THANE MUNICIPAL CORPORATIONTHANE
March, 2009
DEVELOPMENT PLAN IMPLEMENTATION
STATUS REPORT
THANE MUNICIPAL CORPORATIONTHANE
March, 2009
DEVELOPMENT PLAN IMPLEMENTATION
STATUS REPORT
THANE MUNICIPAL CORPORATION, THANEAll rights reserved
Compiled & Prepared byD.P. Implementation CellThane Municipal Corporation,Dr. Almeida Road,Panchpakhadi, Thane – 400 602
I
CONTENTS
1.0 THANE DEVELOPMENT PLAN AT A GLANCE..................................1
1.1 Development plan of Thane City ................................................1
1.2 The salient features of the sanctioned development plan ..........1
1.3 Broad zoning ..............................................................................2
1.4 Status of Reserved Sites ...........................................................2
1.5 Issues and Concerns in D.P. Implementation.............................4
2.0 LAND ACQUISITION...........................................................................5
3.0 MAJOR POLICY DECISION .............................................................13
4.0 MODIFICATIONS TO DCR & DP .....................................................17
5.0 RESERVATION DEVELOPMENT PROGRAMME ............................19
6.0 AMENTITY / R.G. DEVELOPMENT PROGRAMME.........................23
7.0 AREA IMPROVEMENT SCHEMES & MISSING LINKS ...................27
8.0 RECOVERY OF DEVELOPMENT CHARGES .................................29
9.0 OTHER ACHIVEMENTS...................................................................31
ii
ABBRIVATIONS
BPAMS - Building Plan Approval Management System
Cl - Clause
Cr. - Crores
CRZ - Costal Regulation Zone
DCR - Development Control Regulation
DDP - Draft Development Plan
DP - Development Plan
ELU - Existing land use
Enchr - Encroachment
HA - Hector
LDZ - Low Density Zone
MR & TP Act. - Maharashtra Regional & Town Planning Act
NUIS - National Urban Information System
NDZ - No Development Zone
P.G. - Play Ground
PPP - Public Private Partnership
PWD - Public Works Department
R.G. - Recreational Ground
RR - Ready reckoner
STP - Sewerage Treatment Plant
TDO - Town Development Office
TDR - Transferable Development Rights
TMC - Thane Municipal Corporation
TPS - Town Planning Scheme
1
1.0 THANE DEVELOPMENT PLAN AT A GLANCE
1.1 Development plan of Thane City
1.2 The salient features of the sanctioned development plan
After the formation of Thane Municipal Corporation, TMC initiated the
process of preparing the existing land use (ELU) map as first step in
preparation of development plan for the entire corporation limit. The
process of preparation of draft D.P was initiated in the year 1986.The Draft
Development plan (DDP) was published in the year 1991. After complying
with all legal formalities the Revised Draft D.P. was submitted for the
approval of the State Govt. in the year1996. The Govt of Maharashtra after
making necessary enquiry and consulting with Director, Town planning of
Maharashtra state sanctioned the development plan with some
modifications partly on 4 October. 1999. The excluded part (E.P.) where
sanctioned by Government on 3 April, 2003. Thus the Development Plan
for Thane Municipal Corporation Jurisdiction came in to force from 14 May,
2003.
i. The sanctioned development plan as per the details mentioned in
above covers the total area of 12823 Ha. The Planning authority for
the said plan is Thane Municipal Corporation and as per the MR & TP
Act, 1966, Section 42, implementation of the development plan is
obligatory duty of the TMC. The validity of the said DP is for 20 years
from the date of final sanction of this plan
The total area of corporation is 12823 Ha. The broad categorization
shows that 5930 Ha. is developable, 3682 Ha is non developable
while 3211 Ha. is under green zone.
There are 11 planning sectors where 804 are total reserved sites
covering area of 1267.65 Ha.
th
rd
th
o
o
2
o
o
o
The area under road shown in the development plan is 742.97 Ha.
The area under residential zone is 2665.61 Ha, while that under
industrial zone is 1254 Ha.
