Station Maintenance & Cleaning
Engineering & Operations Committee, March 10, 2016
Station Maintenance: Maintenance & Engineering
Station Equipment
Elevator Escalator – Separate
Presentation
Fare equipment
Communications System
Lighting
Pigeon Abatement
Security Grilles
Landscaping
Homeless Encampment (BPD & M&E)
Graffiti Removal
Structures
1
Contracted Services
Sweeping Services
Power Wash
Glass Replacement
Glass Cleaning
Pest Control
Station Maintenance:
Fare Equipment
Current Availability Ticket Vendors – 95.9%
Add Fare Machines – 97.9%
Parking Validation – 99.8%
Gates – 99.1%
Preventive Maintenance
All Equipment, All Stations – Every 10 weeks
Upgrades
Asset Refresh
Clipper
2
Station Maintenance:
Communications System
Preventive Maintenance Quarterly
Emergency Phones
PBX Phones
White Courtesy Telephones
TIMS (Train Information Systems)
Real Time Displays
Agents Console (alarms, controls & indications)
Station BARTNet (equipment, network, fiber optic cable)
Parking Lot/ Garage Call Boxes
Fire Radio System (underground stations)
3
Station Maintenance:
Station Lighting
Preventive Maintenance Lights – Bi-Monthly
Emergency Lighting – Bi Monthly
Timers & Photocells – Bi-Monthly
Emergency Generators – Bi-Monthly
Parking Lot, Garage, Park & Ride Lots Three Times/Year
Upgrade Plans LED
Montgomery
4
Station Maintenance:
Pigeon Abatement
Last year: El Cerrito Del Norte Station- completed
El Cerrito Plaza Station - free areas completed, paid area 70%
South Hayward Station - completed
Coliseum Station Substation completed
Bay Fair Station - Train Control Room completed
West Oakland Station - area around new break room
This Year : San Leandro Substation
Hayward Station
West Oakland Station completion
San Leandro Station
Most Likely Next: 16th Street Station, 24th Street Station, Concord Station and Berkeley Station,
Rockridge Station parking lot, Bay fair Station
5
Station Maintenance:
Security Grilles
Preventive Maintenance: Once Month
Replacement
48 Total Security Grilles
28 Scheduled for replacement
20 completed
Expected Completion: April 2016
6
Station Maintenance:
Landscaping
Quarterly
Every Stations Landscaping
eg; Pleasant Hill, Las Juntas
Park
Pruning for décor
Weed Abatement
Mulching
Mowing Grass
Soil Erosion Control
Irrigation System inspection/
repair
7
Weekly
Large Trash Removal
Shopping Cart Removal
Broken Glass Clean Up
Seasonal
Storm Drain Clearing
Tree Trimming / Removal
Station Maintenance:
Containing Large Homeless
Encampments
8
El Cerrito Del Norte - north of station, behind Home Depot
MacArthur - 40th at MLK Blvd
Hayward Whipple Yard - north end near golf course
45th Ave at San Leandro Blvd, Oakland - under aerial
Coordinate homeless notifications through BART Police
Station Maintenance:
Smaller Homeless Encampments
Balboa Station(north & south) –
Clear every Saturday
ANA substation (south of A15)
Concord Parking Structure
C54 ( in culvert, directly below our
tracks, south end of Concord
Yard)
Lafayette Station (in bushes on
City Side lot)
Below our bridges at 29th St, 30th
St, 52nd St and Shattuck, Oakland
MW09 (in bushes out side C2 side)
Richmond between yard and
station R-2 side, near Rail Road
Tracks
North Berkeley Station (bushes by
substation)
Ashby Station (Ed Roberts lot,
near houses)
9
Fremont Station (East lot in bushes)
Jackson Street, Hayward ( below aerial)
Hayward Station ( in bushes along Rail
Road Right of Way that splits station)
Halcyon Blvd, Hayward (below Aerial)
Union City Station (south end, in
bushes at culvert)
San Bruno Station (under ramp to
parking structure)
West Oakland Station (around station,
moves around a lot)
Millbrae (under pass, Millbrae Ave)
Colma Station ( below bridge to south
end of station at bus zone)
Daly City Station (north end lot at
Caltrans property)
Non Station Graffiti Removal
Hot Spots – Bi- Weekly Removal
