Steel Anchor Bolts

Embed Size (px)

Citation preview

  • 8/21/2019 Steel Anchor Bolts

    1/5

    E-mail:Phone:

    Address:Project:

    1/5Page:Engineer:13/11/2014Date:Company:

    Anchor DesignerSoftwareVersion 2.3.5365.1

    CALCULATION SHEET FOR SIMPSON STRONG-TIE ANCHOR DESIGNER SOFTWARE

    Base MaterialConcrete: Normal-weight C30/37Concrete thickness, h [mm]: 350State: CrackedCompressive strength, fck.cube[N/mm]: 37.00Temperature range: 24/43Hole condition: Dry or Wet

    ReinforcementStraight edge reinf. + stirrups (a 100 mm)Reinforcement to control splitting provided: NoNormal reinforcement: Yes

    Base PlateLength x Width x Thickness [mm]: 360 x 280 x 12Yield stress: 235.00 N/mm

    Profile type/size: IPE 200

    GeneralDesign method: ETAG 001 Annex C / TR 029Units: SI units (metric)

    Anchor Information:Anchor type: Bonded anchorMaterial: Steel Grade 5.8Diameter [mm]: 20

    Effective Embedment depth, hef[mm]: 280hmin[mm]: 328ccr,N[mm]: 420scr,N[mm]: 840ccr,sp[mm]: 840scr,sp[mm]: 1680cmin[mm]: 115smin[mm]: 70

    Load and GeometryDesign loads:NSd[kN]: 0.00VxSd[kN]: 15.00VySd[kN]: 0.00MxSd[kN]: 0.00MySd[kN]: 20.00MzSd[kN]: 0.00

    2. Input Data & Anchor Parameters

    Project description:Location:Fastening description:

    Customer company:Customer contact name:Customer e-mail:Comment:

    1.Project information

    Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.

    5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.comSimpson Strong-Tie Company Inc.

  • 8/21/2019 Steel Anchor Bolts

    2/5

    E-mail:Phone:

    Address:Project:

    2/5Page:Engineer:13/11/2014Date:Company:

    Anchor DesignerSoftwareVersion 2.3.5365.1

    Recommended AnchorAnchor Name: SET-XP - SET-XP M20 - 5.8Code Report Listing: ETA-11/0360

    Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.

    5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.comSimpson Strong-Tie Company Inc.

  • 8/21/2019 Steel Anchor Bolts

    3/5

    VRd,s= VRk,s /gMsShear without lever am

    Steel Resistance [Sec. 5.2.3.2]

    5. Resistances to Shear Loads

    E-mail:Phone:

    Address:Project:

    3/5Page:Engineer:13/11/2014Date:Company:

    Anchor DesignerSoftwareVersion 2.3.5365.1

    3. Resulting Anchor Forces

    Anchor Tension load,

    NSd[kN]

    Shear load x,

    VxSd[kN]

    Shear load y,

    VySd[kN]

    Shear load combined,

    VSd= (VxSd)+(VySd) [kN]1 36.34 3.75 0.00 3.752 36.34 3.75 0.00 3.753 0.00 3.75 0.00 3.754 0.00 3.75 0.00 3.75

    Sum 72.67 15.00 0.00 15.00

    Maximum concrete compression strain []: 0.23Maximum concrete compression stress [N/mm]: 6.98Resultant tension force [kN]: 72.67Resultant compression force [kN]: 72.67Eccentricity of resultant tension forces in x-axis, e'Nx(mm): 0Eccentricity of resultant tension forces in y-axis, e'Ny(mm): 0Eccentricity of resultant shear forces in x-axis, e'Vx(mm): 0Eccentricity of resultant shear forces in y-axis, e'Vy(mm): 0

    18.312.101.044205.201.0001.0000.7542822400672000

    NRd,sp[kN]gMspYh,spN0Rk,c[kN]Yec,NYre,NYs,NA0c,N[mm2]Ac,N[mm2]

    NRd,sp= NRk,sp /gMsp= N0Rk,c(Ac,N / A0c,N)Ys,NYre,NYec,NYh,sp/gMsp[Eq. 3.2 & 5.4]

    Splitting Resistance [Sec. 5.2.2.6]

    37.562.10205.201.0001.0000.807705600336000

    NRd,c[kN]gMcN0Rk,c[kN]Yec,NYre,NYs,NA0c,N[mm2]Ac,N[mm2]

    NRd,c= NRk,c /gMc= N0Rk,c(Ac,N / A0c,N)Ys,NYre,NYec,N/gMc[Eq. 3.2 & 5.3]

    205.2028037.007.2

    N0Rk,c[kN]hef[mm]fck,cube[N/mm2]k1

    N0Rk,c= k1fck,cubehef1.5 [Eq. 5.3a]

    Concrete Cone Resistance [Sec. 5.2.2.4]

    23.232.1052.781.0001.0001.1930.895213333184752

    NRd,p[kN]gMpN0Rk,p[kN]Yre,NpYec,NpYg,NpYs,NpA0p,N[mm2]Ap,N[mm2]

    NRd,p= NRk,p /gMp= N0Rk,p(Ap,N / A0p,N)Ys,NpYg,NpYec,NpYre,Np/gMp[Eq. 3.2 & 5.2]

    52.783.0028020

    N0Rk,p[kN]tRk [N/mm2]hef[mm]d [mm]N

    0Rk,p

    = pdhef

    tRk

    [Eq. 5.2a]

    Combined Pull-out and Concrete Resistance [Sec. 5.2.2.3]

    82.001.50123.00

    NRd,s[kN]gMsNRk,s[kN]

    NRd,s= NRk,s /gMs

    Steel Resistance [Sec. 5.2.2.2]

    4. Resistance to Tension Loads

    Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.