As per 1991 prices, the cost of acquisition of entire land under
reservation was worked out as Rs. 209 Crores.
The broad zoning of sanctioned development plan summarily given in the
following chart.
There are 804 sites reserved for various public purposes. The sector wise
distribution of these sites has been given in following table. The TMC is
development authority for 737 reserved sites whereas for the remaining 67
sites are expected to be developed by the Govt. & other authorities.
1.3 Broad zoning
Table 1.3.1 - Broad zoning as per sanctioned D.P
1.4 Status of Reserved Sites
Sr. No. Zoning Area in Ha.
1 Area under Residential Zone 2665.61
2 Area under Industrial Zone 1254.00
3 Area under Reservation 1267.65
4 Area under Road 742.97
5 Defense Area 122.00
6 Forest Area 3560.00
7 Green Zone Area 3211.77
12823.00
3
Table 1.4.1 - Sector wise distribution of reserved sites.
Table 1.4.2 - Sector wise status of reserved sites – (Upgraded as in March 2009)
4
1.5 Issues and Concerns in D.P. Implementation
Land is a constant instrument that cannot be increased in any case if the
territorial jurisdiction of the city remains unchanged. Therefore if the
present development is analyzed from the point of view of availability of
land, then following issues & concerns alarm the situation.
Present sanctioned development plan shows 3682 Ha. of land falls
under forest and defense purpose & which is not available for
development.
The area under green zone and water bodies is around 3212Ha. As
per the present sanctioned DP and development control regulations,
this land is also not available for development.
About 268 reserved sites and the roads have been encroached and
this situation needs to be tackled by adopting appropriate policy.
About 115 reserved sites and some major roads are affected by the
CRZ stipulations. These site needs to be relocated in the appropriate
area of the corresponding sector.
The Government land under development plan reservation need to be
transferred to the Corporation without any delay.
The present land acquisition process is tedious and time consuming.
Inordinate delays in land acquisition defeat the very purpose of it.
o
o
o
o
o
o
5
2.0 LAND ACQUISITION
2.1 The majority of land shown under the various reserved sites & D.P. Roads
belongs to private owner. The sanctioned Development Plan of the city
shows 1267.65 ha. of land under reserved sites while 742.97 ha. under
the D.P. roads. Besides the vast magnitude, there is the multiplicity of
ownership. Some moderate size of reservations has 30 to 50 different
owners where as land acquisition of large size reservations is more
complex due to very high number of owners.
Keeping a side the magnitude and ownership issue the major hurdle in the
acquisition of land is the financial constraints. The D.P. reports has
estimated the cost of acquiring the entire land under reservation as per
ready reckoner of 1991 was @ Rs. 209 Cr. while the cost of acquiring 300
prioritized reservations comes out to be @ Rs. 6000 Cr. as per current RR.
The Financial constraint along with the magnitude of area & Multiple
ownership badly affects the acquisition program. This has forced the
corporation to undertake other available tools of acquisition and
development. The available tools as per the DCR for acquisition &
development –
1. Compulsory land acquisition & development
2. Undertaking town planning scheme
3. Private negotiations with the land owners
4. Acquisition and development by way of TDR
5. Public Private Participation
6. Transfer of reserved land under Development Proposals.
The corporation has tried different tools for requiring the land under
reservation & roads depending upon the situation, necessity &
effusiveness of the tool. The comparative determent of the land
6
acquisition is summarized here below along with the detailed backup
tables.
Table 2.1.1 - Comparative Statement of LandAcquisition
Table - 2.1.2 Details of Acquired Reservations
Area in Ha.
Area in Ha.
7
Table 2.1.4 - Major Land Acquisition proposals forwardedunder Land Acquisition Act
Table 2.1.3 - Details of Acquisition of D. P. RoadArea in Ha.
Area in Ha.
