities
St Thomas of Aquin’s Draft School Improvement plan 2017-18
Tasks
Priority
By Whom
Resources Timescale Impact &
Quality Indicator
benchmark Revisit and redefine the school community’s vision and values
Consult staff, pupils, parents (Sept ‘17)
Share draft consultation paper with stakeholders (Oct-Nov ‘17)
Draft version of V&V with consultation findings (Jan 17’)
Complete V&V process (March ‘18)
Priority 2
SLT/All Staff
In-services
CAT/DAT
Leadership meetings
Pupil/Parent Council
meetings
May 2018 All staff took part in the August
in-service vision and values
exercise. Pupil Council has
completed the vision and values
exercise. Parents have returned
views from the Award Ceremony
presentations. Take 5 meetings
this year are focusing on V&V.
Feedback from
Staff/pupils/parents delivered at
October in-service.
Pupils continue to meet with
Acting HT regarding Take 5.
A draft vision and values
statement has been written.
Feedback from staff, pupils, and
parents has been used in the
statement. This has been shared
with staff, pupils at Key Adult and
emailed to parents.
Faculties to complete a S1/S2/S3 BGE course outline for each subject
within the Faculty linked to subject Es &Os, assessments, and
Literacy, Numeracy, and Health wellbeing
Share Faculty BGE planning good practice (May ‘17)
Identify amendments needed for BGE Faculty planning (Jun ‘17)
Update BGE plans (Jun ‘18)
Priority 1 and 2
CLs with SLT link
support
Leadership meetings
Faculty meetings
DAT time
June 2018 CLs shared Faculties plans with
SLT in June – found on server in
CL Folder. September Leadership
meeting, colleagues discussed
HMIE good practice in BGE
planning.
Faculty plan updates – identify
Faculties who have updated
Acting HT meeting with all CLs
in May to share BGE plans. Then
all BGE plans to be placed on
school website in Faculty areas.
Continue to share assessment data with school community to develop
a data rich approach to improvement in performances
Priority 1 and 2 Leadership meetings
Faculty meetings June 2018 Insight data shared with all staff in
September: L/N @ L4-5; S4-S6
St Thomas of Aquin’s Draft School Improvement plan 2017-18
Share Insight Data
Share Standardised scores
Share CfE Levels
CLs with SLT link
support
DAT time cumulative tariff scores; S4-6
Attainment v Deprivation; S4-S6
Breadth & Depth v VC.
HT attending Faculty attainment
meetings.
Tracking report spreadsheets has
SIMD data.
CLs sent out new P7-S1
Standardised scores in August.
Insight presentations at October
in-service and November Parent
Council.
Leadership team supported with
Deep Dive course comparator
Insight information. 2018
Leadership meeting to focus in
Insight CPD.
Prelim analysis spreadsheets
completed by S4-S6 DHT
covering L5, L6, &L7
performance. S4 pupils at risk has
been circulated to all faculties.
All spreadsheets placed on
Leadership folder and shared at
February Leadership meeting.
S4 pupils at risk at missing out in
achievement/attainment has been
shared with all CLs since January.
Faculties working with
individuals to maximise focus and
support.
Faculties to share good practice in Achievement of a Level and
development of Benchmarking in the BGE
Learning and Teaching working group to lead school in
Achievement of a Level good practice (Sept ‘17)
Learning and Teaching working group to share good practice in
Moderation and Benchmarking (Feb 17)
Priority 1 and 2
Faculties/ CLs/staff
DAT time
Leadership meetings May 2018 CAT session in September on
sharing good practice on
Achievement of a Level:
Examples for English/Social
Subjects/Art/Computing.
Leadership meeting 5th October
focussed on Leadership
understanding of Moderation and
Achievement of a Level. Next
Steps for staff to share Level 3
examples in L/N/HWB.
St Thomas of Aquin’s Draft School Improvement plan 2017-18
DHT S4-6 attending CEC
Moderation good practice group +
L/HWB co-ordinator.
CL English on QUAMSOs group
for Moderation.
Numeracy Benchmarks identified
across BGE subject areas. Next
steps will be to roll this out in
HWB and Literacy.
MG to update Learning and
Teaching plan after completing
CEC 2.3 QI return.
Consolidate and refine new Higher assessment and coursework (and
National 4/5 courses where necessary)
Discussion item on Leadership meetings
Priority 1 and 2
CLs
DAT
Faculty meetings March 2018
Colleagues attending SQA
understanding standards events
where change of coursework or
new exam is being delivered. E.g.,
HE, Dance, D&M.
SQA updates circulated to all staff
throughout the year.
All Faculties to ensure that their Faculty website pages have course
outlines, home study information, and shared exemplars of pupils’
work.