    5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.comSimpson Strong-Tie Company Inc.

  • 8/21/2019 Steel Anchor Bolts

    4/5

    8. Warnings

    E-mail:Phone:

    Address:Project:

    4/5Page:Engineer:13/11/2014Date:Company:

    Anchor DesignerSoftwareVersion 2.3.5365.1

    149.141.50

    VRd,c[kN]gMc

    41.691.4001.0002.50090.01.0001.000101250155250

    V0Rk,c[kN]Yre,VYec,VYa,VaVYh,VYs,VA0c,V [mm2]Ac,V[mm2]

    VRd,c= VRk,c /gMc= V0Rk,c(Ac,V/ A0c,V)Ys,VYh,VYa,VYec,VYre,V/gMc[Eq. 3.2 & 5.8]

    41.6915037.002800.070.14201.70V

    0Rk,c[kN]c1[mm]fck,cube[N/mm

    2

    ]hef[mm]bad [mm]k1

    V0Rk,c= k1dahefbfck,cubec11.5= [Eq. 5.8a]

    Concrete Edge Resistance [Sec. 5.2.3.4]

    111.241.50205.201.0001.0000.807705600432000

    VRd,cp[kN]gMcN0Rk,c[kN]Yec,NYre,NYs,NA0c,N[mm2]Ac,N[mm2]

    52.781.0001.0001.3420.8952133332807522.0

    N0Rk,p[kN]Yre,NpYec,NpYg,NpYs,NpA0p,N[mm2]Ap,N[mm2]k

    VRd,cp= VRk,cp /gMc= min|kNRK,p; kNRk,c| /gMc= min|kN0Rk,p(Ap,N / A0p,N)Ys,NpYg,NpYec,NpYre,Np ; kN0Rk,c(Ac,N / A0c,N)Ys,NYre,NYec,N| /gMc[Eq. 3.2, 5.7 & 5.7a]

    Concrete Pry-out Resistance [Sec. 5.2.3.3]

    48.801.2561.00

    VRd,s[kN]gMsVRk,s[kN]

    Fail4.101.00.133.97bNa+ bVaStatusRatioabV = VSd/VRdbN = NSd/NRdInteraction check

    Pass0.05149.147.50Concrete Edge

    Pass (Governs)0.13111.2415.00Pry-out

    Pass0.0848.803.75Steel

    StatusRatioResistance, VRd[kN]Action Load, VSd[kN]Shear

    Fail (Governs)3.9718.3172.67Splitting

    Fail1.9437.5672.67Concrete Cone

    Fail3.1323.2372.67PulloutPass0.4482.0036.34Steel

    StatusRatioResistance, NRd[kN]Action Load, NSd[kN]Tension

    Proof of Tensile and Shear Failure and Interaction [Sec. 5.2.4]

    6. Results

    FAIL! Selected anchor type and embedment do not meet the selected design criteria.

    7. Installation

    Effective embedment depth, hef[mm]: 280Concrete thickness, h [mm]: 350Drilled hole diameter, d0[mm]: 24Drilled hole depth, h1[mm]: 280Installation torque, Tinst[Nm]: 80.00Base plate thickness, t fix[mm]: 12Fixture hole diameter [mm]: 22

    Installation instruction:http://dop.strongtie.eu/ETA/ETA-11_0360_en.pdf

    Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.

    5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.comSimpson Strong-Tie Company Inc.

  • 8/21/2019 Steel Anchor Bolts

    5/5

    E-mail:Phone:

    Address:Project:

    5/5Page:Engineer:13/11/2014Date:Company:

    Anchor DesignerSoftwareVersion 2.3.5365.1

    9. Contact Information

    --- Simpson Strong-Tie United Kingdom ---Simpson Strong-TieWinchester RoadCardinal PointTamworth

    StaffordshireB78 3HGUnited KingdomTel: +44 1827 255 600E-mail: [email protected]

    --- Simpson Strong-Tie Australia ---Simpson Strong-Tie1/11 Kenoma Place

    Arndell ParkNSW 2148

    AustraliaTel. : (61) 02 9831 7700Fax : (61) 02 9831 2726Email : [email protected]

    --- Simpson Strong-Tie New Zealand ---Simpson Strong-Tie28 Arrenway Drive

    AlbanyAuckland 0632New ZealandTel. : (64) 9 477 4440Fax : (64) 9 475 9724Email : [email protected]

    --- Simpson Strong-Tie South Africa ---

    Simpson Strong-TieUnit 5Fairway Business Park Stibitz StreetWest Lake Business Park 7934Cape Town, Western ProvinceSouth AfricaTel. : (27) 087 354 0629Fax : (27) 021 702 3679Email : [email protected]

    - Designer must exercise own judgement to determine that the requirements in TR 029 Section 6 "Serviceability limit state" and Section 7"Additional proofs for ensuring the characteristic resistance of concrete member" are fulfilled where required.

    - Per TR 029 Section 5.2.2.5, splitting failure is avoided during anchor installation by complying with minimum values for edge distance Cmin,spacing Smin,member thickness hminand reinforcement as given in the relevant ETA.

    - Designer must exercise own judgement to determine if this design is suitable.

    - Refer to manufacturers product literature for hole cleaning and installation instructions.

    Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.

    5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.comSimpson Strong-Tie Company Inc.