Substation South of Lake Merritt Station under the aerial
Hayward Station Substation at transfer to L Line and Western Blvd
All Columns A-line
All Columns West Oakland Station to Martin Luther King Blvd
Chabot Rd, Rockridge & Ashby BART Parking Lots
Gilman Ave Berkeley
Other Hot Spots: (require coordination)
Oakland 23rd St Portal
Richmond Station Union Pacific Track Wall
W-Line Cal Train Wall
All others on an as-reported basis
10
Station Maintenance:
Structures
11
Roof & Drains
Structural Steel (paint as
necessary)
Platform edge surface
Benches
Map cases, signs, railings &
kiosks
Windscreens
Emergency gates
Partitions
Wall hydrants
Preventive Maintenance Inspections (every 8 weeks) &
Repair (as needed):
Stairs, stair treads and handrails
Walk off rubber mats and aluminum
landings
Grille man-doors & chain barriers
Restroom components
Water heaters
Sump pumps
Drains
Doors, door handles, locks
Floors, pavers, tiles, concrete
terrazzo
Contracted Services:
Sweeping
Contract Monthly
All Park & Ride Lots
Weekly
All Parking Lots / Garages
Twice a Week
Fruitvale Station Plaza, Garage, Parking Lot
Coliseum Station Plaza, Parking Lot
Hayward Station Plaza, Garage, Parking Lot
Bay Fair Station Plaza, Garage, Parking Lot
12
Contracted Services:
Power Washing
Daily
16th Street Station Plaza
24th Street Station Plaza
Twice a Week Fruitvale Station Plaza, Bus Shelters
Coliseum Station Plaza, Bus Shelters
Hayward Station Plaza, Bus Shelters
Fremont Station Plaza, Bus Shelters
Walnut Creek Station Plaza, Bus Shelters, Parking Garage Stairwells
Pleasant Hill Station Plaza, Bus Shelters
MacArthur Station Plaza, Bus Shelters, Parking Garage Stairwells
Dublin/Pleasanton Station Plaza, Bus Shelters
El Cerrito Plaza Station Plaza
Richmond Station Plaza, Bus Shelters, Parking Garage Stairwells
Rockridge Station Plaza
Daly City Station Plaza, Bus Shelters, Parking Garage Stairwells
All Others Once a Week
13
Contracted Services:
Glass Replacement 2015
14
January 2015 February 2015 March 2015 April 2015 May 2015 June 2015
Walnut Creek Concord Embarcadero Hayward Yard 12th Street Rockridge
Walnut Creek South SF El Cerrito Del Norte Lake Merritt North Berkeley Lake Merritt
Walnut Creek Embarcadero El Cerrito Del Norte Powell W Dublin/Pleasanton El Cerrito Del Norte
Concord Embarcadero Civic Center Walnut Creek W Dublin/Pleasanton Lake Merritt
Embarcadero Embarcadero West Oakland Union City Fruitvale
Dublin/Pleasanton Lake Merritt Concord Fruitvale Fruitvale
Berkeley San Leandro Fruitvale Lafayette Berkeley
West Oakland 24th Street Concord Rockridge Montgomery
Concord 24th Street Hayward Fruitvale Powell
Embarcadero Fruitvale Fruitvale Daly City
Fruitvale Embarcadero
Fruitvale
Fruitvale
July 2015 August 2015 September 2015 October 2015 November 2015 December 2015
Embarcadero Fruitvale Civic Center Richmond Embarcadero Montgomery
Coliseum Civic Center Civic Center Daly City Lafayette Coliseum
Embarcadero Dublin/Pleasanton Berkeley Fruitvale El Cerrito Del Norte MacArthur
El Cerrito Del Norte Hayward Richmond BayFair Powell Concord
Daly City Lake Merritt Powell South SF Hayward
Powell Hayward Yard Embarcadero
San Bruno Lafayette
South Hayward El Cerrito Del Norte
16th Street
Contracted Services:
Glass Cleaning
Elevator Exterior Door Glass – Quarterly
Skylights – Quarterly
Bus Shelters - Monthly
15
Contracted Services:
Pest Control
Contract
Monthly Inspection & Treatment
As Needed – On Call
Targets
Bees, wasps, hornets and yellow jackets
Rodents; mice and rats
Ants
Spiders
Fleas
Gnats
Flies
Cockroaches
16
Station Brightening (In House):
Scope
Station Thorough Cleaning
Station Painting
Upgrade lighting
Plumbing fixture and pipe/valve replacements
Tile and Concrete Floor repairs
Stair Tread replacements
Hand Rail Repairs
Replace Some Signs
Decluttering
Fare Evasion Hardening
Station Specific Work; construction of break rooms, paramedic report
