2
MAN Diesel & Turbo 86224 Augsburg, Germany Phone +49 821 332-0 Fax +49 821 332-3382 [email protected] www.mandieselturbo.com All data provided in this document is non-binding. This data serves informa- tional purposes only and is especially not warrented or guaranteed in any way. Depending on the specific individual projects, the relevant data may be subject to changes and will be assessed and determined individually for each project. This will depend on the particular characteristics of each individual project, especially specific site and operational conditions. Copyright © MAN Diesel & Turbo. PLM.092013.3. Printed in Germany MAN PrimeServ – a service brand of MAN Diesel & Turbo Steam Turbine Revamp Conversion to back pressure design

Steam Turbine Revamp - MAN PrimeServ

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Steam Turbine Revamp - MAN PrimeServ

MAN Diesel & Turbo86224 Augsburg, Germany Phone +49 821 332-0Fax +49 821 [email protected]

All data provided in this document is non-binding. This data serves informa-tional purposes only and is especially not warrented or guaranteed in any way. Depending on the specific individual projects, the relevant data may be subject to changes and will be assessed and determined individually for each project. This will depend on the particular characteristics of each individual project, especially specific site and operational conditions. Copyright © MAN Diesel & Turbo. PLM.092013.3. Printed in Germany

MAN PrimeServ – a service brand of MAN Diesel & Turbo

Steam Turbine RevampConversion to back pressure design

MPS_Brochure_4_Pages.indd 1-2 14.10.2013 10:25:28

Page 2: Steam Turbine Revamp - MAN PrimeServ

PrimeServ in line with the proposed concept:

n Modification of stages 3 and 4 of the live steam valven Conversion of the control stage to a single-row impulse wheel n Removal of the low-pressure stages including the corresponding adaptation of the spare rotorn Modification of the shaft seal systemn Extension of the insulation to the outlet arean Adaptation of the control systemn Supply of a spare parts package for multi-year operation SummaryWith the conversion of the existing DK063/080 condensing steam turbine to a DG063/080 back pressure steam turbine, it was possible to achieve the operating parameters specified by the custom- er and thereby to realize the associated energy optimization measures. The timescale of just four weeks available for the conversion – thereof one week for the disassembly and reassembly of the steam turbine and three weeks for the perfor- mance of the actual conversion – required a de- tailed project preparation and an extemly inten- sive project management on the part of MAN PrimeServ.

With the early manufacturing and supply of the new components required for the conversion and the reworking of reserve parts as the spare rotor and the stuffing boxes on the inlet and outlet side, MAN PrimeServ was able to exclude possible bottlenecks during the preparation phase. By retaining the ex- ternal casing it was possible to retain the existing unit design without major changes and therefore to further minimize as well the conversion time as the conversion costs.

Comprehensive ModernizationMAN PrimeServ provides you comprehensive mod- ernization concepts to modernize your equipment – no matter if you want to optimize reliability, oper- ating costs or any other characteristic. Within our so-called Green Projects we develop and realize tailor-made solutions to increase efficiency, to achieve energy savings and to improve environ- mental sustainability. Please contact us for further information.

In order to realize energy optimization measures MAN PrimeServ has converted an

existing DK063/080 condensing steam turbine into a DG063/080 back pressure

steam turbine.

Design before and after modification

ObjectiveAs a result of changed operational requirements and in order to achieve a number of energy optimization measures, MAN PrimeServ was commissioned to undertake a detailed engineering study investigating the possibility of converting an existing condensing steam turbine into a back pressure steam turbine with design parameters provided by the customer. The condensing steam turbine DK063/080 was in- stalled in 2007 during a modernization project as a replacement for a less powerful condensing steam turbine.

According to the framework specified by the cus- tomer, the conversion of the steam turbine was to be performed within a four-week period during a planned plant shutdown. In addition, as many com- ponents as possible were to be re-used in the con- verted machine.

Modernization SolutionIn order to investigate the feasibility of the conver- sion of the condensing steam turbine to a back pressure steam turbine with the specified design parameters, MAN PrimeServ performed extensive thermo-dynamic and mechanical design re-assess- ments. In particular, the design of the rotor blading, the turbine casing and the internals, the structural strength and the dimensional stability for stationary operation, as well as the feasibility in terms of me- chanical, design and time aspects were investigated and verified using the finite element method.

Based on the results of the engineering study, MAN PrimeServ defined the measures necessary for the modification as well as for compliance with the envis- aged timescale in a detailed conversion concept. After careful investigation the customer decided to award the order for the conversion project to MAN

Steam Turbine RevampConversion to back pressure design

MPS_Brochure_4_Pages.indd 3-4 14.10.2013 10:25:29