70
1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G R Pad, 60 Kg 13 10.04.08 25.04.08 29.04.08 2 Vinar Rubber Udyog, Jamshedpur WCR/TP/2006/62/155 dt- 08.11.06 G R Pad, 60 Kg 145 08.03.08 21.04.08 22.04.08 3 Vinar Rubber Udyog, Jamshedpur WCR/TP/2006/62/155 dt- 08.11.06 G R Pad, 60 Kg 146 01.03.08 21.04.08 22.04.08 4 Indiana Track Engineers, Mohali WCR/TP/2007/98/258 dt- 03.04.08 M S Liner 60 Kg 05,06 12.004.08 22.04.08 23.04.08 5 Anil Engineering Works WCR/TP/2007/106/254 dt- 07.02.08 Retro reflective board 35 20.04.08 23.04.08 24.04.08 6 Mayur Industrial Corporation. WCR/TS/2005/54/ERC-III/179 dt.22.12.06 ERC-III MIC/015 15.03.08 12.05.08 15.05.08 8 Indiana Track Engineers, Mohali WCR/TP/2007/98/258 dt- 03.04.08 M S Liner 60 Kg 10, 25.04.08 02.05.08 02.05.08 9 M/s Donypolo CSP,SGZ CS-156 PSC M/L Du/211/08-09/90% 8.05.08 9.05.08 9.05.08 10 M/s Marathwada,CSP,BKH CS-156 PSC M/L MPPL/114/90% 7.05.08 9.05.08 9.05.08 11 M/s Marathwada,CSP,BKH CS-156 PSC M/L MPPL/115/90% 11.05.08 12.05.08 12.05.08 12 M/s Shri Kesharia, CSP, BET CS-156 PSC M/L 90%/Adv./08-09/09 7.05.08 9.05.08 9.05.08 13 M/s Shri Kesharia, CSP, BET CS-156 PSC M/L 90%/Adv./08-09/10 10.05.08 12.05.08 12.05.08 14 M/s Shri Kesharia, CSP, BET CS-156 PSC M/L Updating clame/CS- 156/08-09/01 09.05.08 12.05.08 13.05.08 15 M/s Shri Kesharia, CSP, BET CS-156 PSC M/L Updating clame/CS- 156/08-09/02 10.05.08 12.05.08 13.05.08 16 M/s Shri Kesharia, CSP, BET CS-156 PSC M/L Updating clame/CS- 156/08-09/03 10.05.08 12.05.08 13.05.08 17 M/s Donypolo CSP,SGZ CS-156 PSC M/L Du/212/08-09/90% 12.05.08 13.05.08 13.05.08 Dt. Of bill received in HQ/TP section Dt. Of submissio n of bill to account for Payment Name of firm M/s Details of Bills PO No. Bill No. Items S.N Date

Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07

G R Pad, 60 Kg 13 10.04.08 25.04.08 29.04.08

2 Vinar Rubber Udyog, Jamshedpur

WCR/TP/2006/62/155 dt- 08.11.06

G R Pad, 60 Kg 145 08.03.08 21.04.08 22.04.08

3 Vinar Rubber Udyog, Jamshedpur

WCR/TP/2006/62/155 dt- 08.11.06

G R Pad, 60 Kg 146 01.03.08 21.04.08 22.04.08

4 Indiana Track Engineers, Mohali

WCR/TP/2007/98/258 dt- 03.04.08

M S Liner 60 Kg 05,06 12.004.08 22.04.08 23.04.08

5 Anil Engineering Works WCR/TP/2007/106/254 dt- 07.02.08

Retro reflective board 35 20.04.08 23.04.08 24.04.08

6 Mayur Industrial Corporation. WCR/TS/2005/54/ERC-III/179 dt.22.12.06

ERC-III MIC/015 15.03.08 12.05.08 15.05.08

8 Indiana Track Engineers, Mohali

WCR/TP/2007/98/258 dt- 03.04.08

M S Liner 60 Kg 10, 25.04.08 02.05.08 02.05.08

9 M/s Donypolo CSP,SGZ CS-156 PSC M/L Du/211/08-09/90% 8.05.08 9.05.08 9.05.08

10 M/s Marathwada,CSP,BKH CS-156 PSC M/L MPPL/114/90% 7.05.08 9.05.08 9.05.08

11 M/s Marathwada,CSP,BKH CS-156 PSC M/L MPPL/115/90% 11.05.08 12.05.08 12.05.08

12 M/s Shri Kesharia, CSP, BET CS-156 PSC M/L 90%/Adv./08-09/09 7.05.08 9.05.08 9.05.08

13 M/s Shri Kesharia, CSP, BET CS-156 PSC M/L 90%/Adv./08-09/10 10.05.08 12.05.08 12.05.08

14 M/s Shri Kesharia, CSP, BET CS-156 PSC M/L Updating clame/CS-156/08-09/01

09.05.08 12.05.08 13.05.08

15 M/s Shri Kesharia, CSP, BET CS-156 PSC M/L Updating clame/CS-156/08-09/02

10.05.08 12.05.08 13.05.08

16 M/s Shri Kesharia, CSP, BET CS-156 PSC M/L Updating clame/CS-156/08-09/03

10.05.08 12.05.08 13.05.08

17 M/s Donypolo CSP,SGZ CS-156 PSC M/L Du/212/08-09/90% 12.05.08 13.05.08 13.05.08

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s

Details of Bills

PO No. Bill No. ItemsS.N Date

Page 2: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

18 CSL/GLD/2008-09/02 09.04.08

19 CSL/GLD/2008-09/05 22.04.08

20 Paramount Enterprises Hyderabad

WCR/TP/2006/82/SEJ.60 Kg/ 214/ dt. 06.09.07

SEJ 60 Kg 2 18.04.08 08.05.08 14.05.08

21 Mayur Industrial Corporation. WCR/TS/2005/54/ERC-III/179 dt.22.12.06

ERC-III MIC/015 15.03.08 12.05.08 15.05.08

22 Jain Industries WCR/TS/2005/54/ERC-III/180 dt. 22.12.06

ERC-III 17 23.03.08 13.05.08 15.05.08

23 Vikrant International WCR/TS/2005/54/ERC-III/174 dt. 22.12.06

ERC-III VI/035 25.02.08 13.05.08 15.05.08

24 Ramtek Engg. Works WCR/TS/2005/54/ERC-III/193 dt. 22.12.06

ERC-III REW/026 27.9.07 13.05.08 15.5.08

25 Bee Kay Engg. & Casting Ltd. Bhilai

WCR/TS/2005/57/CMS X-ing/183 dt.12.01.07

CMS X-ing 1:12,60Kg 37 30.04.08 20.5.08 21.05.08

26 Bee Kay Engg. & Casting Ltd. Bhilai

WCR/TP/2006/68/CMS X-ing/196 dt.15.02.07

CMS X-ing 1:12,52Kg 41 30.04.08 20.5.08 21.05.08

27 Bee Kay Engg. & Casting Ltd. Bhilai

WCR/TP/2006/67/CMS X-ing/194 dt.25.01.07

CMS X-ing 1:12,60Kg 6 18.04.08 20.5.08 21.05.08

28 Bhilai Engg. Cop. Ltd Bhilai WCR/TP/2006/73/CMS X-ing/217 dt.17.09.07

CMS X-ing 1:8.5,60Kg 93 06.05.08 21.05.08 22.05.08

29 Calcast Ferrous Ltd. Kolkata WCR/TS/2006/43/Cswitch/142 dt.04.09.06

Curved switch 1:12,60 Kg CFL/FAN/08-09/06 02.05.08 23.05.08 26.05.08

30 J.S.Industries Pvt. Ltd.Secunderabad

WCR/TS/2006/76/switch 1:12,52Kg/199 dt.23.03.07

OR Fan shaped switch 1:12,52 Kg.

JSI/07-08/092 10.02.08 27.05.08 27.05.08

31 M/s Marathwada,CSP,BKH CS-156 PSC M/L MPPL/137/10% 2.06.08 2.06.08 3.06.08

32 M/s Marathwada,CSP,BKH T-84 spl. Sleeper MPPL/90%/curve/08-09/03

2.06.08 2.06.08 3.06.08

33 M/s Donypolo CSP,SGZ CS-156 PSC M/L Du/175A/08-09/10% 31.05.08 3.06.08 3.06.08

34 M/s Donypolo CSP,SGZ CS-156 PSC M/L Du/174A/08-09/10% 31.05.08 3.06.08 3.06.08

13.05.08Calcutta Springs Ltd, Kolkatta

WCR/TP/2005/GJ.55/139 dt. 28.08.06

Glued Joint 52 Kg 13.05.08

Page 3: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

35 J.Sons Co. Ltd.Meerut WCR/TP/2006/89/Switch 1:8.5,52Kg & 60Kg dt.04.01.08

Fan Shaped Switch 1:8.5,52Kg & 60 Kg

010100024,25 dt.09/10.05.08 04.06.08 04.06.08

36 Bhilai Engg. Cop. Ltd Bhilai WCR/TP/2006/73/CMS X-ing/217 dt.17.09.07

CMS X-ing 1:8.5,60Kg 183 26.05.08 06.06.08 06.06.08

37 Indiana Track Engineers, Mohali

WCR/TP/2007/98/258 dt- 03.04.08

M S Liner 60 Kg 22-Jan 01.06.08 09.06.08 10.06.08

38 Anil Engineering Works, Delhi WCR/TP/2007/106/ Retro reflective/254 dt- 07.02.08

Retro reflective Engg Indicator 37 09.06.08 12.06.08 12.06.08

39 R.V.Rail Product Pvt.Ltd. Kolkata

WCR/TS/2005/43/switch/143 dt.04.09.06

OR Fan shaped swirch 1:12,60Kg

RVR PL/08-09/63 31.05.08 05.06.08 13.06.08

40 R.V.Rail Product Pvt.Ltd. Kolkata

WCR/TS/2005/43/switch/143 dt.04.09.06

OR Fan shaped swirch 1:12,60Kg

RVR /08/05/49 29.05.08 02.06.08 13.06.08

39 Bhilai Engg. Cop. Ltd Bhilai WCR/TP/2006/73/CMS X-ing/217 dt.17.09.07

CMS X-ing 1:8.5,60Kg 248 07.06.08 19.06.08 20.06.08

40 Paramount Enterprises Hyderabad

WCR/TP/2006/82/SEJ.60 Kg/ 214/ dt. 06.09.07

SEJ 60 Kg 8 06.06.08 19.06.08 24.06.08

41 R.V.Rail Product Pvt.Ltd. Kolkata

WCR/TP/2006/76/switch/198 dt.23.03.07

OR Fan shaped swirch 1:12,52Kg

RVR PL/08-09/74 06.06.08 16.06.08 30.06.08

42 Calcast Ferrous Ltd. Kolkata WCR/TS/2006/43/switch/142 dt.04.09.06

Curved switch 1:12,60 Kg CFL/FAN/08-09/07 02.05.08 02.06.08 30.06.08

43 Calcast Ferrous Ltd. Kolkata WCR/TS/2006/43/switch/142 dt.04.09.06

Curved switch 1:12,60 Kg CFL/FAN/08-09/08 02.05.08 25.06.08 30.06.08

44 Calcast Ferrous Ltd. Kolkata WCR/TS/2005/44/switch/137 dt.04.09.06

Curved switch 1:12,60 Kg CFL/FAN/08-09/08 02.05.08 28.06.08 30.06.08

45 J.S.Industries Pvt. Ltd.Secunderabad

WCR/TP/2006/76/switch 1:12,52Kg/199 dt.23.03.07

OR Fan shaped switch 1:12,52 Kg.

JSI/07-08/091 10.02.08 29.05.08 01.07.08

46 M/s Ess kay Enterprises,Faridabad

T-162 ERC-III PVC Bill No-04 20.05.08 30.05.08 01.07.08

Page 4: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

47 Culcutta Spring Ltd. Kolkata. T-139 Glued Joint 52 Kg CSL/GLD/2008-09/07 10.05.08 26.05.08 01.07.08

48 M/s R V Rail products, Kolkata

WCR/TP/2006/75/switch/207 dt.04.04.08

OR Fan shaped swirch 1:8.5,52Kg

RVRP/08-09/22 25.06.08 02.07.08 04.07.08

49 M/s Manish Forging Ltd, Raipur

WCR/TP/2007/101/switch 1:8.5,52Kg/252 dt.04.02.08

OR Fan shaped swirch 1:8.5,52Kg

MFPL/21 20.06.08 02.07.08 03.07.08

50 M/s Perna Engg works, Delhi T-164 ERC-III PEW/01 09.06.08 20.06.08 07.7.08

51 M/s Perna Engg works, Delhi T-243 ERC-III PEW/02 20.06.08 30.06.08 07.07.08

52 Ramtek Engg. Works, Noida. T-226 ERC-III REW/02 20.6.08 30.06.08 07.07.08

53 Calcast Ferrous Ltd. Kolkata WCR/TS/2005/44/switch/137 dt.22.08.06

Curved switch 1:8.5,60 Kg CFL/FAN/07-08/11ESCL 11.01.08 07.07.08

54 Calcast Ferrous Ltd. Kolkata WCR/TS/2005/44/switch/137 dt.22.08.06

Curved switch 1:8.5,60 Kg CFL/FAN/07-08/10 ESCL 11.01.08 07.07.08

55 Chinttpurni Engg.Works Barabanki

WCR/TS/2006/82/SEJ-60Kg/213 dt.06.09.07

SEJ-60Kg. 1 25.05.08 23.06.08 08.07.08

56 VAE VKN Industries Pvt.Ltd.Sonipat

WCR/TS/2004/05/CMS X-ing/0096 dt.20.04.05

CMS X-ing 297 & 299 14.11.07 10.07.08

57 Bhilai Engg. Cop. Ltd Bhilai WCR/TP/2006/73/CMS X-ing/217 dt.17.09.07

CMS X-ing 1:8.5,60Kg 309 30.06.08 14.07.08 14.07.08

58 Calcutta springs Ltd. Kolkata WCR/TS/2005/43/switch/141 dt.04.09.06

Curved switch 1:12,60 Kg CSL/FAN/07-08/58 ESCL to 63 ESCL(06Nos.) dt.14.01.08

14.01.08 12.06.08 14.07.08

59 Donypolo Udyog Ltd. CS-156 PSC M/L Du/01/08-09/Escalation 05.07.08 10.07.08 15.07.08

60 Donypolo Udyog Ltd. CS-156 PSC M/L Du/02/08-09/Freight 05.07.08 10.07.08 15.07.08

61 Donypolo Udyog Ltd. CS-156 PSC M/L Du/03/08-09/freight 05.07.08 10.07.08 15.07.08

62 Donypolo Udyog Ltd. CS-156 PSC M/L Du/04/08-09/Inspection 05.07.08 10.07.08 15.07.08

Page 5: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

63 M/s Marathwada,CSP,BKH CS-156 PSC M/L MPPL/01/Escalation 7.07.08 10.07.08 15.07.08

64 M/s Marathwada,CSP,BKH CS-156 PSC M/L MPPL/06/Freight 7.07.08 10.07.08 15.07.08

65 M/s Marathwada,CSP,BKH CS-156 PSC M/L MPPL/0140/10% 14.07.08 15.07.08 15.07.08

66 M/s Marathwada,CSP,BKH CS-156 PSC M/L MPPL/05/100% 14.07.08 15.07.08 15.07.08

67 M/s Marathwada,CSP,BKH CS-156 PSC M/L MBC/sales/06 02.07.08 04.07.08 04.07.08

68 M/s Marathwada,CSP,BKH CS-156 PSC M/L MBC/sales/Escalation 02.05.08 10.07.08 15.07.08

69 M/s Marathwada,CSP,BKH T-72 T-out MPPL/02/10% 09.07.08 10.07.08 10.07.08

70 M/s Marathwada,CSP,BKH T-72 T-out MPPL/03/10% 09.07.08 10.07.08 10.07.08

71 Khemchand T-109 D/S 01/90% 9.07.08 14.07.08 15.07.08

72 M/s Marathwada,CSP,BKH T-91 T-out 10/90% 9.07.08 14.07.08 15.07.08

73 M/S Kontinental Steel corp. kolkata

T-204 Joggle fish Plate BPL/RMD/WCR/07-08/05,06,07

30.07.08 09.07.08 11.07.08

74 M/s Manish Forging Ltd, Raipur

WCR/TP/2007/105/switch 1:12,52Kg/253 dt.04.02.08

OR Fan shaped swirch 1:12,52Kg

MFPL/31 07.07.08 16.07.08 18.07.08

75 MARATHWADA T-OUT WCR/191 MPPL/24/10% 16.07.08 16.07.08 21.07.08

76 MARATHWADA T-OUT WCR/91 MPPL/01/10% 16.07.08 16.07.08 21.07.08

77 MARATHWADA T-OUT WCR/91 MPPL/02/10% 16.07.08 16.07.08 21.07.08

78 MARATHWADA T-OUT WCR/77 MPPL/07/10% 16.07.08 16.07.08 21.07.08

79 Bee Kay Engg. & Casting Ltd. Bhilai

WCR/TS/2005/57/CMS X-ing 1:12,60Kg/183 dt.12.01.06

CMS X-ing 1:12,60Kg 74 31.05.08 17.07.08 22.07.08

Page 6: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

80 Bee Kay Engg. & Casting Ltd. Bhilai

WCR/TS/2005/57/CMS X-ing 1:12,60Kg/183 dt.12.01.06

CMS X-ing 1:12,60Kg 112 30.06.08 17.07.08 22.07.08

81 Bee Kay Engg. & Casting Ltd. Bhilai

WCR/TP/2006/67/CMS X-ing/194 dt.25.01.07

CMS X-ing 1:8.5,52Kg 470 26.03.08 17.07.08 23.07.08

82 Bee Kay Engg. & Casting Ltd. Bhilai

WCR/TP/2006/68/CMS X-ing/196 dt.15.02.07

CMS X-ing 1:12,52Kg 469 26.03.08 17.07.08 23.07.08

83 MARATHWADA T-OUT WCR/37 MPPL/24/10% 24.07.08 24.0708 25.07.08

84 Paramount Enterprises Hyderabad

WCR/TS/2006/88/SEJ.52 Kg/ 212/ dt. 17.08.07

SEJ 52 Kg 13 05.07.08 22.07.08 28.07.08

85Indiana Track Engineers,

Mohali

WCR/TP/2007/98/M S Liner/ 258/ dt. 03.04.08

M S Liner 52 Kg 34 08.07.08 17.06.08 17.06.08

86 J.Sons Co. Ltd.Meerut WCR/TP/2006/85/ D-Switch/219 dt.08.11.07

Drailing Switch 1:8.5,52Kg 10100053 07.07.08 22.07.08 28.07.08

87 Donypolo Udyog Ltd. T/out-114 T/out sleeper Du/06/08-09/90% 23.07.08 24.07.08 25.07.08

88 Donypolo Udyog Ltd. T/out-71 T/out sleeper Du/11A/08-09/10% 23.07.08 24.07.08 25.07.08

89 Donypolo Udyog Ltd. T/out-37 T/out sleeper Du/48/08-09/10% 23.07.08 24.07.08 25.07.08

90 Donypolo Udyog Ltd. T/out-37 T/out sleeper Du/49/08-09/10% 23.07.08 24.07.08 25.07.08

91 Donypolo Udyog Ltd. T/out-77 T/out sleeper Du/09A/08-09/10% 23.07.08 24.07.08 25.07.08

92 MARATHWADA T-OUT WCR/37 MPPL/25/10% 24.07.08 25.07.08 25.07.08

93 MARATHWADA T-77 T-out MPPL/08/10% 25.07.08 29.07.08 29.07.0894 MARATHWADA T-91 t-out MPPL/01/10% 25.07.08 29.07.08 29.07.0895 MARATHWADA T-91 T-out MPPL/01/90% 25.07.08 29.07.08 29.07.0896 Donypolo Udyog Ltd. T-114 T-out Du/07/08-09/90% 26.07.08 29.07.08 29.07.0897 Bee Kay Engg. & Casting Ltd.

BhilaiWCR/TS/2005/57/CMS X-ing

1:12,60Kg/183 dt.12.01.06CMS X-ing 1:12,60Kg 94 25.06.08 16.07.08 30.07.08

Page 7: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

98Indiana Track Engineers,

MohaliWCR/TP/2007/98/M S Liner/ 258/ dt. 03.04.08

M S Liner 52 Kg 36 & 37 22.07.08 30.07.08

99 Gondwana Enterprises WCR/TP/2007/95/ERC-III/239 ERC-III 61 ,62 &63 PVC 25.07.08 29.07.08 31.07.08

100Indiana Track Engineers,

MohaliWCR/TP/2007/98/M S Liner/ 258/ dt. 03.04.08

M S Liner 52 Kg 39 25.07.08 30.07.08 31.07.08

101Indiana Track Engineers,

MohaliWCR/TP/2007/98/M S Liner/ 258/ dt. 03.04.08

M S Liner 52 Kg 40 25.07.08 30.07.08 31.07.08

102Indiana Track Engineers,

MohaliWCR/TP/2007/98/M S Liner/ 258/ dt. 03.04.08

M S Liner 52 Kg 41 25.07.08 30.07.08 31.07.08

103P L Polymers WCR/TP/2006/62/G R Pad/ 152/

dt. 03.04.08G R Pad, 60 Kg PLP/Bill/05 15.04.08 25.07.08 01.08.08

104 J.Sons Co. Ltd.Meerut WCR/TP/2007/87/Switch 1:8.5, 60Kg/247 dt.09.01.08

Fan Shaped Switch 1:8.5, 60 Kg

010100056,62 10.07.08/19.07.08

30.07.08 01.08.08

105 Bee Kay Engg. & Casting Ltd. Bhilai

WCR/TS/2005/57/CMS X-ing 1:12,60Kg/183 dt.12.01.06

CMS X-ing 1:12,60Kg 148 26.07.08 01.08.08 01.08.08

106 Donypolo Udyog Ltd. WCR/ T-out DU/09/08-09/90% 02.08.08 04.08.08 04.08.08107 SHREE KESHRIA CS-156 MBC SKCP/UPDATING/04 07.07.08 04.08.08 04.08.08108 SHREE KESHRIA CS-156 MBC SKCP/UPDATING/05 07.07.08 04.08.08 04.08.08109 Gondwana Enterprises 239 ERC-III 61 25.07.08 29.07.08 31.07.08110 Gondwana Enterprises 239 ERC-III 62 25.07.08 29.07.08 31.07.08111 Gondwana Enterprises 239 ERC-III 63 25.07.08 29.07.08 31.07.08112 Pathick Engg. Works 235 ERC-III 21 02.08.08 08.08.08 08.08.08113 Pathick Engg. Works 235 ERC-III 22 02.08.08 07.08.08 08.08.08114 Pathick Engg. Works 235 ERC-III 23 02.08.08 07.07.08 08.08.08115 MARATHWADA 60 spl. Sleeper MPPL/13/10% 11.08.08 12.08.08 12.08.08116 J.Sons Co. Ltd.Meerut WCR/TP/2006/85/ D-Switch/219

dt.08.11.07Drailing Switch 1:8.5,52Kg 10100063 19.07.08 13.08.08 14.08.08

117 J.Sons Co. Ltd.Meerut WCR/TP/2006/89/Switch1:8.5,52 & 60Kg./246 dt.04.01.08

Curved Switch 1:8.5,52 & 60Kg

10100064,71,72 11.08.08 13.08.08 14.08.08

118 Bhilai Engg. Cop. Ltd Bhilai WCR/TP/2006/73/CMS X-ing/217 dt.17.09.07

CMS X-ing 1:8.5,60Kg 464 31.07.08 13.08.08 14.08.08

119 MARATHWADA CS-156 MBC MPPL/142/10% 18.08.08 19.08.08 19.08.08120 MARATHWADA CURVE CURVE MPPL/02/10% 18.08.08 19.08.08 19.08.08121 MARATHWADA DERAILING SWITCH D SWITCH MPPL/04/10% 18.08.08 19.08.08 19.08.08122 MARATHWADA DERAILING SWITCH D SWITCH M<PPL/05/10% 18.08.08 19.08.08 19.08.08

123Parasnath Enterprises WCR/TP/2007/100/GFN/ 222/ dt.

06.10.07 GFN Liner 067 &068 30.06.08 19.08.08

124Besco Ltd. Kolkata WCR/TP/2007/CMS X-ing

dt.24.01.08CMS X-ing 1:8.5,52Kg

0593/Q-041/07-0809.08.08

19.08.08 20.08.08125 Donypolo Udyog Ltd. CS-156 M/L sleeper DU/01/08-09/ESCL 19.08.08 20.08.08 20.08.08

Page 8: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

126

M/s Manish Forging Ltd, Raipur

WCR/TP/2007/101/switch 1:8.5,52Kg/252 dt.04.02.08

OR Fan shaped swirch 1:8.5,52Kg

MFPL/44 06.08.08 22.08.08 25.08.08

127 MARATHWADA CS-156 MBC MPPL/143/10% 25.08.08 26.08.08 26.08.08

128

R.V.Rail Product Pvt.Ltd. Kolkata

WCR/TS/2005/45/switch1:8.5,52Kg/122 dt.12.07.06

OR Fan shaped swirch 1:8.5,52Kg

RVR PL/07-08/145 28.07.07 22.08.7 27.08.08

129 Gondwana Enterprises 235 ERC-III 30 11.08.08 19.08.08 27.08.08130 235 ERC-III 31 11.08.08 19.08.08 27.08.08131 235 ERC-III 32 11.08.08 19.08.08 27.08.08132 MARATHWADA T-OUT T-out MPPL/02/10% 27.08.08 29.08.08 29.08.08133 MARATHWADA T-OUT T-out MPPL/02/90% 27.08.08 29.08.08 29.08.08134 Bee Kay Engg. & Casting Ltd.

BhilaiWCR/TS/2005/57/CMS X-ing

1:12,60Kg/183 dt.12.01.06CMS X-ing 1:12,60Kg 141 25.07.08 27.08.08 29.08.08

135 Bee Kay Engg. & Casting Ltd. Bhilai

WCR/TP/2006/68/CMS X-ing/196 dt.15.02.07

CMS X-ing 1:12,52Kg 72 31.05.08 27.08.08 29.08.08

136 Bhilai Engg. Cop. Ltd Bhilai WCR/TP/2006/73/CMS X-ing/217 dt.17.09.07

CMS X-ing 1:8.5,60Kg 532 12.08.08 26.08.08 29.08.08

137 Bhilai Engg. Cop. Ltd Bhilai WCR/TP/2006/73/CMS X-ing/217 dt.17.09.07

CMS X-ing 1:8.5,60Kg 533 12.08.08 26.08.08 29.08.08

138VEA VKN Industries Sonepat WCR/TS/2004/05/CMS X-

ing/0096 dt.20.04.05CMS X-ing1:12,60Kg 297 &299 14.11.07 04.03.08 25.08.08

139 MARATHWADA WCR-T-OUT/91 T-out MPPL/04/90% 27.08.08 02.09.08 02.09.08140 Bee Kay Engg. & Casting Ltd.

BhilaiWCR/TS/2005/57/CMS X-ing

1:12,60Kg/183 dt.12.01.06CMS X-ing 1:12,60Kg 183 21.08.08 02.09.08 04.09.08

141 Bee Kay Engg. & Casting Ltd. Bhilai

WCR/TP/2006/68/CMS X-ing/196 dt.15.02.07

CMS X-ing 1:12,52Kg 180 21.08.08 02.09.08 04.09.08

142 M/s Manish Forging Ltd, Raipur

WCR/TP/2007/105/switch 1:12,52Kg/253 dt.04.02.08

OR Fan shaped swirch 1:12,52Kg

MFPL/45 06.08.08 02.09.08 04.09.08

143

Mamkaur

WCR/TP/2007/95/ERC-III/234 ERC-III MKP/15/2008-09 25.08.08 02.09.08 04.09.08

144

Puran Metal

WCR/TP/2007/95/ERC-III/228 ERC-III 1 30.08.08 02.09.09 05.09.08

145

Puran Metal

WCR/TP/2007/95/ERC-III/228 ERC-III 4 31.08.08 02.09.10 05.09.08

Page 9: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

146

Puran Metal

WCR/TP/2007/95/ERC-III/228 ERC-III 3 31.08.08 02.09.11 05.09.08

147

Puran Metal

WCR/TP/2007/95/ERC-III/228 ERC-III 6 31.08.08 04.09.08 05.09.08

148

Puran Metal

WCR/TP/2007/95/ERC-III/229 ERC-III 2 31.08.08 05.09.08 09.09.08

149

Puran Metal

WCR/TP/2007/95/ERC-III/230 ERC-III 5 31.08.08 05.09.08 09.09.08

150

J.Sons Co. Ltd.Meerut WCR/TP/2006/85/ D-Switch/219 dt.08.11.07

Drailing Switch 1:8.5,52Kg 10100082 14.08.08 09.09.08 10.09.08

151 MARATHWADA WCR/77/D SWITCH D-RAILLING MPPL/01/Escalation 01.09.08 10.09.08 11.09.08152 Donypolo Udyog Ltd. T-37 T-out DU/50/10% 10.09.08 11.09.08 11.09.8153 Donypolo Udyog Ltd. T-71 T-out DU/12A/10% 10.09.08 11.09.08 11.08.08

154

Bhilai Engg. Cop. Ltd Bhilai WCR/TP/2006/73/CMS X-ing/217 dt.17.09.07

CMS X-ing 1:8.5,60Kg 574 28.08.08 10.09.08 11.09.08

155 MARATHWADA SPECIAL spl. Sleeper MPPL/15/10% 11.09.08 12.09.08 12.09.08156 MARATHWADA CURVE CURVE MPPL/03/10% 11.09.08 12.09.08 12.09.08157 MARATHWADA T-OUT WCR/84 MPPL/04/10% 11.09.08 12.09.08 12.09.08158 MARATHWADA MBC MBC MPPL/145/10% 11.09.08 12.0908 12.09.8

159Besco Ltd. Kolkata WCR/TP/2007/CMS X-ing

dt.24.01.08CMS X-ing 1:8.5,52Kg

0623/Q-041/07-0830.08.08

16.09.08 17.09.08160 Paramount Enterprises

HyderabadWCR/TP/2006/82/SEJ.60 Kg/ 214/ dt. 06.09.07

SEJ 60 Kg 19 26.08.08 12.09.08 16.9.08

161 MARATHWADA T-37 T-out MPPL/01/10% 18.09.08 18.09.08 18.09.08162 MARATHWADA T-37 T-out MPPL/02/10% 18.09.08 .18.09.08 18.09.08163 MARATHWADA T-91 T-out MPPL/07/90% 18.09.08 18.09.08 18.09.08164 J.Sons Co. Ltd.Meerut WCR/TP/2006/89/Switch1:8.5,52

& 60Kg./246 dt.04.01.08Curved Switch 1:8.5,52 &

60Kg 10100085 23.08.08 16.09.08 18.09.08

165

Kailash Pathi Industries WCR/TP/2006/93/PlateScrew/248

Plate Screw KPI/24,27,28/08-09 27.07.08 17.09.08 18.09.08

166Kailash Pathi Industries WCR/TP/2006/93/PlateScrew/24

8Plate Screw KPI/23/08-09 23.07.08 17.09.08 18.09.08

167M/S Kontinental Steel corp. kolkata

WCR/TP/2008/116/JFP 60KG/262 Joggle fish plate 60 kg T-5849

KSK/RMD/790 dt 30.8.08 30.8.08 16.09.08 19.9.08

168Lauls Limited WCR/TP/2007/95/ERC-III/230 ERC-III LL 008 dt.14.09.08 14.09.08 21.09.08 22.09.08

Page 10: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

169Lauls Limited WCR/TP/2007/95/ERC-III/230 ERC-III LL 009 dt.14.09.08 14.09.08 21.09.08 22.09.08

