154
State Transportation Improvement Program 18 STIP WYDOT PLANNING

State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

  • Upload
    phamnhi

  • View
    220

  • Download
    1

Embed Size (px)

Citation preview

Page 1: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

StateTransportationImprovementProgram ‘18STIP

WYDOTP L A N N I N G

Page 2: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings
Page 3: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings
Page 4: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

TABLE OF CONTENTS

Transportation Commission Districts ....................................................................................................................................................................... 1

Transportation Introduction ...................................................................................................................................................................................... 3

Financial Plan ........................................................................................................................................................................................................... 9

Transit Introduction .................................................................................................................................................................................................. 10

Aeronautics Commission Districts ........................................................................................................................................................................... 19

Aeronautics Introduction .......................................................................................................................................................................................... 21

Highway Districts ...................................................................................................................................................................................................... 23

Albany County .......................................................................................................................................................................................................... 25

Big Horn County ....................................................................................................................................................................................................... 31

Campbell County ...................................................................................................................................................................................................... 36

Carbon County ......................................................................................................................................................................................................... 41

Converse County ..................................................................................................................................................................................................... 46

Crook County ........................................................................................................................................................................................................... 50

Fremont County ....................................................................................................................................................................................................... 53

Goshen County ........................................................................................................................................................................................................ 61

Hot Springs County .................................................................................................................................................................................................. 65

Johnson County ....................................................................................................................................................................................................... 69

Laramie County ........................................................................................................................................................................................................ 73

Lincoln County ......................................................................................................................................................................................................... 80

Natrona County ........................................................................................................................................................................................................ 87

Niobrara County ....................................................................................................................................................................................................... 94

Park County ............................................................................................................................................................................................................. 97

Platte County ............................................................................................................................................................................................................ 103

Sheridan County ...................................................................................................................................................................................................... 107

Sublette County ........................................................................................................................................................................................................ 114

Page 5: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Sweetwater County .................................................................................................................................................................................................. 118

Teton County ............................................................................................................................................................................................................ 123

Uinta County ............................................................................................................................................................................................................ 130

Washakie County ..................................................................................................................................................................................................... 134

Weston County ......................................................................................................................................................................................................... 138

Various Counties ...................................................................................................................................................................................................... 142

Illustrative Project List .............................................................................................................................................................................................. 149

Page 6: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

TRANSPORTATION COMMISSION DISTRICTS

2

73

6

4

5

1

Page 1 of 149

Page 7: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

TRANSPORTATION COMMISSION

1

JIM ESPY - SAVERY

2

5

LOUIE PFRANGLE - WORLAND

6

MIKE LARSON - LUSK

PHIL SCHMIDT - CASPER

7

3

4

RICK NEWTON - BUFFALO

VICE CHAIRMAN

BOB RUWART - WHEATLAND

CHAIRMAN

TODD SEETON - JACKSON

Page 2 of 149

Page 8: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

TRANSPORTATION INTRODUCTION

The Wyoming Department of Transportation utilizes a continuing and comprehensive process of Long Range Transportation Planning, Asset Management, and Performance Management, that encourages input from various sources to assist in determining capital improvement projects that will maintain and enhance Wyoming’s Transportation system (see attached flowchart). Input from engineering studies, the collective judgment of the Transportation Commission, and the Department of Transportation, capital improvement projects are culminated into the Statewide Transportation Improvement Program, commonly known as the STIP. The STIP is not meant to serve solely as an accounting document. Rather, it is a snapshot of expected projects and their schedules, which is continually being updated.

The Wyoming STIP is a six-year approved program. The STIP is fiscally constrained for the years 2018-2023. The financial budget is constrained based on projected federal and state funding. The actual funding level that will be available depends upon Congressional appropriations as well as State appropriations. This STIP presents the planned construction and preliminary engineering programs for fiscal year 2018. Preliminary engineering is also programmed for some projects having an anticipated construction date beyond fiscal year 2023. This is due to a need to indicate planned continuity of construction or because of an anticipated lengthy preliminary engineering process. The Wyoming Department of Transportation fiscal year is October through September.

Since both the nature of the projects and the funding is dynamic, and subject to many sources of change, the STIP is inherently fluid. Scheduling projects for improvement is a very complex undertaking in that there are a very large number of challenges that must be addressed prior to a project being ready for letting. Many of these challenges are outside of the Department’s ability to predict or control at the time the project is initially programmed or scheduled. Some of the challenges faced can be funding source changes, increases in construction costs, right-of-way acquisition delay, and environmental issues. Wyoming continues to be faced with cost volatility for some construction materials, such as oil, steel, cement and some sources of aggregate. WYDOT is also taking advantage of new technology to help identify the roads that have the highest return on investment and is using this data to create a system preservation focus for the Wyoming Transportation network. Changes to the STIP, whether from public input, funding issues, etc., are handled on a quarterly basis, and are approved by the Transportation Commission. The quarterly addendums are posted on the WYDOT website at the link shown in the paragraph below.

WYDOT pledges to do its best to adhere to this program and to serve the public interest through these projects. WYDOT values your input, advice, and support. Any significant changes in either revenues and/or expenses will result in adjusting the schedule of projects.

Page 3 of 149

Page 9: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

NOTE: Project cost estimates contained in the publication, as always, represent the planning estimates of the project. These include: construction and construction engineering costs. They do not represent the final estimated construction cost of any project which goes to letting for bid by contractors.

This document is divided by county alphabetically along with a various section, which includes projects in more than one county. Maps of the seven Transportation Commission Districts, five Aeronautics Commission Districts as well as the Transportation Department’s five Construction and Maintenance Districts are included. The map for each county indicates projects scheduled for construction in Fiscal Year 2018 and future years. The county maps contain the primary location of the project. Aeronautics and transit projects are shown at the locations for the FY 2018 projects.

For an inter-active view of the projects in the STIP go to: https://apps.wyoroad.info/itsm/map.html. For an online view of the STIP follow the link: http://www.dot.state.wy.us/home/engineering_technical_programs/stip_project_listing.html

WYDOT utilizes an extensive public involvement process for development and implementation of the STIP. Once projects have been identified in the planning process and proposed for the STIP, the document is released for public review and comment. WYDOT reviews the proposed STIP with the public in the spring at a number of meetings throughout the state, often using open house style forums in individual counties. After the initial input is received, a draft STIP is then available for public comment for at least 30 days, beginning in August. The STIP is then presented to the Transportation Commission, with the comments received, at its September meeting.

More information on WYDOT’s public involvement process can be found in the Public Involvement Handbook at: http://www.dot.state.wy.us/files/live/sites/wydot/files/shared/Public%20Affairs/District%20Info/2011%20Public%20Involvement%20Handbook.pdf

Public involvement activities inform the public and gather information about concerns and impacts a project may have on communities. WYDOT evaluates many impacts at each step of the transportation life cycle, including the long range plan, selection of projects for the STIP, impacts of project alternatives, construction, maintenance, and performance monitoring. Of special concern is ensuring minority and low-income populations are not disproportionately impacted by transportation projects, also known as Environmental Justice. The WYDOT Planning Program evaluates the state for areas of minority and low-income populations, ensures additional measures are taken to ensure the full and fair participation by all potentially affected communities during the long range planning process and the project selection process. WYDOT also evaluates the performance of the transportation system within those areas to ensure that transportation disadvantaged populations are not being underserved. In addition, special care is taken after the project is selected to ensure smaller communities are not disproportionately impacted.

Page 4 of 149

Page 10: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

ELEMENTS COMPRISING THE WYOMING STATE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

Page 5 of 149

Page 11: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

OTHER PROGRAM FUNDS

INDIAN RESERVATION ROADS:

The Indian Reservation Roads projects are included if their submittal was received prior to the printing of this document.

METROPOLITAN TRANSPORTATION IMPROVEMENT PROGRAMS:

The Casper Metropolitan Transportation Improvement Program (MTIP) and the Cheyenne MTIP for Fiscal Years 2018-2021, and as amended, are included in the STIP by reference, and are available at:

Casper MTIP: http://www.casperwy.gov/UserFiles/Servers/Server_62983/File/Government/Departments/Community%20Development/MPO/FY18-21%20MTIP.pdf

Cheyenne MTIP: http://www.plancheyenne.org/wp-content/uploads/2012/10/The-18_21_TIPwith-sign.pdf

The transit dollar amounts shown in both the narrative and on the county pages do not reflect the entire amount for each MPO. These amounts shown in this STIP represent the State local share. For total Program amounts refer to the Community MTIP's.

FEDERAL LANDS HIGHWAYS PROGRAMS:

Central and Western Federal Lands Transportation Improvement Program projects are included in the STIP by reference, and are available at:

Central Federal Lands: https://flh.fhwa.dot.gov/programs/flpp/tip/cfl.htm

Western Federal Lands: https://flh.fhwa.dot.gov/programs/flpp/tip/wfl.htm

Page 6 of 149

Page 12: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Character of Work Description ExamplesADA IMPROVEMENTS Work to address pedestrian access and mobility wheel chair ramps, curb ramps, correcting uneven surfaces, installation of

truncated domes

ADDITIONAL LANES Projects to improve capacity and/or mobility passing lanes, additional through lanes, truck lanes, climbing lanes, multi-lanes

BRIDGE REPLACEMENT Replacement of existing bridge new bridge, large culvert, or reinforced box culvert

COMMUNITY DEVELOPMENT Enhancements projects (non-highway related work)

pedestrian and bicycle facilities, recreational trails, pathways, safe routes to school projects, community improvements, environmental mitigation related to transportation, entry signs, decorative railing or lighting

DRAINAGE REPAIR Work to address erosion, flood, or other water related damage

flood repairs to slopes, riprap repair or replacement, pipe inlet or outlet repairs, cleaning out culverts and ditches, replacing damaged culverts, debris removal

ENVIRONMENTAL Projects to address environmental issues wetland mitigation or monitoring, dust suppression, wildlife crossing, fish passage

FENCING Projects to address fencing needs add, replace or repair fence, deer/wildlife fence, right-of-way fence

GENERAL MAINTENANCE Work to address maintenance or preservation needs aggregate, salt/sand supply

GRADING Dirt work only, no paving adding dirt shoulders, safety grading for guardrail, flattening slopes

GUARDRAIL Work to provide protection of obstructions within the highway clear zone

add, replace or repair guardrail, w-beam or box beam guardrail, concrete barrier (permanent or temporary), end treatments, crash cushions, cable rail

ITS Intelligent Transportation System work dynamic message signs, variable speed limit signs, RWIS stations, web cameras, ice detection, special software

LIGHTING Work to install lights to improve safety at interchanges, intersections, roads, etc. high mast tower lights, interchange and intersection lighting, decorative lights

MODIFY INTERCHANGE Highway interchange modifications ramp modifications, adding ramps, removing ramps, modify geometricsMODIFY INTERSECTION Highway and street intersection modifications modify intersection geometrics, signal additions or upgrades, turn lanes

NEW CONSTRUCTION Work to build a new roadway or bridge on a new alignment new roadway or bridge in a location that did not previously have one

PARKING Projects to address need for vehicle parking truck parking areas, tourist pull out areas, parking lots

PAVEMENT MAINTENANCE Preserve existing pavement surface crack seal, pothole patching, machine placed patching, joint seal, slab replacements, grinding, dowel bar retrofit

PAVEMENT REHABILITATION Correct functional and structural pavement deficiencies

mill and/or leveling followed by overlay (greater than 2"), crack & seat, isolated reconstruction

PAVEMENT RESURFACE Correct functional pavement deficiencies (IRI/rutting/thermal cracking) thin overlay (2" or less), microsurface, chip seal

PORT OF ENTRY Projects to address needs at Ports of Entry work in and around a port of entry including buildings, parking lot, scales, lighting, signing

RAILROAD Projects dealing with at-grade railroad crossings at grade railroad crossing modifications, electrical, signs, quiet zones, circuitry

RECONSTRUCTION Work to rebuild or expand current roadway or bridges removing and rebuilding roads and structures

Page 7 of 149

Page 13: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Character of Work Description ExamplesREST AREA Projects to address needs at Rest Areas work in and around rest areas including building, parking lot, water, electrical,

lighting, and septic systems, signing

SAFETY IMPROVEMENTS Projects to address vehicle crashes and safety and/or mobility of the highway system

curve warning signs, roadway striping, no passing signs, high friction wearing surface, turn lanes, accel and decel lanes, pedestrian crossings, shoulder widenings

SLIDE REPAIR Work to address geotechnical issues dealing with landslides, rock fall, and slope movements

toe berms, mechanical slide fixes (shear keys, mechanical anchors, shear piles), rock fall mesh, rock fall mitigation, scaling

SNOW FENCE Addition, removal or rehabilitation of snow fence install, rehabilitate, recycle snow fence

STRUCTURE REPAIR Work to address structure conditions or preservation

deck overlay; deck replacement; expansion joint modification; painting; concrete repairs; riprap repairs; slope repairs; bearing device repair or replacement; damage repairs; rehabilitation to large culverts, overhead sign structures, and retaining walls

