STEPS IN TESTING DEVELOPMENT
I. Planning the Test• S= specific• M = Measurable• A = Attainable• R = Reliable• T = Time bound
TABLE OF SPECIFICATION
• - “ test – blueprint”• - a two-way grid in which the objectives
to be developed are assigned to the columns or rows and the major areas of content are assigned to rows/columns. The number of items is entered in the cells to provide weighting of topics and objectives.
Steps in Preparing a Table of Specification
• A. Preparing a list of instructional objectives
• B. Outlining the course content• C. Preparing the table of specification
–one-way grip–two way grid
• Guidelines in making a two-way grid/chart table of specification–1. Number of days is arbitrary.–2. To find the weight, divide the number of
days allotted per content by the total number of days covered multiply by 100.–3. To find the number of items per content
multiply the weight by the number of items of the whole test.–4. To find the number of items per skill,
multiply the percentage per skill by the number of items per content.
TABLE OF SPECIFICATIONTwo-way grid/chart
Content Time Allot
Weight SK15%
KC20%
IAp15%
LAn15%
LS15%
SE20%
No. of Items
Unit 1 Intro to Sci & Tech
10 days
20% 2 2 2 1 1 2 10
Unit 2. Force. Motion & Work
15 days
30% 3 3 2 2 2 3 15
Unit 3. Form & Transformation of Energy
25 days
50% 4 5 4 4 3 5 25
Total 50 days
50% 9 10 8 7 6 10 50
• Guidelines in making the one-way grid table of specification
– 1. Time allotment is arbitrary– 2. To find the number of items per objectives,
divide the number of items of the whole test by the total number of days covered, multiply the answer by the time allotment per objective.
– 3. To find the percentage item, 100% divided by the total number of test items multiplied by the number of items per objective
TABLE OF SPECIFICATIONOne-way grid
Objectives Time allotment(No. of days)
No. of Items % of Items Item No.
1. Defining terms
2 2 4% 2,7
2. Identifying outstanding Filipino Scientist
3 3 6% 8, 9, 11