10
Deco Frame, L-Frame and Z-Frame Eco-Wood Shutters STEP BY STEP INSTALLATION INSTRUCTIONS Warranty Service The enjoyment of your window coverings should be everlasting, which is why our products come with a limited lifetime warranty. The warranty applies to the original owner, requires a proof of purchase (hang on to your receipt!) and covers defects in material or craftsmanship. Shades or blinds must have been properly installed. We reserve the right to determine if your window covering warrants a repair or a replacement. Visit smithandnoble.com/guarantee to see full details. In need of warranty service? Call us at 800.248.8888 and we’ll arrange for a repair or replacement ASAP. © 2019 Smith & Noble Home, Inc. All Rights Reserved SN042019

STEP BY STEP INSTALLATION INSTRUCTIONS Eco-Wood Shutters · Eco-Wood Shutters STEP BY STEP INSTALLATION INSTRUCTIONS Warranty Service The enjoyment of your window coverings should

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: STEP BY STEP INSTALLATION INSTRUCTIONS Eco-Wood Shutters · Eco-Wood Shutters STEP BY STEP INSTALLATION INSTRUCTIONS Warranty Service The enjoyment of your window coverings should

Deco Frame, L-Frame and Z-Frame

Eco-Wood ShuttersSTEP BY STEP INSTALLATION INSTRUCTIONS

Warranty ServiceThe enjoyment of your window coverings should be everlasting, which is why our products come with a limited lifetime warranty. The warranty applies to the original owner, requires a proof of purchase (hang on to your receipt!) and covers defects in material or craftsmanship. Shades or blinds must have been properly installed. We reserve the right to determine if your window covering warrants a repair or a replacement. Visit smithandnoble.com/guarantee to see full details. In need of warranty service? Call us at 800.248.8888 and we’ll arrange for a repair or replacement ASAP.

© 2019 Smith & Noble Home, Inc. All Rights Reserved SN042019

Page 2: STEP BY STEP INSTALLATION INSTRUCTIONS Eco-Wood Shutters · Eco-Wood Shutters STEP BY STEP INSTALLATION INSTRUCTIONS Warranty Service The enjoyment of your window coverings should

1 2smithandnoble.com 800.248.8888

A Smooth Set-UpWe want you to love your new hardware and that includes

having a smooth installation experience. We suggest saving

this guide. If you encounter any difficulties or questions,

please reach out to us for help. It’s why we’re here. Call us at

800.248.8888 for more info on installation.

We recommend you hold on to all packaging until your

hardware is fully installed. Should something go wrong (we

strongly doubt it), we want any potential returns to be a

painless as possible.

Customer Service Hours Monday — Friday: 6am — 6pm PT Saturday — Sunday: 7am — 4pm PTsmithandnoble.com

EverythingYou Need

Table of Contents

Deco FrameGetting Started . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3Installation Steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 - 6 L-FrameGetting Started . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8Installation Steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 - 12

Z-FrameGetting Started . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14Installation Steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 - 17

Warranty . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Back Cover

Page 3: STEP BY STEP INSTALLATION INSTRUCTIONS Eco-Wood Shutters · Eco-Wood Shutters STEP BY STEP INSTALLATION INSTRUCTIONS Warranty Service The enjoyment of your window coverings should

4800.248.8888 3 smithandnoble.com

First, make sure you have all the parts and tools required to install your shades. HARDWARE YOU’LL NEED: Pencil, ¼" nut driver, level, and a drill with a 1⁄16" drill bit.

RECOMMENDED TOOLS: Nail gun or drill, tape measure, level, box knife, Phillips head screw driverMake sure ITEM # (below A) matches on both panel box and frame box. Each window will have 1 box for shutter panels and 1 box for frames.

• Do not dispose of packaging until the shutters are operating appropriately. • Use of a moving blanket or drop cloth is recommended.• Find ample working space to assemble your frame, (preferably in front of the window). • Check the diagram to make sure you have all the parts indicated for an appropriate installation.

DECO FRAME - GETTING STARTE D

Tools & Parts

Hoffman Key Hinge SpacerHinge ScrewLight Block

Screw Hinge PinFrame Screw

INSTALLATION INSTRUCTIONS

4 sided Deco Frame (Outside Mount - 2 Panel)

Getting Started

Recommended Tools: Nail Gun or Drill, Tape Measure, Torpedo Level, Box Knife, 6” Philips head driver

Make sure ITEM# (In Red) matches on both panel box and frame box. Each window will have 1 box for shutter panels and 1 box for frames.