STUDIES Projects that may or may not lead to construction bridge inspection, bridge and pavement management systems, liaisons, studies, planning documents

TRAFFIC SYSTEMS Projects to improve traffic movements new or replacement signal poles and devices, signing, signal heads, overhead signs and structures, pedestrian crossing devices, detection

UTILITY Work to add, replace, relocate, and upgrade utilities within the roadway right of way

adding or relocation power, cable, phone, gas, pipelines, relocating towers or poles, storm drain systems

Page 8 of 149

Page 14: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Anticipated Revenue Aniticipated Obligations

FY 2018 FY 2018 STIP Projects Other 2018 ProjectsFederal 2017 Carryover * $35,879,372 Federal 2018 $230,529,906 Federal 2018 $45,698,966Federal 2018 $260,988,505 State 2018 $81,094,962 State 2018 $7,416,188State 2017 Carryover $12,674,268 Total $311,624,868 Total $53,115,154State 2018 $100,824,896 Total Obligations 2018** $364,740,022Total Federal and State Revenue Authority $410,367,042 Remaining Balance 2018*** $45,627,020

FY 2019 FY 2019 STIP Projects Other 2019 ProjectsFederal 2018 Carryover $446,421 Federal 2019 $204,045,995 Federal 2019 $56,553,262Federal 2019 $267,743,578 State 2019 $112,302,149 State 2019 $13,409,953State 2018 Carryover $10,033,475 Total $316,348,144 Total $69,963,215State 2019 $128,590,361 Total Obligations 2019** $386,311,359Total Federal and State Revenue Authority $406,813,836 Remaining Balance 2019*** $20,502,477

FY 2020 FY 2020 STIP Projects Other 2020 ProjectsFederal 2019 Carryover $471,421 Federal 2020 $212,334,616 Federal 2020 $61,908,738Federal 2020 $273,905,509 State 2020 $46,847,902 State 2020 $15,409,953State 2019 Carryover $5,546,822 Total $259,182,518 Total $77,318,691State 2020 $93,058,979 Total Obligations 2020** $336,501,209Total Federal and State Revenue Authority $372,982,732 Remaining Balance 2020*** $36,481,523

FY 2021 FY 2021 STIP Projects Other 2021 ProjectsFederal 2020 Carryover $496,421 Federal 2021 $193,149,161 Federal 2021 $56,553,262Federal 2021 $273,905,509 State 2021 $46,816,323 State 2021 $15,409,953State 2020 Carryover $27,813,735 Total $239,965,484 Total $71,963,215State 2021 $93,209,901 Total Obligations 2021** $311,928,699Total Federal and State Revenue Authority $395,425,567 Remaining Balance 2020*** $83,496,868

* Includes 2017 obligations on 2018 projects.** Includes contract lettings and other federal and state mandated programs.***Funds are accounted for projects that will be programmed for these years. They include: Urban, Rail Highway Crossings, Dust Mitigation, Transportation Commission Projects, Community Development, Maintenance Chip Seals/Patching, Bridge Rehabilitation, etc.

State of Wyoming Financial PlanState Transportation Improvement Program

Page 9 of 149

Page 15: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

TRANSIT INTRODUCTION

GENERAL

Congress establishes the legal authority to commence and continue Federal Transit Administration (FTA) programs through authorizing legislation covering several years. On December 4, 2015, President Obama signed the Fixing America’s Surface Transportation Act (FAST) Act, reauthorizing surface transportation programs through fiscal year 2020. Each reauthorization amends the Federal Transit Laws codified in 49 USC Chapter 53.

The Wyoming Department of Transportation (WYDOT) acts as a facilitator of public transportation services. WYDOT does not directly provide public transportation services, but contracts for services with local, sub-grantee public transportation providers. WYDOT Transit Staff disseminates information about U.S. Department of Transportation programs and provides technical support to applicants in preparation of funding proposals. The WYDOT Transit Application Guidelines can be found at: http://www.dot.state.wy.us/home/planning_projects/transportation_programs/transit-in-wyoming.html. Local governments and non-profit entities are responsible for the development and operation of their local transit systems.

Private enterprise is encouraged to participate to the maximum extent feasible in providing public transportation. Eligible grantees may contract for services from, or lease vehicles to private operators.

FEDERAL TRANSIT ACT

SECTIONS 5305(d) and 5305(e) PROGRAMS (Formerly 5303 and 5304)

These programs are for planning funds for Metropolitan and Statewide Rural areas to foster the development of coordinated community and regional transit planning. Metropolitan planning funds (Section 5305(d)) are provided to Casper and Cheyenne and are annually combined with FHWA Planning Funds to create the Consolidated Planning Grant (CPG). Statewide planning (Section 5305(e)) is generally placed in a consolidated planning grant and is added to state planning funds and made available to both municipalities and small rural areas for their transit planning needs.

SECTION 5307 – URBANIZED AREA FORMULA GRANTS

This program provides grants to Urbanized Areas (UZA) for public transportation, capital, planning, job access reverse commute projects, administration, preventive maintenance, as well as operating expenses. These funds constitute a core investment in the enhancement and revitalization of public transportation systems in the nation’s urbanized areas, which depend on public transportation to improve mobility and reduce congestion. This funding is obligated to Wyoming’s urbanized areas (Casper and Cheyenne) for public transportation services. All projects must benefit residents in urbanized areas (over 50,000 population) of Wyoming. Section 5307 provides 80% for capital and administrative costs, and 50% of the operating needs of transportation providers.

Page 10 of 149

Page 16: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

The Casper Metropolitan Transportation Improvement Program (MTIP) and the City of Cheyenne MTIP for Fiscal Years 2018-2021, and as amended, are included in the STIP by reference and are available at:

Casper MTIP: http://www.casperwy.gov/UserFiles/Servers/Server_62983/File/Government/Departments/Community%20Development/MPO/FY18-21%20MTIP.pdf

Cheyenne MTIP: http://www.plancheyenne.org/wp-content/uploads/2012/10/The-18_21_TIPwith-sign.pdf

SECTION 5310 – ENHANCED MOBILITY OF SENIORS AND INDIVIDUALS WITH DISABILITIES

This program is intended to enhance mobility for seniors and persons with disabilities by providing funds for programs to serve the special needs of transit-dependent populations beyond traditional public transportation services and Americans with Disabilities Act (ADA) complementary paratransit services.

This program provides formula funding to increase the mobility of seniors and persons with disabilities. The former New Freedom program (Section 5317) is folded into this program. The New Freedom program provided grants for services for individuals with disabilities that went above and beyond the requirements of the Americans with Disabilities Act (ADA). Activities eligible under New Freedom are now eligible under the Enhanced Mobility of Seniors and Individuals with Disabilities program. Using these funds for operating expenses requires a 50% local match while using these funds for capital expenses (including acquisition of public transportation services) requires a 20% local match.

SECTION 5311 – FORMULA GRANTS FOR RURAL AREAS

This program provides capital, administrative and operating assistance to State agencies, local governments, Indian tribes and non-profit organizations providing public transportation services in rural areas, defined as areas with fewer than 50,000 residents. The program remains largely unchanged under the FAST Act. Activities eligible under the former Job Access and Reverse Commute (JARC) program (Section 5316), which provided services to low-income individuals to access jobs, are now eligible under the Rural Area Formula program. Projects must benefit residents in non-urbanized areas of Wyoming. Section 5311 provides up to 80% for preventive maintenance, capital and administrative costs and 56.56% of the operating needs of transportation providers.

SECTION 5311(f) – INTERCITY BUS PROGRAM

This section requires each state to spend 15% of its annual Section 5311 apportionment to develop and support a program of projects for intercity bus transportation. The goal of the program is to connect isolated rural areas throughout the country to larger communities. Wyoming has identified six potential routes that support this goal and serve the people of Wyoming. In Wyoming, intercity bus service is a vital link between otherwise isolated rural communities to other areas of the state and the rest of the nation.

Page 11 of 149

Page 17: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

SECTION 5339 – BUS AND BUS FACILITIES This capital program provides funding to replace, rehabilitate and purchase buses and related equipment and to construct bus-related facilities. Eligible capital projects include the acquisition of buses for fleet and service expansion, bus maintenance and administrative facilities, transfer facilities, bus malls, transportation centers, intermodal terminals, park-and-ride stations, acquisition of replacement vehicles, bus rebuilds, passenger amenities such as passenger shelters and bus stop signs, accessory and miscellaneous equipment such as mobile radio units, supervisory vehicles, fare boxes, computers, and shop and garage equipment. This is an apportionment program divided between the Rural and Urban areas of Wyoming. The urban areas of Wyoming are Casper and Cheyenne. This program requires a 20% local match. BUS CATEGORIES PER FTA C 5010

• Heavy-duty large bus – buses with a minimum service life of 12 years or 500,000 miles, approximately 35-40 feet in length as well as articulated buses

• Heavy-duty small bus – buses with a minimum service life of 10 years or 350,000 miles, approximately 30 feet in length • Medium-duty mid-size bus – buses with a minimum service life of 7 years or 200,000 miles, approximately 25-35 feet in length • Light-duty mid-size bus – buses with a minimum service life of 5 years or 150,000 miles, approximately 25-35 feet in length • Light-duty small bus – buses with a minimum service life of 4 years or 100,000 miles. Cutaways and modified vans,

approximately 16-28 feet in length

Page 12 of 149

Page 18: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

The following is a list of all eligible applicants for FTA programs 5310, 5311, 5339 and 5305(e). Other non-profit groups that provide public transportation service and would meet the requirements of the individual program will be evaluated on a case by case situation. Funding has been awarded for FY2018 for numerous projects and will be solicited on an annual basis for subsequent years.

ACTA High Country Senior Citizens - Dubois

Southern Teton Area Rapid Transit - START

Alltrans, Inc. Hot Springs County Sr. Citizens Center - Thermopolis Star Valley Chamber of Commerce

Baggs Assisted Care Facility Jefferson Lines Star Valley Senior Citizens - Afton Black Hills Stage Lines Kemmerer Senior Citizens Assoc. SW. Sublette Co. Pioneers - Big Piney Buffalo Senior Center

Lander Senior Citizens Center Sweetwater Co. Transit Authority Re-sources - STAR

Campbell County Senior Citizens - Gillette Meeteetse Recreation District Ten Sleep Senior Center Carbon County Senior Services - Rawlins N. Big Horn Senior Center - Lovell Thayne Senior Center Casper Area Transportation Coalition Niobrara Senior Center - Lusk Town of Mills Cheyenne Transit Program Panther International Uinta Senior Citizens - Evanston Child Development Services of Fremont Co. - Riverton Pine Bluffs Seniors University of Wyoming - Laramie Children's Learning Center - Jackson Powell Senior Citizens Ago-Go Warm Valley Senior Center City of Casper Rehabilitation Ent. Of North Eastern Wy -

Renew - Sheridan Washakie County Senior Services - Wor-land

City of Cheyenne Rendezvous Pointe - Pinedale

Weston County Senior Services - Newcas-tle

Cody Council on Aging Riverton Senior Citizens Center Wyoming Independent Living Converse County Aging Services - Douglas S. Big Horn Senior Citizens - Greybull Wyoming Services for Independent Living Crook County Senior Services - Sundance Senior Center of Jackson HoleDiversified Services Senior Citizens Council - Sheridan Eppson Center for Seniors - Laramie Services for Seniors - Wheatland Fremont Co. Association of Gov'ts - Wind River Transit Shoshone & Arapahoe Tribes Goshen Co Senior Friendship Center - Tor-rington Shoshoni Senior Citizens Center

Page 13 of 149

Page 19: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

WYOMING PROGRAM OF PROJECTS FTA VEHICLES – SECTION 5310

FY 2018 – FY 2021

Mobility Management (MM) is currently a statewide project designed to assist with the coordination of transportation services on the lo-cal level. The project lead to the development and continued maintenance of the website www.WyomingTransportationProviders.org that includes a comprehensive listing of available public and private transportation providers throughout Wyoming. The next phase of MM will be to assist WYDOT and local entities with the creation of Coordinated Transportation Plans and work to find solutions to mobili-ty issues that impact the people of Wyoming. Wyoming Independent Living and Wyoming Services for Independent Living administer the Voucher and Mobility Management Projects through annual project agreements with WYDOT.

FY 2018 FY2019 FY 2020 FY 2021

Section 5310 Estimated Apportionment Urban Funding – Carryover Previous Year

Statewide Funding – Carryover Previous Year Total Available

Urban Funding Statewide Funding

$ 426,300 106,580 82,137

$ 615,017

323,201 291,816

$ 426,300 Unknown Unknown $ 426,300

216,621 209,679

$ 426,300 Unknown Unknown $ 426,300

216,621 209,679

$ 426,300 Unknown Unknown $ 426,300

216,621 209,679

Mobility Management Urban Funding

Statewide Funding

Voucher Program Urban Funding

Statewide Funding

Capital & Operating Available

Urban Funding Statewide Funding

-58,455 -60,000

-87,000 -77,920

$177,746 $153,896

-58,455 -60,000

-87,000 -77,920

$71,166 $71,759

-58,455 -60,000

-87,000 -77,920

$71,166 $71,759

-58,455 -60,000

-87,000 -77,920

$71,166 $71,759

Page 14 of 149

Page 20: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

FTA RURAL PUBLIC TRANSIT – SECTION 5311 FY 2018 – FY 2021

WYDOT funds approximately fourteen rural public transit providers under Section 5311. These rural transit agencies provide services in twelve of Wyoming’s twenty-three counties, with the state’s rural transit funding increasing the reach of the program into every one of Wyoming’s counties.

