13
Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg, Ritva Keski-Kuha July 6th, 2012

Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,

Embed Size (px)

Citation preview

Page 1: Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,

Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE)

Northrop Grumman: Charlie Atkinson, Scott C. TexterNASA/GSFC: Lee Feinberg, Ritva Keski-KuhaJuly 6th, 2012

Page 2: Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,

JWST Observatory Breakdown

Optical Telescope Element (OTE)Integrated Science Instrument Module (ISIM)

SunshieldSpacecraft Bus

GSFC

2

Page 3: Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,

OTE Architecture Overview

Secondary Mirror Support Structure (SMSS)

Primary Mirror Segment Assemblies (PMSA)

Primary Mirror Backplane Assembly (PMBA)

Thermal Management Subsystem (TMS)• ISIM Roof Radiators • ISIM Enclosure (MLI)• Parasitic Tray Radiator

Aft Optics Subsystem (AOS)

Secondary Mirror Assembly (SMA)

• PM Backplane Support Structure (PMBSS)• PM Backplane Mechanism

Deployment Tower Assembly (DTA)

Thermal Management Subsystem (TMS)• Deployable “Batwings”• Fixed Diagonal Shield• Deployable Stray-Light “Bib”

OTE Electronics• Cold Junction Box• Cryo Multiplexer Units

Astro

3

Page 4: Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,

All 18 PMSAs are complete!!!

4

Page 5: Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,

Composite Primary Mirror meets requirements

6 PMSAs ready for cryo testing

Measured Primary Mirror Cryogenic Surface Figure Error meets requirements

Requirement = 25.8 nm rmsTotal Measurement + Uncertainty = 25.0 nm rms

A1

17.7

A4

16.8

A2

21.9

A5

15.7

B6

17.0

C4

39.2

A3

21.0

B5

18.1

C5

20.1

B3

18.3

B8

23.3

C3

17.8

C6

23.3

B2

17.8

C2

19.5

A6

44.0

B7

22.2

C1

21.5

5

Page 6: Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,

1

10

100

1000

10000

100000

0 10 20 30 40 50 60 70

Me

as

ure

d R

MS

Su

rfa

ce

Fig

ure

(n

m)

CCOS Iteration

Flight Segment Figure Convergence at Tinsley

Initial XRCF Delivery Target

Final Delivery Requirement

EDU

A1 Batch 1 to Tinsley

B2 Batch 1 to Tinsley

C2 Batch 1 to Tinsley

A2 Batch 1 to Tinsley

B3 Batch 1 to Tinsley

C3 Batch 1 to Tinsley

C1 Batch 2 to Tinsley

A4 Batch 2 to Tinsley

A5 Batch 2 to Tinsley

C4 Batch 2 to Tinsley

B5 Batch 2 to Tinsley

A3 Batch 2 to Tinsley

B6 Batch 3 to Tinsley

C5 Batch 3 to Tinsley

A6 Batch 3 to Tinsley

B7 Batch 3 to Tinsley

C6 Batch 3 to Tinsley

B8 Batch 3 to Tinsley

PMSA process durations improved with each production batch

Final batch CCOS iterations < ½ EDU iterations

So, the final batch completed months ahead of schedule.

EDU

Flight mirrors

Excellent convergence rate on flight mirrors

6

Page 7: Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,

Flight SMA is Complete

20K SMA Measured Surface Figure

14.7nm

SMA SFE: 19.8nm RMS SFE (including measurement uncertainty) vs. 23.5nm req’t

On convex mirror 0.7 meters in diameter.

One of the more challenging tasks on the program, and therefore, one of the more spectacular achievements.

7

Page 8: Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,

Mirror Measured(RMS SFE)

Uncertainty

(RMS SFE)

Total

(RMS SFE)

Require-ment(RMS SFE)

Tertiary

18.1 nm 9.5 nm 20.5 nm

23.2 nm

Fine Steering

13.9 nm 4.9 nm 14.7 nm

18.7 nm

The fully integrated AOS is in final test

Tert

iary

Mir

ror

Fin

e S

tee

rin

g M

irro

r8

Page 9: Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,

System transmission meets requirements

9

Page 10: Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,

OTE Structure Status

• All four SMSS tubes have been manufactured• The PMBSS Center Section is complete• The Backplane Support Frame (BSF) is in

assembly• DTA tubes have been produced and machined• DTA deployment mechanism qualification

testing has started• SMSS and PMBA wing deployment

mechanisms starting their qualification testingBSF

Center Section

OTE Harness

DTA Stowed

Drive Mechanism

IEC Harness

Harness Clamps

DTA Deployed10

Page 11: Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,

OTE Electronics are progressing well

11

• All 22 CMUs have been assembled and have started testing

• 2 have completed acceptance testing

• All but three have completed cryogenic testing; will complete in July.

• The CJB has been assembled and has completed its acceptance testing.

• The EM ADU has been delivered and the flight ADU is in board-level testing.

EM ADUCMU CJB

Page 12: Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,

OTE Integration and Test Preparation

• The Ambient Optical Assembly Stand is currently installed at GSFC, ready for optics integration

• The multi-axis robotic arm used to align and install the PMSAs onto the OTE structure has been demonstrated

Page 13: Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,

• Summary:– The OTE continues to make terrific forward progress

• Acknowledgements– A very large team of very talented individuals– From dozens of organizations across 11 (or more) states