Use of DAT time and identified member of staff
J Payne to liaise with Faculties (Oct ‘17)
Priority 2
CLs and staff
Faculty time and DATs May 2018 Jenny Payne and CS have met
with PC member to look at areas
of the website to improve.
JP has 2 hours a week to support
refreshing the school website.
All Faculties some content to the
school website. May 2018 to be
identified as a slot to continue
with updating information –
especially in the BGE.
J Payne has run support seminars
for staff to support placing
information on the website. This
will continue into session 2018-
19. This is a key communication
priority for 2018-19.
St Thomas of Aquin’s Draft School Improvement plan 2017-18
Continue to develop in-school provision and Partnership Working to
support a range of flexible and varied pathways in the Senior Phase,
with particular regard for youngsters with ASNs
Leadership meetings to discuss Curriculum pathways
December TT loading sheet meeting between HT&CLs/PSLs to
annual review flexible pathways.
Priority 1,2 and 4
SLT/ Leadership Team
16 + group
Leadership meetings
16+ Meetings
TT Loading sheet
meetings
March 2018 Draft Course Choice sheets for
S2, S3, S4-5 emailed to CLs in
September to discuss at FMs.
October in-service Leadership
meeting to discuss the Draft
course sheets and timeline.
Individual meetings with CLs-
AHT will take place in December.
Continue to use transition groups
to support identified pupils with
their progression pathways.
Careers Fayre planned and led by
J Ritchie, C Thomson, and G
Kelly helped pupils and parents
with understanding of positive
destination pathways.
Coursing timeline and SLT/IST
coursing meetings have helped
streamline the coursing process.
Analysis meeting of coursing in
session 2017-18 will take place in
May to ensure pathways for all
S4-6 pupils offer flexibility and
variety.
Continue to refine a Tracking, Monitoring and Reporting system
across all years to ensure consistency of reporting and learners’
conversations to raise attainment for all, including a focus on gifted
and talented learners, LAC, young carers, pupils with ASN and
youngsters from the lowest SIMD deciles
Draft attendance policy completed (Oct ’17)
Consultation of attendance policy (Dec ’17)
Completed attendance policy (March ’17)
Priority 1 and 2
T&M Working Group
CAT and DAT time
Working group time June 2018 Attendance policy update – In-
service programme Jan 2018.
Attendance at BOSCH seminar at
Larbert HS will support the L&T
group to enhance use of tracking
sheets.
The attendance policy will be
completed by May 2018.
Implement the school’s Key Adult programme to support learners’
needs through high-quality universal support
Implement Key Adult programme (Oct ’17)
Analysis and sharing of good practice (Jan ’18)
Evaluate 1st year of Key Adult (May ’18)
Priority 3
SLT/KA co-ordinator &
All Staff
In-service time
CAT time March 2018 Key Adult programme ready for
implementation in October. KA
Planning and materials placed on
staff server. Pupil Assemblies
identified for 24th of Oct. Start of
KA programme on the 25th of Oct.
St Thomas of Aquin’s Draft School Improvement plan 2017-18
Key Adult programme
implemented since October break.
Weekly updates given to all staff
via C Taylor. Key Adult tracking
discussions now in place. January
in-service slot to discuss next
steps.
The Key Adult programme has
been running for 5 months. Staff
and pupil evaluations are taking
place in order to ensure the
delivery of universal support is
improved for session 2018-19.
Literacy, Numeracy, ICT, and Health and Well-being working
groups to develop policies on sharing good practice and enhancement
of learning for all pupils
Group to share L/N/HWB plan with staff (Sept ’17)
Focus of Sept and May learning visits (Sept/May) - To be updated
Priority 1 and 2
Working Groups/All
Staff
CAT time
Working group time June 2018 Literacy, Numeracy, and HWB
plan shared with all staff at
September CAT session. LI/HWB
co-ordinators attended CEC
Moderation and Benchmarking
CPD session in Oct.
Numeracy Peer mentoring
initiative for S1 pupils starting in
Oct.
Symbols for Lit/Num/HWB
shared with all staff in Jan 2018
INSET.
HWB co-ordinator attended
HMIe HWB event.
ICT school managed laptops kept
in SFL to support pupils.
MG to update Learning and
Teaching plan after completing
CEC 2.3 QI return.
Develop S1-S3 IDL opportunities across the school through the
Learning and Teaching working group
All faculties to participate in 1xS1-S3 IDL project by 2018-19
Priority 1 and 3
L&T Working Group
Development Time May 2018 Refocus on this task in light of
HMIe guidance.
Implement recommendations from the local 1+2 languages’ strategy.