170

M/s Manish Forging Ltd, Raipur

WCR/TP/2007/105/switch 1:12,52Kg/253 dt.04.02.08

OR Fan shaped swirch 1:12,52Kg

MFPL/54 28.08.08 12.09.08 23.09.08

171

M/s Manish Forging Ltd, Raipur

WCR/TP/2007/101/switch 1:8.5,52Kg/252 dt.04.02.08

OR Fan shaped swirch 1:8.5,52Kg

MFPL/61 11.09.08 19.09.08 23.09.08

172Gondwana Enterprises WCR/TP/2007/95/ERC-III/239 ERC-III 84 dt.13.09.08 13.09.08 23.09.08 24.09.08

173Gondwana Enterprises WCR/TP/2007/95/ERC-III/239 ERC-III 85 dt.15.09.08 15.09.08 23.09.08 24.09.08

174 MARATHWADA T-37 T-out MPPL/02/100% 23.09.08 25.09.08 25.0908175 MARATHWADA T-37 T-out MPPL/03/90% 23.09.08 25.09.08 25.09.08176 MARATHWADA T-37 T-out MPPL/05/10% 24.09.08 25.09.08/ 25.09.08177 SHREE KESHRIA CS160 MBC SKCP/12/90% 24.09.08 25.09.08 25.09.08

178VAE VKN Industries Pvt.Ltd.Sonipat

WCR/TP/2007/94/Diamond X-ing/251

Diamond X-ing 1;8.5,52Kg D/S & S/S 256 & 259 07.09.08 25.09.08 29.09.08

179

Bhilai Engg. Cop. Ltd Bhilai WCR/TP/2006/73/CMS X-ing/217 dt.17.09.07

CMS X-ing 1:8.5,60Kg 654 15.09.08 23.09.08 29.09.08

180 J.Sons Co. Ltd.Meerut WCR/TP/2007/87/Switch 1:8.5, 60Kg/247 dt.09.01.08

Fan Shaped Switch 1:8.5, 60 Kg

010100087,88 25.08.08 & 28.08.08

26.09.08 29.09.08

181 Ganpati Industrial Pvt. Ltd. Kolkata

WCR/TP/2008/116/JFP 60 Kg/263

Joggled Fish Plate 60 Kg GIPL/08.09/445 dt. 12.9.08 & GIPL/08-09/473 dt. 25.9.08

12.09.08 & 25.09.08

26.09.08 29.09.08

182 MARATHWADA C-S160 MBC MPPL/01/10% 27.09.08 30.09.08 30.09.08183 MARATHWADA C-S160 MBC MPPL/03/90% 29.09.08 30.09.08 30.09.08184 Khemchand T-109 D/S 12/10% 29.09.08 30.09.08 01.10.08

185 Paramount Enterprises Hyderabad

WCR/TS/2006/88/SEJ.52 Kg/ 212/ dt. 17.08.07

SEJ 52 Kg 18 26.08.08 29.09.08 07.10.08

186 Bee Kay Engg. & Casting Ltd. Bhilai

WCR/TS/2005/57/CMS X-ing 1:12,60Kg/183 dt.12.01.06

CMS X-ing 1:12,60Kg 195 26.08.08 02.09.08 07.10.08

187 MARATHWADA CS-160 MBC MPPL/04/90% 07.10.08 07.10.08 07.10.08188 Khemchand T-OUT T-out KC/CSP/T/10 06.10.08 07.10.08 07.10.08189 Donypolo Udyog Ltd. CS-160 MBC DU/04/90% 07.10.08 08.10.08 08.10.08190 Donypolo Udyog Ltd. CS-160 MBC DU/04/10% 07.10.08 08.10.08 08.10.08

Page 11: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

191 Donypolo Udyog Ltd. CS-160 MBC DU/05/10% 11.10.08 13.10.08 13.10.08192 Donypolo Udyog Ltd. CS-160 MBC DU/05/90% 11.10.08 13.10.08 13.10.08193 SHREE KESHRIA CS-160 MBC 90%/16 8.10.08 13.10.08 13.10.08194 MARATHWADA CS-160 MBC MPPL/05/90% 11.10.08 13.10.08 13.10.08195 Vikash Extrusions 232 ERC-III 16 16.09.08 01.10.08 14.10.08196 Gondwana Enterprises 239 ERC-III 84 25.09.08 31.09.08 14.10.08197 micron 237 ERC-III MI/009 04.09.08 01.01.08 14.10.08198 RJ 240 ERC-III RJE/20 16.09.08 01.10.08 14.10.08199 Ram Tek ERC-III 12 06.09.08 01.10.08 14.10.08

200Ganpati Industrial Pvt. Ltd. Kolkata

WCR/TP/2008/116/JFP 60 Kg/263

Joggled Fish Plate 60 Kg GIPL/08.09/54 &55/PVC dated 13.10.08

13.10.08 21.10.08 17.10.08

201 Kailash Pathi Industries WCR/TP/2006/93/plate screw Plate Screw KPI/25,26/08-09 27.07.08 18.09.08 20.10.08202 Lauls Limited 230 ERC-III LL-15 18.10.08 20.10.08 22.10.08203 Lauls Limited 230 ERC-III LL-15 18.10.08 20.10.08 22.10.08204 Donypolo Udyog Ltd. CS-160 MBC DU/07/10% 22.10.08 23.10.08 23.10.08205 MARATHWADA CS-160 MBC MPPL/02/10% 22.10.08 23.10.08 23.10.08206 MARATHWADA CS-160 MBC MPPL/07/90% 22.10.08 23.10.08 23.10.08207 Donypolo Udyog Ltd. T-OUT T-out DU/01/90% 22.10.08 23.10.08 23.10.08208 Donypolo Udyog Ltd. T_out T-out DU/02/90% 22.10.08 23.10.08 23.10.08209 Donypolo Udyog Ltd. T-OUT T-out DU/03/90% 22.10.08 23.10.08 23.10.08210 SHREE KESHRIA CS-160 MBC 90%/20 22.10.08 23.10.08 23.10.08

211Indiana Track Engineers,

MohaliWCR/TP/2007/98/M S Liner/ 258/ dt. 03.04.08

M S Liner 60 Kg 77 21.10.08 31.10.08 31.0.08

212 Donypolo Udyog Ltd. T-OUT T-out DU/08/90% 26.10.08 3.11.08 3.11.08213 Donypolo Udyog Ltd. T_out T-out DU/09/90% 2.11.08 3.11.08 3.11.08

214

Paramount Enterprises Hyderabad

WCR/TP/2006/82/SEJ.60 Kg/ 214/ dt. 06.09.07

SEJ 60 Kg 22 17.10.08 24.10.08 03.11.08

215

Paramount Enterprises Hyderabad

WCR/TP/2006/82/SEJ.60 Kg/ 214/ dt. 06.09.07

SEJ 60 Kg 29 17.10.08 24.10.08 03.11.08

216

Bee Kay Engg. & Casting Ltd. Bhilai

WCR/TS/2005/57/CMS X-ing 1:12,60Kg/183 dt.12.01.06

CMS X-ing 1:12,60Kg 252 30.09.08 03.11.08 03.11.08

217 SHREE KESHRIA CS-160 MBC 90%/20 1.11.08 4.11.08 4.11.08218 SHREE KESHRIA CS-160 MBC 10%/09 24.10.08 04.11.08 04.11.08219 SHREE KESHRIA CS-160 MBC 10%/10 27.10.08 04.11.08 04.11.08220 MARATHWADA CS-160 MBC MPPL/08/90% 04.11.08 04.11.08. 04.11.08

221

M/s Manish Forging Ltd, Raipur

WCR/TP/2007/101/switch 1:8.5,52Kg/252 dt.04.02.08

OR Fan shaped swirch 1:8.5,52Kg

MFPL/78 27.10.08 04.11.08 06.11.08

Page 12: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

222

Paramount Enterprises Hyderabad

WCR/TS/2006/88/SEJ.52 Kg/ 212/ dt. 17.08.07

SEJ 52 Kg 27 08.10.08 05.11.08 06.11.08

223 SHREE KESHRIA CS-160 MBC 90%/22 5.11.08 7.11.08 7.11.08224 MARATHWADA CS-160 MBC MPPL/09/90% 11.11.08 11.11.08 11.11.08225 Donypolo Udyog Ltd. CS-160 MBC DU/01/90% 04.11.08 11.11.08 11.11.08226 MARATHWADA T-OUT T-out MPPL/05/10% 11.11.08 11.0111.08 11.11.08227 Donypolo Udyog Ltd. CS-160 MBC DU/02/10% 04.11.08 11.11.08 11.11.08228 Donypolo Udyog Ltd. Cs-160 MBC 1DU/12/90% 12.11.08 12.11.08 12.11.08229 Gondwana Enterprises 239 ERC-III 105 07.11.08 12.11.08 12.11.08230 Gondwana Enterprises 239 ERC-III 107 08.11.08 12.11.08 12.11.08231 Donypolo Udyog Ltd. CS-160 MBC DU/08/10% 12.11.08 14.1108 14.11.08232 Donypolo Udyog Ltd. CS-160 MBC DU/03/90% 12.11.08 14.11.08 14.11.08233 Donypolo Udyog Ltd. CS-160 MBc DU/02/FRT 04.11.08 14.11.08 14..11.08234 Donypolo Udyog Ltd. CS-160 MBC DU/02/FRT 04.11.08 14.11.08 14.1108235 Donypolo Udyog Ltd. CS-160 MBG DU/03/FRT 11.11.08 14.11.08 14.11.08236 Donypolo Udyog Ltd. CS-160 MBC DU/04/INSPECTION 11.08.08 14.11.08 14.1108

237Besco Ltd. Kolkata WCR/TP/2007/CMS X-ing

dt.24.01.08CMS X-ing 1:8.5,52Kg

0010/Q-041/08-0915.10.08

07.11.08 17.11.08

238Besco Ltd. Kolkata WCR/TP/2007/CMS X-ing

dt.24.01.08CMS X-ing 1:8.5,52Kg

0020/Q-041/08-0931.10.08

17.11.08 17.11.08239 Mamkaur 234 ERC-III MKP/21/2008-09 08.11.08 14.11.08 17.11.08240 Mamkaur 234 ERC-III MKP/22/2008-09 08.11.08 14.11.08 17.11.08241 Everest steel Fabri. 186 ERC-III 35-40 24.10.08 12.11.08 17.11.08242 MARATHWADA WCR/37 T-out MPPL/04?FRT 04.11.08 18.11.08 18.11.08243 MARATHWADA WCR/77/D SWITCH T-out MPPL/02/FRT 04.11.08 18.11.08 18.11.08244 MARATHWADA WCR/91 T-out MPPL/03/FRT 04.11.08 18.11.08 18.11.08245 MARATHWADA WCR/60 spl. Sleeper MPPL/01/FRT 04.11.08 18.11.08 18.11.08246 MARATHWADA WCR/37 T-out MPPL/01/FRT.04.11.08 04.11.08 18.11.08 18.1108247 Donypolo Udyog Ltd. CS-160 MBC DU/14/90% 18.11.08 19.11.08 19.11.08248 Donypolo Udyog Ltd. CS-160 MBC DU/11/10% 18.11.08 19.11.08 19.11.08249 Donypolo Udyog Ltd. CS-160 MBC DU/01/100% 18.11.08 19.11.08 19.11.08250 SHREE KESHRIA CS-160 MBC 90%/23 19.11.08 20.11.08 20.11.08

251Paramount Enterprises Hyderabad

WCR/TS/2006/88/SEJ.52 Kg/ 212/ dt. 17.08.07

SEJ 52 Kg 32 01.11.08 19.11.08 20.11.08

252M/s Manish Forging Ltd, Raipur

WCR/TP/2007/101/switch 1:8.5,52Kg/252 dt.04.02.08

OR Fan shaped swirch 1:8.5,52Kg

MFPL/82 13.11.08 19.11.08 20.11.08

253M/s Manish Forging Ltd, Raipur

WCR/TP/2007/105/switch 1:12,52Kg/253 dt.04.02.08

OR Fan shaped swirch 1:12,52Kg

MFPL/44 13.11.08 19.11.08 20.11.08

254 MARATHWADA CS-160 MBC MPPL/02/90% 20.11.08 21.11.08 21.11.08255 MARATHWADA CS-160 MBC MPPL/02/100% 20.11.08 21.11.08 21.11.08256 MARATHWADA CS-160 MBC MPPL/10/90% 20.11.08 21.1108. 21.11.08257 Donypolo Udyog Ltd. CS-160 MBC DU/01/90% 20.11.08 21.11.08 21.11.08

Page 13: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

258 Donypolo Udyog Ltd. CS-160 MBC DU/02/100% 20.11.08 21.11.08 21.11.08259 Donypolo Udyog Ltd. CS-160 MBC DU/15/90% 20.11.08 21.11.08 21.011.08260 J.Sons Co. Ltd.Meerut WCR/TP/2006/89/Switch1:8.5,52

& 60Kg./246 dt.04.01.08Curved Switch 1:8.5,52 &

60Kg 010100115 & 010100112 06.10.08 &

14.10.0819.11.08 21.11.08

261J.Sons Co. Ltd.Meerut WCR/TP/2006/85/ D-Switch/219

dt.08.11.07Drailing Switch 1:8.5,52Kg 10100113 14.10.08 19.11.08 21.11.08

248 Donypolo Udyog Ltd. CS-160 MBC DU/12/10% 27.11.08 28.11.08 28.11.08259 Donypolo Udyog Ltd. CS-160 MBC DU/16/90% 27.11.08 28.11.08 28.11.08260 MARATHWADA CS-160 MBC MPPL/11/90% 01.12.08 02.12.08 02.12.08261 MARATHWADA CS-160 MBC MPPL/04/10% 01.12.08 02.12.08 02.12.08262 MARATHWADA T-OUT T-out MPPL/07/10% 01.12.08 02.12.08 02.12.08263 MARATHWADA SPECIAL spl. Sleeper MPPL/16/10% 01.12.08 02.12.08 02.12.08264 SHREE KESHRIA CS-160 MBC 90%/24 29.11.08 2.12.08 2.12.08265 Khemchand T-91 T-out 10%/16 02.12.08 04.12.08 04.12.08266 Khemchand T-109 D/s 10%/5 02.12.08 04.12.08 04.12.08267 Khemchand T-91 T-out 10%/15 02.12.08 04.12.08 04.12.08267 Khemchand T-109 T-out 10%/4 02.12.08 04.12.08 04.12.08268 Donypolo Udyog Ltd. CS-160 MBC DU/18/90% 3.12.08 04.12.08 04.12.08

269M/s Manish Forging Ltd, Raipur

WCR/TP/2007/105/switch 1:12,52Kg/253 dt.04.02.08

OR Fan shaped swirch 1:12,52Kg

MFPL/92 27.11.08 03.12.08 05.12.08

270 SHREE KESHRIA CS-160 MBC 90%/25 03.12.08 05.12.08 05.12.08271 Donypolo Udyog Ltd. CS-160 MBC 8/1/2009 27.11.08 05.12.08 05.12.08

272Paramount Enterprises Hyderabad

WCR/TS/2006/88/SEJ.52 Kg/ 212/ dt. 17.08.07

SEJ 52 Kg 18 17.10.08 05.12.08 8.12.08

273Paramount Enterprises Hyderabad

WCR/TS/2006/88/SEJ.52 Kg/ 212/ dt. 17.08.07

SEJ 52 Kg 36 24.11.08 05.12.08 8.12.08

274 J.Sons Co. Ltd.Meerut WCR/TP/2007/87/Switch 1:8.5, 60Kg/247 dt.09.01.08

Fan Shaped Switch 1:8.5, 60 Kg

10,100,116,120 14.10.08 05.12.08 8.12.08

275 MARATHWADA CS-160 MBC MPPL/12/90% 06.12.08 07.12.08 07.12.08276 MARATHWADA CS-160 MBC MPPL/05/10% 06.012.08 07.12.08 07.12.08277 Donypolo Udyog Ltd. CS-160 MBC DU/19/90% 06.12.08 07.12.08 07.12.08278 Donypolo Udyog Ltd. CS-160 MBC DU/14/10% 06.12.08 07.12.08 07.12.08279 Donypolo Udyog Ltd. CS-160 MBC DU/20/90% 10.12.08 11.12.08 2802280 Donypolo Udyog Ltd. CS-160 MBC DU/21/90% 13.012.08 15.12.08 15.12.08281 Donypolo Udyog Ltd. CS-160 MBC DU/15/10% 13.12.08 15.12.08 15.12.08282 MARATHWADA CS-160 MBC MPPL/13/90% 15.12.08 15.12.08 15.1208283 J.Sons Co. Ltd.Meerut WCR/TP/2006/89/Switch1:8.5,52

& 60Kg./246 dt.04.01.08Curved Switch 1:8.5,52 &

60Kg 010100127 & 010100128 03.11.08 &

04.11.0810.12.08 12.12.08

284 Bee Kay Engg. & Casting Ltd. Bhilai

WCR/TP/2006/68/CMS X-ing/196 dt.15.02.07

CMS X-ing 1:12,52Kg 238, 239A&B 26.9.08 16.10.08 16.12.08

285 Bee Kay Engg. & Casting Ltd. Bhilai

WCR/TP/2006/67/CMS X-ing/194 dt.25.01.07

CMS X-ing 1:8.5,52Kg & 60Kg

233, 234 A&B 26.9.08 16.10.08 16.12.08

286Bhilai Engg. Cop. Ltd Bhilai WCR/TP/2006/73/CMS X-

ing/217 dt.17.09.07CMS X-ing 1:8.5,60Kg J-4978/WCR/ESCl/001 to

009 04.12.08 10.012.08 17.12.08

Page 14: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

287Paramount Enterprises Hyderabad

WCR/TS/2006/88/SEJ.52 Kg/ 212/ dt. 17.08.07

SEJ 52 Kg 40 06.12.08 16.12.08 17.12.08

288J.Sons Co. Ltd.Meerut WCR/TP/2006/85/ D-Switch/219

dt.08.11.07Drailing Switch 1:8.5,52Kg 10100129 10.11.08 17.12.08 17.12.08

289 Bhilai Engg. Cop. Ltd Bhilai WCR/TP/2006/69/CMS X-ing/195 dt.25.01.07

CMS X-ing 1:8.5,60Kg J-4861/W.C.Rly./ESCL/001-

02.12.08 10.12.08 19.12.08

290 Donypolo Udyog Ltd. CS-160 MBC DU/16/10% 18.12.08 19.12.08 19.12.08291 Donypolo Udyog Ltd. CS-160 MBC DU/122/90% 18.12.08 19.12.08 19.12.08292 Donypolo Udyog Ltd. CS-160 MBC DU/23/90% 20.12.08 22.12.08 22.12.08

293Chinttpurni Engg.Works Barabanki

WCR/TP/2008/117/Sej/270 dt.23.10.08 SEJ-60KG &52Kg 76 13.12.08 22.12.08 23.12.08

294 Indiana Track Engineers, Mohali

WCR/TP/2007/98/M SLIner/258 dt. 03.04.08 M S Liner, 60 Kg 104 17.12.08 23.12.08 23.12.08

295 Ganpati Industrial Pvt. Ltd. Kolkata

WCR/TP/2008/116/JFP 60 Kg/263

Joggled Fish Plate 60 Kg GIPL/08.09/690/ dated 09.12.08

09.12.08 23.12.08 26.12.08

296 Ganpati Industrial Pvt. Ltd. Kolkata

WCR/TP/2008/116/JFP 60 Kg/263

Joggled Fish Plate 60 Kg GIPL/08.09/690/ dated 18.12.08

18.12.08 24.12.08 26.12.08

297M/s Manish Forging Ltd, Raipur

WCR/TP/2007/105/switch 1:12,52Kg/253 dt.04.02.08

OR Fan shaped swirch 1:12,52Kg

MFPL/102 12.12.08 24.12.08 29.12.08

298M/s Manish Forging Ltd, Raipur

WCR/TP/2007/101/switch 1:8.5,52Kg/252 dt.04.02.08

OR Fan shaped swirch 1:8.5,52Kg

MFPL/101 12.12.08 24.12.08 29.12.08

299 J.Sons Co. Ltd.Meerut WCR/TP/2007/87/Switch 1:8.5, 60Kg/247 dt.09.01.08

Fan Shaped Switch 1:8.5, 60 Kg

10,100,132 20.11.08 24.12.08 29.12.08

300 J.Sons Co. Ltd.Meerut WCR/TP/2007/87/Switch 1:8.5, 60Kg/247 dt.09.01.08

Fan Shaped Switch 1:8.5, 60 Kg

10,100,141 17.12.08 24.12.08 29.12.08

301 Vikash Extrusions WCR/TP/2007/95/ERC-III/ ERC-III 25 09.12.08 26.12.08 29.12.08302 Vikash Extrusions WCR/TP/2007/95/ERC-III/ ERC-III 27 09.12.08 26.12.08 29.12.08303 Ram Tek WCR/TP/2007/95/ERC-III/226 ERC-III 21 09.12.08 26.12.08 29.12.08304 Ram Tek WCR/TP/2007/95/ERC-III/226 ERC-III 22 09.12.08 26.12.08 31.12.08305 Vikash Extrusions WCR/TP/2007/95/ERC-III/ ERC-III 28 09.12.08 26.12.08 31.12.08306 MARATHWADA CS-160 MBC MPPL/15/90% 31.012.08 31.12.08 31.12.08307 Besco Ltd. Kolkata WCR/TP/2007/CMS X-ing

dt.24.01.08CMS X-ing 1:8.5,52Kg

0065/Q-041/08-0905.12.08

31.12.08 31.12.08308 Donypolo Udyog Ltd. CS-160 MBC DU/26/90% 31.12.08 01.01.09 01.01.09309 Donypolo Udyog Ltd. CS-160 MBC DU/18/10% 31.12.08 01.01.09 01.01.09

310 Punit Elastomers P Ltd, Delhi WCR/TP/2006/86/G R Pad/245 dt. 01.01.08

G R Pad, 60 Kg PEPL/08-09/04 29.12.08 31.12.08 01.01.09

311 Ganpati Industrial Pvt. Ltd. Kolkata

WCR/TP/2008/116/JFP 60 Kg/263

Joggled Fish Plate 60 Kg GIPL/08.09/80&81/PVC dated 01.01.09

01.01.09 06.01.09 07.01.09

312 Kontinental Steel Koroporatiopn Distt- Durg

WCR/TP/2008/116/JFP 60 Kg/262

Joggled Fish Plate 60 Kg KSK/RMD/1195 dt 03.12.08 03.12.08 23.12.08 07.01.09

313Kontinental Steel Koroporatiopn Distt- Durg

WCR/TP/2008/116/JFP 60 Kg/262

Joggled Fish Plate 60 Kg KSK/RMD/1195/PVC dt 24.12.08 24.12.08 06.01.09 07.01.09

314 SHREE KESHRIA CS-160 MBC SKCP/29/90% 10.01.09 13.01.09 13.01.09315 SHREE KESHRIA CS-160 MBC SKCP/12/10% 5.01.09 13.01.09 13.01.09316 Donypolo Udyog Ltd. CS-160 MBC DU/30/90% 12.01.09 13.01.09 13.01.09

Page 15: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

317Pragati Steel, Chandigarh WCR/TP/2007/119/M SLIner/267

dt. 15.09.08 M S Liner, 60 Kg 66 20.12.08 14.01.09 14.01.09

318Pragati Steel, Chandigarh WCR/TP/2007/119/M SLIner/267

dt. 15.09.08 M S Liner, 60 Kg 68 27.12.08 14.01.09 14.01.09319 Pragati Steel, Chandigarh WCR/TP/2007/119/M SLIner/267

dt. 15.09.08 M S Liner, 60 Kg 69 27.12.08 14.01.09 14.01.09320 MARATHWADA CS-160 MBC MPPL/17/90% 13.01.09 14.01.09 14.01.09

321Besco Ltd. Kolkata WCR/TP/2007/CMS X-ing

dt.24.01.08CMS X-ing 1:8.5,52Kg

82,83 & 84/Q-041/08-09 09.12.08 16.1.09 17.01.09

322M/s Manish Forging Ltd, Raipur

WCR/TP/2007/101/switch 1:8.5,52Kg/252 dt.04.02.08

OR Fan shaped swirch 1:8.5,52Kg

MFPL/153 12.01.09 19.01.09 20.01.09

323M/s Manish Forging Ltd, Raipur

WCR/TP/2007/105/switch 1:12,52Kg/253 dt.04.02.08

OR Fan shaped swirch 1:12,52Kg

MFPL/150 11.01.09 19.01.09 20.01.09

324Kailash Pathi Industries WCR/TP/2006/93/PlateScrew/24

8 dt.09.01.08 Plate Screw KPI/48,49/08-09 15.01.09 21.01.09 21.01.09

325Lauls Limited WCR/TP/2008/134/ERC/285

dt.06.01.09 ERC-III LL-041 dt.12.01.09 12.01.09 22.01.09 22.01.09

326Lauls Limited WCR/TP/2008/134/ERC/285

dt.06.01.10 ERC-III LL-042 dt.20.01.10 20.01.09 28.01.09 29.01.09

327R R Industries WCR/TP/2007/95/ERC-III/227

dt.27.12.07 ERC-III RRI-011 21.01.09 28.01.09 29.01.09Donypolo Udyog Ltd. CS-160 MBC DU/31/08-09/90% 29.01.09 02.02.09 02.02.09Donypolo Udyog Ltd. CS-160 MBC DU/32/08-09/90% 31.01.09 02.02.09 02.02.09Donypolo Udyog Ltd. CS-160 MBC DU/28/08-09/10% 30.01.09 02.02.09 02.02.09Donypolo Udyog Ltd. CS-160 MBC DU/29/08-09/10% 30.01.09 02.02.09 02.02.09Donypolo Udyog Ltd. CS-160 MBC DU/02/08-09/100% 30.01.09 02.02.09 02.02.09Donypolo Udyog Ltd. CS-160 MBC DU/30/08-09/10% 30.01.09 02.02.09 02.02.09Donypolo Udyog Ltd. CS-160 MBC DU/31/08-09/10% 31.01.09 02.02.09 02.02.09

329Lauls Limited WCR/TP/2008/134/ERC/285

dt.06.01.10 ERC-III LL-043 dt.20.01.10 20.01.09 03.02.09 03.02.09330 J.Sons Co. Ltd.Meerut WCR/TP/2007/87/Switch 1:8.5,

60Kg/247 dt.09.01.08Fan Shaped Switch 1:8.5, 60

Kg10100157 & 010100158 07.01.09 01.02.09 03.02.09

331J.Sons Co. Ltd.Meerut WCR/TP/2006/85/ D-Switch/219

dt.08.11.07Drailing Switch 1:8.5,52Kg 010100162 & 010100164 14.01.09 &

21.01.0901.02.09 03.02.09

332J.Sons Co. Ltd.Meerut WCR/TP/2006/85/ D-Switch/219

dt.08.11.07Drailing Switch 1:8.5,52Kg supplementary 10100113 22.01.09 01.02.09 03.02.09

333J.Sons Co. Ltd.Meerut WCR/TP/2006/85/ D-Switch/219

dt.08.11.07Drailing Switch 1:8.5,52Kg supplementary 10100129 22.01.09 01.02.09 03.02.09

334 J.Sons Co. Ltd.Meerut WCR/TP/2006/89/Switch1:8.5,52 & 60Kg./246 dt.04.01.08

Curved Switch 1:8.5,52 & 60Kg

supplementary010100115 & 010100112

25.12.08 01.02.09 03.02.09

335 Donypolo Udyog Ltd. CS-160 mbc DU/33/90% 03.02.09 06.02.09 06.02.09335 Donypolo Udyog Ltd. CS-160 mbc DU/34/90% 07.02.09 09.02.09 09.02.09

336J.Sons Co. Ltd.Meerut WCR/TP/2008/135/SSD/287

dt.06.01.09 SSD 10100174 01.02.09 10.02.09 10.02.09

337Tiya Industries WCR/TP/2008/134/ERC/286

dt.06.01.10 ERC-III 029 & 030 dt.04.02.09 04.02.09 10.02.09 10.02.09

328

Page 16: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

338VAE VKN Industries Pvt.Ltd.Sonipat

WCR/TP/2007/94/Diamond X-ing/251

Diamond X-ing 1;8.5,52Kg D/S & S/S 398 & 399, 412

31.11.08 ,12.12.08 31.12.08 10.02.09

339Chinttpurni Engg.Works Barabanki

WCR/TP/2008/128/ D-Switch/271 dt.24.10.08

Drailing Switch 1:8.5,52Kg. & 60 Kg.