Agencies to be Federally funded for FY 2018 -Wind River Transportation Authority -University of Wyoming – TransPark Wyoming) (Wind River Indian Reservation and Fremont County) -Southern Teton Area Rapid Transit – START (Jackson) -Sweetwater Transit Authority (Rock Springs & Green River) -Campbell County Seniors (Gillette & Campbell County) -Riverton Senior Center (Riverton and Fremont County) -Buffalo Senior Center (Buffalo and Johnson County) -Wyoming Independent Living & Rehabilitation

-Sheridan Mini-Bus (Sheridan and Sheridan County) -Converse County Aging Services (Douglas, Glenrock & Converse Coun-ty) -Torrington Friendship Senior Center (Torrington & Goshen County) -Lander Senior Center (Lander and Fremont County) -Wyoming Services for Independent Living

Estimated Section 5311 Allocations FY 2018 FY 2019 FY 2020 FY 2021

Estimated Section 5311 Apportionment $6,326,124 $6,326,124 $6,326,124 $6,326,124 Estimated RTAP Apportionment 99,306 99,306 99,306 99,306 Less State Administration* - 632,612 -632,612 -632,612 -632,612 Less Intercity Bus** -948,919 -948,919 -948,919 -948,919 Less RTAP Apportionment*** -99,306 -99,306 -99,306 -99,306 Federal Funds Available for Rural Transit Program $4,744,593 $4,744,593 $4,744,593 $4,744,593 State Public Transit Funds**** 1,500,000 1,500,000 1,500,000 1,500,000 Federal Funds – Estimated Carryover 325,000 Unknown Unknown Unknown Federal State Administration – Estimated Carryover 0 Unknown Unknown Unknown Federal Intercity Bus – Estimated Carryover 105,662 Unknown Unknown Unknown State Public Transit Funds – Estimated Carryover 200,000 Unknown Unknown Unknown

Total Rural Transit Program $6,875,255 $6,244,593 $6,244,593 $6,244,593

*Calculated at 10% of the estimated 5311 apportionment.**Calculated at 15% of the estimated 5311 apportionment. ***RTAP (Rural Transportation Assistance Program) – provides funding to assist in the design and implementation of training and technical assistance projects,

Research and other support services to meet the needs of transit operators. This funding is used by WYDOT and WYTRANS. ****As per Wyoming S.S. 24-15-101, 1999 Session.

Page 15 of 149

Page 21: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

FTA PUBLIC TRANSIT – SECTION 5339 FY 2018 – FY 2021

A new formula grant program is established under Section 5339, replacing the previous Section 5309 discretionary Bus and Bus Facili-ties program. Projects have been solicited for FY2018 utilizing funds from the 2017 apportionment. Projects will be solicited for future fiscal years depending on the publishing of the guidance for the program and the apportionment available.

2018 2019 2020 2021

Section 5339 Estimated Apportionment Urban Estimated Funding Statewide Estimated Funding

Urban Estimated Carryover Statewide Estimated Carryover

$ 206,645 1,750,000

79,868 1,425,051

$ 206,645 1,750,000

Unknown Unknown

$ 206,645 1,750,000

Unknown Unknown

$ 206,645 1,750,000

Unknown Unknown

Total Urban $ 286,513 $ 206,645 $ 206,645 $ 206,645 Total Statewide 3,175,051 1,750,000 1,750,000 1,750,000

Total $ 3,461,564 $ 1,956,645 $ 1,956,645 $ 1,956,645

Page 16 of 149

Page 22: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

FTA RURAL PUBLIC TRANSIT – SECTION 5311(f) Intercity Bus FY 2018 – FY 2021

The Intercity Bus program in Wyoming is primarily used to connect rural areas with larger regional intercity bus carriers. Consistent with this goal, the current high priority projects in Wyoming are:

• I-90 - South Dakota state line to Montana state line;• Wyoming 191,89, 30, 189 & I-80 – Jackson to Utah state line;• I-25 – Colorado state line to Casper and Casper to Buffalo, and• Wyoming 20/26, 20/16/14, US alt 14 and US 310/WYO789 – Big Horn Basin

.

Estimated 5311(f) Allocations

FY 2018 FY 2019 FY 2020 FY 2021 Intercity Bus Apportionment $948,919 $948,919 $948,919 $948,919 Estimated Carryover 105,662 Unknown Unknown Unknown

Total Available for Intercity Bus Projects $1,054,581 $948,919 $948,919 $948,919

Page 17 of 149

Page 23: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

FTA RURAL PUBLIC TRANSIT – SECTIONS 5305(d) and 5305(e) Metropolitan Planning/State Planning and Research Programs

FY 2018 – FY 2021

These programs are for planning funds for Metropolitan and Statewide Rural areas to foster the development of coordinated community and regional transit planning.

Estimated 5305(e) and 5305(d) Allocations

FY 2018 FY 2019 FY 2020 FY 2021 Section 5305(d) – Metropolitan Planning $430,404 $430,404 $430,404 $430,404 Section 5305(e) – Statewide Planning 112,388 112,388 112,388 112,388 Section 5305(e) – Statewide Carryover 174,257 Unknown Unknown Unknown

Total Available for Planning Projects $717,049 $542,792 $542,792 $542,792

Page 18 of 149

Page 24: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

2 1

3

45

AERONAUTICS COMMISSION DISTRICTS

Page 19 of 149

Page 25: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

CODY

BRUCE MCCORMACK

4

ROCK SPRINGS

SIGSBEE DUCK -AT LARGE

CODY

JOHN NEWTON - AT LARGE

1

WHEATLAND

CHUCK BROWN III

2

JACKSON

DOYLE VAUGHAN

3

AERONAUTICS COMMISSION DISTRICTS

CHAIRMAN

SHERIDAN

PETE SCHOONMAKER

VICE CHAIRMAN

CASPER

WILLIAM DEVORE

5

Page 20 of 149

Page 26: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

AERONAUTICS INTRODUCTION

In accordance with Wyoming Statutes §§ 10-3-401 and 10-3-402, the State of Wyoming invests in a system of approximately forty public-use, locally-owned airports located throughout the state. The Aeronautics Division maintains a statewide system of airport capital improvement projects, known as the Wyoming Aviation Capital Improvement Plan (WACIP), which is included as part of the Wyoming Department of Transportation’s State Transportation Improvement Program (STIP). The WACIP is a five year plan that is a collaborative process involving citizens, airport users, airport sponsors, the Division and the Federal Aviation Administration (FAA). Creation of the WACIP is a year-long process which begins at the local level and results in a group of projects being submitted by each sponsor to the Division during the annual planning update. This is followed by an extensive review and prioritization by Division staff, as well as coordination with the FAA. The proposed WACIP is then sent back to the sponsor for comment before final consideration by the Wyoming Aeronautics Commission (WAC). It is important to note that the WACIP is a dynamic document with modifications submitted to the WAC for consideration each month. A two-year “snapshot” of the WACIP is taken in approximately June of each year and included in the STIP.

In administering the grants program, WS §10-3-401(d) requires that the WAC “establish, amend and have available” a five year capital improvement plan for airports in the state. The inclusion of the WACIP in the STIP is intended to satisfy this requirement. As mentioned above, the WACIP is regulated by a seven-member Aeronautics Commission made up of representatives from five districts and two members that serve at-large who are appointed by the governor and confirmed by the senate. The Director of WYDOT is an ex-officio member of the commission.

Wyoming is a channeling act state as referenced in WS §10-3-201(b). This means that in most cases when federal funds are used to finance airport development in Wyoming, the airport sponsor submits requests for reimbursement to the Division with the state making payment directly to the airport. The FAA is then billed by the state for the federal portion of the grant payment.

Federal funds are provided to the airports in varying percentages based on the airport category. Normally primary commercial service airports receive 93.75% and general aviation airports receive 90%. These funds are awarded directly to the airport by the FAA. In many states, the local airport pays the remaining balance. In Wyoming, however, the state invests in airport construction and improvement as well as air service enhancement. State and local shares of the remaining balance are based on the type of project and are defined in commission Policy and Procedures.

Development of a statewide capital improvement plan such as the WACIP is a complex process involving many different entities representing different constituencies. WYDOT is committed to achieving a safe, integrated aviation system that accommodates the wide variety of uses that occur at airports within the state. The WACIP is a collaboration of these different interests and commitment by each stakeholder to develop the state aviation system in the public interest.

For additional information on the Aeronautics Program contact Amy Surdam, Administrator at (307) 777-3952, 200 East 8th Avenue, Cheyenne, Wyoming 82001.

Page 21 of 149

Page 27: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

ELEMENTS COMPRISING THE WYOMING AVIATION CAPITAL IMPROVEMENT PLAN (WACIP)

Page 22 of 149

Page 28: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

1

3

2

5

4

HIGHWAY DISTRICTS

Page 23 of 149

Page 29: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

1

2

3

4

5

ENGINEERING CONTACTS

Phone (307) 745-2100

Laramie, Wyoming 82070

3411 South Third Street

Tom DeHoff, District Engineer

District 1

Phone (307) 674-2300

Sheridan, Wyoming 82801

10 East Brundage Lane

Scott Taylor, District Engineer

District 4

Phone: (307) 473-3200

Casper, Wyoming 82601

900 Bryan Stock Trail

Lowell Fleenor, District Engineer

District 2

Phone (307) 352-3000

Rock Springs, Wyoming 82902

3200 Elk Street

Keith Compton, District Engineer

District 3

Phone (307) 568-3400

Basin, Wyoming 82410

218 West C Street

Pete Hallsten, District Engineer

District 5

Phone (307) 777-4484

Cheyenne, Wyoming 82009

5300 Bishop Boulevard

Mark J. Gillett, Assistant Chief Engineer, Operations

Keith R. Fulton, Assistant Chief Engineer, Engineering and Planning

Gregg C. Fredrick, Chief Engineer

William T. Panos, Director

Wyoming Department of Transportation

Page 24 of 149

Page 30: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

ALBANY COUNTY

01090260105014

0104064

0103091

P261029

P261030P261034 I805178

0101006

I805177

I805172

I805179

I805181I805175I805174I805171

N232067P5510214206001

KEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

CN05080

Page 25 of 149

Page 31: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Albany County Fiscal Year 2018

Transportation Projects

Federal State Other Total2 SCP-TC 0.09 0101006 WOODS LANDING TO COLORADO WOODS LANDING SOUTH/WY 10 101 0.09 9.12 9.03 PAVEMENT REHABILITATION 0 2,084 0 2,0842 SCP-TC 0.00 0103091 LARAMIE TO CENTENNIAL LARAMIE WEST/WY 130 103 0.00 10.00 10.00 PAVEMENT REHABILITATION 0 2,494 0 2,4942 RHC 2.48 CN05080 ALBANY COUNTY UPRR 810427N 5012 2.48 2.48 0.00 RAILROAD 93 0 93 186

FY TOTAL: 19.03 93 4,578 93 4,764

Transit Projects

Federal State Other Total2 LARAMIE EPPSON CENTER FOR SENIORS CAPITAL/OPERATING/ADMIN/PM 0 68 37 105

2 LARAMIE UNIVERSITY OF WYOMING CAPITAL/OPERATING/ADMIN/PM 1,247 0 771 2,018

2 LARAMIE UNIVERSITY OF WYOMINGPURCHASE TWO LIGHT-DUTY SMALL BUSES 35 0 35 70

2 LARAMIE UNIVERSITY OF WYOMINGPURCHASE MEDIUM-DUTY MID-SIZE BUS 329 0 82 411

2 LARAMIE UNIVERSITY OF WYOMING PLANNING PROJECT 136 0 14 150

FY TOTAL: 1,746 68 939 2,754

Aeronautics Projects

Federal State Other Total1 LARAMIE REHABILITATE R/W 3/21 5,505 220 147 5,872

1 LARAMIESEAL COAT AND MARK AIRSIDE PAVEMENTS 0 544 136 680

FY TOTAL: 5,505 764 283 6,552

Trans Comm Dist

Aero Comm Dist

STATE

5305e

5311

5339

5339

Location

Location

Eligible Provider

Character of Work

Cost $1000

Cost $1000

Character of WorkFunding Source

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Begin RM

End RM Length Character of Work

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 26 of 149

Page 32: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Albany County

Transportation Projects Fiscal Year 2019

Federal State Other Total2 NHPPI 330.24 I805172 LARAMIE TO CHEYENNE COUNTY LINE WEST 80 330.24 336.60 6.36 PAVEMENT REHABILITATION 5,023 392 0 5,415

