16
Status of the Independent Detector Testing Lab a laboratory operated by STScI and JHU December 11, 2000 Presentation to STScI Science Staff Don Figer SPACE TELESCOPE SCIENCE INSTITUTE

Status of the Independent Detector Testing Lab - STScI · Status of the Independent Detector Testing Lab ... 60 obtain read noise 61 obtain pattern noise ... room in Bloomberg

Embed Size (px)

Citation preview

Page 1: Status of the Independent Detector Testing Lab - STScI · Status of the Independent Detector Testing Lab ... 60 obtain read noise 61 obtain pattern noise ... room in Bloomberg

Status of theIndependent Detector Testing Lab

a laboratory operated by STScI and JHU

December 11, 2000Presentation to STScI Science Staff

Don Figer

SPACETELESCOPESCIENCEINSTITUTE

Page 2: Status of the Independent Detector Testing Lab - STScI · Status of the Independent Detector Testing Lab ... 60 obtain read noise 61 obtain pattern noise ... room in Bloomberg

Monday, December 11, 2000 2 Presentation to STScI Science Staff

SPACETELESCOPESCIENCEINSTITUTE Status of IDTL

Principles• Serve the interests of staff scientists at STScI and JHU• Obtain best possible measurements• Be impartial• Be on the cutting edge• Offer community service

Page 3: Status of the Independent Detector Testing Lab - STScI · Status of the Independent Detector Testing Lab ... 60 obtain read noise 61 obtain pattern noise ... room in Bloomberg

Monday, December 11, 2000 3 Presentation to STScI Science Staff

SPACETELESCOPESCIENCEINSTITUTE Status of IDTL

Milestones Achieved• Funded by STScI Science Staff (2/7/00)• Began first project (8/1/00)• Established staff (6/1/00 - 12/1/00)• Received thermal and motion control systems (9/1/00)• Selected under NASA SITD NRA (9/18/00)• Ordered dewar (12/06/00)• Received Aladdin MUX (11/15/00)• Explored COE (3/1/00 - current)

Page 4: Status of the Independent Detector Testing Lab - STScI · Status of the Independent Detector Testing Lab ... 60 obtain read noise 61 obtain pattern noise ... room in Bloomberg

Monday, December 11, 2000 4 Presentation to STScI Science Staff

SPACETELESCOPESCIENCEINSTITUTE Status of IDTL

Proposals• Secured STScI DDRF • Secured JHU internal funding (pending NRA award)• Selected under NASA NRA (pending funding)• Proposed to NASA NRA to test 16 NGST near-infrared

detectors with U. Colorado (not selected)• Proposed to NSF to test 24 2K2 near-infrared detectors

with NOAO (pending)• Began proposal effort for Infrared Detector Center of

Excellence

Page 5: Status of the Independent Detector Testing Lab - STScI · Status of the Independent Detector Testing Lab ... 60 obtain read noise 61 obtain pattern noise ... room in Bloomberg

Monday, December 11, 2000 5 Presentation to STScI Science Staff

SPACETELESCOPESCIENCEINSTITUTE Status of IDTL

Target Field Simulation Testbed• 1 1/2 year project to deliver images containg real

detector effects and simulated NGST stellar images based on STScI catalog query

• Images will be delivered to NASA for use in the NGST wavefront sensing and control simulators at JPL and GSFC

• Status: on schedule for 2Q02 completion, first detector data to be obtained 2Q01

Page 6: Status of the Independent Detector Testing Lab - STScI · Status of the Independent Detector Testing Lab ... 60 obtain read noise 61 obtain pattern noise ... room in Bloomberg

Monday, December 11, 2000 6 Presentation to STScI Science Staff

SPACETELESCOPESCIENCEINSTITUTE Status of IDTL

TFST: Work Flow and Timeline

DeploymentWavefront

EstablishmentProcedure

TargetSelectionCriteria

StarCatalogs

RealDeployment

Fields

NGSTEffects

DeploymentSimulator

InputFields

DeploymentSimulator

SimulatedInitial

WavefrontPerformance

ID Task Name

1 Project Management

2 state project

3 develop objectives

4 develop WBS

5 identify resource requirements

6 assign responsibilities

7 sequence deliverables

8 schedule deliverables

9 schedule resources

10 protect the plan

11 start to implement

12 monitor project

13 closeout and evaluate

14 Develop target criteria

15 Select target fields

16 Set up hardware

17 Design hardware

21 Obtain workstation

24 Obtain/fab test hardware

41 Write/modify software

51 I&T

57 Generate images

58 obtain flats

59 obtain biases

60 obtain read noise

61 obtain pattern noise

62 obtain PRF

63 convolve target images

64 Integrate with JPL and GSFC

65 determine interface reqs

66 send data

67 verify performance

Don Figer[10%],Mike Fitzmaurice[5%]

Don Figer[10%],Brian McLean[5%],Jane Morrison[10%]

IDG[30%],Don Figer[10%]

IDG[30%],Don Figer[10%]