AHT/DHT/CL and Faculty to collegiately plan P7-S1-S3 curriculum
for next 2 years (May ’17)
Priority 1 and 2
CL Mod Langs & MM
DAT time
Faculty meetings June 2018 Acting CL ML has met with Lead
Teachers in associated primaries.
Identified current areas of good
practice within cluster and a
St Thomas of Aquin’s Draft School Improvement plan 2017-18
Curriculum plan shared with associated primaries (Jun ’17)
Review throughout year
means of sharing practice and
resources via one drive. Looking
at identifying training needs in
primaries (French) and how to
meet these needs. I lesson a week
given to primary transition.
The school has completed the
March CEC audit for 1+2.
Cluster Meetings have been
organised with 1+2 Leads in the 4
cluster
primaries to ensure that we
have consistency in our
Curriculums.
Implement directives from the STEM strategy to develop practice,
raise awareness and support sustained, positive destinations in this
field
Stem co-ordinator to share Science STEM courses with all Faculties
(Sept ’17)
S1-S3 STEM plan produced incorporating learning in all 4 Faculty
areas (Dec ’17)
Priority 2,3 and 4
STEM Co-ordinator
Development Time
June 2018 M Wilson is the STEM co-
ordinator for St Ts.
STEM plan placed on server in
Oct and shared with colleagues.
The “Race for the Line” STEM
project with CDT and Science
completed in March.
Implement the recommendations of ‘Developing Scotland’s Young
Workforce’ in the context of standards for Career Education and
skills development of our leaners.
Audit school career education experience (Sept ’17)
Identify areas for development in career education and skills
development (Oct ’17)
Liaise with business and Parent Council to support areas for
development (March ’18)
Priority 2, 3 and 4
SLT/All Staff
SLT meetings
DAT time
16+ meetings
June 2018 Draft audit of SfCE shared with
SDS.
Identified CAT session for April
2018 – input from SDS.
Transitions groups identified for
year 2.
CAT session March 16th:
Introduced the aims of Careers
standards to all staff. Through
Developing the Young
Workforce, the use of My World
of Work and understanding the
Marketplace by SDS, staff were
able to complete Standard for
Career Education Audit task.
St Thomas of Aquin’s Draft School Improvement plan 2017-18
Ensure the ICT refresh supports the upskilling of staff and the
learning experiences for all pupils in the school
Plan and implement use of sets of ipads in a box for Faculties (Oct
’17)
ICT group to plan and implement sharing good practice in use of
Ipads (Feb ’18)
Priority 1 and 2
All Staff
In-service time
CAT
DAT
June 2018 Limited update on ICT refresh.
State of play in October is that
refresh will be 100% but not for
monitors/printers.
November meeting with ICT co-
ordinator and then with BM.
Acting HT to identify allocating
an annual.
Classroom in a box strategy to be
considered for all faculties to
support the use of ICT.
Further develop and promote St Thomas’ as an inclusive learning
school to ensure consistent high standards across the school
Identify inclusive practice (Aug ’17)
Plan and implement inclusion through sharing good practice (May
’18)
Plan restorative practice CPD
Analyse and evaluate PPR and CP record keeping
Priority 2 and 3
L&T Working Group
CAT
Integrated Support time May 2018 All staff have experienced a 2-
hour Autism training cpd in
August in–service. Sept-Oct
learning visits are focussed on
inclusive practice. Restorative
CAT session planned for Nov
2017 after 3 colleagues attended
Bill CPD
ELKLAN: speech and language
support training course delivered
to Staff and PSAs
Restorative practice CAT session
led by BrBbBl working group.
Rationale for restorative
conversations presented along
with Faculty auditing a restorative
conversation template.
PPR and CP record keeping
evaluate and moved to same
storage space.
Develop a positive referral system policy to support ‘Better
Relationships, Better Learning, Better Behaviour’ policy
Identify positive referral system structure (Oct ’17)
Plan and implement (March ’18)
Priority 2 and 3
SLT/Working Group
Development time
DAT
CAT
March 2018 Audit of positive recognition
through survey monkey drafted.
Planned CAT restorative good
practice for No 24th.
BrBlBb Cat session in November
supporting teacher toolkit.
St Thomas of Aquin’s Draft School Improvement plan 2017-18
Emphasis on positive language
and primary and secondary
behaviours.
Staged intervention examples
shared.
Faculties returned positive
referral systems questionnaire.
Information to be shared in
May/June 2018.
Through research and local/national collaboration devise
policy and practice to make best use of the pupil equity
funding – see separate planning sheet
Priority 1,2,3, and 4
SLT/SfL/Leadership
team
SLT Time/
CAT/Leadership
meetings
August 2018 Coaches in place
Plan on server
S1-S3 pupils identified through
L/N/HWB measures
Letter out to all parents.
