Zone ReferenceAssociated
Waters
Length (if
applicable
Approx Height Above
Ground (if applicable)
Approx 10 figure NGR
(if applicable)
Licence type required for
SEPAControlled Activity SEPA Comment
4AT1Carron
Water
65m or
therebyN/A NO 87500 85733
CAR Licence not
required
4AT2Carron
Water
2m or
therebyN/A NO 87517 85733 Marine Scotland Marine Scotland Marine Scotland
4AT3Carron
Water
5m or
therebyN/A NO 87459 85748 Temporary Bridge Registration
CAR Licence not
required
4AT4Carron
Water
5m or
therebyN/A NO 87515 85739 Marine Scotland Marine Scotland Marine Scotland
4AT5Carron
Water
20m or
therebyN/A NO 87520 85733 Marine Scotland Marine Scotland Marine Scotland
1BT1Carron
Water
150m or
therebyN/A NO 87314 85756
CAR Licence not
required
1BT2Carron
Water
120m or
therebyN/A NO 87439 85743
CAR Licence not
required
1BT3Carron
Water
5m or
therebyN/A NO 87307 85755 Temporary Bridge Registration
CAR Licence not
required
1BT4Carron
Water
70m or
therebyN/A NO 87388 85738
CAR Licence not
required
1C 1CT1Carron
Water
115m or
therebyN/A NO 87274 85758
CAR Licence not
required
1DT1a+bCarron
Water
120m or
therebyN/A NO 87200 85716
CAR Licence not
required
1DT2Carron
Water
80m or
therebyN/A NO 87100 85657
CAR Licence not
required
1DT3Carron
Water
5m or
therebyN/A NO 87106 85655 Temporary Bridge Registration
CAR Licence not
required
1DT4Carron
Water
5m or
therebyN/A NO 87192 85701 Temporary Bridge Registration
CAR Licence not
required
1DT5Carron
Water
5m or
therebyN/A NO 87068 85644 Temporary Bridge Registration
CAR Licence not
required
1DT6Burn of
Glaslaw
5m or
therebyN/A NO 87086 85640 Temporary Bridge Registration
CAR Licence not
required
1ET1Carron
Water
140m or
therebyN/A NO 87048 85641
CAR Licence not
required
1ET2Carron
Water
2m or
therebyN/A NO 86926 85647 Temporary Bridge Registration
CAR Licence not
required
2GT1Burn of
Glaslaw
60m or
therebyN/A NO 87006 85467
CAR Licence not
required
2GT2Burn of
Glaslaw
50m or
therebyN/A NO 87025 85469
CAR Licence not
required
2GT3Burn of
Glaslaw
90m or
therebyN/A NO 87077 85580
CAR Licence not
required
2GT4Burn of
Glaslaw
2m or
therebyN/A NO 87086 85623 Temporary Bridge Registration
CAR Licence not
required
2GT5Burn of
Glaslaw
75m or
therebyN/A NO 87054 85530
CAR Licence not
required
2GT6Burn of
Glaslaw
20m or
therebyN/A NO 87015 85469
CAR Licence not
required
2GT7Burn of
Glaslaw
5m or
therebyN/A NO 87017 85469 Temporary Bridge Registration
CAR Licence not
required
2GT8Burn of
Glaslaw
5m or
therebyN/A NO 87036 85497 Temporary Bridge Registration
CAR Licence not
required
Temporary construction vehicle access bridge over river flow <5m wide
Temporary barrier to separate works from river flow to facilitate works. End of
barrier adjusts to switch water to opposite side to accommodate works on
opposing banks when necessary.
Temporary barrier to separate works from river flow to facilitate works. End of
barrier adjusts to switch water to opposite side to accommodate works on
opposing banks when necessary.
Temporary construction vehicle access bridge over river flow.
Temporary construction vehicle access bridge over river flow < 5m wide.
Temporary construction vehicle access bridge over river flow < 5m wide.
Temporary bridge diversion of utilities above channel to faciliate bridge and
channel works <5m wide.
Temporary construction vehicle access bridge over river flow < 5m wide.
Stonehaven FAS Expected Temporary
WorksThe background provides a list of associated activities. See separate sheets for depictions of temporary works
Description
2G
1E
Temporary barrier to separate works from river flow to facilitate works. End of
barrier adjusts to switch water to opposite side to accommodate works on
opposing banks when necessary.
Temporary construction vehicle access bridge over river flow <5m wide
Temporary barrier to separate works from river flow to facilitate works. End of
barrier adjusts to switch water to opposite side to accommodate works on
opposing banks when necessary.
Temporary diversion of flow in culvert. Culvert to contain two resting pools at
approximately 40m centres.
Temporary barrier to separate works from river flow to facilitate works. End of
barrier adjusts to switch water to opposite side to accommodate works on
opposing banks when necessary.
Temporary channel diversion along extent to facilitate works. This may be
created by a temporary barrier to separate the works from the river flow. End
of barrier adjusts to switch water to opposite side to accommodate works on
opposing backs when necessary.
Temporary barrier to separate works from river flow to facilitate works. End of
barrier adjusts to switch water to opposite side to accommodate works on
opposing banks when necessary.
Temporary channel diversion and/or overpumping of water along extent to
facilitate channel works.
Temporary barrier to separate works from river flow to facilitate works. End of
barrier adjusts to switch water to opposite side to accommodate works on
opposing banks when necessary.
4A
1B
1DTemporary construction vehicle access bridge over river flow < 5m wide.
Temporary construction vehicle access bridge over river flow < 5m wide.
Temporary barrier to separate works from river flow to facilitate works. End of
barrier adjusts to switch water to opposite side to accommodate works on
opposing banks when necessary.
Temporary bridge diversion of utilities above channel to faciliate bridge and
channel works <5m wide.
Temporary bridge (2m wide, 15m span), to allow pedestrian access for the
public during raising of existing bridge and provide a diversion route for
utilities.
Temporary construction vehicle access bridge over river flow < 5m wide.
Temporary flood defence barrier during construction, to maintain flood
defence standard once existing wall removed.
Temporary overpumping of water to allow for culvert replacement
Temporary reprofiling of slope to allow access to carry out works, including
tree removal.
4AT1
4AT2 - Temporary Bridge
1AT3
4AT51AT4
1BT1
1BT2
1BT31BT4
1CT1
1DT4
1DT1a1DT1b
1DT3
1DT2
1DT1a
2GT3
2GT4 1DT1b
1DT5
1DT6
1ET1
1ET2
2GT2