85 29.01.09 10.02.09 11.02.09

340M/s Manish Forging Ltd, Raipur

WCR/TP/2007/105/switch 1:12,52Kg/253 dt.04.02.08

OR Fan shaped swirch 1:12,52Kg

MFPL/175 02.02.09 06.02.09 11.02.09

341 Donypolo Udyog Ltd. CS-160 mbc DU/36/90% 17.02.09 18.02.09 18.02.09342 Donypolo Udyog Ltd. CS-160 mbc DU/34/10% 17.02.09 18.02.09 18.02.09343 MARATHWADA CS-160 MBC MPPL/22/90% 17.02.09 18.02.09 18.02.09344 MARATHWADA T-37 T-out MPPL/31/10% 17.02.09 18.02.09 18.02.09345 MARATHWADA T-37 T-out MPPL/12/10% 17.02.09 18.02.09 18.02.09346 MARATHWADA T91 T-out MPPL/32/10% 17.02.09 18.02.09 18.02.09347 MARATHWADA T-84 Curve sleeper MPPL/8/10% 17.02.09 18.02.09 18.02.09348 Khemchand CS-160 MBC 02/90% 31.01.09 18.02.09 18.02.09349 Khemchand CS-160 MBC 03/90% 09.02.09 18.02.09 18.02.09350 SAIL Rail Rail 100% 12.02.09 18.02.09 18.02.09351 SAIL Rail Rail 100% 09.02.09 18.02.09 18.02.09352 MARATHWADA WCR/91 T-out MPPL/13/10% 17.02.09 19.02.09 19.02.09

353J.Sons Co. Ltd.Meerut WCR/TP/2006/85/ D-Switch/219

dt.08.11.07Drailing Switch 1:8.5,52Kg 10100178 09.02.09 20.02.09 23.02.09

354 J.Sons Co. Ltd.Meerut WCR/TP/2006/89/Switch1:8.5,52 & 60Kg./246 dt.04.01.08

Curved Switch 1:8.5,52 & 60Kg

010100127 & 010100133 13.02.09 24.02.09 26.02.09

338 MARATHWADA CS-160 MBC MPPL/23/90% 24.02.09 25.02.09 26.02.09339 MARATHWADA CS-160 MBC MPPL/01/ENTRY TAX 20.02.09 25.02.09 26.02.09340 Donypolo Udyog Ltd. CS-160 MBC DU/38/90% 25.02.09 26.02.09 26.02.09341 Donypolo Udyog Ltd. CS-160 MBC DU/36/10% 25.0209 26.02.09 26.02.09342 MARATHWADA WCR/37 T-out MPPL/33/10% 24.02.09 26.02.09 27.02.09343 J.Sons Co. Ltd.Meerut WCR/TP/2006/85/ D-Switch/219

dt.08.11.07Drailing Switch 1:8.5,52Kg 10100134 to 140 & 150 12.02.09 24.02.09 27.02.09

344 SHREE KESHRIA CS-160 MBC SKCP/15/10% 25.02.09 3.03.09 3.03.09345 Donypolo Udyog Ltd. CS-160 MBC DU/39/90% 02.03.09 03.03.09 03.03.09346 J.Sons Co. Ltd.Meerut WCR/TP/2007/87/Switch 1:8.5,

60Kg/247 dt.09.01.08Fan Shaped Switch 1:8.5, 60

Kg10100142 & 010100149 12.02.09 24.02.09 03.03.9

347Lauls Limited WCR/TP/2008/134/ERC/285

dt.06.01.10 ERC-III LL-056 dt.26.02.09 26.02.09 04.03.09 04.03.09

348J.Sons Co. Ltd.Meerut WCR/TP/2008/135/SSD/287

dt.06.01.09 SSD 10100200 09.03.09 16.03.09 16.03.09349 Paramount Rubber Industries wcr/tp/2008/123/280 GR Pads 60 kgs 253 dt 1.3.09 3/16/2009350 Lauls Limited 230 ERC-III LL-39&40 12.01.09 25.02.09 04.03.09351 Donypolo Udyog Ltd. CS-160 MBC DU/40/90% 05.03.09 06.03.09 06.03.09352 Donypolo Udyog Ltd. CS-160 MBC DU/37/10% 05.03.09 06.03.09 06.03.09353 Donypolo Udyog Ltd. T-37 T-out DU/56/10% 05.03.09 06.03.09 06.03.09354 Donypolo Udyog Ltd. CS-160 MBC DU/41/90% 07.03.09 09.03.09 09.03.09355 Donypolo Udyog Ltd. CS-160 MBC DU/38/10% 07.03.09 09.03.09 09.03.09

Page 17: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

356Lauls Limited WCR/TP/2008/134/ERC/285

dt.06.01.10 ERC-III LL-057 10.03.09 13.03.09 13.03.09

357J.Sons Co. Ltd.Meerut WCR/TP/2007/87/Switch 1:8.5,

60Kg/247 dt.09.01.08Fan Shaped Switch 1:8.5, 60

Kg10100195 & 010100196 7.03.09 16.03.09 17.03.09

358J.Sons Co. Ltd.Meerut WCR/TP/2007/87/Switch 1:8.5,

60Kg/247 dt.09.01.08Fan Shaped Switch 1:8.5, 60

Kgsupplementary 10100157 & 010100158

7.01.09 16.03.09 17.03.09

359J.Sons Co. Ltd.Meerut WCR/TP/2006/85/ D-Switch/219

dt.08.11.07Drailing Switch 1:8.5,52Kg 10100179 24.02.09 16.03.09 18.03.09

360J.Sons Co. Ltd.Meerut WCR/TP/2008/135/SSD/287

dt.06.01.09 SSD 10100203 13.03.09 19.03.09 19.03.09

361VAE VKN Industries Pvt.Ltd.Sonipat

WCR/TP/2007/94/Diamond X-ing/251

Diamond X-ing 1;8.5,52Kg D/S & S/S 541 & 547 27.02.09,28.02.09 17.03.09 19.03.09

362VAE VKN Industries Pvt.Ltd.Sonipat

WCR/TP/2007/94/Diamond X-ing/251

Diamond X-ing 1;8.5,52Kg D/S & S/S 542 & 548 27.02.09,28.02.09 17.03.09 19.03.09

363VAE VKN Industries Pvt.Ltd.Sonipat

WCR/TP/2007/94/Diamond X-ing/251

Diamond X-ing 1;8.5,52Kg D/S & S/S 543 & 545 27.02.09 19.03.09 19.03.09

364 Paramount Rubber Industries wcr/tp/2008/123/280 GR Pads 60 kgs 291 dt 02/03/09 17/030/10 3/16/2009

365Bhilai Engg.Corp. Ltd.Bhilai WCR/TP/2008/115/CMS X-

ing/277 dt.31.10.08 CMS-X-ing 1:12,52Kg E/09/1304 06.03.09 19.03.09 20.03.09

366Lauls Limited WCR/TP/2008/134/ERC/285

dt.06.01.10 ERC-III LL-058 25.02.09 30.03.09 30.03.09367 MARATHWADA CS-160 M/l MPPL/13/10% 19.03.09 23.03.09 23.03.09368 Donypolo Udyog Ltd. CS-160 MBC DU/44/90% 21.03.09 23.03.09 23.03.09369 Donypolo Udyog Ltd. CS-160 MBC DU/45/90% 25.03.09 26.03.09 26.03.09370 Donypolo Udyog Ltd. CS-160 MBC DU/46/90% 28.03.09 30.03.09 30.03.09371 Donypolo Udyog Ltd. CS-160 MBC DU/47/90% 31.03.09 30.03.09 30.03.09371 Donypolo Udyog Ltd. CS-160 MBC DU/39/10% 19.03.09 20.03.09 20.03.09372 Donypolo Udyog Ltd. CS-160 MBC DU/01/ freight10% 21.03.09 21.03.09 21.03.09373 Donypolo Udyog Ltd. CS-160 MBC DU/01/ Esc10% 20.03.09 21.03.09 21.03.09374 Donypolo Udyog Ltd. CS-160 MBC DU/01/ freight10% 21.03.09 21.03.09 21.03.09375 R.V.Rail Product Pvt.Ltd. WCR/TP/2008/128/284 Derailing switch 1.8.5,52 Kg RVRPL/08-09/602 29.03.09 2.04.09 2.04.09376 Donypolo Udyog Ltd. CS-160 MBC DU/48/90% 02.04.09 06.04.09 06.04.09377 Donypolo Udyog Ltd. CS-160 MBC DU/40/10% 02.04.09 06.04.09 06.04.09378 Donypolo Udyog Ltd. CS-160 MBC DU/49/90% 08.04.09 09.4.09 09.04.09

379J.Sons Co. Ltd.Meerut WCR/TP/2008/135/SSD/287

dt.06.01.09 SSD 10100003 03.04.09 09.04.09 09.04.09380 Donypolo Udyog Ltd. CS-160 MBC DU/50/90% 15.04.09 16.04.09 16.04.09381 Donypolo Udyog Ltd. CS-160 MBC DU/41/10% 14.04.09 16.04.09 16.04.09382 Donypolo Udyog Ltd. T-OU/T-114 T-out DU/05/10% 14.04.09 16.0409 16.04.09383 Donypolo Udyog Ltd. T-out/37 T-out DU/51/10% 14.04.09 16.04.09 16.04.09

384Bhilai Engg.Corp. Ltd.Bhilai WCR/TP/2008/115/CMS X-

ing/277 dt.31.10.08 CMS-X-ing 1:12,52Kg E/09/1395 31.03.09 16.04.09 17.04.09385 MARATHWADA CS-160 MBC MPPL/01/FRT/90% 18.04.09 20.04.09 20.04.09386 MARATHWADA CS-160 MBC MPPL/24/90% 18.04.09 20.04.09 20.04.09387 MARATHWADA CS-160 MBC MPPL/14/10% 18.04.09 20.04.09 20.04.09

Page 18: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

388 MARATHWADA CS-160 MBC MPPL/15/10% 18.04.09 20.04.09 20.04.09389 MARATHWADA CS-160 MBC MPPL/16/10% 18.04.09 20.04.09 20.04.09390 MARATHWADA CS-160 MBC MPPL/17/10% 18.04.09 20.04.09 20.04.09391 MARATHWADA TOUT/37 T-out MPPL/34/10% 18.04.09 20.04.09 20.04.09392 MARATHWADA T-out91 T-out MPPl/16/10% 18.04.09 20.04.09 20.04.09393 Donypolo Udyog Ltd. CS-160 MBC DU/51/90% 18.04.09 20.04.09 20.04.09394 Donypolo Udyog Ltd. CS-160 MBC DU/42/10% 18.04.09 20.04.09 20.04.09395 Donypolo Udyog Ltd. TOUT/37 T-out DU/60/90 18.04.09 20.04.09 20.04.09396 SHREE KESHRIA CS-160 MBC SKCP/02/90% 13.04.09 20.04.09 20.04.09397 SHREE KESHRIA CS-160 MBC SKCP/03/90 15.04.09 20.04.09 20.04.09398 SHREE KESHRIA CS-160 MBC SKCP/01/10% 14.04.09 20.04.09 20.04.09

399J.Sons Co. Ltd.Meerut WCR/TP/2007/87/Switch 1:8.5,

60Kg/247 dt.09.01.08Fan Shaped Switch 1:8.5, 60

Kg 10100007 & 010100008 14.04.09 21.04.09 21.04.09

400M/s Manish Forging Ltd, Raipur

WCR/TP/2007/105/switch 1:12,52Kg/253 dt.04.02.08

OR Fan shaped swirch 1:12,52Kg

MFPL/212 30.03.09 21.04.09 21.04.09

401 MARATHWADA CS-160 MBC MPPL/25/%/90 24.02.09 28.04.09 28.04.09402 MARATHWADA CS-160 MBC MPPL/18/10% 24.04.09 28.04.09 28.04.09403 MARATHWADA CS-160 MBC MPPL/19/10% 24.04.09 28.04.09 28.04.09404 MARATHWADA CS-160 MBC MPPL/20/10% 24.04.09 28.04.09 28.04.09405 MARATHWADA CS-160 MBC MPPL/02/ENTRY TAX 24.02.09 28.04.09 28.04.09406 MARATHWADA CS-160 MBC MPPL/02/100% 24.04.09 28.04.09 28.04.09407 MARATHWADA CS-160 MBC MPPL/03/100% 24.04.09 28.04.09 28.04.09408 Donypolo Udyog Ltd. CS-160 MBC DU/53/90% 25.04.09 28.409 28.04.09409 Donypolo Udyog Ltd. CS-160 MBC DU/01/ESC 25.03.09 28.04.09 28.04.09410 SHREE KESHRIA CS-160 MBC SKCP/04/90% 18.04.09 28.04.09 28.04.09411 SHREE KESHRIA CS-160 mbc SKCP/05/90% 22.04.09 28.04.09 28.04.09412 PREMIER SALES CS-130 FITTING 002/2009/10 09.04.09 28.04.09 28.04.09412 PREMIER SALES CS-130 FITTING 046/2008-09 10.03.09 28.04.09 28.04.09413 PREMIER SALES CS-130 FITTING 043/2008-09 27.02.09 28.4.09 28.04.09

414Chinttpurni Engg.Works Barabanki

WCR/TP/2008/128/ D-Switch/271 dt.24.10.08

Drailing Switch 1:8.5,52Kg. & 60 Kg.

2 21.04.09 30.04.09 04.05.09

415M/s Manish Forging Ltd, Raipur

WCR/TP/2007/105/switch 1:12,52Kg/253 dt.04.02.08

OR Fan shaped swirch 1:12,52Kg

MFPL/213 31.03.09 11.05.09 11.05.09

416J.Sons Co. Ltd.Meerut WCR/TP/2008/135/SSD/287

dt.06.01.09 SSD 10100018 04.05.09 12.05.09 13.05.09

417Bhilai Engg.Corp. Ltd.Bhilai WCR/TP/2008/115/CMS X-

ing/277 dt.31.10.08 CMS-X-ing 1:12,52Kg Engg/09-10/18 21.04.09 13.05.09 13.05.09

418Bhilai Engg.Corp. Ltd.Bhilai WCR/TP/2008/115/CMS X-

ing/277 dt.31.10.08 CMS-X-ing 1:12,52Kg Engg/09-10/037 30.04.09 13.05.09 13.05.09

419Bhilai Engg.Corp. Ltd.Bhilai WCR/TP/2008/115/CMS X-

ing/277 dt.31.10.08 CMS-X-ing 1:12,52Kg Engg/09-10/012 20.04.09 13.05.09 13.05.09

420Bhilai Engg.Corp. Ltd.Bhilai WCR/TP/2008/115/CMS X-

ing/277 dt.31.10.08 CMS-X-ing 1:12,52Kg Engg/09-10/044 30.04.09 14.05.09 15.05.09

Page 19: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

421M/S Kontinental Steel corp. kolkata

WCR/TP/2008/143/Joggled Fish Plate/290 dt. 24.03.09 Joggled Fish Plate 60 Kg KSK/RMD/120 dt.

23.04.0923.04.09 30.4.09 05.05.09

422VAE VKN Industries Pvt.Ltd.Sonipat

WCR/TP/2007/94/Diamond X-ing/251

Diamond X-ing 1;8.5,52Kg D/S & S/S 627 & 630

30.03.09 & 31.03.09 20.04.09 01.06.09

423Bee Kay Engg. & Casting Ltd. Bhilai

WCR/TS/2005/57/CMS X-ing 1:12,60Kg/183 dt.12.01.06

CMS X-ing 1:12,60Kg 356 31.03.09 24.04.09 04.06.09

424M/s Manish Forging Ltd, Raipur

WCR/TP/2007/101/switch 1:8.5,52Kg/252 dt.04.02.08

OR Fan shaped swirch 1:8.5,52Kg

MFPL/001,002,005 13.05.09,18.05.09,13.05.09

25.04.09 04.06.09

425M/S Kontinental Steel corp. kolkata

WCR/TP/2008/143/Joggled Fish Plate/290 dt. 24.03.09 Joggled Fish Plate 60 Kg KSK/RMD/116 dt.

23.04.0923.04.09 01.6.09 10.06.09

426VAE VKN Industries Pvt.Ltd.Sonipat

WCR/TP/2006/94/Diamond X-ing/251

Diamond X-ing 1;8.5,52Kg D/S & S/S 122,123,124 & 125 06.06.09 23.06.09 24.06.09

427 Donypolo Udyog Ltd. CS-160 MBC DU/68/90% 24.06.09 25.06.09 25.06.09428 SHREE KESHRIA CS-160 MBC SKCP/15/90% 24.06.09 25.06.09 25.06.09

429Bhilai Engg.Corp. Ltd.Bhilai WCR/TP/2008/115/CMS X-

ing/277 dt.31.10.08 CMS-X-ing 1:12,52Kg Engg/09-10/136 03.06.09 26.06.09 26.06.09430 Donypolo Udyog Ltd. CS-160 MBC DU/69/90% 27.06.09 29.06.09 29.06.09431 Donypolo Udyog Ltd. CS-160 MBC DU/53/10% 27.06.09 29.06.09 29.06.09432 Donypolo Udyog Ltd. CS-160 MBC DU/54/10% 27.06.09 29.06.09 29.06.09

433M/s Manish Forging Ltd, Raipur

WCR/TP/2007/101/switch 1:8.5,52Kg/252 dt.04.02.08

OR Fan shaped swirch 1:8.5,52Kg

MFPL/49 15.06.09 06.07.09 06.07.09

434Chinttpurni Engg.Works Barabanki

WCR/TP/2008/128/ D-Switch/271 dt.24.10.08

Drailing Switch 1:8.5,52Kg. & 60 Kg.

34 24.06.09 06.07.09 06.07.09

435 Donypolo Udyog Ltd. CS-160 MBC DU/72/90% 07.07.09 08.07.09 08.07.09436 Donypolo Udyog Ltd. CS-160 MBC DU/56/10% 07.07.09 08.07.09 08.07.09437 Donypolo Udyog Ltd. CS-160 MBC DU/57/10% 07.07.09 08.07.09 08.07.09

438Lauls Limited WCR/TP/2008/134/ERC/285

dt.06.01.10 ERC-III LL-067 08.07.09 10.07.09 13.07.09

439M/s Manish Forging Ltd, Raipur

WCR/TP/2007/105/switch 1:12,52Kg/253 dt.04.02.08

OR Fan shaped swirch 1:12,52Kg

MFPL/53 05.07.09 14.07.09 14.07.09

440Bhilai Engg.Corp. Ltd.Bhilai WCR/TP/2008/115/CMS X-

ing/277 dt.31.10.08 CMS-X-ing 1:12,52Kg Engg/09-10/161 19.06.09 14.07.09 14.07.09

441J.Sons Co. Ltd.Meerut WCR/TP/2007/87/Switch 1:8.5,

60Kg/247 dt.09.01.08Fan Shaped Switch 1:8.5, 60

Kg 10100050,51 & 52 27.06.09 14.07.09 14.07.09

442Digvijay Steels Pvt. Ltd. Batala

WCR/TP/2007/111/HTW X-ing/257 dt.26.03.08

HTW X-ing 1: 12,60 Kg & 52Kg and 1:8.5, 52Kg. 14/15 03.07.09 14.07.09 15.07.09

443Digvijay Steels Pvt. Ltd. Batala

WCR/TP/2007/111/HTW X-ing/257 dt.26.03.08

HTW X-ing 1: 12,60 Kg & 52Kg and 1:8.5, 52Kg. 16/17/18 & 19/20 06.07.09 16.07.09 17.07.09

444J.Sons Co. Ltd.Meerut WCR/TP/2007/87/Switch 1:8.5,

60Kg/247 dt.09.01.08Fan Shaped Switch 1:8.5, 60

Kg10,100,053 02.07.09 17.07.09 22.07.09

445J.Sons Co. Ltd.Meerut WCR/TP/2007/87/Switch 1:8.5,

60Kg/247 dt.09.01.08Fan Shaped Switch 1:8.5, 60

Kg10100058,59,60 13.07.09 20.07.09 22.07.09

446J.Sons Co. Ltd.Meerut WCR/TP/2007/87/Switch 1:8.5,

60Kg/247 dt.09.01.08Fan Shaped Switch 1:8.5, 60

Kg10100054,55,56 09.07.09 17.07.09 22.07.09

447Bhilai Engg.Corp. Ltd.Bhilai WCR/TP/2008/115/CMS X-

ing/277 dt.31.10.08 CMS-X-ing 1:12,52Kg FND/GCV/09-1/37 25.07.09 17.08.09 18.08.09

Page 20: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

448Bhilai Engg.Corp. Ltd.Bhilai WCR/TP/2008/115/CMS X-

ing/277 dt.31.10.08 CMS-X-ing 1:12,52Kg FND/GCV/09-1/45 31.07.09 17.08.09 18.08.09

449J.Sons Co. Ltd.Meerut WCR/TP/2008/135/SSD/287

dt.06.01.09 SSD 10100071 02.08.09 10.08.09 25.08.09

450Chinttpurni Engg.Works Barabanki

WCR/TP/2008/128/ D-Switch/271 dt.24.10.08

Drailing Switch 1:8.5,52Kg. & 60 Kg.

59 14.08.09 27.08.09 28.08.09

451Besco Ltd. Kolkata WCR/TP/2008/140/CMS X-

ingh/296 dt.24.07.09 CMS X-ing 1:12,60Kg 0450/R-039/08-09 08.08.09 31.08.09 31.08.09

452J.Sons Co. Ltd.Meerut WCR/TP/2008/127/Switch

1:8.5,52Kg./291 dt.29.05.09 Curved Switch 1:8.5,52Kg. 10100087 29.08.09 09.09.09 10.09.09

453Besco Ltd. Kolkata WCR/TP/2008/140/CMS X-

ingh/296 dt.24.07.09 CMS X-ing 1:12,60Kg 0440/R-039/08-09 03.08.09 11.09.09 11.09.09

454Chinttpurni Engg.Works Barabanki

WCR/TP/2008/142/Switch 1:12,60Kg/294 dt.20.07.09 Curved Switch 1:12,60Kg. 74 15.09.09 22.09.09 23.09.09

455Cemcon Trck Industries New Delhi

WCR/TP/2008/127/Switch 1:12,52Kg/295 dt.20.07.09 Curved Switch 1:12,52Kg. 38 09.09.09 24.09.09 25.09.09

456Besco Ltd. Kolkata WCR/TP/2008/140/CMS X-

ingh/296 dt.24.07.09 CMS X-ing 1:12,60Kg0479/R-039/08-09 & 0490/R-039/08-09

29.08.09 &03.09.09 01.10.09 08.10.09

457Digvijay Steels Pvt. Ltd. Batala

WCR/TP/2007/111/HTW X-ing/257 dt.26.03.08

HTW X-ing 1: 12,60 Kg & 52Kg and 1:8.5, 52Kg. 26 23.09.09 06.10.09 08.10.09

458J.Sons Co. Ltd.Meerut WCR/TP/2008/127/Switch

1:8.5,52Kg./291 dt.29.05.09 Curved Switch 1:8.5,52Kg. 10100098,99 & 10222.09.09,23.09.09

& 25.09.09 07.10.09 08.10.09

459Orient Steel & Inustries Ltd. Kolkata

WCR/TP/2008/140/CMS X-ingh/292 dt.29.05.09 CMS X-ing 1:12,60Kg

OSC/09-10/078,088 & 105

22.08.09,28.08.09 &24.09.09 14.10.09 16.10.09

460Cemcon Trck Industries New Delhi

WCR/TP/2008/127/Switch 1:12,52Kg/295 dt.20.07.09 Curved Switch 1:12,52Kg. 51 & 52 05.10.09 16.10.09 20.10.09

461Cemcon Trck Industries New Delhi

WCR/TP/2008/127/Switch 1:12,52Kg/295 dt.20.07.09 Curved Switch 1:12,52Kg. CTI/55 16.10.09 27.10.09 28.10.09

462M/s Manish Forging Ltd, Raipur

WCR/TP/2007/105/switch 1:12,52Kg/253 dt.04.02.08

OR Fan shaped swirch 1:12,52Kg

MFPL/107 04.10.09 16.10.09 28.10.09

463M/s Manish Forging Ltd, Raipur

WCR/TP/2007/101/switch 1:8.5,52Kg/252 dt.04.02.08

OR Fan shaped swirch 1:8.5,52Kg

MFPL/106 04.10.09 16.10.09 28.10.09

464Cemcon Trck Industries New Delhi

WCR/TP/2008/127/Switch 1:12,52Kg/295 dt.20.07.09 Curved Switch 1:12,52Kg. 58 01.11.09 18.11.09 19.11.09

465M/s Seth & Co, S V Road , Andheri (W), Mumbai

WCR/TP/2008/146/GFN/298 dt. 17.09.2009

GFN Liner (T-3702) S O 237 09.11.09 09.11.09 09.11.09

465R.V.Rail Product Pvt.Ltd. Kolkata

WCR/TP/2008/142/Switch 1:12,60Kg/293 dt.20.07.09 Curved Switch 1:12,60Kg. RVRPL/09-10/360 10.11.09 24.11.09 24.11.09

466M/s Manish Forging Ltd, Raipur

WCR/TP/2007/101/switch 1:8.5,52Kg/252 dt.04.02.08

OR Fan shaped swirch 1:8.5,52Kg

MFPL/152 14.11.09 01.12.09 02.12.09

467J.Sons Co. Ltd.Meerut WCR/TP/2008/127/Switch

1:8.5,52Kg./291 dt.29.05.09 Curved Switch 1:8.5,52Kg. 10,100,128,12912.11.09, 17.11.09 04.12.09 04.12.09

468Chinttpurni Engg.Works Barabanki

WCR/TP/2008/142/Switch 1:12,60Kg/294 dt.20.07.09 Curved Switch 1:12,60Kg. 165 23.12.09 06.01.10 06.01.10

469M/s Manish Forging Ltd, Raipur

WCR/TP/2007/101/switch 1:8.5,52Kg/252 dt.04.02.08

OR Fan shaped swirch 1:8.5,52Kg

MFPL/164 26.11.09 16.12.09 11.01.10

Page 21: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

470 Digvijay Steels Pvt. Ltd. Batala

WCR/TP/2007/111/HTW X-ing/257 dt.26.03.08

HTW X-ing 1: 12,60 Kg & 52Kg and 1:8.5, 52Kg. 41/42 18.12.09 07.01.010 11.01.10

471 Cemcon Trck Industries New Delhi

WCR/TP/2008/127/Switch 1:12,52Kg/295 dt.20.07.09 Curved Switch 1:12,52Kg. 76/77 31.12.09 13.01.10 14.01.10

472 M/s Seth & Co, S V Road , Andheri (W), Mumbai

WCR/TP/2008/146/GFN/298 dt. 17.09.2009

GFN Liner (T-3702) S O 329 21.12.09 30.12.09 01.01.10

473 R.V.Rail Product Pvt.Ltd. Kolkata

WCR/TP/2008/142/Switch 1:12,60Kg/293 dt.20.07.09 Curved Switch 1:12,60Kg. RVRPL/09-10/481 31.12.09 20.01.10 21.01.10

474 M/s Manish Forging Ltd, Raipur

WCR/TP/2007/105/switch 1:12,52Kg/253 dt.04.02.08

OR Fan shaped swirch 1:12,52Kg

MFPL/202 23.01.10 29.01.10 01.02.10

475 Bhilai Engg.Corp. Ltd.Bhilai WCR/TP/2008/115/CMS X-ing/277 dt.31.10.08 CMS-X-ing 1:12,52Kg

FND/GCV/09-10/379,383&385

13.01.10,13.01.10 & 14.01.10 11.01.10 02.02.10

476 Chinttpurni Engg.Works Barabanki

WCR/TP/2008/142/Switch 1:12,60Kg/294 dt.20.07.09 Curved Switch 1:12,60Kg. 186 18.01.10 15.02.10 15.02.10

477 J.Sons Co. Ltd.Meerut WCR/TP/2008/127/Switch 1:8.5,52Kg./291 dt.29.05.09 Curved Switch 1:8.5,52Kg. 10,100,164 29.01.10 15.02.10 16.02.10

478 M/s Seth & Co, S V Road , Andheri (W), Mumbai

WCR/TP/2008/146/GFN/298 dt. 17.09.2009

GFN Liner (T-3702) S O 354 10.01.2010 15.02.10 15.02.140

479 Cemcon Trck Industries New Delhi

WCR/TP/2008/127/Switch 1:12,52Kg/295 dt.20.07.09 Curved Switch 1:12,52Kg. 96and 97 11.02.10 24.02.10 25.02.10

480 M/s Manish Forging Ltd, Raipur

WCR/TP/2007/101/switch 1:8.5,52Kg/252 dt.04.02.08

OR Fan shaped swirch 1:8.5,52Kg

MFPL/205 31.01.10 19.02.10 04.03.10

481 M/s Eastern Track Udyog Pvt. Ltd. Kolkata

WCR/TP/2008/137/JFP/R/306 dt.09.02.10

Manufacture & Supply of JFP,60 Kg, T-5849

340 A 09.03.10 09.03.10 10.03.10

482Chinttpurni Engg.Works Barabanki

WCR/TP/2008/142/Switch 1:12,60Kg/294 dt.20.07.09 Curved Switch 1:12,60Kg. 187 18.01.10 10.03.10 15.031

483 R.V.Rail Product Pvt.Ltd. Kolkata

WCR/TP/2008/142/Switch 1:12,60Kg/293 dt.20.07.09 Curved Switch 1:12,60Kg. RVRPL/09-10/607 05.03.10 17.03.10 18.03.10

484 R.V.Rail Product Pvt.Ltd. Kolkata

WCR/TP/2008/142/Switch 1:12,60Kg/293 dt.20.07.09 Curved Switch 1:12,60Kg. RVR/09-10/PVC/25 19.11.09 07.12.09 18.03.10

485 M/s Eastern Track Udyog Pvt. Ltd. Kolkata

WCR/TP/2008/137/JFP/R/306 dt.09.02.10

Manufacture & Supply of JFP,60 Kg, T-5849

ETU/349 A 17.03.10 17.03.10 17.03.10

486 Digvijay Steels Pvt. Ltd. Batala

WCR/TP/2007/111/HTW X-ing/257 dt.26.03.08

HTW X-ing 1: 12,60 Kg & 52Kg and 1:8.5, 52Kg. 53/54 25.02.10 18.03.10 18.03.10

487 Digvijay Steels Pvt. Ltd. Batala

WCR/TP/2007/111/HTW X-ing/257 dt.26.03.08

HTW X-ing 1: 12,60 Kg & 52Kg and 1:8.5, 52Kg. 55 25.02.10 18.03.10 18.03.10

488M/s Eastern Track Udyog Pvt. Ltd. Kolkata

WCR/TP/2008/137/JFP/R/306 dt.09.02.10

Manufacture & Supply of JFP,60 Kg, T-5849

356 A 13.03.2010 23.03.2010 23.03.2010

489M/s Eastern Track Udyog Pvt. Ltd. Kolkata

WCR/TP/2008/137/JFP/R/306 dt.09.02.10

Manufacture & Supply of JFP,60 Kg, T-5849

PVC/361/09-10 15.03.10 30.03.2010 30.03.2010

490 M/s Eastern Track Udyog Pvt. Ltd. Kolkata

WCR/TP/2008/137/JFP/R/306 dt.09.02.10

Manufacture & Supply of JFP,60 Kg, T-5849

PVC/360/09-10 15.03.2010 30.03.2010 30.03.2010

491 Digvijay Steels Pvt. Ltd. Batala

WCR/TP/2007/111/HTW X-ing/257 dt.26.03.08

HTW X-ing 1: 12,60 Kg & 52Kg and 1:8.5, 52Kg.