2 NHPPI 291.46 I805174 RAWLINS TO LARAMIEHERRICK LANE TO QUEALY DOME EAST 80 291.46 299.50 8.04 PAVEMENT REHABILITATION 6,349 496 0 6,845

2 SCP-TC 22.16 P261030 LARAMIE TO COLORADOHARMONY-MOUNTAIN HOME/WY 230 26 22.16 33.04 10.88 PAVEMENT REHABILITATION 0 4,422 0 4,422

2 STP 328.52 P551021 LARAMIE GRAND AVENUE/3RD STREET TO15TH STREET 55 328.52 329.32 0.81 PAVEMENT REHABILITATION 2,705 284 0 2,989

FY TOTAL: 26.09 14,077 5,594 0 19,671

Aeronautics Projects Fiscal Year 2019

Federal State Other Total

1 LARAMIEREHABILITATE COMMERCIAL APRON, PH III DESIGN 200 8 5 213

FY TOTAL: 200 8 5 213

Transportation Projects Fiscal Year 2020

Federal State Other Total2 SCP-TC 0.10 0104064 LARAMIE HERRICK LANE/WY 12 104 0.10 12.18 12.08 PAVEMENT REHABILITATION 0 1,876 0 1,876

2 NHPPI 319.00 I805178 LARAMIE TO CHEYENNETELEPHONE CANYONSTRUCTURE NO. BLJ 80 319.00 324.00 5.00 STRUCTURE REPAIR 2,281 178 0 2,459

2 HSIP 280.90 I805181 TRANSPORTATION DISTRICT 1 * I-80/SIGN UPGRADE 80 280.90 336.60 55.70 SAFETY IMPROVEMENTS 835 65 0 9002 SCP-TC 11.50 P261029 LARAMIE TO WOODS LANDING HARMONY/WY 230 26 11.50 22.16 10.66 PAVEMENT REHABILITATION 0 4,811 0 4,811

FY TOTAL: 83.44 3,116 6,930 0 10,046

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Begin RM

End RM Length Character of Work

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Cost $1000Character of Work

Character of WorkCost $1000

LengthTrans Comm

Dist Project General Location Detail Location LRS IDBegin

RMEnd RM

LocationAero Comm

Dist

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 27 of 149

Page 33: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Albany County

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Aeronautics Projects Fiscal Year 2020

Federal State Other Total

1 LARAMIEEXPAND COMMERCIAL TERMINAL, PH II 0 960 640 1,600

1 LARAMIEREHABILITATE COMMERCIAL APRON, PH III 1,800 72 48 1,920

1 LARAMIE ACQUIRE SRE 0 630 70 700

FY TOTAL: 1,800 1,662 758 4,220

Transportation Projects Fiscal Year 2021

Federal State Other Total

2 STP 0.00 0105014 MCFADDEN TO ROCK RIVER ALBANY COUNTY SECTION/WY 13 105 0.00 8.04 8.04 PAVEMENT REHABILITATION 3,091 325 0 3,4162 SCP-TC 0.00 0109026 BOSLER TO WHEATLAND WY 34 109 0.00 9.70 9.70 PAVEMENT REHABILITATION 0 4,231 0 4,2312 NHPPI 282.65 I805177 RAWLINS TO LARAMIE QUEALY DOME WEST 80 282.65 291.46 8.81 PAVEMENT REHABILITATION 7,525 587 0 8,112

2 STP 327.37 N232067 LARAMIE 3RD STREET/CURTIS STREET-BOSWELL DRIVE 23 327.37 400.80 73.43 PAVEMENT REHABILITATION 4,355 458 0 4,813

FY TOTAL: 99.98 14,971 5,601 0 20,572

Aeronautics Projects Fiscal Year 2021

Federal State Other Total

1 LARAMIECONDUCT PLANNING STUDY, MASTER PLAN 440 18 12 469

1 LARAMIE REPLACE SRE 0 270 30 300

1 LARAMIE EXPAND ARFF BUILDING 560 22 15 597

FY TOTAL: 1,000 310 57 1,367

Project General Location

Character of WorkCost $1000Aero Comm

Dist Location

Length

Character of Work

Character of Work

Cost $1000

Cost $1000

Aero Comm Dist Location

Detail Location LRS IDBegin

RMEnd RM

Trans Comm Dist

Page 28 of 149

Page 34: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Albany County

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2022

Federal State Other Total2 NHPPI-PM 310.00 I805175 LARAMIE CURTIS STREET-THIRD STREET 80 310.00 313.80 3.80 PAVEMENT REHABILITATION 1,875 146 0 2,0212 NHPPI 324.01 I805179 LARAMIE TO CHEYENNE * VEDAUWOO WEST 80 324.01 330.24 6.23 PAVEMENT REHABILITATION 5,243 409 0 5,6522 SCP-TC 3.45 P261034 LARAMIE TO WOODS LANDING LAKE HATTIE SEC/WY 230 26 3.45 11.50 8.05 PAVEMENT REHABILITATION 0 3,956 0 3,956

FY TOTAL: 18.08 7,118 4,511 0 11,629

Aeronautics Projects Fiscal Year 2022

Federal State Other Total

1 LARAMIEEXTEND TAXIWAY D TO RW 3 , DESIGN AND EA 300 12 8 320

1 LARAMIESEAL COAT AND MARK AIRSIDE PAVEMENTS 0 700 78 778

1 LARAMIE ACQUIRE ARFF VEHICLE 700 28 19 747

FY TOTAL: 1,000 740 104 1,844

Transportation Projects Fiscal Year 2023

Federal State Other Total

2 NHPPI-BR 310.45 I805171 LARAMIE CURTIS STREET INTERCHANGE/I-80 80 310.45 310.45 0.00 BRIDGE REPLACEMENT 6,775 529 0 7,304

FY TOTAL: 0.00 6,775 529 0 7,304

Cost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Aero Comm Dist Character of WorkLocation

Cost $1000

Page 29 of 149

Page 35: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Albany County

Transportation Projects Fiscal Year 2018

Federal State Other Total

2 SCP 323.00 I805182 INTERSTATE 80 TO CHEYENNE* SUMMIT INTERCHANGE TO I-25CHEYENNE 80 323.00 359.60 36.60 STUDIES 0 30 0 30

FY TOTAL: 36.60 0 30 0 30

Transportation Projects Fiscal Year 2022

Federal State Other Total

2 STPU-LA 0.00 4206001 LARAMIE

BILL NYE/BOULDER AVE TO 15TH CORTHELL AVE/WHITMAN TO BILL NYE AVE 4206 0.00 0.00 0.00 NEW CONSTRUCTION 20 0 2 22

FY TOTAL: 0.00 20 0 2 22

Cost $1000LRS ID

Begin RM

End RM Length Character of Work

STATE TRANSPORTATION IMPROVEMENT PROJECTSPRELIMINARY ENGINEERING

Begin RM

End RM Length Character of Work

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Trans Comm Dist Project General Location Detail Location

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 30 of 149

Page 36: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

BIG HORN COUNTY

0202053

P292003P292004

KEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

0202049N345107

P351030

N371037

N312014

0200029

B145005

0201018

0201017

0201019

CD15009

CN09064

P351031

N345108

N345109

N312015

P292005

CD17511

N345110

Page 31 of 149

Page 37: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Big Horn County Fiscal Year 2018

Transportation Projects

Federal State Other Total

5 CD 0.00 CD15009 LOVELL

SHOSHONE AVE FROM MAIN ST TO 10TH ST SIDEWALK LPA-TOWN OF LOVELL 10509 98.94 99.17 0.23 COMMUNITY DEVELOPMENT 185 0 46 231

5 CD 0.00 CD17511 BURLINGTON VARIOUS LOCATIONSLPA - TOWN OF BURLINGTON 10424 100.11 100.30 0.19 COMMUNITY DEVELOPMENT 72 0 18 90

5 RHC-P 0.00 CN09064 BIG HORN COUNTY * COUNTY ROAD 249/RAIRDEN LANE 090851S 5191 1.97 1.97 0.00 RAILROAD 226 0 25 251

5 SCP-TC 14.80 0201017 MANDERSON TO HYATTVILLE HYATTVILLE WEST 201 14.80 19.20 4.40 PAVEMENT REHABILITATION 0 2,226 0 2,226

5 SCP 0.00 0201019 MANDERSON TO HYATTVILLE

MANDERSON-HYATTVILLE/WY 31STRUCTURE EAST OF MANDERSON 201 5.49 5.49 0.00 DRAINAGE REPAIR 0 105 0 105

5 SCP-TC 100.06 0202049 LOVELL TO EMBLEM LOVELL SOUTHWEST PHASE 2 202 100.06 105.26 5.20 PAVEMENT REHABILITATION 0 3,103 0 3,1035 STP-RF 100.00 0202053 LOVELL TO EMBLEM LOVELL CANAL SECTION 202 100.00 112.72 12.72 FENCING 348 37 0 3855 RHC 55.5825 P351031 BIG HORN COUNTY * US 14A 091517A 35 55.53 55.53 0.00 RAILROAD 41 0 41 82

FY TOTAL: 22.74 872 5,471 130 6,473

Transit Projects

Federal State Other Total5 LOVELL NORTH BIG HORN SENIORS CAPITAL/OPERATING/ADMIN/PM 0 51 28 80

5 GREYBULL SOUTH BIG HORN SENIORS CAPITAL/OPERATING/ADMIN/PM 0 56 34 90

FY TOTAL: 0 107 63 170

Aeronautics Projects

Federal State Other Total4 GREYBULL EXPAND SRE BUILDING 225 15 10 250

FY TOTAL: 225 15 10 250

Character of WorkCost $1000

Funding Source Character of Work

Cost $1000

STATE

STATE

Aero Comm Dist Location

End RM Length Character of Work

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

Trans Comm Dist Location Eligible Provider

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 32 of 149

Page 38: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Big Horn County

Transportation Projects Fiscal Year 2019Federal State Other Total

5 STP 107.02 0200029 BASIN TO BURLINGTON OTTO EAST 200 107.02 112.00 4.98 PAVEMENT REHABILITATION 1,375 144 0 1,5195 NHPP 230.00 N345108 GREYBULL TO LOVELL LOVELL SOUTH 34 230.00 235.42 5.42 PAVEMENT REHABILITATION 2,342 246 0 2,5885 SCP-TC 15.08 N371037 SHELL TO BURGESS JUNCTION SHELL EAST 37 15.08 19.63 4.55 PAVEMENT REHABILITATION 0 2,245 0 2,245

FY TOTAL: 14.95 3,717 2,635 0 6,352

Aeronautics Projects Fiscal Year 2019Federal State Other Total

4 COWLEYSEAL COAT AND MARK AIRSIDE PAVEMENTS 0 167 19 186

4 GREYBULLSEAL COAT AND MARK AIRSIDE PAVEMENTS 0 410 46 455

FY TOTAL: 0 577 64 641

Transportation Projects Fiscal Year 2020Federal State Other Total

5 STP 19.20 0201018 MANDERSON TO HYATTVILLE ALKALI CREEK SECTION 201 19.20 22.09 2.89 PAVEMENT REHABILITATION 1,208 127 0 1,335

5 NHPP-GM 185.62 B145005 MANDERSON TO BASINUS 16 & 20 BETWEEN MANDERSON AND BASIN 34 185.62 194.79 9.17 GRADING 1,357 143 0 1,500

FY TOTAL: 12.06 2,565 270 0 2,835

Aeronautics Projects Fiscal Year 2020Federal State Other Total

4 COWLEY CONSTRUCT WILDLIFE FENCE 750 50 33 833FY TOTAL: 750 50 33 833

End RM Length Character of Work

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

Cost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Aero Comm Dist Location Character of Work

Aero Comm Dist Location Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 33 of 149

Page 39: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Big Horn County

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2021Federal State Other Total

5 NHPP 83.33 N312014 CODY TO GREYBULL EMBLEM SECTION 31 83.33 93.35 10.02 PAVEMENT REHABILITATION 3,235 340 0 3,5755 NHPP 242.94 N345110 COWLEY TO DEAVER * WEST COWLEY 34 242.94 249.42 6.48 PAVEMENT REHABILITATION 2,986 314 0 3,3005 STP 38.00 P292003 BYRON EAST MAIN STREET 29 38.00 39.40 1.40 PAVEMENT REHABILITATION 1,870 197 0 2,0675 STP-E 38.00 P292004 BYRON NORTH CLOUD PEAK STREET 29 38.00 39.40 1.40 COMMUNITY DEVELOPMENT 400 0 99 499

FY TOTAL: 19.30 8,491 851 99 9,441

Aeronautics Projects Fiscal Year 2021Federal State Other Total

4 GREYBULLREHABILITATE R/W 7/25 AND T/W B, DESIGN 0 96 24 120

4 GREYBULL RELOCATE HANGAR TAXILANE 450 30 20 500FY TOTAL: 450 126 44 620

Transportation Projects Fiscal Year 2022Federal State Other Total

5 NHPP 93.35 N312015 EMBLEM TO GREYBULL * DRY CREEK 31 93.35 100.75 7.40 PAVEMENT REHABILITATION 4,216 443 0 4,6595 NHPP 230.00 N345107 GREYBULL TO LOVELL US 310/WY 789 34 230.00 233.00 3.00 GRADING 1,017 107 0 1,1245 STP 70.72 P351030 LOVELL TO BURGESS JUNCTION MEDICINE WHEEL 35 70.72 80.45 9.73 PAVEMENT REHABILITATION 3,603 379 0 3,982