8
Table 2.2 - Prominent Reserved Sites acquired – In lieu of TDR
9
2.3. Governments Land Under Reserved Sites
Table 2.3.1 - Demand of Government Land affected by
Reserved Sites of Development Plan
There is substantial land belongs to government and is with District
Revenue Authority which is affected by reserved sites of development
plan. As per preliminary survey there is about 12 Ha. Government land
affected by 15 reserved sites. Corporation is demanding this much land
and continuously in follow up with the district authority since November,
2000. This land needs to be transferred to the Corporation at the earliest.
10
11
Stadium Site at Kausa
Stadium Site at Kausa
12
Hospital Site at Kausa
R.G. 5, Site at Kausa
13
3.0 MAJOR POLICY DECISIONS
3.1 The Development plan and the Development control Regulations for the
City of Thane are sanctioned in 1995 & 2003 respectively. In order to
achieve the planned development good these documents shall not be
used as “rigid documents”. These documents shall have to be dynamic
and must be in harmony with the overall environment of the city. In order to
make these documents dynamic Thane Municipal Corporation has
carried out proposed number of modifications to the Development plan &
the Development control regulations. In addition to this for effective
implementation of the development plan, following policy decision are
progressed and approved by the corporation. Based on there policy
decisions corporation has undertaken line bound development progress
and area improvement scheme -
The entire area within the Corporation is divided in 11 planning
sectors and accordingly the sites and roads are shown for the
public purposes on the sanctioned development plan of the city.
The first and prime important step in undertaking the D. P.
implementation program is to asses the status of the reserved sites
and to asses the need and necessity. Corporation has prioritize the
reserved sites by taking in to consideration all these aspects. This
prioritization also includes the time bound development program of
the reservations.
Corporation has carried out extensive survey work on the field and
demand based studies before framing the policy & strategy for D.
P. implementation. This facilitates the Corporation in exploring the
various tools available for the acquisition & development of the
sites. Thus yearly targets per option have been set for every
i. Prioritization of Reservations
ii. D. P. Implementation policy & strategy
14
planning sector. This insures in achieving the desired goal of
development.
Thane Municipal Corporation has taken policy decision to grant
26000 sq.mt. plot to Mumbai University for development of
University Sub center in Thane. This is the landmark decision
which will definitely impact on the development of education sector
in Thane. Considering the importance of the situation, Corporation
has resolved the education policy in the month of November, 2008
for development & distribution of reserved sites & amenities of
education purpose. This policy will facilitate Corporation in
developing appropriate & quality educational institutions in
association with private sector.
The development charges for any type of development proposal in
the corporation jurisdiction have been stipulated in the
Maharashtra Regional & Town Planning Act, 1966. These charges
stipulated in the act are uniform for all the Corporations in the state.
The act gives freedom to the Corporation to levy the development
charges within the lower & upper limit prescribed by the act. Thane
is contiguous to Mumbai and the land cost and real estate prizes in
both the cities are somewhere identical. This fact has not
considered in the act and therefore corporation looses substantial
revenue on account of development charges. Considering this
aspect corporation has taken a policy decision to enhance the
development charges in line with suburbs of Mumbai and proposal
to carry out amendment in the act is forwarded to the Govt.
iii. Education Policy
iv. Enhancing Development charges
15
The development control regulations of the city permits
transferable development rights (TDR) in equivalent with the FSI
permissible in that zone. The substantial reserved sites and D.P.
roads have come under green zone where permissible FSI is
0.05/0.025, whereas that for other zones is equivalent to the
affected area. Because of this provision the land owners of green
zone are not ready to handover the reserve area in lieu of TDR.
Considering this difficulty and its impact on the D. P.
implementation corporation has taken policy decision to grant
equivalent FSI for the reserve sites and roads in green zone and
same is forwarded for the approval of the State Government.