64/PVC,65/PVC and 66/PVC

29.03.10 08.04.10 19.04.10

492 Besco Ltd. Kolkata WCR/TP/2008/140/CMS X-ingh/296 dt.24.07.09

CMS X-ing 1:12,60Kg 0292/R-039/09-10 09.04.10 20.04.10 21.04.10

Page 22: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

493 M/s Seth & Co, S V Road , Andheri (W), Mumbai

WCR/TP/2008/146/GFN/298 dt. 17.09.2009

GFN Liner (T-3702) S O 425 08..04.10 09.04.10 09.04.10

494 M/s Seth & Co, S V Road , Andheri (W), Mumbai

WCR/TP/2008/146/GFN/298 dt. 17.09.2009

GFN Liner (T-3702) S O 428 13.04.10 13.04.10 19.04.10

495Parasnath Enterprises, Haridwar

WCR/TP/2008/146/GFN/302 dt. 14.12.09

GFN Liner (T-3706) 237 20.04.10 20.04.10 20.04.10

M/s Adinath Industries, Gurgaon, Hariyana

WCR/TP/2008/146/GFN/303 dt. 14.12.09

GFN Liner (T-3706) 3 20.04.10 03.05.10 04.05.10

496 J.Sons Co. Ltd.Meerut WCR/TP/2008/127/Switch 1:8.5,52Kg./291 dt.29.05.09 Curved Switch 1:8.5,52Kg. 10100015 & 17

07.05.10 & 08.05.10 13.05.10 17.05.10

497 J.Sons Co. Ltd.Meerut WCR/TP/2009/154/ 'D'Switch 1:8.5,52Kg./307 dt.09.02.10 Derailing Switch 1:8.5,52Kg. 10,100,018 08.05.10 13.05.10 17.05.10

498 Digvijay Steels Pvt. Ltd. Batala

WCR/TP/2007/111/HTW X-ing/257 dt.26.03.08

HTW X-ing 1: 12,60 Kg & 52Kg and 1:8.5, 52Kg. 10 08.05.10 02.06.10 02.06.10

499 Digvijay Steels Pvt. Ltd. Batala

WCR/TP/2007/111/HTW X-ing/257 dt.26.03.08

HTW X-ing 1: 12,60 Kg & 52Kg and 1:8.5, 52Kg. 11 08.05.10 02.06.10 02.06.10

500 Cemcon Trck Industries New Delhi

WCR/TP/2008/127/Switch 1:12,52Kg/295 dt.20.07.09 Curved Switch 1:12,52Kg. 18 & 19 27.05.10 07.06.10 07.06.10

501 Parasnath Enterprises, Haridwar

WCR/TP/2008/146/GFN/302 dt. 14.12.09

GFN Liner (T-3706) 47 22.05.2010 .09.06.10 09.06.10

502 M/s Manish Forging Ltd, Raipur

WCR/TP/2007/105/switch 1:12,52Kg/253 dt.04.02.08

OR Fan shaped swirch 1:12,52Kg

MFPL/49 11.06.10 17.06.10 18.06.10

503 Cemcon Trck Industries New Delhi

WCR/TP/2008/127/Switch 1:12,52Kg/295 dt.20.07.09 Curved Switch 1:12,52Kg. 47 & 48 15.06.10 25.06.10 25.06.10

504 M/s Manish Forging Ltd, Raipur

WCR/TP/2009/156R/ERC/314 dt.07.06.10

ERC-MK-III MFPL/29 23.06.10 28.06.10 01.07.10

505 M/s Manish Forging Ltd, Raipur

WCR/TP/2009/156R/ERC/314 dt.07.06.10

ERC-MK-III MFPL/29 A 23.06.10 28.06.10 01.07.10

506M/s Pathick Engineering Works, New Delhi

WCR/TP/2008/126/269 dt.21.10.08

ERC-MK-v014,015,&016 06.07.10 12.07.10 12.07.10

507 M/s Manish Forging Ltd, Raipur

WCR/TP/2009/156R/ERC/314 dt.07.06.10

ERC-MK-III MFPL/32,33&34 30.06,,02.07&06.07.10

15.07.10 15.07.10

508 R.V.Rail Product Pvt.Ltd. Kolkata

WCR/TP/2008/142/Switch 1:12,60Kg/293 dt.20.07.09 Curved Switch 1:12,60Kg. RVRPL/10-11/182 23.06.10 19.07.10 19.07.10

509 Parasnath Enterprises, Haridwar

WCR/TP/2008/146/GFN/302 dt. 14.12.09

GFN Liner (T-3706) 47 22.05.10 08.06.10 09.06.10

510 WCR/TP/2008/146/GFN/303 dt. 14.12.09

GFN Liner (T-3706) 26 04.06.10 07.07.10 08.07.10

511 J.Sons Co. Ltd.Meerut WCR/TP/2009/154/ 'D'Switch 1:8.5,52Kg./307 dt.09.02.10 Derailing Switch 1:8.5,52Kg. 10,100,049 09.07.10 20.07.10 21.07.10

512Vossloh Beekay Costins Ltd. Bhilai

WCR/TP/2009/149/CMS X-ing/308 dt.23.04.10 CMS X-ing 1:8.5,52 Kg 60Kg 32 & 46

21.05.10 & 26.06.10 28.07.10 29.07.10

513Vossloh Beekay Costins Ltd. Bhilai

WCR/TP/2009/149/CMS X-ing/308 dt.23.04.10 CMS X-ing 1:8.5,52 Kg 60Kg 34 & 47

22.05.10 & 28.06.10 29.07.10 29.07.10

514 Besco Ltd. Kolkata WCR/TP/2008/140/CMS X-ingh/296 dt.24.07.09

CMS X-ing 1:12,60Kg 0435/R-039/09-10 20.07.10 30.07.10 .02.07.10

Page 23: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

515 M/s Manish Forging Ltd, Raipur

WCR/TP/2009/156R/ERC/314 dt.07.06.10

ERC-MK-III MFPL/10-11/wcr/erc/02 06.07.10 15.07.10 15.07.10

516 M/s Manish Forging Ltd, Raipur

WCR/TP/2009/156R/ERC/314 dt.07.06.10

ERC-MK-III MFPL/02/A 15.07.10 16.07.10 16.07.10

517 M/s Manish Forging Ltd, Raipur

WCR/TP/2009/156R/ERC/314 dt.07.06.10

ERC-MK-III MFPL/10-11/wcr/erc/04 29.07.10 03.08.10 03.08.10

518 Digvijay Steels Pvt. Ltd. Batala

WCR/TP/2007/111/HTW X-ing/257 dt.26.03.08

HTW X-ing 1: 12,60 Kg & 52Kg and 1:8.5, 52Kg. 39/40 28.08.10 06.08.10 10.08.10

519Digvijay Steels Pvt. Ltd. Batala

WCR/TP/2007/111/HTW X-ing/257 dt.26.03.08

HTW X-ing 1: 12,60 Kg & 52Kg and 1:8.5, 52Kg. 41,42 & 43 07.08.10 11.08.10 12.08.10

520 J.Sons Co. Ltd.Meerut WCR/TP/2009/154/ 'D'Switch 1:8.5,52Kg./307 dt.09.02.10 Derailing Switch 1:8.5,52Kg. 10,100,051 30.07.10 16.08.10 16.08.10

521 J.Sons Co. Ltd.Meerut WCR/TP/2009/154/ 'D'Switch 1:8.5,52Kg./307 dt.09.02.10 Derailing Switch 1:8.5,52Kg. 10,100,052 30.07.10 17.08.10 17.08.10

522 M/s Manish Forging Ltd, Raipur

WCR/TP/2007/105/switch 1:12,52Kg/253 dt.04.02.08

OR Fan shaped swirch 1:12,52Kg

MFPL/78 11.08.10 18.08.10 25.08.10

523Parasnath Enterprises, Haridwar

WCR/TP/2008/146/GFN/302 dt. 14.12.09

GFN Liner (T-3706) 108 20.08.10 07.09.10 .07.9.10

524M/s Eastern Track Udyog Pvt. Ltd. Kolkata

WCR/TP/2008/137/JFP/R/306 dt.09.02.10

Manufacture & Supply of JFP,60 Kg, T-5849

ETUPL/229 A 10.08.10 23.08.10 25.08.10

525M/s Eastern Track Udyog Pvt. Ltd. Kolkata

WCR/TP/2008/137/JFP/R/306 dt.09.02.10

Manufacture & Supply of JFP,60 Kg, T-5849

PVC/STUPL/230 15.08.10 30.03.2010 30.03.2010

526 M/s Ganpati Industrial Pvt. Ltd kilkata

WCR/TP/2009/150/R/1 M Long F P/315 dt.08.06.10

Manufacture & Supply of 1 M long fish plate

GIPL/10-11/618 18.08.10 23.08.10 25.08.10

527 M/s Creative Engineers, Kota WCR/TP/2008/145/GJ/309 dt.12.05.10

Manufacture & Supply of Glued Joint 60 Kg

21 25.08.10 3.09.10 7.09.10

528 M/s Ganpati Industrial Pvt. Ltd kilkata

WCR/TP/2009/150/R/1 M Long F P/315 dt.08.06.10

Manufacture & Supply of 1 M long fish plate

GIPL/10-11/658 27.08.2010 13.09.2010 14.09.2010

529 M/s Ganpati Industrial Pvt. Ltd kilkata

WCR/TP/2009/150/R/1 M Long F P/315 dt.08.06.10

Manufacture & Supply of 1 M long fish plate

GIPL/10-11/696 05.09.2010 13.09.2010 14.09.2010

530 M/s Ganpati Industrial Pvt. Ltd kilkata

WCR/TP/2009/150/R/1 M Long F P/315 dt.08.06.10

Manufacture & Supply of 1 M long fish plate

GIPL/10-11/PVC/52 06.09.2010 14.09.2010 16.08.2010

531 M/s Ganpati Industrial Pvt. Ltd kilkata

WCR/TP/2009/150/R/1 M Long F P/315 dt.08.06.10

Manufacture & Supply of 1 M long fish plate

GIPL/10-11/PVC/53 06.09.2010 14.09.2010 16.08.2010

532 J.Sons Co. Ltd.Meerut WCR/TP/2009/155/ Curved Switch 1:8.5,52Kg./312 dt.25.05.10 Curved Switch 1:8.5,52Kg. 10,100,063 31.08.10 13.09.10 14.09.10

533 M/s Manish Forging Ltd, Raipur

WCR/TP/2009/151/switch 1:8.5,60Kg & 52Kg/300

OR Fan shaped swirch 1:12,52Kg

MFPL/147 02.09.10 13.09.10 14.09.10

534Vossloh Beekay Costins Ltd. Bhilai

WCR/TP/2009/149/CMS X-ing/308 dt.23.04.10 CMS X-ing 1:8.5,52 Kg 60Kg 64 & 65 29.07.10 21.09.10 24.09.10

535Vossloh Beekay Costins Ltd. Bhilai

WCR/TP/2009/149/CMS X-ing/308 dt.23.04.10 CMS X-ing 1:8.5,52 Kg 60Kg 32 & 46 21.05.10,26.06.10 20.09.10 27.09.10

536Vossloh Beekay Costins Ltd. Bhilai

WCR/TP/2009/149/CMS X-ing/308 dt.23.04.10 CMS X-ing 1:8.5,52 Kg 60Kg 21,34,35,47

29.04.10,22.05.10,22.05.10,28.06.1 20.09.10 27.09.10

537Vossloh Beekay Costins Ltd. Bhilai

WCR/TP/2009/149/CMS X-ing/308 dt.23.04.10 CMS X-ing 1:8.5,52 Kg 60Kg 55,56,64,65

10.07.10,10.07.10,29.07.10,29.07.1 20.09.10 27.09.10

Page 24: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

538 M/s Manish Forging Ltd, Raipur

WCR/TP/2009/151/switch 1:8.5,60Kg & 52Kg/300

OR Fan shaped swirch 1:8.5,52Kg

MFPL/154 09.09.10 23.09.10 27.09.10

539calcast ferrous Ltd. Kolkata WCR/TS/2005/44/Switch/137

dt.22.08.06OR Fan shaped swirch

1:8.5,60Kg CFL/FAN/07-08/43 SUPP 27.09.10 30.09.10 01.10..10

540Calcutta Spring Kolkata WCR/TS/2005/43/Switch/141

dt.04.09.06OR Fan shaped swirch

1:12,60Kg CSL/FAN/07-08/47 SUPP 27.09.10 30.09.10 01.10..10

541J.Sons Co. Ltd.Meerut WCR/TP/2009/155/ Curved

Switch 1:8.5,52Kg./312 dt.25.05.10 Curved Switch 1:8.5,52Kg. 10100066,7019.09.10, 28.09.10 06.10.10 12.10.10

542J.Sons Co. Ltd.Meerut WCR/TP/2009/155/ Curved

Switch 1:8.5,52Kg./312 dt.25.05.10 Curved Switch 1:8.5,52Kg. 10100068,69,7129.09.10, 30.09.10 08.10.10 12.10.10

543 Besco Ltd. Kolkata WCR/TP/2008/140/CMS X-ingh/296 dt.24.07.09

CMS X-ing 1:12,60Kg 0546/R-039/09-10 04.10.10 13.10.10 22.10.10

544 Besco Ltd. Kolkata WCR/TP/2008/140/CMS X-ingh/296 dt.24.07.09

CMS X-ing 1:12,60Kg 0555/R-039/09-10 08.10.10 22.10.10 22.10.10

545 Besco Ltd. Kolkata WCR/TP/2008/140/CMS X-ingh/296 dt.24.07.09

CMS X-ing 1:12,60Kg 0551/R-039/09-10 06.10.10 21.10.10 22.10.10

546J.Sons Co. Ltd.Meerut WCR/TP/2009/155/ Curved

Switch 1:8.5,52Kg./312 dt.25.05.10 Curved Switch 1:8.5,52Kg. 10,100,075 24.10.10 11.11.10 11.11.10

547J.Sons Co. Ltd.Meerut WCR/TP/2009/155/ Curved

Switch 1:8.5,52Kg./312 dt.25.05.10 Curved Switch 1:8.5,52Kg. 10,100,081 04.11.10 16.11.10 16.11.10

548 Besco Ltd. Kolkata WCR/TP/2008/140/CMS X-ingh/296 dt.24.07.09

CMS X-ing 1:12,60Kg 0023/R-039/10-11 20.10.10 13.12.10 13.12.10

549J.Sons Co. Ltd.Meerut WCR/TP/2009/155/ Curved

Switch 1:8.5,52Kg./312 dt.25.05.10 Curved Switch 1:8.5,52Kg. 10100084,8706.12.10, 11.12.10 21.12.10 22.12.10

550 M/s Manish Forging Ltd, Raipur

WCR/TP/2007/105/switch 1:12,52Kg/253 dt.04.02.08

OR Fan shaped swirch 1:12,52Kg

MFPL/218A 05.12.10 21.12.10 22.12.10

551 Besco Ltd. Kolkata WCR/TP/2008/140/CMS X-ingh/296 dt.24.07.09

CMS X-ing 1:12,60Kg 0095/R-039/10-11 15.12.10 20.12.10 23.12.10

552 J.Sons Co. Ltd.Meerut WCR/TP/2009/154/ 'D'Switch 1:8.5,52Kg./307 dt.09.02.10 Derailing Switch 1:8.5,52Kg. 10100095/97 17.12.10 22.12.10 28.12.10 28.12.10

553 M/s Manish Forging Ltd, Raipur

WCR/TP/2009/151/switch 1:8.5,60Kg & 52Kg/300

OR Fan shaped swirch 1:12,52Kg

MFPL/124 10.12.10 29.12.10 05.01.11

554 J.Sons Co. Ltd.Meerut WCR/TP/2009/154/ 'D'Switch 1:8.5,52Kg./307 dt.09.02.10 Derailing Switch 1:8.5,52Kg. 10100086,88 09.12.10 11.12.10 07.01.11 07.01.11

555 M/s Adinath Industries, Gurgaon, Hariyana

WCR/TP/2008/146/GFN/303 dt. 14.12.09

GFN Liner (T-3706) 26 04.06.10 07.37.2010 08.07.2010

556 M/s Adinath Industries, Gurgaon, Hariyana

WCR/TP/2008/146/GFN/303 dt. 14.12.09

GFN Liner (T-3706) 153 12.11.2010 25.11.2010 25.11.2010

557 M/s Adinath Industries, Gurgaon, Hariyana

WCR/TP/2008/146/GFN/303 dt. 14.12.09

GFN Liner (T-3706) 184 07.12.2010 12.01.2011 12.01.2011

558M/s vossloh Beekay Raipur WCR/TP/2010160R-A/CMS X-

ing/320 dt.23.11.10 CMS X-ing 1:12,52Kg 190 16.12.10 12.01.11 17.01.11

559M/s vossloh Beekay Raipur WCR/TP/2010160R-A/CMS X-

ing/320 dt.23.11.10 CMS X-ing 1:12,52Kg 201 31.12.10 12.01.11 17.01.11

560 J.Sons Co. Ltd.Meerut WCR/TP/2009/154/ 'D'Switch 1:8.5,52Kg./307 dt.09.02.10 Derailing Switch 1:8.5,52Kg. 10,100,101,102

29.12.1 0, 30.12.10 17.01.11 17.01.11

Page 25: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

561 J.Sons Co. Ltd.Meerut WCR/TP/2009/154/ 'D'Switch 1:8.5,52Kg./307 dt.09.02.10 Derailing Switch 1:8.5,52Kg. 10,100,108 18.01.11 28.01.11 31.01.11

562J.Sons Co. Ltd.Meerut WCR/TP/2009/155/ Curved

Switch 1:8.5,52Kg./312 dt.25.05.10 Curved Switch 1:8.5,52Kg. 10,100,109 18.01.11 31.01.11 31.01.11

563 Cemcon Trck Industries New Delhi

WCR/TP/2008/127/Switch 1:12,52Kg/295 dt.20.07.09 Curved Switch 1:12,52Kg. 111 & 112 12.01.11 02.02.11 03.02.11

564 Cemcon Trck Industries New Delhi

WCR/TP/2008/127/Switch 1:12,52Kg/295 dt.20.07.09 Curved Switch 1:12,52Kg. 116 & 117 15.01.11 02.02.11 03.02.11

565Besco Ltd. Kolkata WCR/TP/2010160R-A/CMS X-

ing/321 dt.23.11.10 CMS X-ing 1:8.5,52 Kg 0149/S-086/10-11 29.01.11 07.02.11 10.02.11

566M/s vossloh Beekay Raipur WCR/TP/2010160R-A/CMS X-

ing/320 dt.23.11.10 CMS X-ing 1:12,52Kg 212 07.02.11 14.02.11 14.02.11

567Besco Ltd. Kolkata WCR/TP/2010160R-A/CMS X-

ing/321 dt.23.11.10 CMS X-ing 1:8.5,52 Kg 0161/S-086/10-11 0153/S-086/10-11

10.02.11 04.02.11 17.02.11 18.02.11

568Calcutta Spring Kolkata WCR/TP/2009/151/Switch

1:8.5,52Kg/301 dt.07.12.09 Curved Switch 1:8.5,52Kg. CSL/FAN/2010-11/1311.06.10/24.01.1

1 23.02.11 24.02.11

569Besco Ltd. Kolkata WCR/TP/2010160R-A/CMS X-

ing/321 dt.23.11.10 CMS X-ing 1:8.5,52 Kg 0176/S-086/10-11 02.03.11 09.03.11 09.03.11

570M/s Manish Forging Ltd, Raipur

WCR/TP/2009/151/switch 1:8.5,60Kg & 52Kg/300

OR Fan shaped swirch 1:8.5,52Kg

MFPL/305 22.02.11 22.03.11 01.04.11

571Besco Ltd. Kolkata WCR/TP/2010160R-A/CMS X-

ing/321 dt.23.11.10 CMS X-ing 1:8.5,52 Kg 0218/S-086/10-11 26.03.11 07.04.11 08.04.11

572Besco Ltd. Kolkata WCR/TP/2010160R-A/CMS X-

ing/321 dt.23.11.10 CMS X-ing 1:8.5,52 Kg 0236/S-086/10-11 08.04.11 19.04.11 21.04.11

573Besco Ltd. Kolkata WCR/TP/2010160R-A/CMS X-

ing/321 dt.23.11.10 CMS X-ing 1:8.5,52 Kg 0245/S-086/10-11 30.04.11 11.05.11 11.05.11

574Cemcon Trck Industries New Delhi

WCR/TP/2008/127/Switch 1:12,52Kg/295 dt.20.07.09 Curved Switch 1:12,52Kg. 121 & 123 28.01.11 29.03.11 13.05.11

575M/s Manish Forging Ltd, Raipur

WCR/TP/2009/151/switch 1:8.5,60Kg & 52Kg/300

OR Fan shaped swirch 1:8.5,52Kg

MFPL/16 19.04.11 29.04.11 13.05.11

576M/s Manish Forging Ltd, Raipur

WCR/TP/2007/105/switch 1:12,52Kg/253 dt.04.02.08

OR Fan shaped swirch 1:12,52Kg

MFPL/280 05.03.11 22.03.11 13.05.11

577J.Sons Co. Ltd.Meerut WCR/TP/2009/155/ Curved

Switch 1:8.5,52Kg./312 dt.25.05.10 Curved Switch 1:8.5,52Kg. 010100014 & 15 06.05.11 18.05.11 23.05.11578

579J.Sons Co. Ltd.Meerut WCR/TP/2009/155/ Curved

Switch 1:8.5,52Kg./312 dt.25.05.10 Curved Switch 1:8.5,52Kg. 10,100,031 27.06.11 07.07.11 08.07.11

580J.Sons Co. Ltd.Meerut WCR/TP/2009/154/ 'D'Switch

1:8.5,52Kg./307 dt.09.02.10 Derailing Switch 1:8.5,52Kg. 010100034,3502.07.11, 03.07.11 20.07.11 21.07.11

581M/s SRINIVASA Enterprises, Hyderabad

WCR/TP/2008/145/GJ/322 dt.27.12.2010 Glued Joint 60 Kg T-2572

SE/GJ/16 dated 07.07.2011

07.07.2011 20.07.11 21.07.2011

582M/s Kontinental Steel Korporation Distt- Durg (C G)

WCR/TP/2010/169/FP/328 dt.23.06.2011

1 M Long Fish Plate 60 Kg , T-5916

KSK/RMD/573 dated 23.07.2011

23.07.2011 08.08.2011 09.08.2011

583M/s Kontinental Steel Korporation Distt- Durg (C G)

WCR/TP/2010/169/FP/328 dt.23.06.2011

1 M Long Fish Plate 60 Kg , T-5916

KSK/RMD/615 dated 30.07.2011

30.07.2011 10.08.2011 11.08.2011

584M/s Manish Forging Ltd, Raipur

WCR/TP/2009/151/switch 1:8.5,60Kg & 52Kg/300

OR Fan shaped swirch 1:8.5,52Kg

MFPL/94 29.07.11 10.08.11 18.08.11

Page 26: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

585M/s Manish Forging Ltd, Raipur

WCR/TP/2009/151/switch 1:8.5,60Kg & 52Kg/300

OR Fan shaped swirch 1:8.5,52Kg

MFPL/84 26.07.11 10.08.11 18.08.11

586M/s Manish Forging Ltd, Raipur

WCR/TP/2009/151/switch 1:8.5,60Kg & 52Kg/300

OR Fan shaped swirch 1:8.5,52Kg

MFPL/95 31.07.11 16.08.11 18.08.11

587J.Sons Co. Ltd.Meerut WCR/TP/2009/154/ 'D'Switch

1:8.5,52Kg./307 dt.09.02.10 Derailing Switch 1:8.5,52Kg. 010100039,4021.07.11, 22.07.11 18.08.11 18.08.11

588 M/s Creative Engneers Kota WCR/TP?2008/145/GJ/309 dated 12.05.2010

Glued Joint 60 Kg T-2572 026 dated 16.08.2011 16.08.2011 24.08.2011 24.08.2011

589M/s Kontinental Steel Korporation Distt- Durg (C G)

WCR/TP/2010/169/FP/328 dt.23.06.2011

1 M Long Fish Plate 60 Kg , T-5916

KSK/RMD/730 dated 27.08.2011

27.08.2011 06.09.2011 08.09.2011

590M/s Kontinental Steel Korporation Distt- Durg (C G)

WCR/TP/2010/169/FP/328 dt.23.06.2011

1 M Long Fish Plate 60 Kg , T-5916

KSK/RMD/734 dated 27.08.2011

27.08.2011 06.09.2011 08.09.2011

591J.Sons Co. Ltd.Meerut WCR/TP/2009/155/ Curved

Switch 1:8.5,52Kg./312 dt.25.05.10 Curved Switch 1:8.5,52Kg. JCL/PVC/312/01 08.12.00 08.12.11 13.12.11

592J.Sons Co. Ltd.Meerut WCR/TP/2009/154/ 'D'Switch

1:8.5,52Kg./307 dt.09.02.10 Derailing Switch 1:8.5,52Kg. JCL/PVC/312/01 & 02 08.12.11 08.12.11 15.12.11

593M/s Techma Engg. Ent. Pvt. Ltd. Kolkata

WCR/TP/2010/169/FP/331 dt.01.08.2011

1 M Long Fish Plate 60 Kg , T-5916

TRRPL/M/2011-12/22 14.11.2011 01.12.2011 02.12.2011

594M/s Manish Forging Ltd, Raipur

WCR/TP/209/159R/ERC/314 dt. 07.06.10

ERC-III MFPL/11-12/WCR/ERC/13

02.11.2011 30.11.11 01.12.11

595M/s Manish Forging Ltd, Raipur

WCR/TP/209/159R/ERC/314 dt. 07.06.10

ERC-III MFPL/11-12/WCR/ERC/15

17.11.11 30.11.11 01.12.11

596M/s Manish Forging Ltd, Raipur

WCR/TP/209/159R/ERC/314 dt. 07.06.10

ERC-III MFPL/11-12/WCR/ERC/17

28.11.11 01.12.11 02.12.11

597M/s Techma Engg. Ent. Pvt. Ltd. Kolkata

WCR/TP/2010/169/FP/331 dt.01.08.2011

1 M Long Fish Plate 60 Kg , T-5916

TRRPL/M/2011-12/22 14.11.2011 07.12.2011 07.12.2011

598M/s Manish Forging Ltd, Raipur

WCR/TP/209/159R/ERC/314 dt. 07.06.10

ERC-III MFPL/11-12/WCR/ERC/16 21.11.11 06.12.11 07.12.11

599M/s Kontinental Steel Korporation Distt- Durg (C G)

WCR/TP/2010/169/FP/328 dt.23.06.2011

1 M Long Fish Plate 60 Kg , T-5916

KSK/RMD/573/PVC 19.10.2011 09.11.2011 09.11.2011

600M/s Manish Forging Ltd, Raipur

WCR/TP/209/159R/ERC/314 dt. 07.06.10

ERC-III MFPL/11-12/WCR/ERC/18 04.12.11 07.12.11 09.12.11

601M/s Manish Forging Ltd, Raipur

WCR/TP/209/159R/ERC/314 dt. 07.06.10

ERC-III MFPL/11-12/WCR/ERC/19 04.12.11 07.12.11 09.12.11

602M/s Kontinental Steel Korporation Distt- Durg (C G)

WCR/TP/2010/169/FP/328 dt.23.06.2011

1 M Long Fish Plate 60 Kg , T-5916

KSK/RMD/615 & 758/PVC

19.10.2011 09.11.2011 09.11.2011

603M/s Shyamashyam Glutech Corporation, AGRA

WCR/TP/2008/145/GJ/318 dated 30.09.2010

Glued Joint 60 Kg T-2572 3 24.09.2011 26.09.2011 30.09.2011

604M/s Shyamashyam Glutech Corporation, AGRA

WCR/TP/2008/145/GJ/318 dated 30.09.2010

Glued Joint 60 Kg T-2572 4 27.12.2011 28.12.2011 02.01.2012

605M/s SRINIVASA Enterprises, Hyderabad

WCR/TP/2008/145/GJ/322 dt.27.12.2010 Glued Joint 60 Kg T-2572 SE/GJ/16, 11,04 & 31 09.10.2011 22.10.2011 24.10.2011

606M/s Manish Forging Ltd, Raipur

WCR/TP/2007/105/switch 1:12,52Kg/253 dt.04.02.08

OR Fan shaped swirch 1:12,52Kg

MFPL/133 09.12.11 19.12.11 20.12.11

607Cemcon Trck Industries New Delhi

WCR/TP/2008/127/Switch 1:12,52Kg/295 dt.20.07.09 Curved Switch 1:12,52Kg. CTI/16 10.12.11 12.12.11 02.01.12

Page 27: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

608Cemcon Trck Industries New Delhi

WCR/TP/2008/127/Switch 1:12,52Kg/295 dt.20.07.09 Curved Switch 1:12,52Kg. CTI/15 10.12.11 12.12.11 02.01.12

609M/s Bhaskar Ind. Dev. Ltd., Kolkata

WCR/TP/2010/169/FP/332 dt. 01.08.2011

1 M Long Fish Plate 52 Kg , T-5915

BID/M/042/11-12 30.12.2011 04.01.12 05.01.12

610M/s Bhaskar Ind. Dev. Ltd., Kolkata

WCR/TP/2010/169/FP/332 dt. 01.08.2011

1 M Long Fish Plate 52 Kg , T-5915

BID/M/PVC/025/11-12 30.12.2011 10.01.12 12.01.12

611M/s Techma Engg. Ent. Pvt. Ltd. Kolkata

WCR/TP/2010/169/FP/331 dt. 01.08.2011

1 M Long Fish Plate 52 Kg , T-5915

TEEPL/M/2011-12/31 29.12.2011 16.01.12 16.01.12

612M/s Techma Engg. Ent. Pvt. Ltd. Kolkata

WCR/TP/2010/169/FP/331 dt. 01.08.2011

1 M Long Fish Plate 60 Kg , T-5916

TEEPL/M/2011-12/33 31.12.2011 16.01.12 17.01.12

613 M/s Seth & Co, Mumbai WCR/TP/2011/179/GFN/335 dt. 17.11.2011

GFN Liner 60 Kg RDSO Drg No. T-3706

S005 04.01.12 16.01.12 16.01.12

614 M/s Seth & Co, Mumbai WCR/TP/2011/179/GFN/335 dt. 17.11.2011

GFN Liner 60 Kg RDSO Drg No. T-3706

S006 04.01.12 16.01.12 17.01.12

615 M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11

CMS X-ing 1:12,60Kg FDN/GCV/11-12/689,690&692

26.12.2011 08.01.12 09.01.12

616J.Sons Co. Ltd.Meerut WCR/TP/2009/154/ 'D'Switch

1:8.5,52Kg./307 dt.09.02.10 Derailing Switch 1:8.5,52Kg. JCL/PVC/307/03 & 04 09.01.12 17.01.12 19.01.12

617J.Sons Co. Ltd.Meerut WCR/TP/2009/155/ Curved

Switch 1:8.5,52Kg./312 dt.25.05.10 Curved Switch 1:8.5,52Kg. JCL/PVC/312/02 09.01.12 17.01.12 20.01.12

618J.Sons Co. Ltd.Meerut WCR/TP/2008/127/Switch

1:8.5,52Kg./291 dt.29.05.09 Curved Switch 1:8.5,52Kg. JCL/PVC/291/01,02,03 09.01.12 17.01.12 25.01.12

619M/s. P. K. Techno Projects Pvt. Ltd., Delhi

WCR/TP/2010176.GR Pad/337 dated 21.11.2011

GR Pad, 60 kg RDSO Drg. No. T-3711 PKT/BILL/06 21.01.12 25.01.12 25.01.12

620 M/s Creative Engneers Kota WCR/TP?2008/145/GJ/309 dated 12.05.2010

Glued Joint 60 Kg T-2572 62 18.01.2012 23.01.12 24.08.2011

621Vossloh Beekay Costins Ltd. Bhilai

WCR/TP/2010 R-A/CMS X-ing/320 dt.23.11.10 CMS X-ing 1:12,52 Kg

PVC/212/JBP and PVC/190/BPL 06.02.12 06.02.12 06.02.12

622 M/s Techma Engg. Ent. Pvt. Ltd. Kolkata

WCR/TP/2010/169/FP/331 dt. 01.08.2011

1 M Long Fish Plate 60 Kg ,T-5916

TEEPL/M/2011-12/32 29.12.2011 21.02.2012 22.02.2012

623M/s Techma Engg. Ent. Pvt. Ltd. Kolkata

WCR/TP/2010/171/JFP/334 dt. 03.10.2011

Joggled Fish Plate 60 Kg RDSO Drg No. T-5849

TEEPL/M/2011-12/38 12.02.2012 21.02.2012 21.02.2012

624 M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11

CMS X-ing 1:12,60Kg FDN/GCV/11-12/774,775&776

31.01.12 15.02.12 16.02.12

625 M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11

CMS X-ing 1:12,60Kg FDN/GCV/11-12/773 31.01.12 15.02.12 16.02.12

626 M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11

CMS X-ing 1:12,60Kg FDN/GCV/11-12/791 31.01.12 15.02.12 17.02.12

627 M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11

CMS X-ing 1:12,60Kg FDN/GCV/11-12/821 23.02.12 20.03.12 20.03.12

628 M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11

CMS X-ing 1:12,60Kg FDN/GCV/11-12/824 24.02.12 20.03.12 20.03.12

629 M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11

CMS X-ing 1:12,60Kg FDN/GCV/11-12/832 27.02.12 20.03.12 20.03.12

630Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2011-12/106 26.03.12 27.03.12 27.03.12

Page 28: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

631Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2011-12/107 26.03.12 27.03.12 27.03.12

632 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/195/2011-2012/90% 26.03.12 27.03.12 27.03.12

633Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:8.5,60Kg DU/34/2011-2012/90% 26.03.12 27.03.12 27.03.12

634Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:12,60Kg DU/14/2011-2012/10% 29.03.12 30.03.12 30.03.12

635 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/196/2011-2012/90% 31.03.12 02.04.12 02.04.12

636Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:8.5,60Kg DU/35/2011-2012/90% 31.03.12 02.04.12 02.04.12

637Vishal Nirmiti Pvt. Ltd. Bankhedi

WCR/TP/2009/152/T/out Sleeper/310/VNPL Dt. 12/05/2010 T-out sleeper 1:8.5,60Kg

VNPL/100%/T-out/2012-13/01 4/4/2012 9/4/2012 9/4/2012

638Vishal Nirmiti Pvt. Ltd. Bankhedi

WCR/TP/2010163/'D' Switch Sleeper/327/VNPL Dt. 20/06/2011

T-out sleeper De- Railing Switch

VNPL/T-out/D-S/2012-13/01 4/4/2012 9/4/2012 9/4/2012

639Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/108 3/4/2012 9/4/2012 9/4/2012

640Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/10%/2012-13/92 3/4/2012 9/4/2012 9/4/2012

641Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/100%/2012-13/05 4/4/2012 9/4/2012 9/4/2012

642 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/197/2011-2012/90% 07.04.12 09.04.12 09.04.12

643P. K. Techno Projects Pvt. Ltd., Delhi

WCR/TP/2010176/GR Pad/337 dated 21.11.2011 G R Pad 60 kg. PKT/BILL/07 13.03.2012 21.03.2012 03.04.2012

644P. L. Polymer, Delhi WCR/TP/2010176/G R Pad/338

dtd. 21.11.2011 G R Pad 60 kg. PLP/BILL/57 dated 24.03.2012 29.03.2012 04.04.2012

645P. L. Polymer, Delhi WCR/TP/2010176/G R Pad/336

dtd. 21.11.2011 G R Pad 60 kg. PLP/BILL/60 dated 24.03.2012 29.03.2012 04.04.2012