▪ Do not dispose of packaging until the shutters are operating appropriately.▪ Use of a moving blanket or drop cloth is recommended.▪ Find ample working space to assemble your frame, (preferably in front of the window).▪ Check the diagram to make sure you have all the parts indicated for an appropriate

installation.

Installation Steps

1. Carefully remove panels and frames from the packaging. Do not mix panels or frames fromother windows.

2. After unpacking panels, remove filler strips from the frame. (Repeat for all sides)

Light Block Screw

Frame Screw

Hinge Pin

Hoffman Key

Hinge Spacer

If applicable

Hinge Screw

Deco Frame Installation Instructions.doc REV. 5/17/16

A A

Page 4: STEP BY STEP INSTALLATION INSTRUCTIONS Eco-Wood Shutters · Eco-Wood Shutters STEP BY STEP INSTALLATION INSTRUCTIONS Warranty Service The enjoyment of your window coverings should

5 6smithandnoble.com 800.248.8888

DECO FRAME - INSTALLATION STEPSDECO FRAME - INSTALLATION STEPS

Hoffman Key

Page 5: STEP BY STEP INSTALLATION INSTRUCTIONS Eco-Wood Shutters · Eco-Wood Shutters STEP BY STEP INSTALLATION INSTRUCTIONS Warranty Service The enjoyment of your window coverings should

7 8smithandnoble.com 800.248.8888

INSTALLATION INSTRUCTIONS

4 Sided L Frame (Outside Mount - Single Panel)

Getting Started

Recommended Tools: Nail Gun or Drill, Tape Measure, Torpedo Level, Box Knife, 6” Philips head driver

Make sure ITEM# (In Red) matches on both panel box and frame box. Each window will have 1 box for shutter panels and 1 box for frames.

▪ Do not dispose of packaging until the shutters are operating appropriately.▪ Use of a moving blanket or drop cloth is recommended.▪ Find ample working space to assemble your frame (preferably in front of the window).▪ Check the diagram to make sure you have all the parts indicated for an appropriate

installation.

Installation Steps

1. Carefully remove panels and frames from the packaging. Do not mixpanels or frames from other windows. Frame parts will be labeledeither top, bottom, right, left.

Hinge Screw

Hinge Pin

Hoffman Key

Hinge Spacer

L Frame Installation Instructions REV. 5/17/16

4-SIDED L FRAME - GETTING STARTED

A A

RECOMMENDED TOOLS: Nail gun or drill, tape measure, level, box knife, 6" Phillips head screw driverMake sure ITEM # (below A) matches on both panel box and frame box. Each window will have 1 box for shutter panels and 1 box for frames.

Page 6: STEP BY STEP INSTALLATION INSTRUCTIONS Eco-Wood Shutters · Eco-Wood Shutters STEP BY STEP INSTALLATION INSTRUCTIONS Warranty Service The enjoyment of your window coverings should

9 10smithandnoble.com 800.248.8888

4-SIDED L FRAME - INSTALLATION STEPS4-SIDED L FRAME - INSTALLATION STEPS

2. Set all frames on floor face up.

3. Position the left frame and the top frame onto a flat surface (small wood block isrecommended to prevent damage to floor and to ensure a flush fit by the Hoffman Key) andline up the Hoffman key.

Tip: The Hoffman Key has a rounded and a flat side to it. The rounded side goes in face up.

Repeat step 3 for remaining corners to complete the 4 sided frame assembly.

If not installing with T-POST skip to Step 5.

4. Locate and identify the top and bottom labeled t-post. Line up the pre-drilled holes with thetop and bottom frame and secure with screws provided.

All L Frame T-Post installations are alike.

5. It is best to pre-drill the top left and right frame if you are mounting with screws. It isrecommended to pre-drill right above, or below the hinge location (within a ¼”), and as faraway from any miter edges as possible.