location, special fencing, erecting wall systems, and street gate Installations
17
Station Brightening (In House):
Progress
Complete / In Progress: Coliseum
Civic Center
Powell
Montgomery
Embarcadero
San Leandro
Needs Based
18
Station Cleaning Transportation & System Service
Cleaning
Daily station and facility cleaning
Deep Cycle Cleaning by the Special Project Crews
(SPC)
Entryway cleaning
Graffiti Removal (contractor)
19
Daily Station Cleaning:
A & B Station Assignments
Powell and Civic Center have some shifts with double coverage 20
A/L Line AM
A/L Line PM
R Line AM
R Line PM
C/K Line AM
C/K Line PM
M/W Line AM
M/W Line PM
Lake Merritt Primary
Lake Merritt Ashby
Secondary Ashby
Oakland West Secondary
Oakland West
Secondary Embarcadero Embarcadero
Fruitvale Fruitvale Berkeley Primary
Berkeley 12th St. 12th St. Montgomery Montgomery
Coliseum/OC Coliseum/OC N. Berkeley
Primary
N. Berkeley Secondary
19th St Primary
19th St. Primary
Powell Powell
San Leandro Primary
San Leandro El Cerrito Plaza
Secondary
El Cerrito Plaza Primary
MacArthur Primary
MacArthur
Primary Civic Center Civic Center
Bay Fair Bay Fair El Cerrito del Norte
EC del Norte
Primary Rockridge Secondary
Rockridge Secondary
16th St Secondary
16th St Primary
Hayward Primary
Hayward
Secondary Richmond
Richmond Secondary
Orinda Secondary
Orinda
Secondary 24th St Primary
24th St
Secondary
S. Hayward Secondary
S. Hayward
Primary Lafayette Secondary
Lafayette Secondary
Glen Park Secondary
Glen Park Primary
Union City Secondary
Union City Walnut Creek
Primary
Walnut Creek Primary
Balboa
Secondary
Balboa Primary
Fremont Primary
Fremont
Secondary Pleasant Hill Secondary
Pleasant Hill Secondary
Daly City Primary
Daly City
Secondary
Castro Valley Secondary
Castro Valley
Primary Concord Primary
Concord Primary
Colma
Primary
Colma Secondary
W. Dub/Pleas Primary
W. Dub/Pleas
Secondary North Concord
Secondary
North Concord Secondary
South SF Primary
South SF
Secondary
E. Dublin Pleasanton
E. Dub/Pleas
Primary Bay Point Primary
Bay Point Primary
San Bruno Secondary
San Bruno
Primary
OKS/OSA Millbrae Millbrae
CHB Secondary
SFIA TM OFC Secondary
SFIA TM OFC Secondary
MET/LMA
A Station Fixed Post
B Station Shared Duties
“A "Station (Green)
Staff stays at their
assigned station all day
“B” Station (Red)
Staff is responsible for
cleaning two stations.
The secondary station
receives a reduced
cleaning program
Daily Station Cleaning:
“A” Station Assignments
Only 28 of 91 stations assignments have a dedicated System Service Worker
21
Comprehensive Cleaning Duties:
1. Thoroughly clean all restrooms.
2. Thoroughly clean elevators.
3. Sweep and degum entrances, stairs and gutters.
4. Police concourse and platform as needed.
5. Empty trash, clean receptacles in station.
6. Thoroughly clean station agent’s booth and break room.
7. Dustmop and degum concourse and platform.
8. Scrub or wet mop concourse and platform. Mop stairs.
9. Clean escalator handrail, ledges and landings.
10. Clean phones, handrails, ledges and water fountains.
11. Thoroughly clean TM zone, restrooms, offices, lunch room, and locker rooms.
12. Bring dumpster to street.
13. Empty recycling cans.
14. Clean dumpster area.
15. Clean fare gates, AFC machines and other metal.
16. Monitor for and clean any wet spills throughout day.
17. Clean parking garage elevators and sweep stairwells.
18. Clean, sweep and police patios, curbs, bus zones and sidewalks.
19. Empty all trash bins on patios, walkways, bus/taxi zones and sidewalks.
20. Clean janitor’s room, all equipment, and organize supplies
Daily Station Cleaning:
B Station Assignments
63 of 91 stations assignments have shared duties between two stations. 22
The shared duties are split with two types of responsibility. The primary station
has a more comprehensive cleaning program and the secondary station
receives a reduced cleaning program.