646P. L. Polymer, Delhi WCR/TP/2011184/GR Pad/343

dated 10.01.2012 G R Pad 52 kg. PLP/BILL/54 24.03.2012 29.03.2012 03.04.2012

647P. L. Polymer, Delhi WCR/TP/2011184/GR Pad/343

dated 10.01.2012 G R Pad 60 kg. PLP/BILL/55 & 56 24.03.2012 29.03.2012 03.04.2012

648P. L. Polymer, Delhi WCR/TP/2011184/GR Pad/343

dated 10.01.2012 G R Pad 60 kg. PLP/BILL/58 24.03.2012 29.03.2012 03.04.2012

649P. L. Polymer, Delhi WCR/TP/2011184/GR Pad/343

dated 10.01.2012 G R Pad 60 kg. PLP/BILL/59 24.03.2012 29.03.2012 03.04.2012650 Shri Kesharia Bareth CS-162 MBC M/L sleeper MBC sales/11-12/54 14.03.12 10.04.12 10.04.12651 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./11-12/60 22.03.12 10.04.12 10.04.12652 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./11-12/61 26.03.12 10.04.12 10.04.12653 Shri Kesharia Bareth CS-162 MBC M/L sleeper MBC sales/11-12/55 15.03.12 11.04.12 11.04.12654 Shri Kesharia Bareth CS-162 MBC M/L sleeper MBC sales/11-12/56 26.03.12 11.04.12 11.04.12655 Shri Kesharia Bareth CS-162 MBC M/L sleeper MBC sales/11-12/57 31.03.12 11.04.12 11.04.12

656Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/109 10.04.12 11.04.12 11.04.12

657 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/88/2012-2013/10% 10.04.12 11.04.12 11.04.12658 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/89/2012-2013/10% 10.04.12 11.04.12 11.04.12

Page 29: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

659Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:12,60Kg DU/15/2012-2013/10% 10.04.12 11.04.12 11.04.12

660 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/198/2012-2013/90% 11.04.12 12.04.12 12.04.12

661Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:12,60Kg DU/17/2012-2013/10% 11.04.12 12.04.12 12.04.12

662Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:8.5,60Kg DU/16/2012-2013/10% 10.04.12 11.04.12 12.04.12

663 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./12-13/01 06.04.12 12.04.12 12.04.12664 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./12-13/02 11.04.12 12.04.12 12.04.12

665Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:12,60Kg DU/18/2012-2013/10% 12.04.12 13.04.12 13.04.12

666Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:12,60Kg DU/19/2012-2013/10% 12.04.12 13.04.12 13.04.12

667Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:12,60Kg DU/20/2012-2013/10% 12.04.12 13.04.12 13.04.12

668Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:12,60Kg DU/21/2012-2013/10% 12.04.12 13.04.12 13.04.12

669Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:12,60Kg DU/22/2012-2013/10% 12.04.12 13.04.12 13.04.12

670Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:12,60Kg DU/23/2012-2013/10% 12.04.12 13.04.12 13.04.12

627 M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11

CMS X-ing 1:12,60Kg FDN/GCV/11-12/893 26.03.12 13.04.12 16.04.12

628 M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11

CMS X-ing 1:12,60Kg FDN/GCV/11-12/883 22.03.12 13.04.12 16.04.12

629 M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11

CMS X-ing 1:12,60Kg FDN/GCV/11-12/881 21.03.12 13.04.12 16.04.12

627 M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11

CMS X-ing 1:12,60Kg FDN/GCV/12-13/5 05.04.12 13.04.12 16.04.12

628 M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11

CMS X-ing 1:12,60Kg FDN/GCV/12-13/6 05.04.12 13.04.12 16.04.12

629 M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11

CMS X-ing 1:12,60Kg FDN/GCV/12-13/7 05.04.12 13.04.12 16.04.12

630Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:8.5,60Kg DU/24/2012-2013/10% 14.04.12 16.04.12 16.04.12

631Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:12,60Kg DU/25/2012-2013/10% 14.04.12 16.04.12 16.04.12

632 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/199/2012-2013/90% 14.04.12 16.04.12 16.04.12

633Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/110 13.04.12 16.04.12 16.04.12

634Vishal Nirmiti Pvt. Ltd. Bankhedi

WCR/TP/2010164/FPJ/329/VNPL Dt. 28/06/2011 Fish Plated Joint sleeper

VNPL/90%/FPJ/2012-13/08 16.04.12 18.04.12 18.04.12

634 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/200/2012-2013/90% 18.04.12 19.04.12 19.04.12

635Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/111 19.04.12 20.04.12 20.04.12

636 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/201/2012-2013/90% 21.04.12 23.04.12 23.04.12

Page 30: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

637 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./12-13/03 17.04.12 23.04.12 23.04.12

638 M/s Seth & Co, Mumbai WCR/TP/2011/179/GFN/335 dt. 17.11.2011

GFN Liner 60 Kg RDSO Drg No. T-3706

S003 02.04.12 23.04.12 24.04.12

639 M/s Seth & Co, Mumbai WCR/TP/2011/179/GFN/346 dt. 19.01.2012

GFN Liner 52 Kg RDSO Drg No. T-3702

S002 02.04.12 23.04.12 24.04.12

640 M/s Seth & Co, Mumbai WCR/TP/2011/179/GFN/335 dt. 17.11.20121

GFN Liner 60 Kg RDSO Drg No. T-3706

S004 01.04.12 25.04.12 26.04.12

641 M/s Seth & Co, Mumbai WCR/TP/2011/179/GFN/346 dt. 19.01.2012

GFN Liner 52 Kg RDSO Drg No. T-3702

S005 01.04.12 25.04.12 26.04.12

642 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./12-13/04 21.04.12 26.04.12 26.04.12643 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/202/2012-2013/90% 25.04.12 26.04.12 26.04.12644 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/90/2012-2013/10% 21.04.12 26.04.12 26.04.12

645Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:12,60Kg DU/26/2012-2013/10% 25.04.12 26.04.12 26.04.13

646Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:12,60Kg DU/27/2012-2013/10% 28.04.12 30.04.12 30.04.12

647 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/203/2012-2013/90% 28.04.12 30.04.12 30.04.12648 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/91/2012-2013/10% 28.04.12 30.04.12 30.04.12

649Donypolo Udyog Ltd. Shamgarh CS-160 MBC M/L sleeper

DU/01/2011-2012/Esc Freight 02.03.12 30.04.12 30.04.12

650Donypolo Udyog Ltd. Shamgarh CS-160 MBC M/L sleeper

DU/02/2011-2012/Esc Freight 02.03.12 30.04.12 30.04.12

651 M/s Seth & Co, Mumbai WCR/TP/2011/179/GFN/346 dt. 19.01.2012

GFN Liner 52 Kg RDSO Drg No. T-3702

S001 02.04.12 01.05.12 03.05.12

652 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./12-13/05 30.04.12 03.05.12 03.05.12

653Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/112 03.05.12 07.05.12 07.05.12

654Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/10%/2012-13/93 03.05.12 07.05.12 07.05.12

655Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/10%/2012-13/94 03.05.12 07.05.12 07.05.12

656Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/10%/2012-13/95 03.05.12 07.05.12 07.05.12

657Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/10%/2012-13/96 03.05.12 07.05.12 07.05.12

658Vishal Nirmiti Pvt. Ltd. Bankhedi

WCR/TP/2010164/FPJ/329/VNPL Dt. 28/06/2011 Fish Plated Joint sleeper

VNPL/10%/FPJ/2012-13/03 03.05.12 07.05.13 07.05.13

659Vishal Nirmiti Pvt. Ltd. Bankhedi

WCR/TP/2010164/Spl.Sleeper/330/VNPL Dt. 28/06/2011 Fish Plated Joint sleeper

VNPL/10%/B.App./2012-13/06 03.05.12 07.05.13 07.05.13

660Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/113 07.05.12 08.05.12 08.05.12

661Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/10%/2012-13/97 07.05.12 08.05.12 08.05.12

662 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/204/2012-2013/90% 07.05.12 08.05.12 08.05.12663 Shri Kesharia Bareth CS-162 MBC M/L sleeper MBC sales/11-12/50 14.02.12 09.05.12 09.05.12

Page 31: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

664Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:12,60Kg DU/28/2012-2013/10% 08.05.12 09.05.12 09.05.12

665Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:12,60Kg DU/29/2012-2013/10% 08.05.12 09.05.12 09.05.12

666Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:12,60Kg DU/30/2012-2013/10% 08.05.12 09.05.12 09.05.12

667Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:12,60Kg DU/31/2012-2013/10% 08.05.12 09.05.12 09.05.12

668Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/10%/2012-13/98 09.05.12 10.05.12 10.05.12

669 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/205/2012-2013/90% 10.05.12 11.05.12 11.05.12670 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/206/2012-2013/90% 13.05.12 14.05.12 14.05.12671 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./12-13/06 09.05.12 15.05.12 17.05.12

672Suchita Steels (India) WCR/TP/2011183/M S Liner/348

dtd. 20.03.11 M S Liner 60 kg 6 19.04.12 27.04.12 27.04.12

673Pragati Steels WCR/TP/2011183/M S Liner/358

dtd. 08.04.12 M S Liner 60 kg 003 & 004 19.04.12 26.04.12 26.04.12

674Pragati Steels WCR/TP/2011183/M S Liner/358

dtd. 08.04.12 M S Liner 60 kg 8 03.05.12 10.05.12 10.05.12

675Pragati Steels WCR/TP/2011183/M S Liner/358

dtd. 08.04.12 M S Liner 60 kg 006 & 00728.04.12 &

01.05.12 10.05.12 11.05.12

676P. L. Polymer, Delhi WCR/TP/2011184/G R Pad/343

dtd. 10.01.12 G R Pad 60 kg. PLP/BILL/02, 05 & 06 05.05.12 09.05.12 09.05.12

677P. L. Polymer, Delhi WCR/TP/2011184/G R Pad/343

dtd. 10.01.12 G R Pad 52 kg. PLP/BILL/03 & 04 05.05.12 09.05.12 10.05.12

678P. L. Polymer, Delhi WCR/TP/2011184/G R Pad/343

dtd. 10.01.12 G R Pad 52 kg. PLP/BILL/07 05.05.12 10.05.12 14.05.12

679P. L. Polymer, Delhi WCR/TP/2011184/G R Pad/343

dtd. 10.01.12 G R Pad 602 kg. PLP/BILL/08 05.05.12 10.05.12 14.05.12680 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/92/2012-2013/10% 17.05.12 18.05.12 18.05.12681 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/207/2012-2013/90% 19.05.12 21.05.12 21.05.12682 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/01/2012-2013/Ft. 07.05.12 21.05.12 21.05.12

683Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:12,60Kg DU/32/2012-2013/10% 19.05.12 21.05.12 21.05.12

684Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/114 16.05.12 18.05.12 21.05.12

685 M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/38 23.04.12. 23.05.12. 24.05.12.

686M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/37 23.04.12. 23.05.12. 24.05.12.

687M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/41 23.04.12. 23.05.12. 24.05.12.

688M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/59 04.05.12. 23.05.12. 24.05.12.

689M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/60 04.05.12. 23.05.12. 24.05.12.

Page 32: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

690M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/61 04.05.12. 23.05.12. 24.05.12.

691M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/881S,883S,893S,5S,6S&7S

03.05.12. 23.05.12. 24.05.12.

Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./12-13/07 15.05.12 22.05.12 23.05.12692 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 30.04.12 22.05.12 23.05.12693 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/208/2012-2013/90% 22.05.12 23.05.12 23.05.12

694 Parasnath Enterprises, New Delhi

WCR/TO/2011/179/GFN/345 dated 19.01.2012

GFN Liner 60 Kg RDSO Drg No. T-3706

243 31.03.2012 15.05.12 22.05.2012

695 Techma Engineering Enterprises Pvt. Ltd Kokata

WCR/TP/2010/171/JFP/334 dt. 03.10.2011

Joggled Fish Plate 60 Kg RDSO Drg No. T-5849 TEEPL/M/2012-13/05 12.05.12 17.05.12 22.05.12

695 Techma Engineering Enterprises Pvt. Ltd Kokata

WCR/TP/2010/171/JFP/334 dt. 03.10.2011

Joggled Fish Plate 60 Kg RDSO Drg No. T-5849

TEEPL/PVC/WCR/334/01

21.05.12 22.05.12 24.05.12

696 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/209/2012-2013/90% 24.05.12 28.05.12 28.05.12

697Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/115 25.05.12 28.05.12 28.05.12

698 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/210/2012-2013/90% 29.05.12 30.05.12 30.05.12699 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/93/2012-2013/10% 29.05.12 30.05.12 30.05.12

700Techma Engineering Enterprises Pvt. Ltd Kokata

WCR/TP/2010/169/FP/331 dated 01.08.11

1 M Long Fish Plate 52 Kg ,T-5915 and 60 Kg, T-5916

TEEPL/M/2011-12/33A 31.12.11 17.05.12

701Techma Engineering Enterprises Pvt. Ltd Kokata

WCR/TP/2010/169/FP/331 dated 01.08.11

1 M Long Fish Plate 52 Kg ,T-5915 and 60 Kg, T-5916

TEEPL/M/2011-12/22A 14.11.11 17.05.12

702Techma Engineering Enterprises Pvt. Ltd Kokata

WCR/TP/2010/169/FP/331 dated 01.08.11

1 M Long Fish Plate 52 Kg ,T-5915 and 60 Kg, T-5916

TEEPL/PVC/WCR/331/04

03.02.12 23.05.12 24.05.12

703Techma Engineering Enterprises Pvt. Ltd Kokata

WCR/TP/2010/169/FP/331 dated 01.08.11

1 M Long Fish Plate 52 Kg ,T-5915 and 60 Kg, T-5916

TEEPL/PVC/WCR/331/01

03.02.12 23.05.12 24.05.12

704Techma Engineering Enterprises Pvt. Ltd Kokata

WCR/TP/2010/169/FP/331 dated 01.08.11

1 M Long Fish Plate 52 Kg ,T-5915 and 60 Kg, T-5916

TEEPL/PVC/WCR/331/02

03.02.12 23.05.12 24.05.12

705Techma Engineering Enterprises Pvt. Ltd Kokata

WCR/TP/2010/169/FP/331 dated 01.08.11

1 M Long Fish Plate 52 Kg ,T-5915 and 60 Kg, T-5916

TEEPL/PVC/WCR/331/05

03.02.12 23.05.12 24.05.12

706Techma Engineering Enterprises Pvt. Ltd Kokata

WCR/TP/2010/169/FP/331 dated 01.08.11

1 M Long Fish Plate 52 Kg ,T-5915 and 60 Kg, T-5916

TEEPL/PVC/WCR/331/03

03.02.12 23.05.12 24.05.12

707M/s Adinath Industries, New Delhi

WCR/TP/2011/179/GFN/344 date 19.01.12

GFN Liner 52 Kg RDSO Drg No. T-3702 and 60 Kg RDSO Drg No. T-3706

2718.05.12 30.05.12 01.06.12

708 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/211/2012-2013/90% 31.05.12 01.06.12 01.06.12709 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/212/2012-2013/90% 02.06.12 04.06.12 04.06.12710 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 29.05.12 04.06.12 04.06.12

711M/s Adinath Industries, New Delhi

WCR/TP/2011/179/GFN/344 date 19.01.12

GFN Liner 52 Kg RDSO Drg No. T-3702 and 60 Kg RDSO Drg No. T-3706

3025.05.12 01.06.12 05.06.12

712 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/213/2012-2013/90% 05.06.12 07.06.12 07.06.12

713Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/116 07.06.12 08.06.12 08.06.12

714Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/10%/2012-13/99 07.06.12 08.06.12 08.06.12

Page 33: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

715 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/214/2012-2013/90% 10.06.12 11.06.12 11.06.12

716Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/E-Tax/CS-162/03/2011-12 26.03.12 02.04.12 13.06.12

717 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./12-13/08 24.05.12 13.06.12 13.06.12718 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./12-13/09 04.06.12 13.06.12 13.06.12

719P. L. Polymer, Delhi WCRTP/2011184/G R Pad/343

dtd. 10.01.12 G R Pad 60 kg. PLP/Bill/09 08.06.12 13.06.12 14.06.12

720P. L. Polymer, Delhi WCRTP/2011184/G R Pad/343

dtd. 10.01.12 G R Pad 52 kg. PLP/Bill/10 08.06.12 13.06.12 14.06.12

721Suchita Steels (India) WCRTP2011183/MS Liner/349

dtd. 20.03.12 M S Liner 52 kg 20 20.03.12 14.06.12 14.06.12

722Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/117 14.06.12 15.06.12 15.06.12

723Pragati Steels WCRTP2011183/MS Liner/358

dtd. 09.04.12 M S Liner 60 kg 014 & 01502.06.12 &

05.06.12 18.06.12 18.06.12724 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./12-13/10 04.06.12 13.06.12 18.06.12725 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/215/2012-2013/90% 16.06.12 18.06.12 18.06.12

726Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/118 19.06.12 20.06.12 20.06.12

727Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/10%/2012-13/100 19.06.12 20.06.12 20.06.12

728 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/216/2012-2013/90% 24.06.12 25.06.12 25.06.12729 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/94/2012-2013/10% 24.06.12 25.06.12 25.06.12730 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/217/2012-2013/90% 27.06.12 28.06.12 28.06.12731 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/95/2012-2013/10% 27.06.12 28.06.12 28.06.12732 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./12-13/11 25.06.12 29.06.12 29.06.12733 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/218/2012-2013/90% 30.06.12 02.07.12 02.07.12

734Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/119 28.06.12 02.07.12 02.07.12

735Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/10%/2012-13/101 28.06.12 02.07.12 02.07.12

736Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/10%/2012-13/102 28.06.12 02.07.12 02.07.12

737 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./12-13/12 29.06.12 04.07.12 04.07.12

738Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/01/2012-2013/90% 30.06.12 05.07.012 05.07.12

739Donypolo Udyog Ltd. Shamgarh CS-162 MBC M/L sleeper

DU/01/2012-2013/insp. Chages 05.06.12 05.07.12 05.07.12

740 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L sleeper VNPL/4th updatin/90% 21.06.12 05.07.12 05.07.12741 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L sleeper VNPL/4th updatin/10% 21.06.12 05.07.12 05.07.12

742Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/01/90% 02.07.12 05.07.012 05.07.12

743Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 SEJ VNPL/01/90% 03.07.12 05.07.012 05.07.12

Page 34: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

744Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 Br.Central VNPL/01/90% 03.07.12 05.07.012 05.07.12

745Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 Br.App. VNPL/01/90% 03.07.12 05.07.012 05.07.12

746Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/120 30.06.12 09.07.12 09.07.12

747Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/02/90% 05.07.12 09.07.12 09.07.12

748Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/02/2012-2013/90% 08.07.12 09.07.12 09.07.12

749Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/121 10.07.12 11.07.12 11.07.12

750 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/219/2012-2013/90% 11.07.12 12.07.12 12.07.12751 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/96/2012-2013/10% 11.07.12 12.07.12 12.07.12

752Parasnath Enterprises, New Delhi

GFN Liner 60 Kg RDSO Drg No. T-3706

65 25.05.12 04.06.12 11.06.12

753 Adinath Industries, Haridwar WCR/TP/2011/179/gfn/345 dated 19.01.12

GFN Liner 60 Kg RDSO Drg No. T-3706

31 25.05.12 04.06.12 11.06.12

754Techma Engineering Enterprises Pvt. Ltd Kokata

WCR/TP/2010/171/JFP/334 dt. 03.10.2011

Joggled Fish Plate 60 Kg RDSO Drg No. T-5849

TEEPL/PVC/WCR/334/02

20.06.2012 2406.12 26.06.12

755 SRINIVASA Enterprises Hyd WCRTP2011185/Glued Joint/366 Glued Joint 52 Kg (T-5361) and 60 Kg T-2572

SE/GJ/8 17.06.2012 25.06.12 27.06.2012

756Surya Alloy Industries Ltd., Kolkata

WCRTP2011183/MS Liner/355 dated 4.4.12

MS Liner 60kg, (T-3740) SAIL/MGL/017/12-13 31.05.12 20.06.12 02.06.2012

757Surya Alloy Industries Ltd., Kolkata

WCRTP2011183/MS Liner/355 dated 4.4.12

MS Liner combination, (T-3741/42)

SAIL/MGL/020/12-13 19.06.12 20.06.12 02.06.2012

758Surya Alloy Industries Ltd., Kolkata

WCRTP2011183/MS Liner/355 dated 4.4.12

MS Liner combination, (T-3741/42)

SAIL/MGL/016/12-13 31.05.12 20.06.12 02.06.2012

759Surya Alloy Industries Ltd., Kolkata

WCRTP2011183/MS Liner/355 dated 4.4.12

MS Liner combination, (T-3741/42)

SAIL/MGL/016/12-13 31.05.12 20.06.12 02.06.2012

760P. L. Polymer, Delhi WCRTP/2011184/G R Pad/343

dtd. 10.01.12 G R Pad 52 kg. PLP/Bill/12 27.06.12 02.07.12 03.07.12

761Pragati Steels WCRTP2011183/MS Liner/358

dtd. 09.04.12 M S Liner 60 kg 17 15.06.12 21.06.12 09.07.12

762M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/129 01.06.12 02.07.12 02.07.12

763M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/128 01.06.12 02.07.12 02.07.12

764M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/162 09.06.12 02.07.12 02.07.12

765M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/163 09.06.12 02.07.12 02.07.12

766 M/s Cacutta Springs Limited, Kolkata

WCRTP2010173/CMS X-ing/340 dt.21.11.11.

CMS X-ing 1:12,60Kg CSL/CMS/12-13/09 18.05.12. 12.06.12 02.07.12

767 M/s Cacutta Springs Limited, Kolkata

WCRTP2010173/CMS X-ing/340 dt.21.11.11.

CMS X-ing 1:12,60Kg CSL/CMS/12-13/08 18.05.12. 12.06.12 02.07.12

Page 35: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

768 M/s Cacutta Springs Limited, Kolkata

WCRTP2011182/CMS X-ing1:12,60Kg/350 dt.21.03.12.

CMS X-ing 1:12,60Kg CSL/CMS/12-13/12 19.06.12 29.06.12 02.07.12

769 M/s Cacutta Springs Limited, Kolkata

WCRTP2010174/Curve Switch1:12,60Kg/339 dt.21.11.11.

Curve Switch 1:12,60Kg CSL/FAN/12-13/13 13.06.12 29.06.12 02.07.12

770 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/97/2012-2013/10% 12.07.12 13.07.12 13.07.12771 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/98/2012-2013/10% 12.07.12 13.07.12 13.07.12

772Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/01/2012-2013/10% 11.07.12 13.07.12 13.07.12

773 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/220/2012-2013/90% 13.07.12 16.07.12 16.07.12774 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/99/2012-2013/10% 13.07.12 16.07.12 16.07.12

775Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/03/2012-2013/90% 13.07.12 16.07.12 16.07.12

776Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/03/90% 13.07.12 16.07.12 16.07.12

777Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:12,60Kg DU/33/2012-2013/10% 13.07.12 17.07.12 17.07.12

778Donypolo Udyog Ltd. Shamgarh

WCR/TP/2010163/T-out sleeper/326/Donypolo dt.20.06.11 T-out sleeper 1:8.5,60Kg DU/34/2012-2013/10% 13.07.12 17.07.12 17.07.12

779M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/201 07.07.12 18.07.12 18.07.12

780M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/203 09.07.12 18.07.12 18.07.12

781M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/213 12.07.12 18.07.12 18.07.12

782M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/214 12.07.12 18.07.12 18.07.12

783Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/122 15.07.12 23.07.12 23.07.12

784Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/10%/2012-13/103 19.07.12 23.07.12 23.07.12

785Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/10%/2012-13/104 19.07.12 23.07.12 23.07.12

786Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/10%/2012-13/105 19.07.12 23.07.12 23.07.12

787Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/01/10% 19.07.12 23.07.12 23.07.12

788 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/100/2012-2013/10% 21.07.12 23.07.12 23.07.12

789Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/04/2012-2013/90% 24.07.12 25.07.12 25.07.12

790Shri Kesharia Bareth

CS-162 MBC M/L sleeperupdating claim/CS-162/12-13/01 17.07.12 25.07.12 25.07.12

791Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/04/90% 23.07.12 26.07.12 26.07.12

792 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 30.05.12 27.07.12 27.07.12793 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 08.06.12 27.07.12 27.07.12794 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 28.06.12 27.07.12 27.07.12

Page 36: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

795Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/05/2012-2013/90% 26.07.12 27.07.12 27.07.12

796Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/06/2012-2013/90% 31.07.12 01.08.12 01.08.12

797 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 28.06.12 01.08.12 01.08.12798 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 28.06.12 01.08.12 01.08.12799 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 30.06.12 01.08.12 01.08.12800 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/101/2012-2013/10% 06.08.12 07.08.12 07.08.12

801Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/02/2012-2013/10% 06.08.12 07.08.12 07.08.12

802Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/07/2012-2013/90% 06.08.12 08.08.12 08.08.12

803Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out De-railing Switch DU/01/2012-2013/90% 07.08.12 08.08.12 08.08.12

804Donypolo Udyog Ltd. Shamgarh CS-162 MBC M/L sleeper

updating claim/CS-162/12-13/01 06.08.12 09.08.12 09.08.12

805Donypolo Udyog Ltd. Shamgarh CS-162 MBC M/L sleeper

updating claim/CS-162/12-13/02 06.08.12 09.08.12 09.08.12

806Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/05/90% 04.08.12 09.08.12 09.08.12

807Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/06/90% 08.08.12 09.08.12 09.08.12

808Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 SEJ VNPL/02/90% 07.08.12 09.08.12 09.08.12

809Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B. Central 4088 VNPL/02/90% 07.08.12 09.08.12 09.08.12

810Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B. App. VNPL/02/90% 07.08.12 09.08.12 09.08.12

811Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/02/10% 06.08.12 09.08.12 09.08.12

812Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 SEJ VNPL/01/10% 06.08.12 09.08.12 09.08.12

813 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/106/10% 06.08.12 09.08.12 09.08.12

814Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/08/2012-2013/90% 17.08.12 21.08.12 21.08.12

815Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/03/2012-2013/10% 20.08.12 21.08.12 21.08.12

816Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 SEJ DU/01/2012-2013/90% 16.08.12 21.08.12 21.08.12

817Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/09/2012-2013/90% 21.08.12 22.08.12 22.08.12

818Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out De-railing Switch DU/02/2012-2013/90% 21.08.12 22.08.12 22.08.12

819 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/107/10% 22.08.12 23.08.12 23.08.12820 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/108/10% 22.08.12 23.08.12 23.08.12

Page 37: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

821Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 SEJ VNPL/03/90% 22.08.12 23.08.12 23.08.12

822Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B. App. VNPL/03/90% 22.08.12 23.08.12 23.08.12

823Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B. Central 4088 VNPL/03/90% 22.08.12 23.08.12 23.08.12

824Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/03/10% 22.08.12 23.08.12 23.08.12

825Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/04/10% 22.08.12 23.08.12 23.08.12

826Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B. Central 4088 VNPL/01/10% 22.08.12 23.08.12 23.08.12

827Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 SEJ VNPL/02/10% 22.08.12 23.08.12 23.08.12

828Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 B. Central 408890%/Adv/B.Central/12-13/1 22.08.12 24.08.12 24.08.12

829Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 B. Central 408890%/Adv/B.Central/12-13/2 22.08.12 24.08.12 24.08.12

830Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 L.C90%/Adv/L.Crossing/12-13/1 22.08.12 24.08.12 24.08.12

831Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 L.C90%/Adv/L.Crossing/12-13/2 22.08.12 24.08.12 24.08.12

832Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/10/2012-2013/90% 25.08.12 27.08.12 27.08.12

833Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 SEJ DU/02/2012-2013/90% 25.08.12 27.08.12 27.08.12

834Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 L.C DU/01/2012-2013/90% 25.08.12 27.08.12 27.08.12

835Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/07/90% 27.08.12 28.08.12 28.08.12

836Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/11/2012-2013/90% 28.08.12 29.08.12 29.08.12

837Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out De-railing Switch DU/03/2012-2013/90% 28.08.12 29.08.12 29.08.12

838P. L. Polymer, Delhi WCRTP/2011184/G R Pad/343

dtd. 10.01.12 G R Pad 52 kg. PLP/Bill/19 18.08.12 22.08.12 24.08.12

839P. L. Polymer, Delhi WCRTP/2011184/G R Pad/343

dtd. 10.01.12 G R Pad 60 kg. PLP/Bill/20 18.08.12 22.08.12 24.08.12

840P. L. Polymer, Delhi WCRTP/2011184/G R Pad/343

dtd. 10.01.12 G R Pad 52 kg. PLP/Bill/18 18.08.12 23.08.12 24.08.12

841P. L. Polymer, Delhi WCRTP/2011184/G R Pad/343

dtd. 10.01.12 G R Pad 60 kg. PLP/Bill/17 18.08.12 23.08.12 24.08.12

842P. L. Polymer, Delhi WCRTP/2011184/G R Pad/343

dtd. 10.01.12 G R Pad 52 kg. PLP/Bill/21 24.08.12 29.08.12 30.08.12

843P. L. Polymer, Delhi WCRTP/2011184/G R Pad/343

dtd. 10.01.12 G R Pad 60 kg. PLP/Bill/22 24.08.12 29.08.12 30.08.12

Page 38: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

844P. L. Polymer, Delhi WCRTP/2011184/G R Pad/343

dtd. 10.01.12 G R Pad 60 kg. PLP/Bill/23 24.08.12 29.08.12 30.08.12

845P. L. Polymer, Delhi WCRTP/2011184/G R Pad/343

dtd. 10.01.12 G R Pad 52 kg. PLP/Bill/24 24.08.12 29.08.12 30.08.12

846Suchita Steels (India) WCRTP2011183/MS Liner/348

dtd. 20.03.12 M S Liner 60 kg 36 14.08.12 27.08.12 27.08.12

847

M/s Adinath Industries, New Delhi

WCR/TP/2011/179/GFN/344 date 19.01.12

GFN Liner 52 Kg RDSO Drg No. T-3702 and 60 Kg RDSO Drg No. T-3706

56 20.7.12 07.08.12 09.08.12

848

M/s Adinath Industries, New Delhi

WCR/TP/2011/179/GFN/344 date 19.01.12

GFN Liner 52 Kg RDSO Drg No. T-3702 and 60 Kg RDSO Drg No. T-3706

57 20.07.12 07.08.12 09.08.12

849 M/s SRINIVASA Enterprises WCRTP2011185/Glued Joint/366 Glued Joint 52 Kg (T-5361) SE/GJ/17/3 19.08.12 29.08.12 30.08.12

850M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/231 30.07.12 22.08.12 22.08.12

851M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/230 30.07.12 22.08.12 22.08.12

852M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/237 31.07.12 22.08.12 22.08.12

853M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/238 31.07.12 22.08.12 22.08.12

854M/s Manash Firgings Pvt. Ltd., Kolkata.

WCRTP2011193/ERC-J/357 dt.24.05.12. ERC-J MFPL/M/017/12-13 08.08.12 20.8.12 21.08.12

855M/s Manash Firgings Pvt. Ltd., Kolkata.

WCR/TP/2010160R-A/CMS X-ing/333 dt.27.09.11. ERC-J MFPL/M/018/12-13 08.08.12 20.8.12 21.08.12

856M/s Orient Steel& Industries Ltd, Kolkata.

WCR/TP/2010160R-A/CMS X-ing/333 dt.27.09.11.

CMS X-ing 1:12,52Kg & 1:8.5,52 Kg OSC/12-13/059(100%) 08.08.12 28.08.12 29.08.12

857M/s Orient Steel& Industries Ltd, Kolkata.

WCR/TP/2010160R-A/CMS X-ing/333 dt.27.09.11.