The private land owners and developers submit the proposal for
the development in accordance of the development control
regulations and D.P. provisions of the City. Many times there
proposal consist the area affected by reserved sites and roads. But
in the absences of standing orders and procedures these areas get
neglected and ultimately corporation could not those areas in time
for development. Considering this regulaty corporation has policy
decision to make mandatory submission of registered declaration
before commencement certificate and handing over of such areas
in the name of Thane Municipal Corporations in 7/12 extracts
before the plinth certificate in that proposal. This insures timely
handing over of land affected by reserve sites & road to the
corporation.
v. Acquisition of Land under Reserved sites in Green Zone
vi. Acquisition of Land under development proposals
Boriwade-Bhayanderpada Area Improvement Scheme
17
4.0 MODIFICATIONS TO DCR & DP
In order to make development control regulations and development plan more
dynamic corporation has initiated the action under section 37 of MRTPAct, 1966
for effecting modifications in both of these planning documents. The major
modifications initiated are enlisted herein after.
Table 4.1 - Modification proposed in the development control regulations
18
Table 4.2 - Major Modifications proposed in the development plan
19
5.0 RESERVATION DEVELOPMENT PROGRAM
Corporation has undertaken reservation development program as per the policy
& strategy for D. P. implementation. The reserved sites acquired by the
Corporation are either developed by the P.W.D. or by TDO under the provision
appendix 'W'. In the resent period the prominent sites undertaken for the
development and there status is enlisted herein after.
The Corporation has developed only 67 reserved sites uptill year 2005. Then
corporation resolved the policy & strategy of DP implementation. In the Policy &
strategy of D.P. implementation in the year 2006. Which proves fruitful and
therefore corporation succeeded in developing 29 Reservation uptil March 2009.
Thus 96 No. of reserved site have developed till March 2009.
Table 5.1 - RESERVATION DEVELOPMENT PROGRAM – (PPP BASIS)
20
In addition to above corporation has also undertaken reservation development
program as per the provisions of Appendix 'P' i.e. the accommodation
reservation policy. In the recent period the prominent sites undertaken for the
development and there status is enlisted herein after.
Table 5.2 - RESERVATION DEVELOPMENT PROGRAM
Accommodation Reservation (App. 'P')
21
The Corporation has developed only 5 reserved sites upto the year 2005. While
thereafter corporation succeed in developing additional 15 sites by utilizing the
provision of accommodation reservation (Appendix 'P').
22
School for Adiwasi Children at Kokanipada
Medical Student's Hostel at Khopat
23
6.0 AMENTITY / R.G. DEVELOPMENT PROGRAM
Corporation has undertaken reservation development program as enlisted in the
Table 5.1 & 5.2. In addition to this corporation has also undertaken amenity /
R.G. development program. In recent period the prominent sites undertaken for
the development and there status is enlisted herein after.
Table 6.1 - Amenity / R.G. Development Program
24
25
The development plan implementation strategy & policy facilitated the
corporation to undertake above mentioned various projects. Some of these
projects are completed while others are at various stages of development.
Recently on 26 February, 2009 Thane Art Gallery at Kapurbawadi has been
opened for public which is the land mark development in history of Thane. Some
of the ongoing projects like Auditorium, central library, Nursing College & Hostel,
Art Center will definitely leave positive impact in the development of Thane
th
KAVESAR, OWALE - AREA IMPROVEMENT SCHEME
27
7.0 AREA IMPROVEMENT SCHEMES & MISSING LINKS
In addition to reservation and amenity / R.G. development program Corporation
has also concentrated on specific developing areas. Four such areas have been
identified. Integrated development approach has been planned to develop the D.
P. roads, Missing links & the reservations in such areas. The areas identified for
area improvement schemes are –
KausaArea Improvement Scheme
ManpadaArea Improvement Scheme
Kavesar-VadavaliArea Improvement Scheme
Borivade-BhyanderpadaArea Improvement Scheme
The land under D.P. Road, Missing links & reserved sites in above areas is being
acquired on priority basis. To expedite the process of acquisition the ownership
record in those area have been taken from the respective authority. The major
amenities particularly of social sector are planned on PPP basis in those areas.
The status of acquired land has already been given in the table 2.2.
