Status of Joint Implementation and Green Investment Scheme. Vlad Tru sca Ministry of Environment and Sustainable Development Romania - Annual meeting of the Host Country Committee - Cologne, 30 April - 1 May 200 7. Overview. Joint Implementation Status JI Supervisory Committee - PowerPoint PPT Presentation
Citation preview
Status of Joint Implementation and Green Investment Scheme
Vlad TruscaMinistry of Environment and Sustainable Development
Romania- Annual meeting of the Host Country Committee -
Cologne, 30 April-1 May 2007
Overview
Joint Implementation Status
JI Supervisory Committee
Green Investment Scheme Status
JI & GIS Questions
Joint Implementation Status
Reported volumes and values (PointCarbon, March 2007): 2005 - 28 Mt CO2 - 96 M Euro 2006 - 21 Mt CO2 - 95 M Euro 2007 - 45 Mt CO2 - 277 M Euro (forecasted)
JI projects - 156 (UNEP Risoe Centre, April 2007)
Most attractive sellers - Ro, Ukr, Bg (PointCarbon-Apr. 2007)
Most active buyers - the Netherlands, Denmark, Austria, WB
Most active sellers in the future - Russia and Ukraine
EU ETS (linking) - effect on the ERU price (increase)
EU ETS double counting issue - impossibility of developing JI projects at the installations covered by EU ETS - expected low number of projects in the new EU member states
Average price in 2006-6.5 Euro/ERU (4.5-12.5) (PointCarbon)
Type of JI projects
Type NumberVolume
2008 – 2012(thou. ERUs)
Afforestation 1 0,6% 410 0,3%
Biogas 4 2,6% 2272 1,6%
Biomass energy 18 11,5% 10183 7,0%
Coal bed/mine methane 5 3,2% 13154 9,0%
Energy distribution 9 5,8% 8774 6,0%
EE households 1 0,6% 350 0,2%
EE industry 12 7,7% 14139 9,7%
EE supply side 9 5,8% 7655 5,3%
Fossil fuel switch 8 5,1% 11838 8,1%
Fugitive 12 7,7% 43417 29,8%
Geothermal 4 2,6% 1639 1,1%
Hydro 26 16,7% 5486 3,8%
Landfill gas 20 12,8% 8823 6,1%
N2O 3 1,9% 8990 6,2%
Wind 24 15,4% 8503 5,8%
Total 156 100% 145633 100%
Source: UNEP Risoe Centre, April 2007
JI projects host countries
Host countries
All JI tracks JI Track 2
Numberthou. ERUs
annuallyNumber
thou. ERUs annually
Russia & Ukraine 45 19338 28 16953
Russia 31 14468 23 12879
Ukraine 14 4870 5 4074
Eastern Europe 103 9204 18 1360
Bulgaria 22 3382 5 466
Czech Republic 21 814 0 0
Romania 15 1590 2 223
Poland 14 879 3 192
Hungary 11 1437 1 141
Estonia 11 602 3 212
Lithuania 6 216 4 126
Slovakia 3 285 0 0
Others 8 705 1 57
Germany 3 194 1 57
New Zealand 5 511 0 0
Total JI countries 156 29247 47 18370
Source: UNEP Risoe Centre, April 2007
JI Supervisory Committee (JISC)
JISC established at COP/MOP 1 Montreal
JISC - process development and supervisory roles Development of project design document(s) Guidance on baseline setting and monitoring Recommendations to MOP on revisions of JI guidelines Supervision of Track 2 procedure Accreditation of independent entities
JISC - 6 meetings (5 in 2006), JISC 7 - 2-4 May
JI-Accreditation Panel (AP) - 4 meetings (3 in 2006)
2 JI technical workshops (1 in 2006)
2 Q&A sessions (SBs and MoP) and 1 side-event at MoP2
26 Oct. - launch of JI Track 2 process, only in 9 months!
50 JI PDDs submitted for comments (April 2007)
6 Oct. - opening of application process for entities wishing to become AIEs under JI
13 independent entities (AIE) have applied for accreditation by the JISC (April 2007)
25 Annex I Parties informed the UNFCCC about their designated JI NFP, from which 14 submitted also their procedures for approving JI projects
27 Mar.-determination of the first JI project (“Switch from wet-to-dry process at Podilsky Cement, Ukraine”) was deemed final as neither party involved nor 3 members of the JISC requested a review – 1st registered JI project
JI Supervisory Committee (JISC) - 2
Green Investment Scheme Status
No reported volumes and values
Only one IET (KP Article 17) transaction (Slovakia)
Only GIS studies: Ro, Bg, Ru, Uk, Lv
Potential sellers - new EU MS (Lv, Bg, Ro, Po) + Ru and Uk
Potential buyers - EU MS, Japan, Canada
More demand for JI than GIS due to lack of market interest yet and EU ETS (AAUs not allowed);
AAU price - very important for further development of GIS
GIS good for projects unlikely to become JI
Environmental and social integrity of GIS needed
Transparency to be handled properly
Green Investment Scheme Status - 2
Potential AAU supply - 7-8 Gt Potential CER/ERU supply - 1-3 Gt Limited private demand for AAUs Uncertainties: Canada, Japan
JI & GIS - Questions
How will JI continue to exist in the EU Member States considering EU ETS implications?
Will JI exist after 2012? How will it be shaped? In what sectors and activities?
What will be the JISC implications for Track I JI?
Is there a market for AAUs, with or without GIS?
What should be the price per AAU? Are the AAUs taxable?
How simple/complicated should a GIS be?
What should be the legal background for GIS?
What are the conditions for AAUs transactions between KP Parties and private entities?