CMS X-ing 1:12,52Kg & 1:8.5,52 Kg OSC/12-13/057(100%) 08.08.12 28.08.12 29.08.12

858Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/01/12-13/90% 13.08.12 31.08.12 31.08.12

859Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/12/2012-2013/90% 31.08.12 03.09.12 03.09.12

860Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out De-railing Switch DU/04/2012-2013/90% 31.08.12 03.09.12 03.09.12

861 M/s SRINIVASA Enterprises WCRTP2011185/Glued Joint/363 Glued Joint 52 Kg (T-5361) SE/GJ/17/02 19.08.12 29.08.12 06.09.12862 M/s Dynamic Enginners, Kota WCRTP2011185/Glued Joint/363 Glued Joint 60 Kg (T-2572) 1 30.08.12 03.09.12 06.09.12863 M/s Dynamic Enginners, Kota WCRTP2011185/Glued Joint/363 Glued Joint 60 Kg (T-2572) PVC-P/O-01 30.08.12 03.09.12 06.09.12864 M/s Creative Enginners, Kota WCRTP2011185/Glued Joint/373 Glued Joint 60 Kg (T-2572) 37 05.09.12 11.09.12 12.09.12865 M/s Creative Enginners, Kota WCRTP2011185/Glued Joint/373 Glued Joint 60 Kg (T-2572) 37 A 05.09.12 11.09.12 12.09.12866 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/221/2012-2013/90% 26.07.12 05.09.12 05.09.12867 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/222/2012-2013/90% 05.09.12 06.09.12 06.09.12

868Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/13/2012-2013/90% 08.09.12 11.09.12 11.09.12

869Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 SEJ DU/03/2012-2013/90% 08.09.12 11.09.12 11.09.12

Page 39: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

870Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 L.C DU/02/2012-2013/90% 08.09.12 11.09.12 11.09.12

871Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 Br. App. DU/01/2012-2013/90% 08.09.12 11.09.12 11.09.12

872

Donypolo Udyog Ltd. Shamgarh

CS-162 MBC M/L sleeper

DU/03/2012-2013/90%(Rate up dating

diff.) 06.07.12 12.09.12 12.09.12

873Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/08/90% 06.09.12 10.09.12 10.09.12

874 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/109/10% 06.09.12 10.09.12 10.09.12

875Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 L.C90%/Adv/L.Crossing/12-13/3 30.08.12 06.09.12 06.09.12

876Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br. Central90%/Adv/Br.Central/12-13/3 22.08.12 06.09.12 06.09.12

877Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br. Central90%/Adv/Br.Central/12-13/4 05.09.12 10.09.12 10.09.12

878Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 L.C90%/Adv/L.Crossing/12-13/4 09.09.12 12.09.12 12.09.12

879 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 09.07.12 13.09.12 13.09.12880 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 12.07.12 13.09.12 13.09.12881 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 30.07.12 13.09.12 13.09.12

882Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/09/90% 11.09.12 13.09.12 13.09.12

883Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/05/10% 10.09.12 13.09.12 13.09.12

884Vishal Nirmiti Pvt. Ltd. Bankhedi

WCR/TP/2010164/FPJ/329/VNPL Dt. 28/06/2011 Fish Plated Joint sleeper

VNPL/10%/FPJ/2012-13/04 10.09.12 13.09.12 13.09.12

885Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 SEJ VNPL/03/10% 10.09.12 13.09.12 13.09.12

886Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B. Central 4088 VNPL/02/10% 10.09.12 13.09.12 13.09.12

887Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 Br. App. VNPL/01/10% 10.09.12 13.09.12 13.09.12

888Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out De-railing Switch DU/05/2012-2013/90% 15.09.12 17.09.12 17.09.12

889Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 SEJ DU/04/2012-2013/90% 15.09.12 17.09.12 17.09.12

890Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 L.C DU/03/2012-2013/90% 15.09.12 17.09.12 17.09.12

891Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/10/90% 20.09.12 21.09.12 21.09.12

892Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/06/10% 20.09.12 21.09.12 21.09.12

893Vishal Nirmiti Pvt. Ltd. Bankhedi

WCR/TP/2010164/FPJ/329/VNPL Dt. 28/06/2011 Fish Plated Joint sleeper

VNPL/10%/FPJ/2012-13/05 20.09.12 21.09.12 21.09.12

Page 40: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

894Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 SEJ VNPL/04/10% 20.09.12 21.09.12 21.09.12

895Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B. Central 4088 VNPL/03/10% 20.09.12 21.09.12 21.09.12

896Ganpati Industrial Pvt. Ltd.

KolkataWCRTP2012200/FP/377 dated

22.08.12Various Fish Plate GIPL/2012/02 14.09.12 19.09.12 24.09.12

897M/s Adinath Industries, New Delhi

WCR/TP/2011/179/GFN/344 date 19.01.12

GFN Liner 52 Kg RDSO Drg No. T-3702

105 04.09.12 25.09.12 26.09.12

898Ganpati Industrial Pvt. Ltd. Kolkata

WCRTP2012200/FP/377 dated 22.08.12 Various Fish Plate GIPL/2012/02 22.09.12 25.09.12 27.09.12

899Shri Kesharia Bareth

CS-162 MBC M/L sleeperup dating claim/CS-

162/12-13/02 diff bill 17.07.12 20.09.12 20.09.12900 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 20.08.12 26.09.12 26.09.12901 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 31.08.12 26.09.12 26.09.12902 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 31.08.12 26.09.12 26.09.12903 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/102/2012-2013/10% 15.09.12 17.09.12 17.09.12904 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/103/2012-2013/10% 22.09.12 24.09.12 24.09.12

905Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br. Central90%/Adv/Br.Central/12-13/6 22.09.12 24.09.12 24.09.12

906 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/223/2012-2013/90% 28.09.12 01.10.12 01.10.12

907Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/14/2012-2013/90% 22.09.12 24.09.12 24.09.12

908Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out De-railing Switch DU/06/2012-2013/90% 22.09.12 24.09.12 24.09.12

909Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/15/2012-2013/90% 24.09.12 27.09.12 27.09.12

910Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out De-railing Switch DU/07/2012-2013/90% 26.09.12 27.09.12 27.09.12

911Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 L.C DU/04/2012-2013/90% 26.09.12 27.09.12 27.09.12

912Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 SEJ DU/05/2012-2013/90% 26.09.12 27.09.12 27.09.12

913Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 L.C90%/Adv/L.Crossing/12-13/5 27.09.12 03.10.12 03.10.12

914Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 Br. App. DU/02/2012-2013/90% 28.09.12 01.10.12 01.10.12

915Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/123 29.09.12 01.10.12 01.10.12

916 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/110/10% 27.09.12 01.10.12 01.10.12

917Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/11/90% 27.09.12 01.10.12 01.10.12

918Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 SEJ VNPL/05/10% 27.09.12 01.10.12 01.10.12

919Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B. Central 4088 VNPL/04/10% 27.09.12 01.10.12 01.10.12

920 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/224/2012-2013/90% 30.09.12 04.10.12 04.10.12

Page 41: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

921Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/124 03.10.12 04.10.12 04.10.12

922Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/12/90% 03.10.12 04.10.12 04.10.12

923 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/104/2012-2013/10% 04.10.12 05.10.12 05.10.12

924Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/04/2012-2013/10% 04.10.12 05.10.12 05.10.12

925Ganpati Industrial Pvt. Ltd. Kolkata

WCRTP2012200/FP/377 dated 22.08.12 Various Fish Plate GIPL/2012/03 03.10.12 05.10.12 05.10.12

926Ganpati Industrial Pvt. Ltd. Kolkata

WCRTP2012200/FP/377 dated 22.08.12 Various Fish Plate GIPL/12-13/765-A 27.09.12 05.10.12 05.10.12

927Ganpati Industrial Pvt. Ltd. Kolkata

WCRTP2012200/FP/377 dated 22.08.12 Various Fish Plate GIPL/12-13/765 27.09.12 05.10.12 05.10.12

928 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/225/2012-2013/90% 06.10.12 08.10.12 08.10.12

929Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 L.C DU/05/2012-2013/90% 06.10.12 08.10.12 08.10.12

930Ganpati Industrial Pvt. Ltd. Kolkata

WCRTP2012200/FP/377 dated 22.08.12 Various Fish Plate GIPL/12-13/774 28.09.12 05.10.12 08.10.12

931 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/226/2012-2013/90% 09.10.10 10.10.12 10.10.12

932Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/16/2012-2013/90% 06.10.12 10.10.12 10.10.12

933Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/125 06.10.12 10.10.12 10.10.12

934Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/13/90% 06.10.12 10.10.12 10.10.12

935Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out De-railing Switch DU/08/2012-2013/90% 13.10.12 15.10.12 15.10.12

936 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/227/2012-2013/90% 13.10.12 15.10.12 15.10.12

937Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/126 13.10.12 15.10.12 15.10.12

938 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/111/10% 15.10.12 16.10.12 16.10.12

939Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/14/90% 13.10.12 16.10.12 16.10.12

940Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/07/10% 15.10.12 16.10.12 16.10.12

941Vishal Nirmiti Pvt. Ltd. Bankhedi

WCR/TP/2010164/FPJ/329/VNPL Dt. 28/06/2011 Fish Plated Joint sleeper

VNPL/10%/FPJ/2012-13/06 15.10.12 16.10.12 16.10.12

942Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/05/2012-2013/10% 15.10.12 16.10.12 16.10.12

943Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/06/2012-2013/10% 15.10.12 16.10.12 16.10.12

944Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 Derailing Switch DU/01/2012-2013/10% 15.10.12 16.10.12 16.10.12

945 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/228/2012-2013/90% 17.10.12 18.10.12 18.10.12

946Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 L.C DU/06/2012-2013/90% 17.10.12 18.10.12 18.10.12

Page 42: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

947Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/127 18.10.12 19.10.12 19.10.12

948Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 L.C90%/Adv/L.Crossing/12-13/6 10.10.12 19.10.12 19.10.12

949 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/229/2012-2013/90% 20.10.12 22.10.12 22.10.12

950Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/17/2012-2013/90% 21.10.12 25.10.12 25.10.12

951 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/230/2012-2013/90% 24.10.12 25.10.12 25.10.12Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/128 22.10.12 25.10.12 25.10.12

952 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/112/10% 23.10.12 25.10.12 25.10.12Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/15/90% 22.10.12 25.10.12 25.10.12

953Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B. Central 4088 VNPL/04/10% 23.10.12 25.10.12 25.10.12

954Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B. App. VNPL/04/90% 20.10.12 25.10.12 25.10.12

955Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B. App. VNPL/05/90% 23.10.12 25.10.12 25.10.12

956Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/08/10% 23.10.12 25.10.12 25.10.12

957Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 SEJ VNPL/06/10% 23.10.12 25.10.12 25.10.12

958Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B. Central 4088 VNPL/05/10% 23.10.12 25.10.12 25.10.12

959 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/231/2012-2013/90% 28.10.12 29.10.12 29.10.12

960Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out De-railing Switch DU/09/2012-2013/90% 29.10.12 31.10.12 31.10.12

961Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/18/2012-2013/90% 29.10.12 31.10.12 31.10.12

962Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 L.C DU/07/2012-2013/90% 31.10.12 01.11.12 01.11.12

963 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/232/2012-2013/90% 31.10.12 01.11.12 01.11.12

964Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/129 29.10.12 01.11.12 01.11.12

965Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B. Central 4088 VNPL/05/90% 29.10.12 01.11.12 01.11.12

966Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/03/12-13/90% 20.10.12 01.11.12 01.11.12

967Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/01/12-13/10% 20.10.12 01.11.12 01.11.12

968Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/02/12-13/10% 24.10.12 01.11.12 01.11.12

967M/s Shyamashyam Glutech

Corporation, AGRAWCR/TP/2008/145/GJ/318 dated

30.09.2010Glued Joint 60 Kg T-2572 13 26.10.12 29.10.12 31.10.12

Page 43: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

968M/s Adinath Industries, New Delhi

WCR/TP/2011/179/GFN/371 date 27.06.12

GFN Liner 52 Kg RDSO Drg No. T-3702

140 13.10.12 26.10.12 29.10.12

969M/s Adinath Industries, New Delhi

WCR/TP/2011/179/GFN/371 date 27.06.12

GFN Liner 52 Kg RDSO Drg No. T-3702

148 21.10.12 01.11.12 02.11.12

970M/s Adinath Industries, New Delhi

WCR/TP/2011/179/GFN/344 date 19.01.12

GFN Liner 60 Kg RDSO Drg No. T-3706

141 13.10.12 26.10.12 31.10.12

971M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/282 15.09.12 26.09.12 26.09.12

972M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/287 21.09.12 26.09.12 26.09.12

973M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/292 25.09.12 15.10.12 15.10.12

974M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/291 25.09.12 15.10.12 15.10.12

975M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/303 01.10.12 15.10.12 15.10.12

976M/s Bhilai Engg. Corporation Limited, Bhilai

WCRTP2010173/CMS X-ing/341 dt.25.11.11.

CMS X-ing 1:12,60Kg FDN/GCV/12-13/304 01.10.12 15.10.12 15.10.12

977 M/sVAE VKN Industries Pvt. Limited, Delhi

WCRTP2011182/CMS X-ing1:12,60Kg/351 dt.25.11.11.

CMS X-ing 1:12,60Kg 402 10.10.12 18.10.12 18.10.12

978 M/s. Ked Sati Iron & Steel Pvt. Ltd., Kolkata

WCRTP2011184/G R Pad/362 dated 02.05.2012

G R Pad 60 kg. KSITPL/02 19.09.12 08.10.12 08.10.12

979 M/s. Suchita Steels (India), Chandigarh

WCR/TP/2011183/M.S.Liner/348 dated 20.03.12

M S Liner, 60 kg 53 12.09.12 25.09.12 05.10.12

980 M/s. Suchita Steels (India), Chandigarh

WCR/TP/2011183/M.S.Liner/348 dated 20.03.12

M S Liner, 60 kg 62 10.10.12 10.10.12 17.10.12

981 M/s. P. L. Polymer, Delhi WCRTP2011184/G R Pad/343 dtd. 10.01.12

G R Pad 52 kg. PLP/BILL/25 01.10.12 05.10.12 08.10.12

982 M/s. P. L. Polymer, Delhi WCRTP2011184/G R Pad/343 dtd. 10.01.12

G R Pad 60 kg. PLP/BILL/26 01.10.12 05.10.12 08.10.12

983 M/s. P. L. Polymer, Delhi WCRTP2011184/G R Pad/343 dtd. 10.01.12

G R Pad 60 kg. PLP/BILL/29 22.10.12 29.10.12 31.10.12

984 M/s. P. L. Polymer, Delhi WCRTP2011184/G R Pad/343 dtd. 10.01.12

G R Pad 52 kg. PLP/BILL/28 22.10.12 29.10.12 31.10.12

985 M/s. P. L. Polymer, Delhi WCRTP2011184/G R Pad/343 dtd. 10.01.12

G R Pad 52 kg. PLP/BILL/30 22.10.12 30.10.12 31.10.12

986Parasnath Enterprises, New Delhi

WCR/TP/2011/179/gfn/345 dated 19.01.12

GFN Liner 60 Kg RDSO Drg No. T-3706

170 11.10.12 26.10.12 01.11.12

987Parasnath Enterprises, New Delhi

WCR/TP/2011/179/gfn/345 dated 19.01.12

GFN Liner 60 Kg RDSO Drg No. T-3706

172 16.10.12 26.10.12 01.11.12

988 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/233/2012-2013/90% 03.11.12 05.11.12 05.11.12999 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/234/2012-2013/90% 06.11.12 07.11.12 07.11.12

1000Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out De-railing Switch DU/10/2012-2013/90% 06.11.12 07.11.12 07.11.12

1001Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/130 05.11.12 07.11.12 07.11.12

1002 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/113/10% 05.11.12 07.11.12 07.11.12

Page 44: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1003 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/114/10% 05.11.12 07.11.12 07.11.12

1004Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/04/12-13/90% 06.11.12 07.11.12 07.11.12

1005Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B. Central 4088 VNPL/06/90% 08.11.12 09.11.12 09.11.12

1006Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/09/10% 05.11.12 09.11.12 09.11.12

1007Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 SEJ VNPL/07/10% 05.11.12 09.11.12 09.11.12

1008Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 SEJ VNPL/08/10% 08.11.12 09.11.12 09.11.12

1009Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/131 08.11.12 09.11.12 09.11.12

1010 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/115/10% 08.11.12 09.11.12 09.11.121011 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/116/10% 08.11.12 09.11.12 09.11.12

1012Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/19/2012-2013/90% 09.11.12 12.11.12 12.11.12

1013Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out De-railing Switch DU/11/2012-2013/90% 09.11.12 12.11.12 12.11.12

1014Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out De-railing Switch DU/02/2012-2013/10% 09.11.12 12.11.12 12.11.12

1015Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/05/2012-2013/10% 09.11.12 12.11.12 12.11.12

1016Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 L.C. DU/01/2012-2013/10% 09.11.12 12.11.12 12.11.12

1017Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 SEJ DU/01/2012-2013/10% 09.11.12 12.11.12 12.11.12

1018Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/06/2012-2013/10% 15.11.12 16.11.12 16.11.12

1019Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/07/2012-2013/10% 15.11.12 16.11.12 16.11.12

1020Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 L.C DU/08/2012-2013/90% 17.11.12 19.11.12 19.11.12

1021Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 Br. App. DU/03/2012-2013/90% 17.11.12 19.11.12 19.11.12

1022Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out De-railing Switch DU/12/2012-2013/90% 17.11.12 19.11.12 19.11.12

1023 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./12-13/13 09.11.12 19.11.12 19.11.121024 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./12-13/14 12.11.12 19.11.12 19.11.121025 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./12-13/15 16.11.12 19.11.12 19.11.121026 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/117/10% 20.11.12 21.11.12 21.11.121027 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/118/10% 20.11.12 21.11.12 21.11.121028 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/119/10% 20.11.12 21.11.12 21.11.121029 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/120/10% 20.11.12 21.11.12 21.11.121030 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/121/10% 20.11.12 21.11.12 21.11.12

Page 45: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1031Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/08/2012-2013/10% 21.11.12 22.11.12 22.11.12

1032Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out De-railing Switch DU/03/2012-2013/10% 21.11.12 22.11.12 22.11.12

1033Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 SEJ DU/02/2012-2013/10% 21.11.12 22.11.12 22.11.12

1034Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 SEJ DU/03/2012-2013/10% 21.11.12 22.11.12 22.11.12

1035 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 12.09.12 22.11.12 22.11.121036 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 18.09.12 22.11.12 22.11.121037 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 27.09.12 22.11.12 22.11.121038 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/107/2012-2013/10% 24.11.12 26.11.12 26.11.121039 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./12-13/16 21.11.12 26.11.12 26.11.12

1040Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/05/12-13/90% 08.11.12 26.11.12 26.11.12

1041Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.Central SKCP/06/12-13/90% 08.11.12 26.11.12 26.11.12

1042Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/20/2012-2013/90% 25.11.12 29.11.12 29.11.12

1043Ganpati Industrial Pvt. Ltd. Kolkata

WCRTP2012200/FP/377 dated 22.08.12 Various Fish Plate GIPL/12-13/884 30.10.122 07.11.12 20.11.12

1044Industrial Component Industrial Kolkata

WCRTP2011198/GFN/381 date 14.09.12 GFN Liner ICI/77/2012-2013 01.11.12 19.11.12 20.11.12

1045Industrial Component Industrial Kolkata

WCRTP2011198/GFN/381 date 14.09.12 GFN Liner ICI/78/2012-2013 03.11.12 15.11.12 20.11.12

1046 M/s Tirupati Metal Fabricators, Faridabad

WCRTP2011185/Glued Joint/375 dated 23.07.12

Glued Joint 52 Kg 32 10.11.12 26.11.12 27.11.12

1047 M/s Tirupati Metal Fabricators, Faridabad

WCRTP2011185/Glued Joint/375 dated 23.07.12

Glued Joint 52 Kg 30 09.11.12 26.11.12 27.11.12

1048 M/s Tirupati Metal Fabricators, Faridabad

WCRTP2011185/Glued Joint/375 dated 23.07.12

Glued Joint 52 Kg 34 10.11.12 26.11.12 27.11.12

1049 M/s Tirupati Metal Fabricators, Faridabad

WCRTP2011185/Glued Joint/375 dated 23.07.12

Glued Joint 52 Kg 31 10.11.12 26.11.12 27.11.12

1050Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/10/10% 26.11.12 30.11.12 09.11.12

1051Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 Br.App. VNPL/02/10% 26.11.12 30.11.12 09.11.12

1052Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 Br.App. VNPL/03/10% 26.11.12 30.11.12 09.11.12

1053Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B. Central 4088 VNPL/07/90% 26.11.12 30.11.12 09.11.12

1054Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B. Central 4088 VNPL/06/10% 26.11.12 30.11.12 09.11.12

1055Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B. Central 4088 VNPL/07/10% 26.11.12 30.11.12 09.11.12

Page 46: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1056Vishal Nirmiti Pvt. Ltd. Bankhedi

WCR/TP/2010164/FPJ/329/VNPL Dt. 28/06/2011 Fish Plated Joint sleeper

VNPL/10%/FPJ/2012-13/07 26.11.12 30.11.12 09.11.12

1057 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/122/10% 26.11.12 30.11.12 09.11.12

1058Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/132 02.12.12 03.12.12 03.12.12

1059Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/133 02.12.12 03.12.12 03.12.12

1060Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12

DU/01/2012-2013/90%(updating) 03.12.12 05.12.12 05.12.12

1061Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12

DU/02/2012-2013/90%(updating) 03.12.12 05.12.12 05.12.12

1062Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12

DU/03/2012-2013/10%(updating) 03.12.12 05.12.12 05.12.12

1063 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/235/2012-2013/90% 04.12.12 05.12.12 05.12.121064 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/108/2012-2013/10% 04.12.12 05.12.12 05.12.12

1065Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/01/12-13/90% 29.11.12 05.12.12 05.12.12

1066Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 L.C. SKCP/01/12-13/10% 20.10.12 05.12.12 05.12.12

1067Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.Central SKCP/02/12-13/10% 18.09.12 05.12.12 05.12.12

1068Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.Central SKCP/03/12-13/10% 20.10.12 05.12.12 05.12.12

1069Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 L.C DU/09/2012-2013/90% 06.12.12 07.12.12 07.12.12

1070Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 Br. App. DU/04/2012-2013/90% 06.12.12 07.12.12 07.12.12

1071 Calcutta springs Ltd.,Kolkata WCRTP2011182/CMS Xing 1:8.5,52Kg /352 dt.21.03.12

CMS Xing CSL/CMS/12-13/32 01.08.12 28.11.12 29.11.12

1072 Calcutta springs Ltd.,Kolkata WCRTP2011182/CMS Xing 1:8.5,52Kg /352 dt.21.03.12

CMS Xing CSL/CMS/12-13/34 20.10.12 04.12.12 04.12.12

1073VAE VKN Industries Pvt. Ltd. Delhi.

WCRTP2011182/CMS Xing 1:8.5,52Kg /351 dt.21.03.12

CMS Xing 402 30.11.12 21.11.12 30.11.12

1074 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/236/2012-2013/90% 08.12.12 10.12.12 10.12.12

1075Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/134 08.12.12 10.12.12 10.12.12

1076 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/123/10% 08.12.12 10.12.12 10.12.12

1077Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5(Ind.) VNPL/11/10% 06.12.12 10.12.12 10.12.12

1078Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/16/90% 06.12.12 10.12.12 10.12.12

1079 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 09.10.12 13.12.12 13.12.121080 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 31.10.12 13.12.12 13.12.12

1081Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/06/12-13/90% 06.12.12 13.12.12 13.12.12

Page 47: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1082Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 SEJ DU/04/2012-2013/10% 12.12.12 13.12.12 13.12.12

1083Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out De-railing Switch DU/04/2012-2013/10% 12.12.12 13.12.12 13.12.12

1084Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 Br.App. DU/01/2012-2013/10% 12.12.12 13.12.12 13.12.12

1085Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/07/12-13/90% 13.12.12 17.12.12 17.12.12

1086Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/06/12-13/90% 06.12.12 13.12.12 13.12.121087 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/237/2012-2013/90% 15.12.12 17.12.12 17.12.12

1088Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/09/2012-2013/10% 12.12.12 17.12.12 17.12.12

1089Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/135 14.12.12 17.12.12 17.12.12

1090 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./12-13/17 11.12.12 17.12.12 17.12.121091 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./12-13/18 14.12.12 19.12.12 19.12.121092 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/238/2012-2013/90% 20.12.12 21.12.12 21.12.121093 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/109/2012-2013/10% 20.12.12 21.12.12 21.12.12

1094Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 Br. App. DU/05/2012-2013/90% 15.12.12 21.12.12 21.12.12

1095Donypolo Udyog Ltd. Shamgarh CS-162 MBC M/L sleeper

DU/01,02,03/2012-2013/10% (MF) 09.11.12 26.12.12 26.12.12

1096 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/239/2012-2013/90% 26.12.12 27.12.12 27.12.121097 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/110/2012-2013/10% 28.12.12 31.12.12 31.12.12

1098Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 Br. App. DU/06/2012-2013/90% 26.12.12 27.12.12 27.12.12

1099Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 L.C DU/10/2012-2013/90% 26.12.12 27.12.12 27.12.12

1100Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 SEJ DU/05/2012-2013/10% 28.12.12 31.12.12 31.12.12

1101Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/136 26.12.12 27.12.12 27.12.12

1102 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/124/10% 29.12.12 31.12.12 31.12.12

1103Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5(Ind.) VNPL/12/10% 29.12.12 31.12.12 31.12.12

1104Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/137 31.12.12 01.01.13 01.01.13

1105 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/240/2012-2013/90% 31.12.12 02.01.13 02.01.131106 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./12-13/19 26.12.12 02.01.13 02.01.13

1107Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/08/12-13/90% 27.12.12 02.01.13 02.01.13

1108Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.Central SKCP/07/12-13/90% 25.12.12 02.01.13 02.01.13

1109M/s Tirupati Metal Fabricators, Faridabad

WCRTP2011185/Glued Joint/375 dated 23.07.12

Glued Joint 52 Kg 35 24.11.12 27.11.12 04.01.13

Page 48: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1110M/s Tirupati Metal Fabricators, Faridabad

WCRTP2011185/Glued Joint/375 dated 23.07.12

Glued Joint 52 Kg 36 24.11.12 27.11.12 04.01.13

1111 M/s SRINIVASA Enterprises WCRTP2011185/Glued Joint/363 Glued Joint 60 Kg (T-2572) SE/GJ/25 08.12.12 16.12.12 28.12.121112 M/s SRINIVASA Enterprises WCRTP2011185/Glued Joint/363 Glued Joint 52 Kg (T-5361) SE/GJ/8/PVC 19.08.12 16.12.12 28.12.121113 M/s SRINIVASA Enterprises WCRTP2011185/Glued Joint/363 Glued Joint 52 Kg (T-5361) SE/GJ/17/2 & 17/3 PVC 19.08.12 16.12.12 28.12.121114 M/s SRINIVASA Enterprises WCRTP2011185/Glued Joint/363 Glued Joint 60 Kg (T-2572) SE/GJ/24 13.12.12 16.12.12 04.01.13

1115M/s Shyamashyam Glutech

Corporation, AGRAWCR/TP/2008/145/GJ/318 dated

30.09.2010Glued Joint 60 Kg T-2572 18 23.12.12 02.01.13 04.01.13

1116Ganpati Industrial Pvt. Ltd. Kolkata

WCRTP2012200/FP/377 dated 22.08.12 Various Fish Plate GIPL/12-13/884 30.10.12 07.11.12 20.11.12

1117Ganpati Industrial Pvt. Ltd. Kolkata

WCR/TP/2011191/JFP/386 dated 09.11.12 Joggle Fish Plate 60 Kg GIPL/12-13/1010 19.12.12 27.12.12 27.12.12

1118Ganpati Industrial Pvt. Ltd. Kolkata

WCR/TP/2011191/JFP/386 dated 09.11.12 Joggle Fish Plate 60 Kg GIPL/12-13/22 11.12.12 26.12.12 27.12.12

1119M/s Cacutta Springs Limited, Kolkata

WCR/TP/2011185/Glued Joint/354 dated 03.04.12

Glued Joint 52 Kg (T-5361) CSL/GLD/12-13/45 06.12.12 12.12.12 02.01.2013

1120 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/125/10% 02.01.13 04.01.12 04.01.121121 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/4th/Escl.(PVC) 24.12.12 08.01.13 08.01.13

1122Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/138 07.01.13 08.01.13 08.01.13

1123Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/139 10.01.13 11.01.13 11.01.13

1124 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/241/2012-2013/90% 06.01.13 07.01.13 07.01.131125 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/242/2012-2013/90% 09.01.13 10.01.13 10.01.13

1126Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/10/2012-2013/10% 04.01.13 07.01.13 07.01.13

1127Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 Br.App. DU/02/2012-2013/10% 04.01.13 07.01.13 07.01.13

1128Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 SEJ DU/06/2012-2013/10% 04.01.13 07.01.13 07.01.13

1129 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./12-13/20 05.01.13 07.01.13 07.01.13

1130Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/03/12-13/10% 24.11.12 03.01.13 03.01.13

1131Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/04/12-13/10% 19.12.12 03.01.13 03.01.13

1132Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/05/12-13/10% 24.12.12 03.01.13 03.01.13

1133Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/06/12-13/10% 31.12.12 07.01.13 07.01.13

1134Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.Central SKCP/04/12-13/10% 31.12.12 07.01.13 07.01.131135 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/243/2012-2013/90% 12.01.13 14.01.13 14.01.131136 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/111/2012-2013/10% 12.01.13 14.01.13 14.01.131137 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/244/2012-2013/90% 16.01.13 17.01.13 17.01.13

1138Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/140 16.01.13 17.01.13 17.01.13

Page 49: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1139 Shri Kesharia Bareth CS-162 MBC M/L sleeper 90%/Adv./12-13/21 11.01.13 14.01.13 14.01.13

1140Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.Central SKCP/08/12-13/90% 11.01.13 14.01.13 14.01.131141 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/245/2012-2013/90% 20.01.13 21.01.13 21.01.131142 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 01.12.02 21.01.13 21.01.131143 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 11.12.12 21.01.13 21.01.131144 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 19.01.13 22.01.13 22.01.13

1145Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/09/12-13/90% 12.01.13 22.01.13 22.01.13

1146Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/02/12-13/90% 15.01.13 22.01.13 22.01.131147 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/112/2012-2013/10% 22.01.13 23.01.13 23.01.13

1148Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/141 24.01.13 28.01.13 28.01.13

1149 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/126/10% 24.01.13 28.01.13 28.01.131150 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/127/10% 24.01.13 28.01.13 28.01.131151 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/246/2012-2013/90% 28.01.13 29.01.13 29.01.13

1152Donypolo Udyog Ltd. Shamgarh CS-162 MBC M/L sleeper

DU/01/2012-2013/90%(rate diff) 28.01.13 29.01.13 29.01.13

1153 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/128/10% 28.01.13 30.01.13 30.01.131154 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/06/100%(MF) 28.01.13 30.01.13 30.01.131155 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/113/2012-2013/10% 31.01.13 01.02.13 01.02.13

1156Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/142 31.01.13 04.02.13 04.02.13

1157Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B. Central 4088 VNPL/08/10% 31.01.13 04.02.13 04.02.13

1158 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 24.01.13 04.02.13 04.02.13

1159Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.Central SKCP/09/12-13/90% 24.01.13 04.02.13 04.02.13

1160Aas Udyog, Kolkata WCRTP2012210/Plate Screw/392

dt.05.12.12 Plate Screw T-3913 AU/12-13/392 30.01.13 06.02.13 07.02.13

1161Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2012-13/143 05.02.13 07.02.13 07.02.13

1162Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/100%/2012- 24.01.13 05.02.13 05.02.13

1163 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/247/2012-2013/90% 04.02.13 05.02.13 05.02.131164 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/114A/2012- 04.02.13 05.02.13 05.02.131165 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/114B/2012- 04.02.13 05.02.13 05.02.131166 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 05.02.13 07.02.13 07.02.13

1167Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/10/12-13/90% 04.02.13 07.02.13 07.02.13

1168M/s. Suchita Steels (India), Chandigarh

WCR/TP/2011183/M.S.Liner/348 dated 20.03.12 M S Liner, 60 kg 112 03.01.13 10.01.13 10.01.13

1169M/s. Suchita Steels (India), Chandigarh

WCR/TP/2011183/M.S.Liner/348 dated 20.03.12 M S Liner, 60 kg 114 11.01.13 21.01.13 21.01.03

Page 50: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1170M/s. Suchita Steels (India), Chandigarh