The Corporation has developed various D.P. roads as per the requirement of the
time. Some roads are developed to its fullest width and length while some are
partially developed depending upon the trends of development in those areas.
Now considering present and future growth for improving connectivity & mobility
of the developed areas corporation has identified some missing links for
prioritizing the road development work. Some of the important missing links are
enlisted herein under.
�
�
�
�
28
Table 7.1 - Area improvement Schemes & Missing Link
29
8.0 RECOVERY OF DEVELOPMENT CHARGES
Corporation has made systematic effort for enhancing the own revenue. Town
Development Department is one of the revenue generating department of the
corporation. In addition to improvements in the service delivery by channelizing
building plan approval process the department has bring various other aspects
like Podium charges, Free area premium, Regularization charges etc. in the
revenue net in order to enhance the revenue collection. The comparative
revenue generation statement given herein after shows the quantum of
increased revenue in the recent past.
Since the financial year 2005-06 the collection of development charges has
substantively increased. In the recent financial year in spite of recession Period
Corporation succeeded in collecting Rs. 74.37 Cr. towards development charges
which are about 25% more than the allotted target of Rs. 60 Cr.
Table 8.1 - Development ChargesRs. In Crores
30
Central Library at Vartaknagar - Work in Progress
Shopping Center at Rutu Park - Work in Progress
31
9.0 OTHER ACHIVEMENTS
In the recent past corporation has made systematic efforts to increase the plant
development of the city. Various policy decisions have been taken in order to
stream line the Building plan approval process and acquisition of land in lieu of
TDR. In addition to this efforts Town Development Department has also carried
out innovative reforms to enhance the performance and transparency in working.
Some of such initiatives are enlisted herein after –
Corporation has installed and implemented building plan
approval software customized by M/s. Softtech. In order to carry out
building plan approval process by using this software the entire hardware
part and networking part has also been carried out. This system has been
commissioned since 1 2008. In the last financial year total 135 proposals
were received through this system of which 64 proposals are sanctioned.
This system is becoming more user friendly with every pass of time. This
system also eliminate the probable human error and also reduced the
time of scrutiny.
The Town Development Department is mainly
responsible in acquiring the land under development plan reservations,
roads and amenity / R.G. The various tools are used for acquiring those
lands. The land bank thus created must be recorded in the standard
formats and such information must be up-dated from time to time. The
Department has prepared Asset Registers of this land bank by using
customized software. This facilitates in getting information in different
formats.
Thane is one of the city included in the National Urban Information
System, program initiated by Govt. of India. The department through there
representative attended various workshops & seminars in this regards.
st
�
�
�
BPAMS –
Asset Register –
NUIS –
32
The Department has also created data bank as per the guidelines of
NUIS. This data bank includes the information and statistics of various
departments pertaining to Thane City. This information is very much
useful in the planning, developing and monitoring city affairs.
This department is
responsible is for procuring satellite imagery of the City in 2005 and 2006.
The latest imagery of 2008 has also been ordered from NRSAC,
Hyderabad. The base map of the city has been created by MRSAC,
Nagpur. Some important layers of slum, road etc. are also developed.
Department has prepared consolidated city map under the
guidance of Hon. Municipal Commissioner. There are D.P. Sheets
available in the Department but consolidated single city map was not
developed till 2007. Now due to the systematic efforts & guidance of Hon.
Municipal Commissioner handy single city map is ready to use for every
stakeholder.
Thane Municipal Corporation was established by merging
32 villages to the then Municipal Council Area. Therefore Corporation has
undertaken city survey in those 32 villages. This exercise is on the verge
of completion excluding 14 villages of Sector 10 & 11.
�
�
�
Satellite imagery and creation of base map –
City Map –
City Survey –
Kausa Area Improvement Scheme
Thane Municipal Corporation,TOWN PLANNING DEPARTMENT - D. P. IMPLEMENTATION CELL
Dr. Almeida Road, Panchpakhadi, Thane – 400 602
Email – [email protected]
www.thanemahapalika.com
Garden at Vadavali - Work in Progress