Limited cleaning activities at the “B” Secondary Stations:
1. Thoroughly clean all restrooms.
2. Thoroughly clean elevators.
3. Police concourse and platform as needed.
4. Empty trash, clean receptacles in station.
5. Thoroughly clean station agent’s booth and break room.
6. Monitor for and clean any wet spills throughout day.
7. Clean janitor’s room, all equipment, and organize supplies.
Deep Cycle Cleaning:
Special Project Crew (SPC)
Each color represents a different 3 person team 23
A/L Line SPC
R Line SPC
C/K Line SPC
M/W Line SPC
14 Special Project Crews Lake Merritt
Ashby
Oakland West
Embarcadero
Fruitvale
Team 1
Berkeley
Team 4
12th St.
Team 5
Montgomery
Coliseum/OC
Team 1
N. Berkeley
Team 4
19th
Team 5
Powell
San Leandro
El Cerrito Plaza
Team 4
Mac Arthur
Civic Center
Bay Fair
Team 2
El Cerrito
del Norte 4
Rockridge
Team 5
16th St
Team 12
Hayward
Richmond
Team 4
Orinda
Team 6
24th St
S. Hayward
Team 3
Lafayette
Team 6
Glen Park
Team 13
Union City
Team 3
Walnut Creek
Team 6
Balboa
Team 13
Fremont
Team 3
Pleasant Hill
Daly City
Castro Valley
Team 2
Concord
Team 7
Colma
W. Dublin
Pleasanton 2 North Concord 7
South
San Francisco 14
E. Dublin
Pleasanton 2
Bay Point
Team 7
San Bruno
Team 14
OKS/OSA/LMA Team 1 Millbrae
Team 14
M/W Line – SF Stations now
have dedicated resources for
the four Downtown Stations and
16th and 24th St Stations share
one crew. This will have an
immediate effect on
cleanliness.
SPC Crews on other Lines will
take months before they return.
The R –Line is an example.
One crew for 6 stations.
Each station takes 3-5 weeks
depending on size
Deep Cycle Cleaning:
SPC - Scope of Activities
Special Project Crews use heavy equipment to do deep cleaning for the entire station. This includes use of
mechanized equipment on the platform and cleaning of the yellow strip at the edge of the platform during non-
revenue.
Comprehensive station cleaning duties:
1. Use chemicals to strip and buff floors. Wax and Seal.
2. Use heavy equipment to perform deep cleaning on floors (during the non-revenue hours on platform)
3. Steam clean stairs
4. Scrub, and clean stairs, walls, pillars, handrails, and gutters, and landings
5. High dust, clean, and polish beams
6. Thoroughly clean elevators and escalators inside and outside elevators.
7. Clean trash cans. Detail clean trash cans, benches, maps, signs, phones
8. De- gum, sweep/dust-mop, light scrub, and wet mop all floors
9. Detail clean, strip floor, rinse, and seal and wax agent booth’s floor and break-room floor. Wash and polish metal outside of
booth. Clean and wash glass in/out of agent booth
10.Steam clean restroom walls, toilets, sinks, urinals. Wash and clean metals.
11.De- gum, steam clean yellow safety strips (non-revenue hours only)
12.Detail clean and polish all metal including walls, emergency gates, TVM Machines, AFC Gates and other metal surfaces.
13.Detail clean and wash glass, ledges and baseboards
14.Vacuum, shampoo and clean carpets in offices. Strip, and rinse, clean wax and seal office floors
15.Strip, clean and rinse train control room floors. Wax and seal floors
16.Police station including: sweeping and mopping any wet or sticky spills and police stairs
17.Clean all equipment and handle any emergencies at stations that may occur on your shift.
18.Lay winter carpets and replace carpets as deemed necessary for special events
24
Entryway Cleaning
Entrance Crew
The Entrance Crew is comprised of 3 System Service Workers that work
in a team primarily in the Downtown San Francisco and Oakland Stations
to ensure the staircase are power washed to maintain a clean look and
smell.
Comprehensive station cleaning duties:
1. Steam clean stairs
2. Seam clean escalator, gutters, rails and landings
3. Squeegee stairs dry
4. Dry-mop stairs
5. Clean eight feet in front of stairs
6. Steam clean walls adjacent to stairs
7. Replace and re-tape rugs
25
Graffiti Removal
Graffiti Contractor
The Contractor performs graffiti removal services in accordance with the
requirements and standards as described in the scope of services of the
contract with the District. These services consist of the following:
1. Daily inspection of each station.
2. Removal of graffiti that include unauthorized markings, drawings,
scribbling, writings, signs, posters, or labels from inside BART
stations followed by an inspection of the station.
