Steward Suffolk Team Partnership RN CH SRC 072612

Embed Size (px)

Citation preview

Page 1: Steward Suffolk Team Partnership RN CH SRC 072612
Page 2: Steward Suffolk Team Partnership RN CH SRC 072612

| Steward Health Care SystemSuffolk Construction Company, Inc.2

“PARTNERSHIP”

Page 3: Steward Suffolk Team Partnership RN CH SRC 072612

| Steward Health Care SystemSuffolk Construction Company, Inc.3

PRECONSTRUCTION

Page 4: Steward Suffolk Team Partnership RN CH SRC 072612

| Steward Health Care SystemSuffolk Construction Company, Inc.4

TASKS

• Weekly Construction Meetings (A/E/C team only)• Sustainable Design Meetings (if applicable)• Public Approval Meetings (if applicable)• Site Diligence• Existing Condition Report• Subcontractor Development• Regulatory Approval• Design Review

Page 5: Steward Suffolk Team Partnership RN CH SRC 072612

| Steward Health Care SystemSuffolk Construction Company, Inc.5

PROJECT BUDGET

Page 6: Steward Suffolk Team Partnership RN CH SRC 072612

| Steward Health Care SystemSuffolk Construction Company, Inc.6

BUDGET DELIVERABLES

• Order of Magnitude Initial SF or Lump Budget - the rough starting point.

• Conceptual Design Budget with Full Constructability Report – CR#1– Including: Description, Issues, Existing Conditions,

Logistics, Master Campus Schedule, Project Specific Schedule, Conceptual Budget Estimate. Due 2 weeks from issuance of the design team document package.

Page 7: Steward Suffolk Team Partnership RN CH SRC 072612

| Steward Health Care SystemSuffolk Construction Company, Inc.7

BUDGET DELIVERABLES

• Schematic Design Budget with Full Constructability Report – CR#2– Including: Description, Issues, Updated deliverables to

all the above, and the first Engineering Constructability Matrix, with Design Team Input, Building Systems Narrative, and Value Management Log #1 and the official Budget #1 with Suffolk in house quantities in the schedule of values. Due 2 weeks from issuance of the design team document package.

Page 8: Steward Suffolk Team Partnership RN CH SRC 072612

| Steward Health Care SystemSuffolk Construction Company, Inc.8

BUDGET DELIVERABLES

• Design Documents Budget with Full Constructability Report – CR#3– Including: All the above updated deliverables; with new

schedules and logistics, and finer detail Engineering Constructability Matrix, which has been vetted and responded by the Steward Design Team, Value Management Log #2, and Budget #2 that has been sent out to at a minimum of 3 subcontractors; with rough bid tabs, and new updated in-house Suffolk quantities for comparison. With the list of Qualifications and Assumptions and Allowances and Hold Values known or anticipated to date. Due 3 weeks from issuance of the design team document package.

Page 9: Steward Suffolk Team Partnership RN CH SRC 072612

| Steward Health Care SystemSuffolk Construction Company, Inc.9

BUDGET DELIVERABLES

• GMP Contract Value to coincide with a final review of the design team’s 100 CD package that has answered and accounted for all Qualifications and Assumptions and Holds and Allowances from above.