WCR/TP/2011183/M.S.Liner/348 dated 20.03.12 M S Liner, 60 kg 114 11.01.13 21.01.13 21.01.03

1171M/s. Pragati Steels, Mohali WCR/TP/2012205/M S Liner/401

dated 09.01.13 M S Liner, 60 kg 56 31.01.13 05.02.13 05.01.13

1172M/s. Indiana Track Engineers, Mohali

WCR/TP/2012205/M S Liner/399 dated 09.01.13 M S Liner, 60 kg 125 01.02.13 07.02.13 07.02.13

1173M/s. P. L. Polymer, Delhi WCR/TP/2011184/G R/343 dated

10.01.12 G R. Pad, 60 kg 36 15.12.12 03.01.13 03.01.13

1174M/s. P. L. Polymer, Delhi WCR/TP/2011184/G R/343 dated

10.01.12 G R. Pad, 60 kg 38 02.01.13 07.01.13 07.01.13

1175M/s. P. L. Polymer, Delhi WCR/TP/2011184/G R/343 dated

10.01.12 G R. Pad, 60 kg 37 01.01.13 08.01.13 08.01.13

1176M/s. P. L. Polymer, Delhi WCR/TP/2011184/G R/343 dated

10.01.12 G R. Pad, 60 kg 39 12.01.13 17.01.13 17.01.13

1177M/s. P. L. Polymer, Delhi WCR/TP/2011184/G R/343 dated

10.01.12 G R. Pad, 60 kg 41 19.01.13 24.01.13 24.01.13

1178M/s. P. L. Polymer, Delhi WCR/TP/2011184/G R/343 dated

10.01.12 G R. Pad, 60 kg 42 19.01.13 29.01.13 29.01.131179 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/248/2012-2013/90% 07.02.13 08.02.13 08.02.13

1180Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/11/2012-2013/10% 06.02.13 08.02.13 08.02.13

1181Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/12/2012-2013/10% 06.02.13 08.02.13 08.02.13

1182 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/249/2012-2013/90% 11.02.13 12.02.13 12.02.131183 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/115/2012-2013/10% 12.02.13 13.02.13 13.02.131184 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L sleeper VNPL/CS-162/5th (Escl.) 28.01.13 13.02.13 13.02.131185 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 13.02.13 14.02.13 14.02.13

1186Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.Central SKCP/10/12-13/90% 13.02.13 14.02.13 14.02.131187 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/116/2012-2013/10% 14.02.13 15.02.13 15.02.131188 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/250/2012-2013/90% 16.02.13 18.02.13 18.02.131189 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/117/2012-2013/10% 16.02.13 18.02.13 18.02.131190 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/129/10% 15.02.13 21.02.13 21.02.131191 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/130/10% 15.02.13 21.02.13 21.02.13

1192Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/11/12-13/90% 16.02.13 21.02.13 21.02.13

1193Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/03/12-13/90% 16.02.13 21.02.13 21.02.131194 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/118/2012-2013/10% 21.02.13 22.02.13 22.02.131195 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/251/2012-2013/90% 21.02.13 22.02.13 22.02.131196 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/131/10% 21.02.13 22.02.13 22.02.13

1197Aas Udyog, Kolkata WCRTP2011195/Bolts & Nuts/380

dt.4.09.12 Bolts & Nuts AU/12-13/380 05.02.13 20.02.13 20.02.13

1198Aas Udyog, Kolkata WCRTP2011195/Bolts & Nuts/380

dt.4.09.12 Bolts & Nuts AU/12-13/380/I 05.02.13 20.02.13 20.02.13

Page 51: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1199Aas Udyog, Kolkata WCRTP2011195/Bolts & Nuts/380

dt.4.09.12 Bolts & Nuts AU/12-13/380/II 06.02.13 20.02.13 20.02.13

1200Aas Udyog, Kolkata WCRTP2011195/Bolts & Nuts/380

dt.4.09.12 Bolts & Nuts AU/12-13/380/IV 07.02.13 22.02.13 22.02.131201 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/252/2012-2013/90% 25.02.13 26.02.13 26.02.131202 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/119/2012-2013/10% 26.02.13 28.02.13 28.02.131203 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 23.02.13 26.02.13 26.02.13

1204Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D/Switch SKCP/01/12-13/90% 15.02.13 01.03.13 01.03.12

1205Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/12/12-13/90% 26.02.13 01.03.13 01.03.12

1206Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.Central SKCP/11/12-13/90% 27.02.13 01.03.13 01.03.121207 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/253/2012-2013/90% 28.02.13 04.03.13 04.03.13

1208Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/13/2012-2013/10% 02.03.13 04.03.13 04.03.13

1209Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out De-railing Switch DU/05/2012-2013/10% 02.03.13 04.03.13 04.03.13

1210 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 26.02.13 04.03.13 04.03.13

1211Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/13/12-13/90% 11.03.13 14.03.13 14.03.13

1212Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/04/12-13/90% 11.03.13 14.03.13 14.03.131213 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/120/2012-2013/10% 12.03.13 14.03.13 14.03.131214 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/132/10% 11.03.13 15.03.13 15.03.131215 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/133/10% 11.03.13 15.03.13 15.03.13

1216Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/07/12-13/10% 25.02.13 19.03.13 19.03.13

1217Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/08/12-13/10% 25.02.13 19.03.13 19.03.13

1218Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/09/12-13/10% 01.03.13 19.03.13 19.03.13

1219Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/01/12-13/10% 25.02.13 19.03.13 19.03.13

1220Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D/Switch SKCP/02/12-13/90% 18.03.13 21.03.13 21.03.13

1221Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/14/12-13/90% 18.03.13 21.03.13 21.03.13

1222Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.Central SKCP/12/12-13/90% 19.03.13 21.03.13 21.03.13

1223Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12

DU/14,15,16,17/2012-2013/10% 22.03.13 25.03.13 25.03.13

1224Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out De-railing Switch

DU/06,07,08,09/2012-2013/10% 22.03.13 25.03.13 25.03.13

1225 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/134 & 135/10% 29.03.13 01.04.13 01.04.13

Page 52: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1226Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D/Switch SKCP/01/12-13/10% 25.02.13 02.04.13 02.04.13

1227Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.Central SKCP/05/12-13/10% 12.01.13 02.04.13 02.04.13

1228Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.Central SKCP/06/12-13/10% 07.02.13 02.04.13 02.04.13

1229Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/03/12-13/10% 14.03.13 02.04.13 02.04.131230 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 19.12.12 03.04.13 03.04.131231 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 24.12.12 03.04.13 03.04.131232 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 31.12.12 03.04.13 03.04.131233 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 12.01.13 03.04.13 03.04.131234 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 19.01.13 03.04.13 03.04.131235 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/121/2012-2013/10% 02.04.13 03.04.13 03.04.13

1236Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 L.C DU/11/2012-2013/90% 02.04.13 03.04.13 03.04.13

1237 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 22.01.13 04.04.13 04.04.131238 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 31.01.13 04.04.13 04.04.131239 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 07.02.13 04.04.13 04.04.131240 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 18.02.13 08.04.13 08.04.131241 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 19.02.13 08.04.13 08.04.131242 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/254/2012-2013/90% 05.04.13 09.04.13 09.04.131243 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/122/2012-2013/10% 08.04.13 09.04.13 09.04.131244 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/07/100%(MF) 29.03.13 08.04.13 08.04.13

1245Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012224/Wide gauge PSC/427 dt.18.03.13 Wide gauge T-4171,T-4172 VNPL/W.G./01/90% 01.04.13 08.04.13 08.04.13

1246Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012244/PSC T-out/430 dt. 19.03.13 T-out 1:8.5 VNPL/T-out/01/90% 01.04.13 08.04.13 08.04.13

1247Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5

VNPL/T-out/01/100%(MF) 29.03.13 08.04.13 08.04.13

1248Vishal Nirmiti Pvt. Ltd. Bankhedi

WCR/TP/2010164/FPJ/329/VNPL Dt. 28/06/2011 Fish Plated Joint sleeper VNPL/FPJ/01/100%(MF) 29.03.13 08.04.13 08.04.13

1249Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B. Central 4088 VNPL/G.R/01/100%(MF) 29.03.13 08.04.13 08.04.13

1250Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 L.C. VNPL/L.C./01/100%(MF) 29.03.13 08.04.13 08.04.13

1251Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 SEJ VNPL/SEJ/01/100%(MF) 29.03.13 08.04.13 08.04.13

1252Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/01/13-14/90% 03.04.13 10.04.13 10.04.13

1253Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/01/13-14/90% 03.04.13 10.04.13 10.04.131254 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/06th/Escl.(PVC) 08.03.13 10.04.13 10.04.13

1255Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12

DU/01/13-14/90%(freight) 02.04.13 16.04.13 16.04.13

Page 53: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1256Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12

DU/02/13-14/10%(freight) 02.04.13 16.04.13 16.04.13

1257Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12(ind)

DU/03/13-14/90%(freight) 02.04.13 16.04.13 16.04.13

1258Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12(ind.)

DU/04/13-14/10%(freight) 02.04.13 16.04.13 16.04.13

1259Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 D-switch

DU/05/13-14/90%(freight) 02.04.13 16.04.13 16.04.13

1260Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 D-switch

DU/06/13-14/10%(freight) 02.04.13 16.04.13 16.04.13

1261Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 L.C.

DU/07/13-14/90%(freight) 02.04.13 16.04.13 16.04.13

1262Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 L.C.

DU/08/13-14/10%(freight) 02.04.13 16.04.13 16.04.13

1263Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 Br.App.

DU/09/13-14/90%(freight) 02.04.13 16.04.13 16.04.13

1264Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 Br.App.

DU/10/13-14/10%(freight) 02.04.13 16.04.13 16.04.13

1265Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 SEJ

DU/11/13-14/90%(freight) 02.04.13 16.04.13 16.04.13

1266Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 SEJ

DU/12/13-14/10%(freight) 02.04.13 16.04.13 16.04.13

1267 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 26.02.13 16.04.13 16.04.131268 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 12.03.13 16.04.13 16.04.131269 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 14.03.13 16.04.13 16.04.13

1270Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 L.C. DU/12/13-14/90% 16.04.13 17.04.13 17.04.13

1271Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12 DU/01/13-14/90% 16.04.13 17.04.13 17.04.13

1272Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:8.5 DU/01/13-14/90% 16.04.13 17.04.13 17.04.13

1273Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4170 DU/01/13-14/90% 16.04.13 17.04.13 17.04.13

1274Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4173 DU/01/13-14/90% 16.04.13 17.04.13 17.04.13

1275 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 13.03.13 18.04.13 18.04.131276 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 23.03.13 18.04.13 18.04.131277 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/136/10% 15.04.13 22.04.13 22.04.131278 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/137/10% 15.04.13 22.04.13 22.04.131279 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/138/10% 16.04.13 22.04.13 22.04.13

1280Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/02/13-14/90% 16.04.13 22.04.13 22.04.13

1281Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012224/Wide gauge PSC/427 dt.18.03.13 Wide gauge T-4171,T-4172 VNPL/W.G./02/90% 16.04.13 22.04.13 22.04.13

1282Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5(Ind.) VNPL/13/10% 15.04.13 22.04.13 22.04.13

Page 54: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1283Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 SEJ VNPL/09/10% 16.04.13 22.04.13 22.04.13

1284Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B.App. VNPL/04/10% 15.04.13 22.04.13 22.04.13

1285Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/02/13-14/90% 15.04.13 24.04.13 25.04.13

1286Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D-Switch SKCP/01/13-14/90% 15.04.13 24.04.13 25.04.13

1287Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/02/13-14/90% 15.04.13 24.04.13 25.04.13

1288Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.Central SKCP/01/13-14/90% 11.04.13 24.04.13 25.04.13

1289Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 L.C. DU/13/13-14/90% 24.04.13 25.04.13 25.04.13

1290Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12 DU/02/13-14/90% 24.04.13 25.04.13 25.04.13

1291Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:8.5 DU/02/13-14/90% 24.04.13 25.04.13 25.04.13

1292Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4173 DU/02/13-14/90% 24.04.13 25.04.13 25.04.13

1293Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4170 DU/02/13-14/90% 24.04.13 25.04.13 25.04.13

1294Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.Central SKCP/01/13-14/10% 11.04.13 01.05.13 01.05.13

1295Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/04/13-14/10% 23.03.13 01.05.13 01.05.13

1296Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:8.5 DU/03/13-14/90% 30.04.13 01.05.13 01.05.13

1297Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4173 DU/03/13-14/90% 30.04.13 01.05.13 01.05.13

1298Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4170 DU/03/13-14/90% 30.04.13 01.05.13 01.05.13

1299Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/14/10% 25.04.13 01.05.13 01.05.13

1300Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012244/PSC T-out/430 dt.19.03.13 T/out 1:8.5 VNPL/01/10% 25.04.13 01.05.13 01.05.13

1301Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 Br. App. VNPL/05/10% 25.04.13 01.05.13 01.05.13

1302Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B. Central 4088 VNPL/08/10% 25.04.13 01.05.13 01.05.13

1303 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/139,140/10% 25.04.13 01.05.13 01.05.13

1304Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4170 DU/04/13-14/90% 30.04.13 08.05.13 08.05.13

1305Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4173 DU/04/13-14/90% 30.04.13 08.05.13 08.05.13

1306Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 L.C. DU/13/13-14/90% 05.05.13 08.05.13 08.05.13

Page 55: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1307Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L Sleeper

VNPL/141,142,143,144/10% 06.05.13 08.05.13 08.05.13

1308Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/15/10% 06.05.13 08.05.13 08.05.13

1309Surya Alloy Industries Ltd., Kolkata

WCR/TP/201191/JFP/410 dt 06.02.13

JFP 60 Kg T-5849 SAIL/BAR/B1873/12-13 12.03.13 26.03.13 01.04.13

1310Surya Alloy Industries Ltd., Kolkata

WCR/TP/201191/JFP/410 dt 06.02.13

JFP 60 Kg T-5849 SAIL/BAR/B1899/12-13 17.03.13 12.04.13 12.04.13

1311Surya Alloy Industries Ltd., Kolkata

WCR/TP/201191/JFP/410 dt 06.02.13

JFP 60 Kg T-5849 SAIL/BAR/B1916/12-13 19.03.13 07.05.13 08.05.13

1312Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D-Switch SKCP/02/13-14/90% 02.05.13 08.05.13 08.05.13

1314Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D-Switch SKCP/03/13-14/90% 07.05.13 08.05.13 08.05.13

1315Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.Central SKCP/02/13-14/90% 02.05.13 08.05.13 08.05.131316 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/145/10% 09.05.13 10.05.13 10.05.131317 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/146/10% 15.05.13 17.05.13 17.05.13

1318Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12 DU/03/13-14/90% 14.05.13 15.05.13 15.05.13

1319Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4170 DU/01/13-14/10% 16.05.13 17.05.13 17.05.13

1320Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4173 DU/01/13-14/10% 16.05.13 17.05.13 17.05.13

1321Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:8.5 DU/04/13-14/90% 18.05.13 20.05.13 20.05.13

1322Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12(Ind.) DU/18/2013-2014/10% 16.05.13 17.05.13 17.05.13

1323 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/123/2012-2013/10% 16.05.13 17.05.13 17.05.13

1324Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D-Switch SKCP/04/13-14/90% 10.05.13 14.05.13 14.05.13

1325Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/02/12-13/10% 01.03.13 16.05.13 16.05.13

1326Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/10/12-13/10% 18.03.13 16.05.13 16.05.13

1327Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/11/12-13/10% 23.03.13 16.05.13 16.05.13

1328Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/03/13-14/90% 10.05.13 20.05.13 20.05.13

1329Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/04/13-14/90% 13.05.13 20.05.13 20.05.13

1330Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/03/13-14/90% 29.04.13 02.05.13 02.05.13

1331Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/04/13-14/90% 14.05.13 20.05.13 20.05.13

1332Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/05/13-14/90% 18.05.13 21.05.13 21.05.13

Page 56: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1333Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.Central SKCP/03/13-14/90% 18.05.13 21.05.13 21.05.13

1334Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/06/13-14/90% 22.05.13 24.05.13 24.05.13

1335Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/12/12-13/10% 23.03.13 24.05.13 24.05.131336 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/12- 25.03.13 14.05.13 14.05.131337 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/13- 18.04.13 24.05.13 24.05.131338 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/124/2012-2013/10% 23.05.13 24.05.13 24.05.13

1339Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:8.5 DU/05/13-14/90% 23.05.13 24.05.13 24.05.13

1340Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:8.5 DU/01/13-14/10% 23.05.13 24.05.13 24.05.13

1341ECON Gwalior WCRTP2012223/PSC Spl.T-

out/412 dt. 07.02.13 S/Double slip 02/13-14/90% 08.05.13 20.05.13 20.05.13

1342ECON Gwalior WCRTP2012223/PSC Spl.T-

out/412 dt. 07.02.13 S/Double slip 01/13-14/90% 29.04.13 24.05.13 24.05.13

1343ECON Gwalior WCRTP2012223/PSC Spl.T-

out/412 dt. 07.02.13 S/Double slip 01/13-14/10% 10.05.13 24.05.13 24.05.13

1344ECON Gwalior WCRTP2012223/PSC Spl.T-

out/412 dt. 07.02.13 S/Double slip 01/13-14/(freight) 10.05.13 24.05.13 24.05.13

1345Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/05/13-14/90% 25.05.13 27.05.13 27.05.13

1346Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/07/13-14/90% 25.05.13 27.05.13 27.05.131347 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/125/2012-2013/10% 27.05.13 28.05.13 28.05.13

1348M/s SRINIVASA Enterprises Hyd

WCRTP2011185/Glued Joints/366 dated 24.05.13 Glued Joints 52 Kg & 60 Kg SE/GJ/5 18.05.13 23.05.13 28.05.13

1349M/s SRINIVASA Enterprises Hyd

WCRTP2011185/Glued Joints/366 dated 24.05.13 Glued Joints 52 Kg & 60 Kg SE/GJ/5/1PVC 21.05.13 23.05.13 28.05.13

1350M/s Ganpati Industrial Pvt. Ltd. Kolkata

WCR/TP/2011/191/JFP/386 dated 09.11.12 JFP 60 Kg T-5849 GIPL/13-14/PVC/01 01.04.13 21.05.13 30.05.13

1351M/s Ganpati Industrial Pvt. Ltd. Kolkata

WCR/TP/2011/191/JFP/386 dated 09.11.12 JFP 60 Kg T-5849 GIPL/13-14/PVC/02 01.04.13 21.05.13 30.05.13

1352Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12 DU/04/13-14/90% 29.05.13 30.05.13 30.05.13

1353Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/08/13-14/90% 29.05.13 31.05.13 31.05.13

1354Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/06/13-14/90% 29.05.13 31.05.13 31.05.13

1355

Ganpati Industrial Pvt. Ltd. Kolkata

WCRTO2012200/FP/377 dated 22.08.12 & enhanced quantity dt 16.04.13

1 M Long Fish Plate 52 Kg to RDSO Drg no. T-5915 GIPL/13-14/130 13.05.13 31.05.13 03.06.13

1356Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/16/10% 30.05.13 31.05.13 31.05.13

Page 57: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1357Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/17/10% 30.05.13 31.05.13 31.05.13

1358Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/18/10% 30.05.13 03.06.13 03.06.13

1359Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/19/10% 30.05.13 03.06.13 03.06.13

1360Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/13/12-13/10% 23.03.13 03.06.13 03.06.13

1361Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/14/12-13/10% 23.03.13 03.06.13 03.06.13

1362Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/15/12-13/10% 23.03.13 03.06.13 03.06.13

1363ECON Gwalior WCRTP2012223/PSC Spl.T-

out/412 dt. 07.02.13 S/Double slip 03/13-14/90% 24.05.13 31.05.13 03.06.13

1364ECON Gwalior WCRTP2012223/PSC Spl.T-

out/412 dt. 07.02.13 S/Double slip 02/13-14/(freight) 25.05.13 31.05.13 03.06.13

1365ECON Gwalior WCRTP2012223/PSC Spl.T-

out/412 dt. 07.02.13 Without slip 03/13-14/(freight) 25.05.13 31.05.13 03.06.13

1366ECON Gwalior WCRTP2012223/PSC Spl.T-

out/412 dt. 07.02.13 S/Double slip 02/13-14/10% 25.05.13 31.05.13 03.06.13

1367ECON Gwalior WCRTP2012223/PSC Spl.T-

out/412 dt. 07.02.13 Without slip 03/13-14/10% 25.05.13 31.05.13 03.06.13

1368Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012224/Wide gauge PSC/427 dt.18.03.13 Wide gauge T-4171,T-4172 VNPL/W.G./04/90% 31.05.13 04.06.13 04.06.13

1369 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/147/10% 31.05.13 04.06.13 04.06.13

1370Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:8.5 DU/06/13-14/90% 01.06.13 04.06.13 04.06.13

1371Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/07/13-14/90% 03.06.13 04.06.13 04.06.13

1372Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/09/13-14/90% 03.06.13 04.06.13 04.06.13

1373Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.Central SKCP/04/13-14/90% 03.06.13 04.06.13 04.06.13

1374Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/01/13-14/10% 18.04.13 05.06.13 05.06.13

1375Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/02/13-14/10% 16.05.13 05.06.13 05.06.131376 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/13- 16.05.13 05.06.13 05.06.13

1377Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 T/out 1:8.5 VNPL/20/10% 06.06.13 07.06.13 10.06.13

1378Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 SEJ VNPL/10/10% 06.06.13 07.06.13 10.06.13

1379Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D-Switch SKCP/05/13-14/90% 08.06.13 10.06.13 10.06.13

1380Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/08/13-14/90% 08.06.13 10.06.13 10.06.13

Page 58: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1381Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/10/13-14/90% 08.06.13 10.06.13 10.06.13

1382Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/03/13-14/10% 16.05.13 11.06.13 11.06.13

1383Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/04/13-14/10% 16.05.13 11.06.13 11.06.13

1384Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/05/13-14/10% 03.06.13 11.06.13 11.06.131385 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/126/2012-2013/10% 13.06.13 14.06.13 14.06.13

1386Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4170 DU/02/13-14/10% 13.06.13 14.06.13 14.06.13

1387Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4173 DU/02/13-14/10% 13.06.13 14.06.13 14.06.13

1388Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12 DU/05/13-14/90% 13.06.13 14.06.13 14.06.13

1389Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12(Ind) DU/19/2013-2014/10% 13.06.13 14.06.13 14.06.13

1390Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/20/2013-2014/10% 13.06.13 14.06.13 14.06.13

1391 Tirupati Metal Fabricators, Faridabad

WCRTP2011185/Glued Joint/375 dated 23.07.12

52 Kg Glued Joint 7 07.06.13 13.06.13 14.06.13

1392 Tirupati Metal Fabricators, Faridabad

WCRTP2011185/Glued Joint/375 dated 23.07.12

52 Kg Glued Joint 5 30.05.13 13.06.13 14.06.13

1393 Kontinental Steel Korporation, Dist- Durg

WCR/TP/2011/191/JFP/396 dated 08.01.13

JFP 60 Kg T-5849 KSK/RMD/2283/PVC 28.05.13 31.05.13 14.06.13

1394 Kontinental Steel Korporation, Dist- Durg

WCR/TP/2011/191/JFP/396 dated 08.01.13

JFP 60 Kg T-5849 KSK/RMD/2232/PVC 28.05.13 31.05.13 14.06.13

1395Ganpati Industrial Pvt. Ltd. Kolkata

WCRTO2012200/FP/377 dated 22.08.12 & enhanced quantity dt 16.04.13

1 M Long Fish Plate 52 Kg to RDSO Drg no. T-5915 GIPL/13-14/98 05.05.13 31.06.13 17.06.13

1396 Eastern Track Udyog Pvt. Ltd., Kolkata

WCRTP2012228A/M S Clamps/424 dated 07.03.13

M S Clamps for Joggled Fish Plate

ETU/132 25.05.13 10.06.13 17.06.13

1397 Eastern Track Udyog Pvt. Ltd., Kolkata

WCRTP2012228A/M S Clamps/424 dated 07.03.13

M S Clamps for Joggled Fish Plate

ETU/135 26.05.13 13.06.13 17.06.13

1398Eastern Track Udyog Pvt.

Ltd., KolkataWCRTP2012228A/M S

Clamps/424 dated 07.03.13M S Clamps for Joggled Fish

Plate ETU/141 01.06.13 13.06.13 17.06.13

1399 Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369 dt.29.06.12 T/out 1:8.5 SKCP/11/13-14/90% 12.06.13 14.06.13 14.06.13

1400Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/09/13-14/90% 12.06.13 14.06.13 14.06.13

1401 Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369 dt.29.06.12 D-Switch SKCP/06/13-14/90% 12.06.13 14.06.13 14.06.13

1402 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/127/2012-2013/10% 15.06.13 17.06.13 17.06.13

1403 Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:8.5 DU/07/13-14/90% 15.06.13 17.06.13 17.06.13

1404Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:8.5 DU/02/13-14/10% 15.06.13 17.06.13 17.06.13

Page 59: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1405 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/148/10% 14.06.13 17.06.13 17.06.13

1406Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.Central SKCP/07/13-14/10% 25.03.13 17.06.13 17.06.13

1407Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/06/13-14/10% 03.06.13 18.06.13 18.06.13

1408Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/12/13-14/90% 15.06.13 18.06.13 18.06.13

1409Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/09/13-14/90% 15.06.13 18.06.13 18.06.13

1410ECON Gwalior WCRTP2012223/PSC Spl.T-

out/412 dt. 07.02.13 S/Double slip 04/13-14/10% 10.06.13 19.06.13 19.06.13

1411ECON Gwalior WCRTP2012223/PSC Spl.T-

out/412 dt. 07.02.13 S/Double slip 04/13-14/(freight) 10.06.13 19.06.13 19.06.13

1412Tirupati Metal Fabricators, Faridabad

WCRTP2011185/Glued Joint/375 dated 23.07.12

52 Kg Glued Joint 9 07.06.13 13.06.13 20.06.13

1413Tirupati Metal Fabricators, Faridabad

WCRTP2011185/Glued Joint/375 dated 23.07.12

52 Kg Glued Joint 8 07.06.13 13.06.13 20.06.13

1414Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/07/13-14/10% 03.06.13 20.06.13 20.06.13

1415Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/08/13-14/10% 13.06.13 20.06.13 20.06.13

1416Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D-Switch SKCP/01/13-14/10% 16.05.13 20.06.13 20.06.13

1417Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/01/13-14/10% 18.04.13 21.06.13 21.06.13

1418Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5SKCP/01/13-14/10% (diff.) 12.06.13 21.06.13 21.06.13

1419 Shri Kesharia Bareth CS-162 MBC M/L sleeper SKCP/MBC/sales/13- 16.05.13 21.06.13 21.06.131420 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/149/10% 19.06.13 20.06.13 20.06.13

1421Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 B. Central 4088 VNPL/09/10% 19.06.13 20.06.13 20.06.13

1422Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4173 DU/05/13-14/90% 17.06.13 20.06.13 20.06.13

1423Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4170 DU/05/13-14/90% 17.06.13 20.06.13 20.06.13

1424 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/128/2012-2013/10% 20.06.13 21.06.13 21.06.13

1425Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.Central SKCP/05/13-14/90% 18.06.13 24.06.13 24.06.13

1426 Shyamashyam Glutech Corporation, AGARA

WCR/TP/2008/145/GJ/318 dated 30.09.2010

60 Kg Glued Joints 2 15.06.13 21.06.13 25.06.13

1427 Seth & Co, Mumbai WCR/TP/2011/179/GFN/355 dated 17.11.2011

60 Kg GFN Liner PVC/S004 16.03.13 02.04.13 27.06.13

1428 Seth & Co, Mumbai WCR/TP/2011/179/GFN/355 dated 17.11.2011

60 Kg GFN Liner PVC/S005 16.03.13 02.04.13 27.06.13

1429 Seth & Co, Mumbai WCR/TP/2011/179/GFN/355 dated 17.11.2011

60 Kg GFN Liner PVC/S006 16.03.13 02.04.13 27.06.13

Page 60: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1430 Seth & Co, Mumbai WCR/TP/2011/179/GFN/346 dated 19.01.2012

52 Kg GFN Liner PVC/S001 16.03.13 02.04.13 27.06.13

1431 Seth & Co, Mumbai WCR/TP/2011/179/GFN/346 dated 19.01.2012

52 Kg GFN Liner PVC/S002 16.03.13 02.04.13 27.06.13

1432 Seth & Co, Mumbai WCR/TP/2011/179/GFN/346 dated 19.01.2012

52 Kg GFN Liner PVC/S003 16.03.13 02.04.13 27.06.13

1433Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12 DU/06/13-14/90% 26.06.13 27.06.13 27.06.13

1434Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/11/13-14/90% 22.06.13 27.06.13 27.06.13

1435Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/12/13-14/90% 24.06.13 27.06.13 27.06.13

1436Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D-Switch SKCP/07/13-14/90% 22.06.13 28.06.13 28.06.13

1437Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D-Switch SKCP/08/13-14/90% 22.06.13 28.06.13 28.06.13

1438Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/13/13-14/90% 22.06.13 28.06.13 28.06.13

1439Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12 DU/07/13-14/90% 30.06.13 01.07.13 01.07.13

1440Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12 DU/08/13-14/90% 01.07.13 04.07.13 04.07.13

1441ECON Gwalior WCRTP2012223/PSC Spl.T-

out/412 dt. 07.02.13 S/Double slip 06/13-14/10% 20.06.13 03.07.13 03.07.13

1442ECON Gwalior WCRTP2012223/PSC Spl.T-

out/412 dt. 07.02.13 Without slip 05/13-14/10% 20.06.13 03.07.13 03.07.13

1443ECON Gwalior WCRTP2012223/PSC Spl.T-

out/412 dt. 07.02.13 S/Double slip 06/13-14/(Freight) 20.06.13 03.07.13 03.07.13

1444ECON Gwalior WCRTP2012223/PSC Spl.T-

out/412 dt. 07.02.13 Without slip 05/13-14/(Freight) 20.06.13 03.07.13 03.07.13

1445M/s Ganpati Industrial Pvt. Ltd. Kolkata

WCRTP2012200/FP/377 dated 22.08.12

Supply 1 M long Fish plate 52 Kg GIPL/13-14/272 17.06.2013 27.06.2013 01.07.2013

1446M/s Ganpati Industrial Pvt. Ltd. Kolkata

WCRTP2012243/JFP/440 dated 15.04.2013 JFP 60 Kg T-5849 GIPL/13-14/198 31.05.13 27.06.2013 02.07.2013

1447M/s Dynamic Enginners, Kota WCRTP2011185/Glued Joint/363

dated 11.05.12 52 Kg & 60 Kg Glued Joints PVC Bill No. 02 04.06.2013 10.06.2013 04.07.2013

1448 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/150/10% 03.07.13 04.07.13 04.07.13

1449Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012244/PSC T-out/430 dt.19.03.13 T/out 1:8.5 VNPL/02/10% 03.07.13 04.07.13 04.07.13

1450M/s Cacutta Springs Limited, Kolkata

WCRTP2011185/Glued Joint/354 dated 03.04.12

52 Kg Glued Joint GSL/GLDJ/13-14/2 22.05.13 01.07.13 05.07.2013

1451ECON Gwalior WCRTP2012223/PSC Spl.T-

out/412 dt. 07.02.13 S/Double slip 07/13-14/10% 27.06.13 08.07.13 08.07.13

1452ECON Gwalior WCRTP2012223/PSC Spl.T-

out/412 dt. 07.02.13 S/Double slip 07/13-14/(Freight) 27.06.13 08.07.13 08.07.13

1453Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012244/PSC T-out/430 dt.19.03.13 T/out 1:8.5 VNPL/04/90% 05.07.13 08.07.13 08.07.13

Page 61: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1454Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/14/13-14/90% 26.06.13 09.07.13 09.07.13

1455Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D-Switch SKCP/09/13-14/90% 26.06.13 09.07.13 09.07.13

1456Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/13/13-14/90% 26.06.13 09.07.13 09.07.13

1457 Shree Laxmi Iorn & Steel Works Pvt. Ltd., Kolkata

WCRTP2012243/JFP/451 dated 24.05.2013

JFP 60 Kg T-5849 FAB/20/2013-2014 29.06.13 09.07.13 09.07.13

1458Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/09/13-14/10% 03.06.13 10.07.13 10.07.13