3. Monitor BART’s Graffiti Hotline at least four (4) times daily.
4. Clean all graffiti reported from hotline and graffiti found while
performing daily inspections.
5. Produce and email reports that include pictures of graffiti prior to
and after cleanup and cleaning logs.
26
27
AFC Gate Availability
60%
70%
80%
90%
100%
Oct Nov Dec Jan Feb Mar April May June July Aug Sept Oct Nov Dec
Results
Goal
99.14%, 99.00% goal exceeded
28
60%
70%
80%
90%
100%
FY13 FY14 FY15 FY16 Qtr 2 - YTD
Results Goal
AFC Gate Availability
Historical Performance
28
29
60%
70%
80%
90%
100%
Oct Nov Dec Jan Feb Mar April May June July Aug Sept Oct Nov Dec
Results
Goal
AFC Vendor Availability
Ticket Vendor Availability - 95.9% - exceeded goal
Add Fare Availability – 97.9%
Add Fare Parking Availability – 97.7%
Parking Validation Machines Availability – 99.79%
30
60%
70%
80%
90%
100%
FY13 FY14 FY15 FY16 Qtr 2 - YTD
Results Goal
AFC Vendor Availability
Historical Performance
30
31
2.72 2.70 2.78 2.74 2.73
1
2
3
4
FY2015 Qtr 2 FY2015 Qtr 3 FY2015 Qtr 4 FY2016 Qtr 1 FY2016 Qtr 2
Results
Goal
Environment - Outside Stations
Composite rating of:
Walkways & Entry Plaza Cleanliness (50%) 2.64
BART Parking Lot Cleanliness (25%) 2.95
Appearance of BART Landscaping (25%) 2.70
Overall goal not met, although Landscaping sub-category improved slightly and met its sub-goal
Cleanliness ratings of either Excellent or Good:
Walkways/Entry Plazas: 61.6% Parking Lots: 77.1%
Landscaping Appearance: 63.7%
Ratings guide:
4 = Excellent
3 = Good
2.80 = Goal
2 = Only Fair
1 = Poor
32
1
2
3
4
FY13 FY14 FY15 FY16 Qtr 2 - YTD
Results* Goal
Environment - Outside Stations
Historical Performance
* Composite rating of: Walkways & Entry Plaza Cleanliness (50%); BART Parking Lot Cleanliness (25%);
Appearance of BART Landscaping (25%)
Excellent
Poor
Only Fair
Good
32
33
2.71 2.65 2.74 2.73 2.73
1
2
3
4
FY2015 Qtr 2 FY2015 Qtr 3 FY2015 Qtr 4 FY2016 Qtr 1 FY2016 Qtr 2
Results
Goal
Environment - Inside Stations
Goal not met
Cleanliness ratings of either Excellent or Good:
Station Platform: 73.1% Other Station Areas: 62.7%
Restrooms: 42.7% Elevators: 53.9%
Focus on downtown San Francisco stations showing some results, 3 of 4 M Line indicators improved
Composite rating for Cleanliness of:
Station Platform (60%) 2.87
Other Station Areas (20%) 2.68
Restrooms (10%) 2.25
Elevator Cleanliness (10%) 2.47
Ratings guide:
4 = Excellent
3 = Good
3.00 = Goal
2 = Only Fair
1 = Poor
34
1
2
3
4
FY13 FY14 FY15 FY16 Qtr 2 - YTD
Results* Goal
Environment - Inside Stations
Historical Performance
* Composite rating for Cleanliness of: Station Platforms (60%); Other Station Areas (20%); Restrooms (10%); Elevators (10%)
Excellent
Poor
Only Fair
Good
34
35
Station Vandalism
2.98 2.97 3.01 3.01 3.04
1
2
3
4
FY2015 Qtr 2 FY2015 Qtr 3 FY2015 Qtr 4 FY2016 Qtr 1 FY2016 Qtr 2
Results
Goal
Goal not met, improved rating
80.3% of those surveyed ranked this category as either Excellent or Good
Station Kept Free of Graffiti
Ratings guide:
4 = Excellent
3.19 = Goal
3 = Good
2 = Only Fair
1 = Poor
36
1
2
3
4
FY13 FY14 FY15 FY16 Qtr 2 - YTD
Results* Goal
Station Vandalism
Historical Performance
* Station Kept Free of Graffiti
Excellent
Poor
Only Fair
Good
36