21
4 2 5 1 0011 0010 1010 1101 0001 0100 1011 Status, Issues and Observations-- Postcards from Paraguay R. Dixon

Status, Issues and Observations-- Postcards from Paraguay

Embed Size (px)

DESCRIPTION

Status, Issues and Observations-- Postcards from Paraguay. R. Dixon. Trip Planner. Status Issues Facing the Accelerator Division Issues we share with the Laboratory Global Issues. What is the Key to Our Success?. AD Personnel Talented Dedicated Focused Tough Together. - PowerPoint PPT Presentation

Citation preview

Page 1: Status, Issues and Observations-- Postcards from Paraguay

42510011 0010 1010 1101 0001 0100 1011

Status, Issues and Observations-- Postcards from Paraguay

R. Dixon

Page 2: Status, Issues and Observations-- Postcards from Paraguay

4251

0011 0010 1010 1101 0001 0100 1011

R. Dixon AD Seminar 12-13-05

f Trip Planner

• Status• Issues Facing the Accelerator

Division• Issues we share with the

Laboratory• Global Issues

Page 3: Status, Issues and Observations-- Postcards from Paraguay

4251

0011 0010 1010 1101 0001 0100 1011

R. Dixon AD Seminar 12-13-05

f

Page 4: Status, Issues and Observations-- Postcards from Paraguay

4251

0011 0010 1010 1101 0001 0100 1011

R. Dixon AD Seminar 12-13-05

f

Page 5: Status, Issues and Observations-- Postcards from Paraguay

4251

0011 0010 1010 1101 0001 0100 1011

R. Dixon AD Seminar 12-13-05

f

Page 6: Status, Issues and Observations-- Postcards from Paraguay

4251

0011 0010 1010 1101 0001 0100 1011

R. Dixon AD Seminar 12-13-05

f

Page 7: Status, Issues and Observations-- Postcards from Paraguay

4251

0011 0010 1010 1101 0001 0100 1011

R. Dixon AD Seminar 12-13-05

f

Page 8: Status, Issues and Observations-- Postcards from Paraguay

4251

0011 0010 1010 1101 0001 0100 1011

R. Dixon AD Seminar 12-13-05

f What is the Key to Our Success?

• AD Personnel– Talented– Dedicated– Focused– Tough– Together

Page 9: Status, Issues and Observations-- Postcards from Paraguay

4251

0011 0010 1010 1101 0001 0100 1011

R. Dixon AD Seminar 12-13-05

f Accelerator Division Issues (1)

• Completing the present Program– Run II– Neutrinos

• End of Tevatron Era– Energy Frontier Disappears– Fermilab is now the only U.S. HEP laboratory– EPP2010 asks how long Tevatron should run

• Defining a future accelerator program– Neutrinos– Proton Driver– Other high beam power sources for neutrinos and other

applications such as The OBIETRON– ILC– Astrophysics and accelerators

Page 10: Status, Issues and Observations-- Postcards from Paraguay

4251

0011 0010 1010 1101 0001 0100 1011

R. Dixon AD Seminar 12-13-05

f Accelerator Division Issues (2)

• Accelerator Division Manpower– Making the Transition to the future

program(s)– Maintaining a vital workforce

• Budgets• Global issues for later

– U.S. Support of Science – The gathering storm

Page 11: Status, Issues and Observations-- Postcards from Paraguay

4251

0011 0010 1010 1101 0001 0100 1011

R. Dixon AD Seminar 12-13-05

f Total Accelerator Program

Accelerator Program

010,00020,00030,00040,00050,00060,00070,00080,00090,000

100,000

FY04 FY05 FY06 FY07 FY08 FY09

M&S

SWF

Page 12: Status, Issues and Observations-- Postcards from Paraguay

4251

0011 0010 1010 1101 0001 0100 1011

R. Dixon AD Seminar 12-13-05

f Technician Classifications

Page 13: Status, Issues and Observations-- Postcards from Paraguay

4251

0011 0010 1010 1101 0001 0100 1011

R. Dixon AD Seminar 12-13-05

f Technician Ages

Page 14: Status, Issues and Observations-- Postcards from Paraguay

4251

0011 0010 1010 1101 0001 0100 1011

R. Dixon AD Seminar 12-13-05

f AD manpower needs forAccelerator Operations FY05-09

Accelerator Program FTEs - Accelerator Division

0

100

200

300

400

500

600

FY05 FY06 FY07 FY08 FY09

LHC Support

Proton Plan

Run 2 Upgrades

Upgrades - other

NuMI Beamline

Accelerator M&O

External Beams

Other Support

AD now 575Present Level

Page 15: Status, Issues and Observations-- Postcards from Paraguay

4251

0011 0010 1010 1101 0001 0100 1011

R. Dixon AD Seminar 12-13-05

f Accelerator Division Issues (3)

• Aging Infrastructure• Collaborations w/other laboratories

and Universities

Page 16: Status, Issues and Observations-- Postcards from Paraguay

4251

0011 0010 1010 1101 0001 0100 1011

R. Dixon AD Seminar 12-13-05

f Laboratory Issues that Relate to AD

• Contract is to be re-bid– History– Institutional Relationship

• Relationship with our users• Relationship with our funding

agency– Big science and funding– Oversight

Page 17: Status, Issues and Observations-- Postcards from Paraguay

4251

0011 0010 1010 1101 0001 0100 1011

R. Dixon AD Seminar 12-13-05

f Global Issues

• Science outlook in the U.S.– Original Motivations

• What is the future of accelerators at the energy frontier?– “Real”Accelerator R&D vs “Real”

Projects

Page 18: Status, Issues and Observations-- Postcards from Paraguay

4251

0011 0010 1010 1101 0001 0100 1011

R. Dixon AD Seminar 12-13-05

fRising Above The Gathering Storm: Energizing and Employing America for a Brighter Economic Future

(2005)Committee on Science, Engineering, and Public Policy

Page 19: Status, Issues and Observations-- Postcards from Paraguay

4251

0011 0010 1010 1101 0001 0100 1011

R. Dixon AD Seminar 12-13-05

fRising Above The Gathering Storm: Energizing and Employing America for a Brighter Economic Future

(2005)Committee on Science, Engineering, and Public Policy

Page 20: Status, Issues and Observations-- Postcards from Paraguay

4251

0011 0010 1010 1101 0001 0100 1011

R. Dixon AD Seminar 12-13-05

f Pseudo Science

Page 21: Status, Issues and Observations-- Postcards from Paraguay

4251

0011 0010 1010 1101 0001 0100 1011

R. Dixon AD Seminar 12-13-05

f