Page 10: Steward Suffolk Team Partnership RN CH SRC 072612

| Steward Health Care SystemSuffolk Construction Company, Inc.10

CONSTRUCTABILITY REPORT

Page 11: Steward Suffolk Team Partnership RN CH SRC 072612

| Steward Health Care SystemSuffolk Construction Company, Inc.11

CONSTRUCTABILITY REPORT

• Description

• Technical Constructability Report

• Detailed Report by Section

• Summary of Phasing

Page 12: Steward Suffolk Team Partnership RN CH SRC 072612

| Steward Health Care SystemSuffolk Construction Company, Inc.12

ATTACHMENTS

• Floor Plans with

Remarks

• Engineering Matrix

• Architectural Drawings

• Fire Protection

Drawings

• Plumbing Drawings

• HVAC Drawings

• Electrical Drawings

• Logistics Plan

• Master Schedule for

the Campus

• Site Project Schedule

• Budget Estimate

• Historical Estimate

• Backup of Quantities

Page 13: Steward Suffolk Team Partnership RN CH SRC 072612

| Steward Health Care SystemSuffolk Construction Company, Inc.13

LOGISTICS PLAN

Page 14: Steward Suffolk Team Partnership RN CH SRC 072612

| Steward Health Care SystemSuffolk Construction Company, Inc.14

LOBBY LOGISTICS PLAN

Page 15: Steward Suffolk Team Partnership RN CH SRC 072612

| Steward Health Care SystemSuffolk Construction Company, Inc.15

SURGERY LOGISTICS PLAN

Page 16: Steward Suffolk Team Partnership RN CH SRC 072612

| Steward Health Care SystemSuffolk Construction Company, Inc.16

SCHEDULE

Page 17: Steward Suffolk Team Partnership RN CH SRC 072612

| Steward Health Care SystemSuffolk Construction Company, Inc.17

MASTER SCHEDULE

Page 18: Steward Suffolk Team Partnership RN CH SRC 072612

| Steward Health Care SystemSuffolk Construction Company, Inc.18

PROJECT SCHEDULE

Page 19: Steward Suffolk Team Partnership RN CH SRC 072612

| Steward Health Care SystemSuffolk Construction Company, Inc.19

BUDGET ESTIMATE

Page 20: Steward Suffolk Team Partnership RN CH SRC 072612

| Steward Health Care SystemSuffolk Construction Company, Inc.20

BUDGET ESTIMATE

Page 21: Steward Suffolk Team Partnership RN CH SRC 072612

| Steward Health Care SystemSuffolk Construction Company, Inc.21

ESTIMATE #1 WITH QUANTITIES

Page 22: Steward Suffolk Team Partnership RN CH SRC 072612

| Steward Health Care SystemSuffolk Construction Company, Inc.22

DISCUSSION

Page 23: Steward Suffolk Team Partnership RN CH SRC 072612
Page 24: Steward Suffolk Team Partnership RN CH SRC 072612

“PARTNERSHIP”

Page 25: Steward Suffolk Team Partnership RN CH SRC 072612

OPERATIONSProject Management

•Project Authorizations•Subcontractor Procurement•PCO’s & Contingency Authorizations•Requisitions•Meeting Minutes and Reports•Submittals/RFI’s•Future Meeting Topics

Page 26: Steward Suffolk Team Partnership RN CH SRC 072612

PROJECT AUTHORIZATIONS

• Should be based on agreed to scope/cost/Q&A’s

• Text and Exhibits generated by Suffolk

• Items requiring discussion, Liquidated Damages, Holiday,

Subguard, CCIP

Page 27: Steward Suffolk Team Partnership RN CH SRC 072612

Click icon to add picturePROJECT AUTHORIZATION

Page 28: Steward Suffolk Team Partnership RN CH SRC 072612

EXHIBIT A

Page 29: Steward Suffolk Team Partnership RN CH SRC 072612

SUBCONTRACTOR PROCUREMENT

• Suffolk “Exhibit B” – Scope of Work– Covers work not specifically shown or additional work

required– Distributed to Suffolk Project Team and Steward PM for

review and comment.• Subcontractor pricing is received, reviewed and tabulated

based on exhibit and distributed to Steward PM prior to “best and final for comment.

• Bid tabs and exhibits are forwarded to Suffolk Purchasing for best and final. Successful bidder is awarded project. Steward PM is notified.

Page 30: Steward Suffolk Team Partnership RN CH SRC 072612

LETTER OF RECOMMENDATION

• Suffolk PM generates Subcontractor award approval letter with Letter of Recommendation, Bid Tab & Exhibit B.

Page 31: Steward Suffolk Team Partnership RN CH SRC 072612

MEETING MINUTESAND PM LOGS/REPORTS

• Meeting Minutes will be broken into standard sections, indicate BIC, and date initiated.

• Minute items should be clear, concise and non-biased.• Meeting Minutes should be distributed within 24-48 hours of

meeting so they can be used as a tool.• Attachments weekly should include the following– 3 Week Look Ahead– Submittals– RFI’s– PCO’s/Contingency Authorization Log

Page 32: Steward Suffolk Team Partnership RN CH SRC 072612

MEETING MINUTES

Page 33: Steward Suffolk Team Partnership RN CH SRC 072612

3 WEEK LOOK AHEAD

Page 34: Steward Suffolk Team Partnership RN CH SRC 072612

SUBMITTALS

Page 35: Steward Suffolk Team Partnership RN CH SRC 072612

PCO AND CONTINGENCY LOG

Page 36: Steward Suffolk Team Partnership RN CH SRC 072612

CONTINGENCY AUTHORIZATIONS

Page 37: Steward Suffolk Team Partnership RN CH SRC 072612

PCO

Page 38: Steward Suffolk Team Partnership RN CH SRC 072612

OWNER CHANGE ORDER

Page 39: Steward Suffolk Team Partnership RN CH SRC 072612

REQUISITIONS

• Pencil Received by 5th of every month to Steward PM

• Comments Due from Steward PM By 10th

• Final Signed Version, Suffolk and Architect Due to Steward PM by 15th of the month– Preconstruction Req are Letter Bills– Construction Reqs (even if work occurs during

Preconstruction) are submitted on AIA G702, G703 & signed by Architect

Page 40: Steward Suffolk Team Partnership RN CH SRC 072612

REQUISITIONSFOR PRECONSTRUCTION

Page 41: Steward Suffolk Team Partnership RN CH SRC 072612

REQUISITIONSFOR PRECONSTRUCTION

Page 42: Steward Suffolk Team Partnership RN CH SRC 072612

REQUISITIONSFOR CONSTRUCTION

Page 43: Steward Suffolk Team Partnership RN CH SRC 072612

REQUISITIONSFOR CONSTRUCTION

Page 44: Steward Suffolk Team Partnership RN CH SRC 072612

FUTURE MEETING TOPICS

• CCIP/Subguard• Logistics• ICRA/ILSM• Scheduling• Signage/Postings• Shut Downs• Scheduling• A & E Deliverables

Page 45: Steward Suffolk Team Partnership RN CH SRC 072612

DISCUSSION

Page 46: Steward Suffolk Team Partnership RN CH SRC 072612