1459 Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369 dt.29.06.12 T/out 1:8.5 SKCP/10/13-14/10% 18.06.13 10.07.13 10.07.13

1460Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/11/13-14/10% 18.06.13 10.07.13 10.07.13

1461 Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012224/Wide gauge PSC/427 dt.18.03.13 Wide gauge T-4171,T-4172 VNPL/W.G./05/90% 09.07.13 10.07.13 10.07.13

1462 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/129/2012-2013/10% 10.07.13 11.07.13 11.07.13

1463 Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12

DU/21 &22/2013-2014/10% 10.07.13 11.07.13 11.07.13

1464Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12 DU/09/13-14/90% 10.07.13 11.07.13 11.07.13

1465 Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12 DU/01/13-14/10% 10.07.13 11.07.13 11.07.13

1466Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4170 DU/06/13-14/90% 10.07.13 11.07.13 11.07.13

1467 Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4173 DU/06/13-14/90% 10.07.13 11.07.13 11.07.13

1468Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12 DU/02/13-14/10% 10.07.13 11.07.13 11.07.13

1469 Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:8.5 DU/03 &04/13-14/10% 10.07.13 11.07.13 11.07.13

1470 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/151/10% 16.07.13 17.07.13 17.07.13

1471 Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:8.5 DU/05/13-14/10% 18.07.13 19.07.13 19.07.13

1472Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 L.C DU/02/2013-2014/10% 18.07.13 19.07.13 19.07.13

1473 Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 SEJ DU/07/2012-2013/10% 18.07.13 19.07.13 19.07.13

1474Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 Br.App. DU/03/2012-2013/10% 18.07.13 19.07.13 19.07.13

1475 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/130/2012-2013/10% 18.07.13 19.07.13 19.07.131476 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/131/2012-2013/10% 20.07.13 22.07.13 22.07.13

1477Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5SKCP/13 & 14/13-14/10% 27.06.13 19.07.13 19.07.13

1478Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/14/13-14/10% 27.06.13 24.07.13 24.07.13

Page 62: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1479Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/15/13-14/10% 03.07.13 24.07.13 24.07.13

1480Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5SKCP/15/13-14/90%(Ind.) 28.06.13 30.07.13 30.07.13

1481Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12SKCP/14/13-14/90%(Ind.) 28.06.13 30.07.13 30.07.13

1482 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/132/2012-2013/10% 30.07.13 31.07.13 31.07.13

1483Donypolo Udyog Ltd. Shamgarh

WCRTP2012250/PSC Sleeper/449 dt.21.05.13 L.C DU/01/2013-2014/90% 29.07.13 31.07.13 31.07.13

1484 M/s Dynamic Enginners, Kota WCRTP2011185/Glued Joint/363 dated 11.05.12

60 Kg Glued Joints 7 13.06.13 09.07.2013 31.07.13

1485 M/s Eastern Track Udyog Pvt. Ltd. Kolkata

WCRTP2012251 /1 M Long Fish Plate 60 Kg / 448 dated 231.05.13

1 M Long Fish Plate 60 Kg ETU/265 12.07.13 26.07.13 31.07.13

1486 M/s Shyamashyam Glutech Corporation, AGRA

WCR/TP/2008/145/GJ/318 dated 30.09.2010

Glued Joint 60 Kg 4 22.07.13 22.07.13 08.08.13

1487 M/s Cacutta Springs Limited, Kolkata

WCRTP2011185/Glued Joint/354 dated 03.04.12

Glued Joint 52 Kg CSL/GLD/13-14/02 24.05.13 09.07.13 31.07.13

1488 M/s Shree Laxmi Iron & Steel Work Pvt. Ltd. Kolkata

WCRTP2012243/JFP/451 dated 24.05.2013

JFP 60 Kg T-5849 FAB/26/2013-2014 22.07.13 30.07.13 31.07.13

1489 M/s Shree Laxmi Iron & Steel Work Pvt. Ltd. Kolkata

WCRTP2012243/JFP/451 dated 24.05.2013

JFP 60 Kg T-5849 FAB/23/2013-2014 17.07.13 25.07.13 12.08.13

1490 M/s Eastern Track Udyog Pvt. Ltd. Kolkata

WCRTP2012251 /1 M Long Fish Plate 60 Kg / 448 dated 231.05.13

1 M Long Fish Plate 60 Kg ETU/204 16.07.13 06.08.13 08.08.132

1491 M/s Eastern Track Udyog Pvt. Ltd. Kolkata

WCRTP2012251 /1 M Long Fish Plate 60 Kg / 448 dated 231.05.13

1 M Long Fish Plate 60 Kg ETU/208/13-14 05.08.13 06.08.13 08.08.132

1492 M/s Industrial Component Industires, Kolkata

WCRTP2011196/GFN/395 dated 19.12.12

Cut GFN Liner ICI/31/2013-2014 22.07.2013 06.08.13 16.08.13

1493 M/s Industrial Component Industires, Kolkata

WCRTP2011196/GFN/395 dated 19.12.12

Cut GFN Liner ICI/32/2013-2014 23.07.2013 26.07.13 16.08.13

1494 M/s Techma engineering Enterprises Pvt. Ltd. Kolkata

WCR/TP/2011191/JFP/409 dated 06.02.13

JFP 60 Kg T-5849 TEEPL/PVC/409/01 14.06.13 25.07.13 12.08.13

1495M/s Techma engineering

Enterprises Pvt. Ltd. KolkataWCR/TP/2011191/JFP/409 dated

06.02.13JFP 60 Kg T-5849 TEEPL/M/2013-14 03.05.13 14.05.13 15.05.13

1496 M/s Parasnath Enterprises, New Delhi

WCR/TP/2011/179/gfn/345 dated 19.01.12

GFN Liner 60 Kg RDSO Drg No. T-3706

94 07.07.13 24.07.13 08.08.13

1497Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12 DU/10/13-14/90% 01.08.13 02.08.13 02.08.13

1498 Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12 DU/11/13-14/90% 03.08.13 07.08.13 07.08.13

1499Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:8.5 DU/08/13-14/90% 03.08.13 07.08.13 07.08.13

1500 Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:8.5 DU/09/13-14/90% 09.08.13 12.08.13 12.08.13

1501Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12 DU/12/13-14/90% 08.08.13 12.08.13 12.08.13

1502 Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12 DU/13/13-14/90% 14.08.13 16.08.13 16.08.13

Page 63: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1503Donypolo Udyog Ltd. Shamgarh

WCRTP2012250/PSC Sleeper/449 dt. 21.05.13 L.C. DU/01/13-14/90% 01.08.13 02.08.13 02.08.13

1504 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/152/10% 19.08.13 20.08.13 20.08.131505 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/153/10% 19.08.13 20.08.13 20.08.131506 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/154/10% 19.08.13 20.08.13 20.08.131507 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/133/2013-2014/10% 23.08.13 26.08.13 26.08.13

1508 Donypolo Udyog Ltd. Shamgarh

WCRTP2012250/PSC Sleeper/464 dt. 11.06.13 Br.App. DU/01/13-14/90% 22.08.13 26.08.13 26.08.13

1509Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D-Switch SKCP/03/13-14/10% 22.07.13 26.08.13 26.08.13

1510 Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369 dt.29.06.12 D-Switch SKCP/04/13-14/10% 27.07.13 26.08.13 26.08.13

1511Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D-Switch SKCP/05/13-14/10% 07.08.13 26.08.13 26.08.13

1512 Shri Kesharia Bareth WCRTP2012250/PSC Sleeper/469 dt. 19.06.13 Br. Central SKCP/01/13-14/90% 08.08.13 26.08.13 26.08.13

1513Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/18/13-14/10% 07.08.13 27.08.13 27.08.13

1514 Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012244/PSC T-out/430 dt.19.03.13 T/out 1:8.5 VNPL/03 & 04/10% 19.08.13 26.08.13 26.08.13

1515Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012244/PSC T-out/430 dt.19.03.13 T/out 1:8.5 VNPL/05/10% 19.08.13 26.08.13 26.08.13

1516M/s Industrial Component Industires, Kolkata

WCRTP2011196/GFN/395 dated 19.12.12

Cut GFN Liner ICI/33/2013-2014 24.07.2013 22.08.13 22.08.13

1517 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/134/2013-2014/10% 27.08.13 28.08.13 28.08.13

1518Donypolo Udyog Ltd. Shamgarh

WCRTP2012250/PSC Sleeper/464 dt. 11.06.13 Br.App. DU/02/13-14/90% 27.08.13 30.08.13 30.08.13

1519Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2011194/PSC Sleeper/370 dt.29.06.12 SEJ VNPL/11 & 12/10% 19.08.13 30.08.13 30.08.13

1520Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012244/PSC T-out/430 dt.19.03.13 T/out 1:8.5 VNPL/05/90% 27.08.13 02.09.13 02.09.13

1521Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012224/Wide gauge PSC/427 dt.18.03.13 Wide gauge T-4171,T-4172 VNPL/W.G./01/10% 19.08.13 02.09.13 02.09.13

1522Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012250/PSC Sleeper/441 dt.24.04.13 L.C.(T-4148) VNPL/01/90% 27.08.13 02.09.13 02.09.13

1523Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012250/PSC Sleeper/444 dt.09.05.13 Br.App(T-4089 to T-4097) VNPL/01/90% 27.08.13 02.09.13 02.09.13

1524 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/135/2013-2014/10% 02.09.13 03.09.13 03.09.131525 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/8th/Escl.(PVC) 26.08.13 04.09.13 04.09.131526 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/136/2013-2014/10% 05.09.13 06.09.13 06.09.13

1527Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 SEJ DU/08/2012-2013/10% 05.09.13 06.09.13 06.09.13

1528Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/02/13-14/10% 22.08.13 06.09.13 06.09.13

1529Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/16/13-14/10% 11.07.13 06.09.13 06.09.13

Page 64: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1530Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D-Switch SKCP/02/13-14/10% 11.07.13 06.09.13 06.09.13

1531Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/17/13-14/10% 23.07.13 12.09.13 12.09.13

1532Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/19/13-14/10% 12.08.13 12.09.13 12.09.13

1533Shri Kesharia Bareth WCRTP2012244/PSC T-out/431

dt.19.03.13 T/out 1:12 SKCP/01/13-14/90% 09.09.13 12.09.13 12.09.13

1534Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012244/PSC T-out/430 dt.19.03.13 T/out 1:8.5 VNPL/06/10% 12.09.13 13.09.13 13.09.13

1535Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012244/PSC T-out/430 dt.19.03.13 T/out 1:8.5 VNPL/07 & 8/10% 12.09.13 13.09.13 13.09.13

1536Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012224/Wide gauge PSC/427 dt.18.03.13 Wide gauge T-4171,T-4172 VNPL/W.G./02/10% 12.09.13 13.09.13 13.09.13

1537 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/137/2013-2014/10% 18.09.13 19.09.13 19.09.131538 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/138/2013-2014/10% 18.09.13 19.09.13 19.09.131539 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/255/2013-2014/90% 18.09.13 19.09.13 19.09.131540 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/139/2013-2014/10% 21.09.13 23.09.13 23.09.13

1541Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4170 DU/03/13-14/10% 21.09.13 23.09.13 23.09.13

1542Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 SEJ DU/09/2012-2013/10% 21.09.13 23.09.13 23.09.13

1543Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 L.C DU/03/2013-2014/10% 21.09.13 23.09.13 23.09.13

1544Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 Br.App. DU/04/2012-2013/10% 21.09.13 23.09.13 23.09.13

1545Donypolo Udyog Ltd. Shamgarh

WCRTP2012250/PSC Sleeper/464 dt. 11.06.13 SEJ DU/01/13-14/10% 21.09.13 23.09.13 23.09.13

1546 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/256/2013-2014/90% 24.09.13 25.09.13 25.09.13

1547Donypolo Udyog Ltd. Shamgarh

WCRTP2012250/PSC Sleeper/463 dt. 11.06.13 Br.Central DU/01/13-14/90% 24.09.13 25.09.13 25.09.13

1548Shri Kesharia Bareth WCRTP2012244/PSC T-out/431

dt.19.03.13 T/out 1:12 SKCP/02/13-14/90% 21.09.13 25.09.13 25.09.13

1549Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/20/13-14/10% 12.08.13 25.09.13 25.09.13

1550Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2013-14/144 23.09.13 25.09.13 25.09.13

1551Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012224/Wide gauge PSC/427 dt.18.03.13 Wide gauge T-4172 VNPL/W.G./03/10% 23.09.13 25.09.13 25.09.13

1552Surya Alloy Industries Ltd., Kolkata

WCR/TP/201191/JFP/410 dt 06.02.13

JFP 60 Kg T-5849 SAIL/BAR/PV/017/13-14 22.08.13 06.09.13 19.09.13

1553Surya Alloy Industries Ltd., Kolkata

WCR/TP/201191/JFP/410 dt 06.02.13

JFP 60 Kg T-5849 SAIL/BAR/PV/019/13-14 22.08.13 06.09.13 20.09.13

1554 M/s Seth & Co, Mumbai WCRTP2012230 Combination GFN Liner/434 dated 25.03.13

Combination GFN Liner SO263 08.08.13 13.09.13 26.09.13

Page 65: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1555 M/s Seth & Co, Mumbai WCRTP2012231/GFN Liner 60 kg/435 dated 28.03.13

GFN Liner 60 Kg SO319 30.08.13 20.09.13 26.09.13

1556M/s Parasnath Enterprises,

New DelhiWCR/TP/2011/179/gfn/345 dated

19.01.12GFN Liner 60 Kg RDSO Drg

No. T-3706115 09.08.13 03.09.13

1557Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12(Individual) DU/03/13-14/10% 26.09.13 27.09.13 27.09.13

1558Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 L.C DU/04/2013-2014/10% 26.09.13 27.09.13 27.09.13

1559Donypolo Udyog Ltd. Shamgarh

WCRTP2012250/PSC Sleeper/464 dt. 11.06.13 SEJ DU/02/13-14/10% 26.09.13 27.09.13 27.09.13

1560Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12SKCP/15/13-14/90%(Ind.) 16.07.13 30.09.13 30.09.13

1561Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12SKCP/16/13-14/90%(Ind.) 14.08.13 30.09.13 30.09.13

1562Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2013-14/145 30.09.13 01.10.13 01.10.13

1563 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/257/2013-2014/90% 30.09.13 03.10.13 03.10.131564 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/140/2013-2014/10% 30.09.13 03.10.13 03.10.131565 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/258/2013-2014/90% 04.10.13 07.10.13 07.10.131566 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/259/2013-2014/90% 09.10.13 10.10.13 10.10.13

1567Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2013-14/146 08.10.13 09.10.13 09.10.13

1568Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4170 DU/04/13-14/10% 30.09.13 04.10.13 04.10.13

1569Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12(Individual) DU/04/13-14/10% 30.09.13 04.10.13 04.10.13

1570Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:8.5 DU/06/13-14/10% 09.10.13 11.10.13 11.10.13

1571Donypolo Udyog Ltd. Shamgarh

WCRTP2012250/PSC Sleeper/463 dt. 11.06.13 Br.Central DU/02/13-14/90% 30.09.13 03.10.13 03.10.13

1572Donypolo Udyog Ltd. Shamgarh

WCRTP2012250/PSC Sleeper/464 dt. 11.06.13 SEJ DU/03/13-14/10% 30.09.13 08.10.13 08.10.13

1573Donypolo Udyog Ltd. Shamgarh

WCRTP2012250/PSC Sleeper/464 dt. 11.06.13 Br.App. DU/01/13-14/10% 30.09.13 08.10.13 08.10.13

1574Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 Br.App. DU/05/2012-2013/10% 30.09.13 08.10.13 08.10.13

1575Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/23/2013-2014/10% 09.10.13 11.10.13 11.10.13

1576Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 SEJ DU/10/2012-2013/10% 09.10.13 11.10.13 11.10.13

1577Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 SEJ DU/11/2012-2013/10% 09.10.13 11.10.13 11.10.13

1578Shri Kesharia Bareth WCRTP2012244/PSC T-out/431

dt.19.03.13 T/out 1:12 SKCP/03/13-14/90% 03.10.13 07.10.13 07.10.13

1579Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12SKCP/01/13-14/(rate diff 10%) 19.09.13 11.10.13 11.10.13

Page 66: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1580Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.CentralSKCP/01/13-14/(rate diff 10%) 19.09.13 11.10.13 11.10.13

1581 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/260/2013-2014/90% 12.10.13 14.10.13 14.10.13

1582Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12(Individual) DU/05/13-14/10% 15.10.13 18.10.13 18.10.13

1583Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:8.5 DU/07/13-14/10% 15.10.13 18.10.13 18.10.13

1584Donypolo Udyog Ltd. Shamgarh

WCRTP2012250/PSC Sleeper/463 dt. 11.06.13 Br.Central DU/03/13-14/90% 15.10.13 17.10.13 17.10.13

1585Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2013-14/147 17.10.13 18.10.13 18.10.13

1586 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/155/10% 17.10.13 18.10.13 18.10.13

1587Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12SKCP/01/13-14/(rate diff 90%) 19.09.13 17.10.13 17.10.13

1588Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D-SwitchSKCP/01/13-14/(rate diff 90%) 19.09.13 17.10.13 17.10.13

1589Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.CentralSKCP/01/13-14/(rate diff 90%) 19.09.13 17.10.13 17.10.13

1590Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 L.C.SKCP/01/13-14/(rate diff 90%) 19.09.13 17.10.13 17.10.13

1591Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 L.C.SKCP/01/13-14/(rate diff 10%) 19.09.13 18.10.13 18.10.13

1592Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D-SwitchSKCP/01/13-14/(rate diff 10%) 19.09.13 18.10.13 18.10.13

1593Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D-Switch SKCP/06/13-14/10% 22.08.13 18.10.13 18.10.13

1594Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 Br.Central SKCP/02/13-14/10% 18.06.13 18.10.13 18.10.13

1595Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12(Individual) DU/06/13-14/10% 18.10.13 21.10.13 21.10.13

1596Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4173 DU/03/13-14/10% 18.10.13 21.10.13 21.10.13

1597Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4170 DU/05/13-14/10% 18.10.13 21.10.13 21.10.13

1598Donypolo Udyog Ltd. Shamgarh

WCRTP2012250/PSC Sleeper/463 dt. 11.06.13 Br.Central DU/01/13-14/10% 18.10.13 21.10.13 21.10.13

1599Donypolo Udyog Ltd. Shamgarh

WCRTP2012250/PSC Sleeper/464 dt. 11.06.13 Br.App. DU/02/13-14/10% 18.10.13 21.10.13 21.10.13

1600 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/261/2013-2014/90% 19.10.13 21.10.13 21.10.131601 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/141/2013-2014/10% 18.10.13 21.10.13 21.10.131602 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/262/2013-2014/90% 21.10.13 22.10.13 22.10.13

1603Shri Kesharia Bareth WCRTP2012244/PSC T-out/431

dt.19.03.13 T/out 1:12 SKCP/04/13-14/90% 12.10.13 21.10.13 21.10.13

1604Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2013-14/148 22.10.13 23.10.13 23.10.13

Page 67: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1605Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out 1:12 DU/24/2013-2014/10% 30.10.13 01.11.13 01.11.13

1606Donypolo Udyog Ltd. Shamgarh

WCRTP2012250/PSC Sleeper/463 dt. 11.06.13 Br.Central DU/04/13-14/90% 30.10.13 01.11.13 01.11.13

1607Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:8.5 DU/08/13-14/10% 30.10.13 01.11.13 01.11.13

1608 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/263/2013-2014/90% 30.10.13 31.10.13 31.10.131609 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/264/2013-2014/90% 06.11.13 07.11.13 07.11.131610 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/142/2013-2014/10% 06.11.13 07.11.13 07.11.13

1611Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4173 DU/04/13-14/10% 06.11.13 07.11.13 07.11.13

1612Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4170 DU/06/13-14/10% 06.11.13 07.11.13 07.11.13

1613Donypolo Udyog Ltd. Shamgarh

WCRTP2012250/PSC Sleeper/463 dt. 11.06.13 Br.Central DU/02/13-14/10% 06.11.13 07.11.13 07.11.13

1614Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2013-14/149 07.11.13 08.11.13 08.11.13

1615Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:8.5 SKCP/21/13-14/10% 10.10.13 08.11.13 08.11.13

1616Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/03/13-14/10% 07.10.13 08.11.13 08.11.131617 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/265/2013-2014/90% 09.11.13 11.11.13 11.11.13

1618Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2013-14/150 11.11.13 13.11.13 13.11.13

1619Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012244/PSC T-out/430 dt.19.03.13 T/out 1:8.5 VNPL/06/90% 11.11.13 13.11.13 13.11.13

1620 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/266/2013-2014/90% 13.11.13 14.11.13 14.11.131621 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/267/2013-2014/90% 16.11.13 18.11.13 18.11.131622 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/268/2013-2014/90% 20.11.13 21.11.13 21.11.131623 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/143/2013-2014/10% 13.11.13 14.11.13 14.11.131624 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/144/2013-2014/10% 13.11.13 14.11.13 14.11.131625 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/145/2013-2014/10% 21.11.13 22.11.13 22.11.131626 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/269/2013-2014/90% 27.11.13 28.11.13 28.11.131627 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/146/2013-2014/10% 27.11.13 28.11.13 28.11.13

1628Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2013-14/151 27.11.13 28.11.13 28.11.13

1629Donypolo Udyog Ltd. Shamgarh

WCRTP2012250/PSC Sleeper/463 dt. 11.06.13 Br.Central DU/03/13-14/10% 27.11.13 28.11.13 28.11.13

1630Donypolo Udyog Ltd. Shamgarh

WCRTP2012250/PSC Sleeper/464 dt. 11.06.13 Br.App. DU/03/13-14/10% 27.11.13 28.11.13 28.11.13

1631Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4173 DU/05/13-14/10% 27.11.13 28.11.13 28.11.13

1632Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12 DU/07/13-14/10% 28.11.13 29.11.13 29.11.13

1633Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12 DU/08/13-14/10% 28.11.13 29.11.13 29.11.13

Page 68: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1634Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12 DU/09/13-14/10% 28.11.13 29.11.13 29.11.13

1635Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 T/out De-railing Switch DU/10/2013-2014/10% 28.11.13 29.11.13 29.11.13

1636Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 T/out 1:12 SKCP/04/13-14/10% 23.10.13 28.11.13 28.11.13

1637Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D-Switch SKCP/15/13-14/10% 07.10.13 28.11.13 28.11.13

1638Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D-Switch SKCP/16/13-14/10% 07.10.13 28.11.13 28.11.13

1639Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D-Switch SKCP/18/13-14/10% 10.10.13 28.11.13 28.11.13

1640Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D-SwitchSKCP/07 & 08/13-14/10% 24.09.13 29.11.13 29.11.13

1641Shri Kesharia Bareth WCRTP2011194/PSC Sleeper/369

dt.29.06.12 D-SwitchSKCP/11 & 14/13-14/10% 07.10.13 29.11.13 29.11.13

1642 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/270/2013-2014/90% 01.12.13 02.12.13 02.12.13

1643Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2013-14/152 02.12.13 03.12.13 03.12.13

1644Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012224/Wide gauge PSC/427 dt.18.03.13 Wide gauge T-4172 VNPL/W.G./04/10% 02.12.13 03.12.13 03.12.13

1645Shri Kesharia Bareth WCRTP2012244/PSC T-out/431

dt.19.03.13 T/out 1:12 SKCP/05/13-14/90% 05.11.13 04.12.13 04.12.13

1646Shri Kesharia Bareth WCRTP2012244/PSC T-out/431

dt.19.03.13 T/out 1:12 SKCP/06/13-14/90% 05.11.13 04.12.13 04.12.131647 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/271/2013-2014/90% 05.12.13 06.12.13 06.12.131648 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/272/2013-2014/90% 07.12.13 09.12.13 09.12.131649 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/273/2013-2014/90% 10.12.13 11.12.13 11.12.13

1650Vishal Nirmiti Pvt. Ltd. Bankhedi CS-162 MBC M/L sleeper

VNPL/CS-162/90%/2013-14/153 10.12.13 11.12.13 11.12.13

1651Donypolo Udyog Ltd. Shamgarh

WCRTP2012224/Wide gauge PSC/ 428 dt. 19.03.13 Wide gauge T-4173 DU/06/13-14/10% 10.12.13 11.12.13 11.12.13

1652 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/147/2013-2014/10% 13.12.13 16.12.13 16.12.13

1653Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12 DU/10/13-14/10% 13.12.13 16.12.13 16.12.13

1654 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/148/2013-2014/10% 24.12.13 26.12.13 26.12.13

1655Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12 DU/14/13-14/90% 24.12.13 26.12.13 26.12.13

1656 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/01/2013-2014/90% 31.12.13 06.01.14 06.01.141657 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/02/2013-2014/90% 04.01.14 06.01.14 06.01.141658 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/149/2013-2014/10% 02.01.14 08.01.14 08.01.14

1659Donypolo Udyog Ltd. Shamgarh

WCRTP2012244/PSC T-out/429 dt. 19.03.13 T-out 1:12 DU/11/13-14/10% 02.01.14 08.01.14 08.01.14

1660Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012224/Wide gauge PSC/427 dt.18.03.13 Wide gauge T-4172/T-4171 VNPL/W.G./05/10% 06.01.14 08.01.14 08.01.14

Page 69: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1661Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012250/PSC Sleeper/444 dt.09.05.13 Br.App(T-4089 to T-4097) VNPL/01/10% 06.01.14 08.01.14 08.01.14

1662Vishal Nirmiti Pvt. Ltd. Bankhedi CS-166 MBC M/L sleeper

VNPL/CS-166/90%/2013-14/01 06.01.14 08.01.14 08.01.14

1663 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/03/2013-2014/90% 08.01.14 09.01.14 09.01.141664 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/274/2013-2014/90% 09.01.14 10.01.14 10.01.141665 Shri Kesharia Bareth CS-166 MBC M/L sleeper SKCP/90%/Adv./13- 17.12.13 15.01.14 15.01.141666 Shri Kesharia Bareth CS-166 MBC M/L sleeper SKCP/90%/Adv./13- 31.12.13 15.01.14 15.01.14

1667Vishal Nirmiti Pvt. Ltd. Bankhedi CS-166 MBC M/L sleeper

VNPL/CS-166/90%/2013-14/02 13.01.14 16.01.14 16.01.14

1668 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/04/2013-2014/90% 18.01.14 20.01.14 20.01.141669 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/150/2013-2014/10% 18.01.14 20.01.14 20.01.141670 Shri Kesharia Bareth CS-166 MBC M/L sleeper SKCP/90%/Adv./13- 13.01.14 23.01.14 23.01.141671 Shri Kesharia Bareth CS-166 MBC M/L sleeper SKCP/90%/Adv./13- 22.01.14 23.01.14 23.01.141672 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/05/2013-2014/90% 23.01.14 24.01.14 24.01.14

1673Vishal Nirmiti Pvt. Ltd. Bankhedi CS-166 MBC M/L sleeper

VNPL/CS-166/90%/2013-14/03 24.01.14 28.01.14 28.01.14

1674 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/151/2013-2014/10% 28.01.14 29.01.14 29.01.141675 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/06/2013-2014/90% 28.01.14 29.01.14 29.01.141676 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/07/2013-2014/90% 31.01.14 03.02.14 03.02.141677 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/08/2013-2014/90% 03.02.14 04.02.14 04.02.141678 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/09/2013-2014/90% 06.02.14 07.02.14 07.02.141679 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/10/2013-2014/90% 08.02.14 10.02.14 10.02.14

1680Donypolo Udyog Ltd. Shamgarh CS-166 MBC M/L sleeper

DU/01/2013-2014/90%(rate diff.) 08.02.14 10.02.14 10.02.14

1681Vishal Nirmiti Pvt. Ltd. Bankhedi CS-166 MBC M/L sleeper

VNPL/CS-166/90%/2013-14/04 10.02.14 12.02.14 12.02.14

1682 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/156/10% 10.02.14 12.02.14 12.02.141683 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/157/10% 10.02.14 12.02.14 12.02.14

1684Vishal Nirmiti Pvt. Ltd. Bankhedi

WCRTP2012250/PSC Sleeper/444 dt.09.05.13 SEJ VNPL/01/90% 08.02.14 12.02.14 12.02.14

1685 Shri Kesharia Bareth CS-166 MBC M/L sleeper SKCP/90%/Adv./13- 08.02.14 12.02.14 12.02.141686 Shri Kesharia Bareth CS-166 MBC M/L sleeper SKCP/90%/Adv./13- 11.02.14 12.02.14 12.02.141687 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/11/2013-2014/90% 13.02.14 14.02.14 14.02.141688 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/12/2013-2014/90% 17.02.14 18.02.14 18.02.141689 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/Freight/02 21.01.14 14.02.14 14.02.141690 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/13/2013-2014/90% 20.02.14 21.02.14 24.02.141691 Shri Kesharia Bareth CS-166 MBC M/L sleeper SKCP/90%/Adv./13- 20.02.14 21.02.14 24.02.14

1692Vishal Nirmiti Pvt. Ltd. Bankhedi CS-166 MBC M/L sleeper

VNPL/CS-166/90%/2013-14/05 19.02.14 20.02.14 24.02.14

1693Vishal Nirmiti Pvt. Ltd. Bankhedi CS-166 MBC M/L sleeper

VNPL/CS-166/90%/2013-14/01(rate diff.) 17.02.14 20.02.14 24.02.14

1694 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/14/2013-2014/90% 24.02.14 25.02.14 25.02.141695 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/152/2013-2014/10% 25.02.14 26.02.14 26.02.14

Page 70: Status of bills - wcr.indianrailways.gov.inwcr.indianrailways.gov.in/uploads/files/1396605553463-Status of bills.pdf1 Paramount Rubber Industries WCR/TP/2007/86/220 dt- 03.12.07 G

Dt. Of bill

received in

HQ/TP section

Dt. Of submission of bill

to account for

Payment

Name of firm M/s PO No. Bill No. ItemsS.N Date

1696 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/153/2013-2014/10% 25.02.14 26.02.14 26.02.14

1697Donypolo Udyog Ltd. Shamgarh

WCRTP2011194/PSC Sleeper/372 dt.29.06.12 L.C DU/05/2013-2014/10% 25.02.14 26.02.14 26.02.14

1698 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/15/2013-2014/90% 27.02.14 28.02.14 28.02.141699 Shri Kesharia Bareth CS-166 MBC M/L sleeper SKCP/90%/Adv./13- 28.02.14 03.03.14 03.03.141700 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/16/2013-2014/90% 03.03.14 04.03.14 04.03.14

1701Vishal Nirmiti Pvt. Ltd. Bankhedi CS-166 MBC M/L sleeper

VNPL/CS-166/90%/2013-14/06 04.03.14 05.03.14 05.03.14

1702 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/17/2013-2014/90% 06.03.14 07.03.14 07.03.141703 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/18/2013-2014/90% 08.03.14 10.03.14 10.03.141704 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/19/2013-2014/90% 12.03.14 13.03.14 13.03.141705 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/20/2013-2014/90% 14.03.14 18.03.14 18.03.141706 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/21/2013-2014/90% 19.03.14 20.03.14 20.03.14

1707Vishal Nirmiti Pvt. Ltd. Bankhedi CS-166 MBC M/L sleeper

VNPL/CS-166/90%/2013-14/07 20.03.14 21.03.14 21.03.14

1708 Vishal Nirmiti Pvt. Ltd. CS-162 MBC M/L Sleeper VNPL/158/10% 20.03.14 21.03.14 21.03.141709 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/22/2013-2014/90% 22.03.14 24.03.14 24.03.141710 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/23/2013-2014/90% 25.03.14 26.03.14 26.03.141711 Donypolo Udyog Ltd. CS-162 MBC M/L sleeper DU/154/2013-2014/10% 25.03.14 26.03.14 26.03.141712 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/24/2013-2014/90% 27.03.14 28.03.14 28.03.14

1713Donypolo Udyog Ltd. Shamgarh CS-162 MBC M/L sleeper

DU/01/2013-2014/Escl. & Freight 13.02.14 28.03.14 28.03.14

1714 Donypolo Udyog Ltd. CS-166 MBC M/L sleeper DU/25/2013-2014/90% 28.03.14 31.03.14 31.03.14