Set Hoffman Key round side up and push top frame down onto the Hoffman Key Hoffman

Key

Deco Frame Installation Instructions.doc REV. 5/17/16

L Frame Installation Instructions REV. 5/17/16

Page 7: STEP BY STEP INSTALLATION INSTRUCTIONS Eco-Wood Shutters · Eco-Wood Shutters STEP BY STEP INSTALLATION INSTRUCTIONS Warranty Service The enjoyment of your window coverings should

11 12smithandnoble.com 800.248.8888

12. Check gaps between panels and frame and adjust accordingly with hinge spacers provided(if needed).

13. Now that you have secured the top and bottom corners and your panel operates properly,secure with nail/screw (pre-drill) the middle of the bottom, top and side frames.

Make sure the gap between the panel and the frame are even.

Tip: Move top and bottom frames up and down to achieve proper tolerance between panel and frame.

Tip: Move side frame in and out to achieve proper tolerance between panel and frame.

14. Make sure shutters operate properly. Add additional nail/screws (pre-drill) (if needed).

Loosen screws on panel hinge. Do not remove completely.

Insert hinge spacer.

Tighten screws. Hinge spacer installed.

Hinge Spacer Installation

L Frame Installation Instructions REV. 5/17/16

12. Check gaps between panels and frame and adjust accordingly with hinge spacers provided(if needed).

13. Now that you have secured the top and bottom corners and your panel operates properly,secure with nail/screw (pre-drill) the middle of the bottom, top and side frames.

Make sure the gap between the panel and the frame are even.

Tip: Move top and bottom frames up and down to achieve proper tolerance between panel and frame.

Tip: Move side frame in and out to achieve proper tolerance between panel and frame.

14. Make sure shutters operate properly. Add additional nail/screws (pre-drill) (if needed).

Loosen screws on panel hinge. Do not remove completely.

Insert hinge spacer.

Tighten screws. Hinge spacer installed.

Hinge Spacer Installation

L Frame Installation Instructions REV. 5/17/16

12. Check gaps between panels and frame and adjust accordingly with hinge spacers provided(if needed).

13. Now that you have secured the top and bottom corners and your panel operates properly,secure with nail/screw (pre-drill) the middle of the bottom, top and side frames.

Make sure the gap between the panel and the frame are even.

Tip: Move top and bottom frames up and down to achieve proper tolerance between panel and frame.

Tip: Move side frame in and out to achieve proper tolerance between panel and frame.

14. Make sure shutters operate properly. Add additional nail/screws (pre-drill) (if needed).

Loosen screws on panel hinge. Do not remove completely.

Insert hinge spacer.

Tighten screws. Hinge spacer installed.

Hinge Spacer Installation

L Frame Installation Instructions REV. 5/17/16

4-SIDED L FRAME - INSTALLATION STEPS4-SIDED L FRAME - INSTALLATION STEPS

Page 8: STEP BY STEP INSTALLATION INSTRUCTIONS Eco-Wood Shutters · Eco-Wood Shutters STEP BY STEP INSTALLATION INSTRUCTIONS Warranty Service The enjoyment of your window coverings should

13 14smithandnoble.com 800.248.8888

NORMAN SHUTTERSINSTALLATION INSTRUCTIONS

4 Sided Z Frame(Inside Mount - 2 panel)

Getting Started

Recommended Tools: Nail Gun or Drill, Tape Measure, Torpedo Level, Box Knife, 6” Philips head driver

Make sure ITEM# (In Red) matches on both panel box and frame box. Each window will have 1 box for shutter panels and 1 box for frames.

▪ Do not dispose of packaging until the shutters are operating appropriately.▪ Use of a moving blanket or drop cloth is recommended.▪ Find ample working space to assemble your frame (preferably in front of the window).▪ Check the diagram to make sure you have all the parts indicated for an appropriate

installation.

Installation Steps

1. Carefully remove panels and frames from the packaging.Do not mix panels or frames from other windows. Allframe pieces are labeled (top, bottom, right, left).

2. Set all frames on floor face up.

Hinge Spacer

HingeScrew

Hinge Pin

Hoffman Key

Z Frame Installation Instructions REV.5/17/16

4-SIDED Z FRAME - GETTING STARTED

A A

RECOMMENDED TOOLS: Nail gun or drill, tape measure, level, box knife, 6" Phillips head screw driverMake sure ITEM # (below A) matches on both panel box and frame box. Each window will have 1 box for shutter panels and 1 box for frames.