IDG[30%],Don Figer[10%]

IDG[30%],Don Figer[10%]

IDG[30%],Don Figer[10%]

Mike Regan[30%]

Don Figer[5%]

J FMAMJ JA SONDJFMAMJ J ASONDJ FMAMJ J A SONDJ FMAMJ J2000 2001 2002 2003

Page 7: Status of the Independent Detector Testing Lab - STScI · Status of the Independent Detector Testing Lab ... 60 obtain read noise 61 obtain pattern noise ... room in Bloomberg

Monday, December 11, 2000 7 Presentation to STScI Science Staff

SPACETELESCOPESCIENCEINSTITUTE Status of IDTL

TFST: Staff

Tom ReevesDewar Engineer

Robert BarkhouserOptical Engineer

Don FigerProject Manager, PI

Mike ReganSoftware Scientist

Bernie RauscherData Acquisition Scientist

Gretchen GreeneSoftware Engineer

Knute RayDetector Engineer

Eddie BergeronData Analyst

Steve McCandlissJHU Lead

TBDIntern

Page 8: Status of the Independent Detector Testing Lab - STScI · Status of the Independent Detector Testing Lab ... 60 obtain read noise 61 obtain pattern noise ... room in Bloomberg

Monday, December 11, 2000 8 Presentation to STScI Science Staff

SPACETELESCOPESCIENCEINSTITUTE Status of IDTL

The Lab

room in Bloomberg

conference

design/prototype

test

Page 9: Status of the Independent Detector Testing Lab - STScI · Status of the Independent Detector Testing Lab ... 60 obtain read noise 61 obtain pattern noise ... room in Bloomberg

Monday, December 11, 2000 9 Presentation to STScI Science Staff

SPACETELESCOPESCIENCEINSTITUTE Status of IDTL

Early Tech Demos

thermal control

motion control

Page 10: Status of the Independent Detector Testing Lab - STScI · Status of the Independent Detector Testing Lab ... 60 obtain read noise 61 obtain pattern noise ... room in Bloomberg

Monday, December 11, 2000 10 Presentation to STScI Science Staff

SPACETELESCOPESCIENCEINSTITUTE Status of IDTL

Detectors

Aladdin MUX

Hawaii 1 fanout

Aladdin fanout

Page 11: Status of the Independent Detector Testing Lab - STScI · Status of the Independent Detector Testing Lab ... 60 obtain read noise 61 obtain pattern noise ... room in Bloomberg

Monday, December 11, 2000 11 Presentation to STScI Science Staff

SPACETELESCOPESCIENCEINSTITUTE Status of IDTL

DIRBE External Calibrator

Page 12: Status of the Independent Detector Testing Lab - STScI · Status of the Independent Detector Testing Lab ... 60 obtain read noise 61 obtain pattern noise ... room in Bloomberg

Monday, December 11, 2000 12 Presentation to STScI Science Staff

SPACETELESCOPESCIENCEINSTITUTE Status of IDTL

Dewar

Page 13: Status of the Independent Detector Testing Lab - STScI · Status of the Independent Detector Testing Lab ... 60 obtain read noise 61 obtain pattern noise ... room in Bloomberg

Monday, December 11, 2000 13 Presentation to STScI Science Staff

SPACETELESCOPESCIENCEINSTITUTE Status of IDTL

Optical Design

Cryogenic Offner plus Schwarzchild

On-axis PSF

Page 14: Status of the Independent Detector Testing Lab - STScI · Status of the Independent Detector Testing Lab ... 60 obtain read noise 61 obtain pattern noise ... room in Bloomberg

Monday, December 11, 2000 14 Presentation to STScI Science Staff

SPACETELESCOPESCIENCEINSTITUTE Status of IDTL

Education• Goal: to train students and scientists in using and

designing infrared detector technology• Applied for intern under STScI internship program• In talks with JHU P&A, ECE and APL to train graduate

students• Will place ads for post-docs

Page 15: Status of the Independent Detector Testing Lab - STScI · Status of the Independent Detector Testing Lab ... 60 obtain read noise 61 obtain pattern noise ... room in Bloomberg

Monday, December 11, 2000 15 Presentation to STScI Science Staff

SPACETELESCOPESCIENCEINSTITUTE Status of IDTL

Summary• Your lab is funded and up and running• DDRF is being allocated as planned• STScI scientists are encouraged to dream big about

science applications using our infrared detector expertise

• Thank you for your support

Page 16: Status of the Independent Detector Testing Lab - STScI · Status of the Independent Detector Testing Lab ... 60 obtain read noise 61 obtain pattern noise ... room in Bloomberg

Monday, December 11, 2000 16 Presentation to STScI Science Staff

SPACETELESCOPESCIENCEINSTITUTE Status of IDTL

Infrared Detector COE• NSF/NASA sponsored (at least)• Distributed with overall management at JHU/STScI• 10 year lifetime with 3-5 year external reviews• Initial focus areas: astronomy, medical, military,

commercial, education• Partnering with Universities, Industry, and

Government