FY TOTAL: 20.13 8,836 929 0 9,765

Aeronautics Projects Fiscal Year 2022Federal State Other Total

4 GREYBULL REHABILITATE R/W 7/25 & T/W B 0 1,061 265 1,326FY TOTAL: 0 1,061 265 1,326

LRS ID

Begin RM

End RM Length

Begin RM

End RM Length

Trans Comm Dist Project General Location Detail Location

Character of WorkCost $1000

Character of WorkCost $1000

Character of WorkCost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Aero Comm Dist Location

Character of WorkCost $1000Aero Comm

Dist Location

Page 34 of 149

Page 40: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Big Horn County

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2023Federal State Other Total

5 NHPP 249.42 N345109 DEAVER TO MONTANA * MONTANA STATE LINE/FRANNIE 34 249.42 257.03 7.61 PAVEMENT REHABILITATION 3,620 380 0 4,0005 STP 34.28 P292005 GARLAND TO BYRON * SIDON CANAL 29 34.28 38.28 4.00 PAVEMENT REHABILITATION 2,262 238 0 2,500

FY TOTAL: 11.61 5,882 618 0 6,500

Begin RM

End RM Length Character of Work

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Page 35 of 149

Page 41: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

CAMPBELL COUNTY

KEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

P433041

0302089

0302090

N433044I903101

5349001

5349002

I903102

I903100

N432057

N432053

N432056

N4320550300048

CD17409

5349003

B194024

0300A03

0300039

Page 36 of 149

Page 42: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Campbell Fiscal Year 2018

Transportation Projects

Federal State Other Total

4 STP 5.50 5349001 GILLETTE TO MONTANA

GILLETTE-MONTANA STATE LINE; COUNTY ROAD 38NNORTHERN EXTENSION; PHASE I 4622 5.50 9.80 4.30 NEW CONSTRUCTION 14,875 0 1,563 16,438

4 CD 111.28 CD17409 GILLETTE

GILLETTE; S DALBEY PARK PATHWAY; WY 59LPA - CITY OF GILLETTE 43 111.28 111.28 0.00 COMMUNITY DEVELOPMENT 275 0 69 344

FY TOTAL: 4.30 15,150 0 1,632 16,782

Transit Projects

Federal State Other Total4 GILLETTE CAMPBELL COUNTY SENIORS CAPITAL/OPERATING/ADMIN/PM 174 0 109 283

4 GILLETTE CAMPBELL COUNTY SENIORSPURCHASE LIGHT-DUTY SMALL BUS 6 0 52 58

FY TOTAL: 179 0 161 341

Aeronautics Projects

Federal State Other Total

5 GILLETTE

RELOCATE TAXIWAYS "D" & "B" AND CONNECT PARALLEL TAXIWAY "A" TO "E", DESIGN 500 20 13 533

FY TOTAL: 500 20 13 533

Cost $1000

Aero Comm Dist Location Character of Work

Cost $1000

Funding Source Character of Work

5311

5310

Trans Comm Dist Location Eligible Provider

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 37 of 149

Page 43: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Campbell

Transportation Projects Fiscal Year 2019Federal State Other Total

4 STP 3.01 0300039 GILLETTE LAKEWAY ROAD SOUTH SECTION 300 3.01 5.08 2.07 RECONSTRUCTION 10,204 1,072 0 11,276

4 ARSCT 3.01 0300A03 GILLETTE* WY 50-LAKEWAY SOUTH SECTION CAMPBELL COUNTY ARS 300 3.01 4.97 1.96 COMMUNITY DEVELOPMENT 0 0 319 319

4 STP 0.00 5349002 GILLETTE TO MONTANA

GILLETTE-MONTANA STATE LINE; COUNTY ROAD 38NSOUTHERN EXTENSION; PHASE II 4622 0.00 5.50 5.50 RECONSTRUCTION 9,325 0 7,772 17,097

4 STPU-GI 2.85 5349003 GILLETTE INTERSECTION GARNER LAKE ROAD AND BOXELDER 5349 2.85 2.85 0.00 TRAFFIC SYSTEMS 498 0 52 550

4 STP-BR 4.13 B194024 TRANSPORTATION DISTRICT 4 STRUCTURE NO. FIT 5349 4.13 4.13 0.00 STRUCTURE REPAIR 905 95 0 1,000

4 HSIP 0.00 N433044 GILLETTE

INTERSECTIONS OF WARLOW DRIVE AND US 14/16, US 14/16 AND NORTH 4TH; 2ND AND BROOKS 43 115.28 115.28 0.00 TRAFFIC SYSTEMS 995 105 0 1,100

FY TOTAL: 9.53 21,927 1,272 8,143 31,342

Aeronautics Projects Fiscal Year 2019Federal State Other Total

5 GILLETTE

RELOCATE TAXIWAYS "D" & "B" AND CONNECT PARALLEL TAXIWAY "A" TO "E" 5,000 200 133 5,333

FY TOTAL: 5,000 200 133 5,333

Character of WorkCost $1000

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Aero Comm Dist Location

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 38 of 149

Page 44: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Campbell

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2020Federal State Other Total

4 STP-BR 88.02 0302089 BUFFALO TO GILLETTEWILDCAT CREEK, STRUCTURE NO. CLF 302 88.02 88.02 0.00 BRIDGE REPLACEMENT 1,658 174 0 1,832

4 STP-BR 96.14 0302090 BUFFALO TO GILLETTERAWHIDE CREEK, STRUCTURE NO. CLH 302 96.14 96.14 0.00 BRIDGE REPLACEMENT 2,764 290 0 3,054

4 NHPP 70.99 N432055 DOUGLAS TO GILLETTE WRIGHT SECTION 43 70.99 77.08 6.09 ADDITIONAL LANES 14,666 1,541 0 16,2074 NHPP-RF 77.08 N432056 WRIGHT TO GILLETTE WY 59 43 77.08 85.65 8.57 FENCING 289 30 0 3194 STP 155.20 P433041 GILLETTE TO MONTANA WHITETAIL CREEK SECTION 43 155.20 163.50 8.30 RECONSTRUCTION 10,916 1,147 0 12,063

FY TOTAL: 22.96 30,293 3,182 0 33,475

Aeronautics Projects Fiscal Year 2020Federal State Other Total

5 GILLETTE MARK AIRSIDE PAVEMENTS 0 144 16 160

5 GILLETTE ACQUIRE SRE 1,000 40 27 1,067

FY TOTAL: 1,000 184 43 1,227

Transportation Projects Fiscal Year 2021Federal State Other Total

4 NHPP 77.97 N432053 RENO JUNCTION TO GILLETTE GILLETTE SOUTH 43 77.97 101.38 23.41 ADDITIONAL LANES 4,367 459 0 4,826FY TOTAL: 23.41 4,367 459 0 4,826

Aeronautics Projects Fiscal Year 2021Federal State Other Total

5 GILLETTE REPLACE ARFF EQUIPMENT 700 28 19 747

FY TOTAL: 700 28 19 747

Character of WorkCost $1000

Aero Comm Dist Location

General Location Detail Location LRS IDBegin

RMEnd RM Length Character of Work

Aero Comm Dist Location

Trans Comm Dist Project

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Cost $1000

Character of WorkCost $1000

Page 39 of 149

Page 45: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Campbell

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2022Federal State Other Total

4 NHPPI 135.43 I903102 GILLETTE TO MOORCROFTROZET SECTION EAST AND WEST/WESTBOUND LANE 90 135.43 145.20 9.77 PAVEMENT REHABILITATION 9,934 775 0 10,709

FY TOTAL: 9.77 9,934 775 0 10,709

Transportation Projects Fiscal Year 2023Federal State Other Total

4 STP 36.00 0300048 GILLETTE TO PINE TREE JUNCTION * 300 36.00 52.67 16.67 ADDITIONAL LANES 6,523 685 0 7,208

4 NHPPI 135.43 I903100 GILLETTE TO MOORCROFTROZET EAST AND WEST/EASTBOUND LANE 90 135.43 145.20 9.77 PAVEMENT REHABILITATION 9,447 737 0 10,184

4 NHPPI 112.50 I903101 BUFFALO TO GILLETTE WILDHORSE CREEK SECTION 90 112.50 118.30 5.80 PAVEMENT REHABILITATION 5,894 460 0 6,354FY TOTAL: 32.24 21,864 1,882 0 23,746

Transportation Projects Fiscal Year Future YearFederal State Other Total

4 NHPP 87.00 N432057 WRIGHT TO GILLETTE WY 59 43 87.00 101.50 14.50 ADDITIONAL LANES 17,430 1,832 0 19,262FY TOTAL: 14.50 17,430 1,832 0 19,262

Trans Comm Dist Project General Location Detail Location

Cost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

LRS IDBegin

RMEnd RM Length Character of Work

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Page 40 of 149

Page 46: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

CARBON COUNTY

N211061

N211060

KEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

B181011

I804260

04010380401037

CN06066

P182031

0404014

0412008

P182032

I804263

0105015

P182033

P221051

I804268I804267

I804266I804265

I804261

I804258

I804264

P221052

P221053

B181006

Page 41 of 149

Page 47: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Carbon Fiscal Year 2018

Transportation Projects

Federal State Other Total

2 NHPPI-BR 0.00 B181011 TRANSPORTATION DISTRICT 1 STRUCTURE NO. AVC, AVD, AVE, AVF, AVG, AVH, AVI, AVJ, AVK, AVL 80 258.95 258.95 0.00 STRUCTURE REPAIR 2,249 176 0 2,425

2 NHPPI 227.50 I804260 RAWLINS TO WALCOTT JUNCTION FORT STEELE SECTION 80 227.50 233.76 6.26 PAVEMENT REHABILITATION 9,319 727 0 10,0462 NHPPI 275.60 I804261 ELK MOUNTAIN TO LARAMIE COOPER COVE SECTION 80 275.60 282.65 7.05 PAVEMENT REHABILITATION 7,567 591 0 8,1582 SCP-TC 22.97 N211060 RAWLINS TO MUDDY GAP LAMONT SECTION 21 22.97 32.99 10.02 ADDITIONAL LANES 0 6,507 0 6,5072 SCP-TC 2.17 N211061 RAWLINS TO MUDDY GAP RAWLINS NORTH 21 2.17 12.55 10.38 PAVEMENT REHABILITATION 0 4,451 0 4,451

FY TOTAL: 33.71 19,135 12,452 0 31,587

Transit Projects

Federal State Other Total2 RAWLINS CARBON COUNTY SENIOR CENTER CAPITAL/OPERATING/ADMIN/PM 0 40 21 61

2 BAGGS ASSISTED CARE FACILITY CAPITAL/OPERATING/ADMIN/PM 0 12 6 18

FY TOTAL: 0 52 27 78

Aeronautics Projects

Federal State Other Total

1 DIXONSEAL COAT AND MARK AIRSIDE PAVEMENTS 0 165 41 206

1 SARATOGASEAL COAT AND MARK AIRSIDE PAVEMENTS 0 266 66 332

2 RAWLINSSEAL COAT AND MARK AIRSIDE PAVEMENTS 0 242 61 303

2 RAWLINSCONDUCT PLANNING STUDY, MASTER PLAN 300 0 33 333

FY TOTAL: 300 673 202 1,174

Cost $1000

Aero Comm Dist Location Character of Work

Cost $1000

Funding Source Character of WorkSTATE

STATE

Trans Comm Dist Location Eligible Provider

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 42 of 149

Page 48: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Carbon

Transportation Projects Fiscal Year 2019Federal State Other Total

2 STP-BROS 0.40 CN06066 CARBON COUNTY COUNTY RD/SAVERY CREEK RD STRUCTURE FRR CN6-561S 5498 0.40 0.40 0.00 BRIDGE REPLACEMENT 946 0 99 1,045

2 STP-GM 17.90 B181006 TRANSPORTATION DISTRICT 1 VARIOUS LOCATIONS 401 19.00 19.00 0.00 FENCING 378 40 0 4182 NHPPI 210.98 I804258 RAWLINS TO LARAMIE RAWLINS MARGINAL 80 210.98 216.22 5.24 PAVEMENT REHABILITATION 4,145 323 0 4,4682 SCP-TC 20.00 P182031 CRESTON JUNCTION TO BAGGS MUDDY CREEK SOUTH/WY 789 18 20.00 30.00 10.00 PAVEMENT REHABILITATION 0 4,041 0 4,041