Page 9: STEP BY STEP INSTALLATION INSTRUCTIONS Eco-Wood Shutters · Eco-Wood Shutters STEP BY STEP INSTALLATION INSTRUCTIONS Warranty Service The enjoyment of your window coverings should

15 16smithandnoble.com 800.248.8888

Only secure one screw into the top left frame.

Only secure one screw into the top left frame.

Only secure one screw into the top right frame.

Only secure one screw into the top right frame.

Slide panel into frame hinges.

Tip: Use a counter sink bit for best results.

6. Position the assembled frame evenly into the window opening by using a tape measure andshims.

7. Once you have evenly spaced the frame into the window opening, secure with a nail/screw(pre-drill) into the upper left frame ONLY. Shutter will be fully secured in later steps.

8. Once the left side is secured, level the frame on the window and secure with a nail/screw(pre-drill) into upper right frame. Shutter will be fully secured in later steps.

9. With the top right and left frame secured, place the left shutter panel in the frame and slideinto position. Insert the hinge pins into hinges.

Using Screws Using Nail Gun

Measure Right & Top frame for spacing. Measure Left & Top frame for spacing.

Using Screws Using Nail Gun

Frame EVENLY in the window.

Level the top frame.

Position panel in the frame.

Z Frame Installation Instructions REV.5/17/16

4-SIDED Z FRAME - INSTALLATION STEPS4-SIDED Z FRAME - INSTALLATION STEPS

3. Position the left frame and the top frame onto a flat surface (small wood block isrecommended to prevent damage to floor and to ensure a flush fit by the Hoffman Key) andline up the Hoffman key.

Tip: The Hoffman Key has a rounded and a flat side to it. The rounded side goes in face up.

Repeat step 3 for remaining corners to complete the 4 sided assembly.

If not installing with T-POST, skip to Step 5.

4. The top and bottom of the t-post are labeled. Locate and identify.

Line up the pre-drilled holes with the top and bottom frame and secure with screws provided.

All Z-Frame T-Post installations are exactly alike.

5. If SCREWS will be used, PRE-DRILL in the top left and right frame, bottom left and right frame,and in the middle of the top and bottom frame before bringing the frame onto the window.

Hoffman Key

Set Hoffman Key round side up and push top frame down onto the Hoffman Key

Pre-Drill top right & left frame. Pre-Drill bottom right & left frame. Pre-Drill middle of top and bottom frame.

Z Frame Installation Instructions REV.5/17/16

Page 10: STEP BY STEP INSTALLATION INSTRUCTIONS Eco-Wood Shutters · Eco-Wood Shutters STEP BY STEP INSTALLATION INSTRUCTIONS Warranty Service The enjoyment of your window coverings should

17 18smithandnoble.com 800.248.8888

Only secure one screw into the bottom right frame.

Only secure one screw into the bottom right frame.

Only secure one screw into the bottom frame.

Only secure one screw into the bottom frame.

Only secure one screw into the top frame.

Only secure one screw into the top frame.

13. After securing the bottom left, secure with a nail or screw at the bottom right.

TIP: Step away from the window and open louvers to make sure shutter is evenly positioned to window.

Things to look for: Window mullions, sectioned glass with shutter lines of stile or louvers.

14. Check gaps between panels and adjust accordingly with hinge spacers provided if needed.

15. Once reveal (gap between the panel and the frame) is aligned, secure the top and bottomframe.

Tip: Move top & bottom frame up and down to achieve proper tolerance between panel and frame.

Tip: Move side frames in and out to achieve proper tolerance between panel and frame.

16. After the top and bottom frame are secured, check that the shutter operates properly. Securethe shutter by installing additional nails/screws (pre-drill) to all sides of the frame of the shutter.

Tip: It is recommended to apply 2 nails or screws for every hinge, and 1 nail or screw between hinges.

Using Screws Using Nail Gun

Using Screws Using Nail Gun Using Screws Using Nail Gun

Loosen screws. Insert spacer behind hinge.

Tighten Screws.

Spacer Installed.

Z Frame Installation Instructions REV.5/17/16

4-SIDED Z FRAME - INSTALLATION STEPS4-SIDED Z FRAME - INSTALLATION STEPS