Steps the chemical laboratory should follow to prepare for an ISO/IEC 17025 technical assessment Chris Fouché ( Laboratory Quality Cure(Pty) Ltd) www.labqualitycure.co.za NLA Conference : 09 October 2013

Steps the chemical laboratory should follow to prepare for an ISO/IEC 17025 technical assessment Chris Fouché ( Laboratory Quality Cure(Pty) Ltd)

Embed Size (px)

Citation preview

Page 1: Steps the chemical laboratory should follow to prepare for an ISO/IEC 17025 technical assessment Chris Fouché ( Laboratory Quality Cure(Pty) Ltd)

NLA Conference : 09 October 2013

Steps the chemical laboratory should follow to prepare for an ISO/IEC 17025 technical assessment

Chris Fouché

( Laboratory Quality Cure(Pty) Ltd)

www.labqualitycure.co.za

Page 2: Steps the chemical laboratory should follow to prepare for an ISO/IEC 17025 technical assessment Chris Fouché ( Laboratory Quality Cure(Pty) Ltd)

NLA Conference : 09 October 2013

Two types of Assessments:

Management requirements

Technical requirements

Page 3: Steps the chemical laboratory should follow to prepare for an ISO/IEC 17025 technical assessment Chris Fouché ( Laboratory Quality Cure(Pty) Ltd)

NLA Conference : 09 October 2013

Management Requirements:

Quality DocumentationSub clauses 4.1 to 4.15

(Organization, Complaints to Management review)

Page 4: Steps the chemical laboratory should follow to prepare for an ISO/IEC 17025 technical assessment Chris Fouché ( Laboratory Quality Cure(Pty) Ltd)

NLA Conference : 09 October 2013

Technical Requirements:

Quality DocumentationSub clauses 5.1 to 5.10

(General, Equipment to Reporting of results)

Page 5: Steps the chemical laboratory should follow to prepare for an ISO/IEC 17025 technical assessment Chris Fouché ( Laboratory Quality Cure(Pty) Ltd)

NLA Conference : 09 October 2013

Technical Assessment:

Witnessing( F15)

Vertical(F44)

General Technical (F49)

Page 6: Steps the chemical laboratory should follow to prepare for an ISO/IEC 17025 technical assessment Chris Fouché ( Laboratory Quality Cure(Pty) Ltd)

NLA Conference : 09 October 2013

Witnessing Activity(F15):

EquipmentCalibration StandardsQuality Control StandardsMethod ValidationUncertainty of measurementProficiency TestingQuality Control ChartsCompetenceEnvironmental Conditions

Page 7: Steps the chemical laboratory should follow to prepare for an ISO/IEC 17025 technical assessment Chris Fouché ( Laboratory Quality Cure(Pty) Ltd)

Witnessing quality verification:

Laboratory water qualityGlassware volume-GradingBalanceCalibrationDaily verificationTemperatureThermometersOvensFurnacesWaterbaths

NLA Conference : 09 October 2013

Page 8: Steps the chemical laboratory should follow to prepare for an ISO/IEC 17025 technical assessment Chris Fouché ( Laboratory Quality Cure(Pty) Ltd)

Vertical Assessment(F44):

Report traceability

Technical Signatory

NLA Conference: 09 October 2013

Page 9: Steps the chemical laboratory should follow to prepare for an ISO/IEC 17025 technical assessment Chris Fouché ( Laboratory Quality Cure(Pty) Ltd)

Vertical Traceability:Data transferTraining competenceMethod validationAssurance of results( QC)Proficiency TestingCalibration StandardsEquipment calibrationAccommodationLaboratory consumablesTest item handlingReporting of results

NLA Conference: 09 October 2013

Page 10: Steps the chemical laboratory should follow to prepare for an ISO/IEC 17025 technical assessment Chris Fouché ( Laboratory Quality Cure(Pty) Ltd)

Non Conformance(F03):Detailed observationClassification-Major/MinorSub clause referenceSignatures :

Laboratory staffLead/ Technical Assessor

Corrective ActionRoot CausePreventative ActionTime frame NC-25 working daysTechnical Assessor clearanceNext assessment clearance

NLA Conference: 09 October 2013

Page 11: Steps the chemical laboratory should follow to prepare for an ISO/IEC 17025 technical assessment Chris Fouché ( Laboratory Quality Cure(Pty) Ltd)

Recommendation Report(F04):Continued accreditationScope of accreditationEffective clearance of NCPositive & negative aspects around qualityDifferent assessments:

Pre- assessmentFull assessment(5y cycle)Surveillance (18months x 2)

NLA Conference: 09 October 2013

Page 12: Steps the chemical laboratory should follow to prepare for an ISO/IEC 17025 technical assessment Chris Fouché ( Laboratory Quality Cure(Pty) Ltd)

Acceptance Approvals Committee:

Final evidence of all data verification

Final approval by Technical/ Lead assessor

Final approval by Field Programme Manager

Updated scope of accreditation certificate

NLA Conference: 09 October 2013

Page 13: Steps the chemical laboratory should follow to prepare for an ISO/IEC 17025 technical assessment Chris Fouché ( Laboratory Quality Cure(Pty) Ltd)

Conclusion:

Recommendation & Approval:

MethodsTechnical SignatoryFinal Accreditation StatusSANAS laboratory reference T number

NLA Conference: 09 October 2013

Page 14: Steps the chemical laboratory should follow to prepare for an ISO/IEC 17025 technical assessment Chris Fouché ( Laboratory Quality Cure(Pty) Ltd)

References:

ISO/IEC 17025www.sanas.co.zawww.labqualitycure.co.zaSANAS R03- Technical Signatory RequirementsSANAS R04- Logo requirementsSANAS P30-Scope of testingSANAS R51- Suspension statusSANAS R80-Proficiency TestingSANAS TG07-Method Validation

NLA Conference: 09 October 2013