FY TOTAL: 15.24 5,469 4,404 99 9,972

Aeronautics Projects Fiscal Year 2019Federal State Other Total

1 DIXON CONDUCT MASTER PLAN 300 20 13 333

1 SARATOGA ACQUIRE LAND, R/W 23 RPZ 150 10 7 167

1 SARATOGA ACQUIRE LAND, R/W 5 RPZ 0 9 6 15

FY TOTAL: 450 39 26 515

Transportation Projects Fiscal Year 2020Federal State Other Total

2 STP 6.00 0401037 DIXON TO ENCAMPMENT SAVERY/WY 70 WEST SECTION 401 6.00 10.98 4.98 PAVEMENT REHABILITATION 1,995 210 0 2,2052 STP 10.98 0401038 DIXON TO ENCAMPMENT SAVERY/WY 70 EAST SECTION 401 10.98 16.90 5.92 PAVEMENT REHABILITATION 1,997 210 0 2,2072 SCP-TC 10.00 P182032 CRESTON JUNCTION TO BAGGS MUDDY CREEK NORTH 18 10.00 20.00 10.00 PAVEMENT REHABILITATION 0 4,194 0 4,194

FY TOTAL: 20.90 3,992 4,614 0 8,606

Character of Work

Character of Work

Cost $1000

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Aero Comm Dist Location

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 43 of 149

Page 49: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Carbon

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2021Federal State Other Total

2 STP 12.29 0404014 HANNA TO ELK MOUNTAIN WY 72 SOUTH 404 12.29 15.98 3.69 PAVEMENT REHABILITATION 1,133 119 0 1,2522 STP 0.00 0412008 HANNA ELMO/WY 72 NORTH 412 0.00 3.02 3.02 PAVEMENT REHABILITATION 1,115 117 0 1,232

2 NHPPI 245.90 I804265 RAWLINS TO LARAMIE* HALLECK RIDGE WEST EASTBOUND LANE 80 245.90 245.90 0.00 PAVEMENT REHABILITATION 2,819 220 0 3,039

2 NHPPI 252.50 I804266 RAWLINS TO LARAMIE * ELK MOUNTAIN SECTION 80 252.50 258.90 6.40 PAVEMENT REHABILITATION 2,733 213 0 2,9462 STP 50.30 P182033 COLORADO TO BAGGS LITTLE SNAKE RIVER NORTH 18 50.30 53.20 2.90 PAVEMENT REHABILITATION 2,544 267 0 2,811

FY TOTAL: 16.01 10,344 936 0 11,280

Aeronautics Projects Fiscal Year 2021Federal State Other Total

1 DIXON RELOCATE FENCE 450 30 20 500

2 RAWLINSCONSTRUCT GA TERMINAL BUILDING 750 50 33 833

FY TOTAL: 1,200 80 53 1,333

Transportation Projects Fiscal Year 2022Federal State Other Total

2 STP 8.04 0105015 MCFADDEN TO ROCK RIVER CARBON COUNTY SECTION/WY 13 105 8.04 17.30 9.26 PAVEMENT REHABILITATION 2,957 311 0 3,2682 NHPPI 258.90 I804263 RAWLINS TO LARAMIE WAGONHOUND WEST 80 258.90 267.00 8.10 PAVEMENT REHABILITATION 7,196 562 0 7,7582 NHPPI 221.20 I804267 SINCLAIR TO WALCOTT JUNCTION * EASTBOUND LANE 80 221.20 227.50 6.30 PAVEMENT REHABILITATION 3,167 247 0 3,4142 NHPPI 221.20 I804268 SINCLAIR TO WALCOTT JUNCTION * WESTBOUND LANE 80 221.20 227.50 6.30 PAVEMENT REHABILITATION 3,167 247 0 3,4142 STP 100.00 P221051 RIVERSIDE TO COLORADO * BEAVER CREEK SECTION 22 100.00 110.13 10.13 PAVEMENT REHABILITATION 4,158 437 0 4,595

FY TOTAL: 40.09 20,645 1,804 0 22,449

Character of WorkCost $1000Aero Comm

Dist Location

Trans Comm Dist Project General Location Detail Location

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Cost $1000LRS ID

Begin RM

End RM Length Character of Work

Page 44 of 149

Page 50: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Carbon

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Aeronautics Projects Fiscal Year 2022Federal State Other Total

1 DIXONSEAL COAT AND MARK AIRSIDE PAVEMENTS 0 222 25 247

1 SARATOGA EXPAND GA APRON, PH I 750 50 33 833

1 SARATOGASEAL COAT AND MARK AIRSIDE PAVEMENT 0 299 33 332

2 RAWLINSSEAL COAT AND MARK AIRSIDE PAVEMENTS 0 279 31 310

FY TOTAL: 750 850 122 1,722

Transportation Projects Fiscal Year 2023Federal State Other Total

2 NHPPI 267.00 I804264 RAWLINS TO LARAMIE ARLINGTON SECTION 80 267.00 275.60 8.60 PAVEMENT REHABILITATION 7,869 614 0 8,4832 STP 110.13 P221052 SARATOGA TO COLORADO * SKYLINE SECTION 22 110.13 116.90 6.77 PAVEMENT REHABILITATION 3,693 388 0 4,0812 STP 116.90 P221053 SARATOGA TO COLORADO * BIG CREEK SECTION 22 116.90 127.06 10.16 PAVEMENT RESURFACE 2,276 239 0 2,515

FY TOTAL: 25.53 13,838 1,241 0 15,079

Aero Comm Dist Location Character of Work

Cost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Page 45 of 149

Page 51: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

CONVERSE COUNTYKEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

W091008N401017

N431035

W091006

I253118

I253116

I253117

CN13074CN13072

CN13073

0502021

B152040

Page 46 of 149

Page 52: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Converse Fiscal Year 2018

Transportation Projects

Federal State Other Total7 RHC-P 0.00 CN13072 CONVERSE COUNTY * COUNTY ROAD 55 094754W 5588 1.20 1.20 0.00 RAILROAD 181 0 20 2017 RHC 0.00 CN13074 CONVERSE COUNTY * COUNTY ROAD 55 094754W 5588 1.20 1.20 0.00 RAILROAD 51 51 0 102

FY TOTAL: 0.00 232 51 20 303

Transit Projects

Federal State Other Total7 DOUGLAS CONVERSE COUNTY AGING SERVICES CAPITAL/OPERATING/ADMIN/PM 108 0 54 162

FY TOTAL: 108 0 54 162

Aeronautics Projects

Federal State Other Total

3 DOUGLASSEAL COAT AND MARK AIRSIDE PAVEMENTS 0 304 76 380

FY TOTAL: 0 304 76 380

Character of WorkCost $1000Aero Comm

Dist Location

Funding Source Character of Work

5311

Cost $1000Trans Comm Dist Location Eligible Provider

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 47 of 149

Page 53: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Converse

Transportation Projects Fiscal Year 2019Federal State Other Total

7 RHC-P 8.72 0502021 CONVERSE COUNTY * WY 93; OPAL 089301U 502 8.72 8.72 0.00 RAILROAD 226 0 25 251

7 RHC-P 0.00 CN13073 CONVERSE COUNTY * COUNTY ROAD 1/IRVINE RD089281K 5531 13.09 13.09 0.00 RAILROAD 226 0 25 251

7 SCP-TC 0.00 N401017 ORIN TO LOST SPRINGS US 18/20 40 0.00 5.25 5.25 PAVEMENT REHABILITATION 0 2,818 0 2,8187 SCP-TC 8.00 W091008 DOUGLAS COLD SPRINGS ROAD 91 8.00 13.20 5.20 PAVEMENT REHABILITATION 0 1,389 0 1,389

FY TOTAL: 10.45 452 4,207 50 4,709

Aeronautics Projects Fiscal Year 2019Federal State Other Total

3 DOUGLAS CONSTRUCT HELIPADS 600 40 27 667

FY TOTAL: 600 40 27 667

Transportation Projects Fiscal Year 2020Federal State Other Total

7 STPU 0.00 B152040 CONVERSE COUNTY BROWNFIELD ROAD/ROBIN LANE 5592 0.77 1.34 0.57 RECONSTRUCTION 1,657 0 174 1,831

7 NHPP 0.00 N431035 DOUGLAS TO GILLETTEDOUGLAS NORTH/WY 59 BYPASSSTRUCTURE NO. FDB 43 0.00 2.79 2.79 ADDITIONAL LANES 5,084 534 0 5,618

FY TOTAL: 3.36 6,741 534 174 7,449

Character of WorkCost $1000

Character of Work

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Aero Comm Dist Location

Begin RM

End RM Length

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 48 of 149

Page 54: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Converse

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2022Federal State Other Total

7 NHPPI 126.70 I253117 GLENDO TO DOUGLASDOUGLAS SOUTH NORTHBOUND LANE 25 126.70 134.90 8.20 PAVEMENT REHABILITATION 3,642 284 0 3,926

FY TOTAL: 8.20 3,642 284 0 3,926

Aeronautics Projects Fiscal Year 2022Federal State Other Total

3 DOUGLAS REHABILITATE ACCESS ROAD 0 352 88 440

FY TOTAL: 0 352 88 440

Transportation Projects Fiscal Year 2023Federal State Other Total

7 NHPPI 160.01 I253116 CASPER TO DOUGLAS

GLENROCK MARGINAL & GLENROCK NORTH; NORTHBOUND LANE 25 160.01 175.10 15.09 PAVEMENT REHABILITATION 6,971 544 0 7,515

7 NHPPI 150.00 I253118 DOUGLAS TO GLENROCK * GLENROCK SOUTH 25 150.00 160.00 10.00 PAVEMENT RESURFACE 1,796 140 0 1,936

7 SCP-TC 13.30 W091006 DOUGLAS COLD SPRINGS ROAD/SOUTH SECTION 91 13.30 23.10 9.80 PAVEMENT REHABILITATION 0 4,033 0 4,033

FY TOTAL: 34.89 8,767 4,717 0 13,484

Character of WorkCost $1000Aero Comm

Dist Location

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Page 49 of 149

Page 55: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

CROOK COUNTY

KEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

B1840300602002

CN18057I904138

CN18058

0607036

I904141

I904140

CM17406

CD17410

HR17403

Page 50 of 149

Page 56: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Crook Fiscal Year 2018

Transportation Projects

Federal State Other Total6 CD 99.26 CD17410 SUNDANCE LPA - CITY OF SUNDANCE 19429 99.93 100.00 0.07 COMMUNITY DEVELOPMENT 62 0 16 78

6 CM 0.00 CM17406 CROOK COUNTY VARIOUS COUNTY ROADSLPA - CROOK COUNTY 5600 0.00 2.00 2.00 ENVIRONMENTAL 160 0 40 200

6 HRRR 0.00 HR17403 CROOK COUNTY

VARIOUS LOCATIONS; MOSKEE RD, WARREN PEAK, PINE RIDGE, OLD SUNDANCE, MCKERNLPA - CROOK COUNTY 5681 0.00 8.00 8.00 SAFETY IMPROVEMENTS 90 0 10 100

6 HSIP 0.00 B184030 TRANSPORTATION DISTRICT 4

INTERSECTIONS: US 14 & WY 24;WY 24 & WY 110; WY 24 & WY 111STURGIS SIGNALS 607 181.19 181.19 0.00 TRAFFIC SYSTEMS 233 24 0 257

6 STP 0.00 0602002 DEVILS TOWER WY 110/WY 24 & DEVIL'S TOWER MONUMENT 602 0.00 0.59 0.59 RECONSTRUCTION 950 100 0 1,050

FY TOTAL: 10.66 1,495 124 66 1,685

Transit Projects

Federal State Other Total6 SUNDANCE CROOK COUNTY SENIORS CAPITAL/OPERATING/ADMIN/PM 0 46 21 67

6 VARIOUS JEFFERSON LINES INTERCITY BUS OPERATING 143 0 110 253

FY TOTAL: 143 46 131 320

Cost $1000Funding Source Character of WorkSTATE

5311f

Trans Comm Dist Location Eligible Provider

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 51 of 149

Page 57: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Crook

Transportation Projects Fiscal Year 2019Federal State Other Total

6 STP-BROS 4.20 CN18057 CROOK COUNTY COUNTY ROAD 18-179 SOUTHEAST OF MOORCROFT 5668 4.20 4.20 0.00 BRIDGE REPLACEMENT 619 65 0 684

6 NHPPI 155.10 I904138 MOORCROFT TO SUNDANCE MOORCROFT EAST 90 155.10 160.30 5.20 PAVEMENT REHABILITATION 4,048 316 0 4,364FY TOTAL: 5.20 4,667 381 0 5,048

Transportation Projects Fiscal Year 2020Federal State Other Total

6 STP-BROS 0.60 CN18058 CROOK COUNTY COUNTY ROAD 18-33A; NORTHEAST OF HULETT 9229 0.60 0.60 0.00 BRIDGE REPLACEMENT 771 0 81 852

FY TOTAL: 0.00 771 0 81 852

Transportation Projects Fiscal Year 2021Federal State Other Total

6 SCP-TC 186.10 0607036 DEVILS TOWER TO SUNDANCE US 14 607 186.10 194.50 8.40 PAVEMENT REHABILITATION 0 2,703 0 2,703

6 NHPPI 160.30 I904140 MOORCROFT TO SUNDANCEWIND CREEK SECTION WESTBOUND LANE 90 160.30 168.50 8.20 PAVEMENT REHABILITATION 3,548 277 0 3,825