Targeted letter out end of Oct.
Coaching starting in Nov.
Coaches have completed Nurture
training.
Coaches has started meeting with
pupils
PEF plan has been updated on the
server and sent to all staff.
Coaches will meet with Integrated
Support Team in January to
continue refining targeted support
for identified pupils.
Textbooks to be bought for all S3
pupils moving on from PEF
coaching.
Room 2.33 identified as learning
and nurture hub.
BM to purchase furniture for
L&N room.
Continue to develop a communication strategy to further support
parental engagement: parental email and website development.
Letter, email, and Phone practice reviewed and updated in light of
SLT/PSL/SfLL/CL structure (Dec ’17)
Priority 3
SLT
SLT Time December
2017
Draft CL letters written and
placed on CL folder.
School using email as means of
communicating with parents
New CL of ML has shared text
messaging communication policy
St Thomas of Aquin’s Draft School Improvement plan 2017-18
and school will adopt this in
February after seemis training.
Updated communication protocol
for parents who wish to liaise with
PSLs/HT has been streamlined
and will be shared with all parents
in Jan 2018 (email)
Weekly emails sent to parents on
Monday
CLs texting parents with
information about home learning,
assessments, good work,
detentions. Trailed until June.
Complete Policy updates in the following areas
1. School vision and values (May ’18)
2. Curriculum (Sept ’17)
3. Better b, better l, better r (May ’18)
4. Equalities and ethos (Oct ’17)
5. Learning and Teaching (June ’18)
6. Meeting learners’ needs (June ’18)
7. Absence management and cover
8. Fire protocol
9. Attendance and late coming
10. School Handbook (June 18’)
June 2018 Draft Curriculum policy
completed. Out for SLT
consultation before going to all
staff.
Draft Learning and Teaching
policy completed and to be shared
with SLT in January
Vision and Values statement
drafted and shared with Pupil
Council in March.
To be discussed…
Priority: Cluster Priorities/Transition
Tasks By Whom Resources Timescale Impact
Continuation of work with cross-section Learning Teams to
support literacy and numeracy, health and well-being and
curricular progression
Working Groups Cluster Development
Time
June 2017
Support the implementation of the 1+2 Languages’
Programme
CL Mod Langs &
ML + Primary
Link Teachers
1 + 2 Timetabled
Time
June 2017
St Thomas of Aquin’s Draft School Improvement plan 2017-18
Priority: Continuing Professional Development
Tasks By Whom Resources Timescale Impact
Plan and implement a Leadership away day to enhance vision
and values of leadership in the school
SLT/Leadership
team Staff
CPD Time/ June 2018
Through PRD and Professional review enhance CAT/CPD
sessions to support bespoke needs of colleagues
All Staff CPD Time June 2018
Priority: Self Evaluation
Tasks By Whom Resources Timescale Impact
Further develop self-evaluation through an agreed Quality
Assurance programme of events and opportunities
SLT/Leadership
Team
Team Meetings October 2017
Planning of In-service and CAT 2017-18 – Updated September 25th 20117
Vision and Values – 4 slots throughout the year
Learning and Teaching – 4 slots throughout the year
Pupil Equity Funding – 3 slots
Key Adult - 4 slots
ICT 3 slots – amended due to no update on refresh
BrBlBb – 2 slots
St Thomas of Aquin’s Draft School Improvement plan 2017-18
Website – 2 slots
Ethos and Equality – 1 slot
Attendance Policy – 1 slot
August
In-service
September
CAT 1
October
CAT 2
October
In-service
October
CAT 3
November
CAT 4
January
in-service
April
CAT 6
May
In-service
June CAT?
MAY
CAT 7
June
CAT 8
Attainment
(1)
Learning and
Teaching (1)
Achievement
of a Level
Pupil
Equity
Funding
update
(1)
1 in 5
Update of
SIP
Key Adult
Vision &
Values (2)
Learning and
Teaching
sharing (3) –
Co-operative
Learning
BrBlBb (1)
Restorative
practice
Update of SIP
Vision &
Values (3)
Developing
the Young
Workforce
School
Improvement
Planning
Pupil Equity
Funding (3)
SNC BrBlBb
(2)
Vision &
Values (1)
Learning and
Teaching
sharing good
practice –
Inclusion (2)
Leadership
Meetings
Pupil Equity
Funding (2)
Learning and
teaching: (4)
Vision &
Values (4)
Updating of
Faculty
website
pages (2)
SNC
Implement
Key Adult
programme
(1)
L/N/HWB
plan shared
with staff
CEC subject
meetings
+ Updating of
Faculty
website pages (1)
Key Adult
programme (2)
Evaluation of
1st Year of
Key Adult (4)