FY TOTAL: 16.60 3,548 2,980 0 6,528

Transportation Projects Fiscal Year 2022Federal State Other Total

6 NHPPI 160.30 I904141 MOORCROFT TO SUNDANCEWIND CREEK SECTION/EASTBOUND LANE 90 160.30 168.50 8.20 PAVEMENT REHABILITATION 3,953 309 0 4,262

FY TOTAL: 8.20 3,953 309 0 4,262

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 52 of 149

Page 58: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

FREMONT COUNTYKEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

B185002

CD17512

DR51726

DR51728

DR51732DR51724

N342050

07030200703011

0710027

DR51725

DR51730

DR51743

DR51776DR51741DR51740DR51739

B185A01B185001DR51742

0708028

0708029

N202070

N202069

N202072

N203069

P142051

N302054

N303057N302053

N151027

N151028

N302055

N302056

N342047

N202073

N302058

N342048

N203072

N342051

CN10109

CN10108CN10107

Page 53 of 149

Page 59: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Fremont Fiscal Year 2018

Transportation Projects

Federal State Other Total

7 HRRR 0.00 CN10107 WIND RIVER INDIAN RESERVATION

LPA - EASTERN SHOSHONE TRIBE & NORTHERN ARAPAHO TRIBE OF THE WIND RIVER INDIAN RESERVATION IRR 5, 8, 12, 16, 19, 21, 25, 27, 33, 38, 40, 46, 49, 4004, 8005, 9003 NA 0.00 0.00 0.00 SAFETY IMPROVEMENTS 100 0 11 111

7 HRRR 0.00 CN10108 WIND RIVER INDIAN RESERVATION

LPA - EASTERN SHOSHONE TRIBE & NORTHERN ARAPAHO TRIBE OF THE WIND RIVER INDIAN RESERVATION IRR 0046 NA 0.00 0.00 0.00 GUARDRAIL 13 0 1 14

7 IRP 0.00 CN10109 MONETA TO LYSITE MONETA AT US 20/26 TO LYSITE 5754 0.00 8.51 8.51 RECONSTRUCTION 0 901 901 1,8027 STP 0.01 0703011 ETHETE ETHETE SOUTH 703 0.01 6.56 6.55 RECONSTRUCTION 15,685 1,648 0 17,3337 STP-E 3.38 0703020 ETHETE ETHETE SOUTH 703 3.38 6.56 3.18 COMMUNITY DEVELOPMENT 347 0 206 5537 STP 1.04 0710027 RIVERTON GAS HILLS ROAD 710 1.04 6.71 5.67 PAVEMENT REHABILITATION 884 93 0 977

7 STP 7.65 DR51725 ETHETE TO KINNEARNORTH OF ETHETEWY 132; RM 7.65 703 7.65 7.65 0.00 DRAINAGE REPAIR 375 39 0 414

7 STP 0.30 DR51730 LANDER TO ETHETE WY 132; RM 0.30 703 0.30 0.30 0.00 DRAINAGE REPAIR 212 22 0 234

7 STP 62.18 DR51739 FARSON TO LANDER

SOUTH OF LANDER; JOHNNY LEE CORNERUS 14; RM 62.18 14 62.18 62.18 0.00 SLIDE REPAIR 392 41 0 433

7 STP 53.75 DR51740 FARSON TO LANDER

SOUTH OF LANDER; BACKSLOPES SLIDEUS 14; RM 53.7 14 53.75 53.85 0.10 SLIDE REPAIR 366 38 0 404

7 STP 58.60 DR51741 FARSON TO LANDERWY 28; RM 58.60WOODEN BIN WALL 14 58.60 58.60 0.00 DRAINAGE REPAIR 149 16 0 165

7 STP 2.04 DR51743 SINKS CANYON SOUTH OF LANDER; CONCRETE VAULT SLIDE; WY 131; RM 2.04 701 2.04 2.04 0.00 SLIDE REPAIR 138 15 0 153

7 STP 55.45 DR51776 FARSON TO LANDER 14 55.45 55.45 0.00 SLIDE REPAIR 315 33 0 3485 NHPP 121.18 N203072 RIVERTON TO SHOSHONI US 26/287 & WY 789 20 121.18 127.30 6.12 PAVEMENT REHABILITATION 543 57 0 6007 NHPP-GM 0.00 B185002 RIVERTON RIVERTON MAIN STREET/US 26 30 131.20 133.25 2.05 ADA IMPROVEMENTS 905 95 0 1,000

7 CD 53.42 CD17512 DUBOIS

STREET LIGHTING WITHIN TOWN LIMITS OF DUBOISLPA - TOWN OF DUBOIS 30 53.42 56.76 3.35 COMMUNITY DEVELOPMENT 150 0 37 187

7 NHPP 103.16 DR51724 HUDSON TO RIVERTON 20 103.16 103.16 0.00 DRAINAGE REPAIR 21 2 0 23

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 54 of 149

Page 60: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Fremont Fiscal Year 2018

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects

Federal State Other Total

7 NHPP 90.83 DR51726 HUDSON TOWN OF HUDSONWY 789; RM 90.83 20 90.83 90.83 0.00 DRAINAGE REPAIR 169 18 0 187

7 NHPP 16.17 DR51728FORT WASHAKIE TO DIVERSION DAM

NORTH OF FORT WASHAKIEUS 287; RM 16.17 15 16.17 16.17 0.00 DRAINAGE REPAIR 125 13 0 138

7 NHPP 104.36 DR51732 HUDSON TO RIVERTONNORTH OF RIVERTONWY 789; RM 104.36 20 104.36 104.36 0.00 DRAINAGE REPAIR 362 38 0 400

7 NHPP 84.58 DR51742 LANDER TO RIVERTON

NORTH OF LANDER; RIFLE RANGE SLIDEWY 789; RM 84.58 20 84.58 84.58 0.00 SLIDE REPAIR 202 21 0 223

7 NHPP 99.04 N342050 SHOSHONI TOWN OF SHOSHONI/US 20 34 99.04 100.47 1.43 PAVEMENT REHABILITATION 181 19 0 200

7 STPU-LN 0.00 B185001 LANDER JEFFERSON STREET AND EAST MAIN STREET 20 80.21 80.51 0.30 RECONSTRUCTION 1,200 0 126 1,326

7 ARSCT 80.21 B185A01 LANDER JEFFERSON STREET 20 80.21 80.51 0.30 UTILITY 0 0 492 492FY TOTAL: 37.56 22,834 3,109 1,774 27,717

Transit Projects

Federal State Other Total7 LANDER CHILD DEVELOPMENT CAPITAL/OPERATING/ADMIN/PM 0 60 30 90

7 RIVERTON RIVERTON SENIOR CENTER CAPITAL/OPERATING/ADMIN/PM 100 0 58 157

7 DUBOIS HIGH COUNTRY SENIORS CAPITAL/OPERATING/ADMIN/PM 0 25 13 38

7 LANDER LANDER SENIOR CENTER CAPITAL/OPERATING/ADMIN/PM 101 0 58 160

7 RIVERTON WIND RIVER TRANSIT AUTHORITY - WRTA CAPITAL/OPERATING/ADMIN/PM 600 0 307 907

7 SHOSHONI SHOSHONI SENIOR CENTER CAPITAL/OPERATING/ADMIN/PM 0 4 2 6

7 VARIOUS BLACK HILLS STAGE LINES INTERCITY BUS OPERATING 511 0 392 903

FY TOTAL: 1,312 89 862 2,2625311f

Cost $1000

STATE

5311

STATE

5311

5311

STATE

Funding Source Character of Work

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

Trans Comm Dist Location Eligible Provider

End RM Length Character of Work

Cost $1000

Page 55 of 149

Page 61: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Fremont Fiscal Year 2018

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Aeronautics Projects

Federal State Other Total

3 RIVERTON REHABILITATE S GA APRON PH I 780 52 35 867

3 DUBOIS CONSTRUCT SRE BUILDING 0 135 15 150

FY TOTAL: 780 187 50 1,017

Character of WorkCost $1000Aero Comm

Dist Location

Page 56 of 149

Page 62: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Fremont

Transportation Projects Fiscal Year 2019Federal State Other Total

7 STP 17.25 0708028 RIVERTON TO SAND DRAW BEAVER RIM 708 17.25 24.15 6.90 PAVEMENT REHABILITATION 4,999 525 0 5,5247 NHPP 79.11 N202069 MUDDY GAP TO LANDER LANDER SOUTH 20 79.11 80.16 1.05 SAFETY IMPROVEMENTS 917 96 0 1,0137 NHPP 90.60 N203069 HUDSON TO RIVERTON HUDSON NORTH 20 90.60 97.75 7.15 ADDITIONAL LANES 5,721 601 0 6,3227 STP-GM 41.00 P142051 FARSON TO LANDER US 287/WY 789, WY 28 14 41.00 41.00 0.00 ITS 529 56 0 585

FY TOTAL: 15.10 12,166 1,278 0 13,444

Aeronautics Projects Fiscal Year 2019Federal State Other Total

3 LANDERSEAL COAT AND MARK AIRSIDE PAVEMENTS 0 90 10 100

3 RIVERTONSEAL COAT AND MARK AIRSIDE PAVEMENT 0 774 86 860

3 RIVERTON REHABILITATE S GA APRON, PH II 1,000 40 27 1,067

FY TOTAL: 1,000 904 123 2,027

Transportation Projects Fiscal Year 2020Federal State Other Total

5 NHPP 47.22 N202072 MUDDY GAP TO LANDER * BEAVER RIM 20 47.22 54.43 7.21 PAVEMENT REHABILITATION 4,692 493 0 5,1857 NHPP 56.40 N302054 DUBOIS TO DIVERSION DAM US 26/287 30 56.40 67.25 10.85 PAVEMENT REHABILITATION 6,108 642 0 6,750

7 NHPP 132.20 N303057 RIVERTON MAJOR STREET AND MAIN STREET 30 132.20 132.20 0.00 MODIFY INTERSECTION 860 90 0 950

FY TOTAL: 18.06 11,660 1,225 0 12,885

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM Character of Work

End RM Length

Cost $1000Aero Comm Dist Location Character of Work

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 57 of 149

Page 63: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Fremont

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Aeronautics Projects Fiscal Year 2020Federal State Other Total

3 DUBOIS EXPAND GA APRON 300 0 33 333

3 RIVERTONREHABILITATE TAXIWAY A, DESIGN 167 7 4 178

FY TOTAL: 467 7 38 511

Transportation Projects Fiscal Year 2021Federal State Other Total

7 NHPP 0.00 N151027 LANDER TO FORT WASHAKIELANDER STREETS ANDLANDER-FT WASHAKIE 15 10.00 24.17 14.17 PAVEMENT REHABILITATION 8,891 934 0 9,825

7 NHPP 64.27 N202070 MUDDY GAP TO LANDER US 287/WY 789 20 64.27 74.21 9.94 PAVEMENT REHABILITATION 4,166 438 0 4,6047 STP 133.19 N302053 RIVERTON MAIN STREET 30 133.19 133.71 0.52 PAVEMENT REHABILITATION 439 46 0 4857 NHPP 40.68 N302055 MORAN JUNCTION TO DUBOIS MABEL'S HILL 30 40.68 45.66 4.98 PAVEMENT REHABILITATION 2,740 288 0 3,028

FY TOTAL: 29.61 16,236 1,706 0 17,942

Aeronautics Projects Fiscal Year 2021Federal State Other Total

3 DUBOISCONDUCT PLANNING STUDY, MASTER PLAN 150 10 7 167

3 LANDERRELOCATE TAXIWAY A (RUNWAY 3 END), DESIGN 300 20 13 333

3 RIVERTON REHABILITATE TAXIWAY A 1,840 74 49 1,963

FY TOTAL: 2,290 104 69 2,463

Aero Comm Dist Location

Aero Comm Dist Location

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Character of WorkCost $1000

Cost $1000Character of Work

Page 58 of 149

Page 64: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Fremont

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2022Federal State Other Total

7 STP 24.15 0708029 RIVERTON TO SAND DRAW BEAVER RIM SOUTH 708 24.15 34.59 10.44 PAVEMENT REHABILITATION 2,180 229 0 2,4097 NHPP 2.00 N151028 LANDER TO FORT WASHAKIE US 287 15 2.00 6.00 4.00 GRADING 1,220 128 0 1,3487 NHPP 72.07 N302056 DUBOIS TO DIVERSION DAM CROWHEART SECTION 30 72.07 85.03 12.96 PAVEMENT REHABILITATION 4,366 459 0 4,8257 NHPP 75.00 N342047 WALTMAN TO SHOSHONI WALTMAN-SHOSHONI 34 75.00 99.53 24.53 ADDITIONAL LANES 4,068 427 0 4,4955 NHPP 100.47 N342051 SHOSHONI TO THERMOPOLIS * BADWATER SECTION 34 100.47 108.80 8.33 PAVEMENT REHABILITATION 5,520 580 0 6,100

FY TOTAL: 60.26 17,354 1,823 0 19,177

Aeronautics Projects Fiscal Year 2022Federal State Other Total

3 RIVERTONCONDUCT PLANNING STUDY, MASTER PLAN 400 16 11 427

3 LANDERRELOCATE TAXIWAY A (RUNWAY 3 END), PH I 2,800 187 124 3,111

3 RIVERTON ACQUIRE SRE 0 495 55 550

FY TOTAL: 3,200 698 190 4,088

Transportation Projects Fiscal Year 2023Federal State Other Total

7 NHPP 74.21 N202073 MUDDY GAP TO LANDER * LYONS VALLEY 20 74.21 79.10 4.89 PAVEMENT REHABILITATION 2,742 288 0 3,0307 NHPP 92.41 N303058 DUBOIS TO DIVERSION DAM * BULL LAKE 30 92.41 96.94 4.53 PAVEMENT REHABILITATION 2,262 238 0 2,5007 NHPP 109.00 N342048 SHOSHONI TO THERMOPOLIS US 20/WY 789 34 109.00 112.00 3.00 ADDITIONAL LANES 3,418 359 0 3,777

FY TOTAL: 12.42 8,422 885 0 9,307

Character of WorkCost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Character of WorkCost $1000Aero Comm

Dist Location

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length

Page 59 of 149

Page 65: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Fremont

Transportation Projects Fiscal Year 2018Federal State Other Total

7 CD 0.00 CD16516 LANDERMAIN STREET; PLANNINGLPA - CITY OF LANDER NA 0.00 0.00 0.00 COMMUNITY DEVELOPMENT 20 0 5 25

FY TOTAL: 0.00 20 0 5 25

STATE TRANSPORTATION IMPROVEMENT PROJECTSPRELIMINARY ENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 60 of 149

Page 66: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

GOSHEN COUNTYKEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

N853092

0805156

0805157

N853095N853094

0807007

0803141

4954002

0C07086

0803140

Page 61 of 149

Page 67: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Goshen Fiscal Year 2018

Transportation Projects

Federal State Other Total

1 SCP-TC 7.00 0805156TORRINGTON TO SUGAR FACTORY ROAD WEST SECTION/WY 156 805 7.00 14.28 7.28 PAVEMENT REHABILITATION 0 4,840 0 4,840

1 RHC 14.74 0805157 GOSHEN COUNTY * WY 156/MAIN STREET089227S 805 14.74 14.74 0.00 RAILROAD 73 0 8 81

1 STPU-TO 0.00 4954002 TORRINGTON TORRINGTON; INDUSTRIAL PARK AVE PHASE II 4954 0.02 0.55 0.54 PAVEMENT RESURFACE 297 0 31 328

FY TOTAL: 7.82 370 4,840 39 5,249

Transit Projects

Federal State Other Total1 TORRINGTON GOSHEN COUNTY SENIOR FRIENDSHIP CENTER CAPITAL/OPERATING/ADMIN/PM 152 0 75 227

1 TORRINGTON DIVERSIFIED SERVICES CAPITAL/OPERATING/ADMIN/PM 0 31 15 46

FY TOTAL: 152 31 90 273

Aeronautics Projects

Federal State Other Total

1 TORRINGTONRELOCATE TAXIWAY A/B, DESIGN 0 150 17 167

FY TOTAL: 0 150 17 167

Cost $1000

Aero Comm Dist Location Character of Work

Cost $1000

Funding Source Character of Work

5311

STATE

Trans Comm Dist Location Eligible Provider

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 62 of 149

Page 68: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Goshen

Transportation Projects Fiscal Year 2019Federal State Other Total

1 STP 7.00 0803140 VETERAN VETERAN NORTH 803 7.00 14.10 7.10 PAVEMENT REHABILITATION 3,271 344 0 3,615

1 STP-BROS 8.20 0C07086 GOSHEN COUNTY HORSE CREEK STRUCTURE NO. EYB 9343 8.20 8.20 0.00 BRIDGE REPLACEMENT 713 0 75 788

1 RHC-P 82.23 N853094 GOSHEN COUNTY * SILVER TIP 816334P 85 82.23 82.23 0.00 RAILROAD 226 0 25 2511 RHC 82.23 N853095 GOSHEN COUNTY * SILVER TIP 816334P 85 82.23 82.23 0.00 RAILROAD 51 0 51 102

FY TOTAL: 7.10 4,261 344 151 4,756

Aeronautics Projects Fiscal Year 2019Federal State Other Total

1 TORRINGTON RELOCATE TAXIWAY A/B, PH I 1,950 130 87 2,167

FY TOTAL: 1,950 130 87 2,167

Transportation Projects Fiscal Year 2020Federal State Other Total

1 NHPP 115.64 N853092 LINGLE TO LUSK RAWHIDE SECTION 85 115.64 130.11 14.47 PAVEMENT REHABILITATION 5,593 588 0 6,181FY TOTAL: 14.47 5,593 588 0 6,181

Transportation Projects Fiscal Year 2021Federal State Other Total

1 STP 7.55 0807007 TORRINGTON HUNT RD/EAST SECTION/WY 92 807 7.55 14.07 6.52 PAVEMENT REHABILITATION 2,034 214 0 2,248FY TOTAL: 6.52 2,034 214 0 2,248

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Aero Comm Dist Location Character of Work

Cost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 63 of 149

Page 69: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Goshen

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Aeronautics Projects Fiscal Year 2022Federal State Other Total

1 TORRINGTON RELOCATE TAXIWAY A/B, PH II 1,450 97 64 1,611

1 TORRINGTONSEAL COAT AND MARK PAVEMENTS 0 135 15 150

FY TOTAL: 1,450 232 79 1,761

Transportation Projects Fiscal Year 2023Federal State Other Total

1 STP 14.10 0803141 VETERAN TO YODER * VETERAN ROAD 803 14.10 23.12 9.02 PAVEMENT REHABILITATION 3,635 382 0 4,017FY TOTAL: 9.02 3,635 382 0 4,017

Character of WorkCost $1000Aero Comm

Dist Location

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Page 64 of 149

Page 70: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

HOT SPRINGS COUNTY

N343042

N343032

N343044

N343038

HR17504

KEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

Page 65 of 149

Page 71: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Hot Springs Fiscal Year 2018

Transportation Projects

Federal State Other Total

5 HRRR 0.00 HR17504 HOT SPRINGS COUNTY COUNTY ROAD 8, EAST RIVER RDLPA - HOT SPRINGS COUNTY 6219 2.50 4.30 1.80 GUARDRAIL 100 0 11 111

5 NHPP 137.18 N343042 THERMOPOLIS TO WORLAND US 20/789 34 137.18 137.62 0.44 SAFETY IMPROVEMENTS 597 63 0 660FY TOTAL: 2.24 697 63 11 771

Transit Projects

Federal State Other Total5 THERMOPOLIS HOT SPRINGS SENIOR CENTER CAPITAL/OPERATING/ADMIN/PM 0 40 20 60

FY TOTAL: 0 40 20 60

Funding Source Character of WorkSTATE

Cost $1000Trans Comm Dist Location Eligible Provider

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 66 of 149

Page 72: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Hot Springs

Transportation Projects Fiscal Year 2019Federal State Other Total

5 SCP-TC 139.80 N343032 THERMOPOLIS TO WORLAND LUCERNE NORTH 34 139.80 146.60 6.80 PAVEMENT REHABILITATION 0 2,154 0 2,154FY TOTAL: 6.80 0 2,154 0 2,154

Aeronautics Projects Fiscal Year 2019Federal State Other Total

4 THERMOPOLISSEAL COAT AND MARK AIRSIDE PAVMENTS 0 215 24 239

4 THERMOPOLISSEAL COAT AND MARK LANDSIDE PAVEMENTS 0 40 4 44

FY TOTAL: 0 255 28 283

Transportation Projects Fiscal Year 2020Federal State Other Total

5 NHPP-GM 113.00 N343038 SHOSHONI TO THERMOPOLIS WIND RIVER CANYON 34 113.00 128.00 15.00 SLIDE REPAIR 3,059 322 0 3,3815 NHPP 128.32 N343044 THERMOPOLIS US 20/WY 789 34 128.32 133.40 5.08 PAVEMENT REHABILITATION 2,217 233 0 2,450

FY TOTAL: 20.08 5,276 555 0 5,831

Aeronautics Projects Fiscal Year 2020Federal State Other Total

4 THERMOPOLIS ACQUIRE SRE 450 30 20 500

FY TOTAL: 450 30 20 500

Cost $1000

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Aero Comm Dist Location Character of Work

Aero Comm Dist Location

Character of Work

Character of Work

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length

Cost $1000

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 67 of 149

Page 73: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Hot Springs

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Aeronautics Projects Fiscal Year 2022Federal State Other Total

4 THERMOPOLISCONDUCT PLANNING STUDY, MASTER PLAN 300 20 13 333

4 THERMOPOLIS ACQUIRE MOWING EQUIPMENT 0 173 19 192

FY TOTAL: 300 193 33 525

Aero Comm Dist Location Character of Work

Cost $1000

Page 68 of 149

Page 74: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

JOHNSON COUNTY

I255117

KEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

I902122

1004009

I902123I255109

I255112

I255118

0255095

P422008

1000018

CN16024

CM17407

Page 69 of 149

Page 75: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Johnson Fiscal Year 2018

Transportation Projects

Federal State Other Total

4 NHPPI 56.21 I902122 INTERSTATE 25 TO INTERSTATE 90 INTERCHANGE 90 56.21 59.17 2.96 PAVEMENT REHABILITATION 3,146 246 0 3,3924 NHPPI 58.70 I902123 BUFFALO TO GILLETTE BUFFALO-GILLETTE 90 58.70 69.80 11.10 PAVEMENT REHABILITATION 10,677 833 0 11,510

4 CM 0.00 CM17407 JOHNSON COUNTY VARIOUS COUNTY ROADSLPA - JOHNSON COUNTY 6290 0.00 12.00 12.00 ENVIRONMENTAL 200 0 50 250

4 STP-GM 109.00 1000018 KAYCEE TO BARNUM WY 190 1000 109.00 109.00 0.00 DRAINAGE REPAIR 448 47 0 4954 STP 7.42 1004009 BUFFALO TO UCROSS US 16 1004 7.42 17.74 10.32 PAVEMENT REHABILITATION 2,045 215 0 2,2604 IRP 0.00 CN16024 JOHNSON COUNTY COUNTY ROAD 204; T W ROAD 6290 0.00 3.40 3.40 RECONSTRUCTION 0 2,040 3,533 5,573

FY TOTAL: 39.78 16,516 3,381 3,583 23,480

Transit Projects

Federal State Other Total4 BUFFALO BUFFALO SENIOR CENTER CAPITAL/OPERATING/ADMIN/PM 74 21 48 143

FY TOTAL: 74 21 48 143

Funding Source Character of Work

5311

Cost $1000Trans Comm Dist Location Eligible Provider

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 70 of 149

Page 76: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Johnson

Transportation Projects Fiscal Year 2019Federal State Other Total

4 STP 114.85 P422008JOHNSON COUNTY TO CAMPBELL COUNTY DISTRICT BOUNDARY/WY 387 42 114.85 131.85 17.00 PAVEMENT REHABILITATION 7,153 752 0 7,905

FY TOTAL: 17.00 7,153 752 0 7,905

Aeronautics Projects Fiscal Year 2019Federal State Other Total

5 BUFFALO ACQUIRE SRE 2019 300 20 13 333

FY TOTAL: 300 20 13 333

Aeronautics Projects Fiscal Year 2020Federal State Other Total

5 BUFFALOSEAL COAT AND MARK AIRSIDE PAVEMENTS 0 180 20 200

FY TOTAL: 0 180 20 200

Transportation Projects Fiscal Year 2021Federal State Other Total

4 NHPPI 244.00 0255095 CASPER TO KAYCEETTT SECTION/NORTH BOUND LANE STRUCTURE NO. AKA, AJV 25 244.00 253.07 9.07 PAVEMENT REHABILITATION 9,241 721 0 9,962

FY TOTAL: 9.07 9,241 721 0 9,962

Character of WorkCost $1000Trans Comm

Dist Project General Location Detail Location LRS IDBegin

RMEnd RM Length

Character of WorkCost $1000Aero Comm

Dist Location

Character of WorkCost $1000Aero Comm

Dist Location

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 71 of 149

Page 77: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Johnson

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2022Federal State Other Total

4 NHF 254.00 I255112 KAYCEE TO BUFFALO KAYCEE NORTH 25 254.00 257.00 3.00 ITS 1,533 120 0 1,653FY TOTAL: 3.00 1,533 120 0 1,653

Aeronautics Projects Fiscal Year 2022Federal State Other Total

5 BUFFALOCONSTRUCT R/W 13 TEACUP AND GRADE SAFETY AREA 450 30 20 500

FY TOTAL: 450 30 20 500

Transportation Projects Fiscal Year 2023Federal State Other Total

4 NHPPI 272.11 I255117 KAYCEE TO BUFFALO DISTRICT BOUNDARY NORTH 25 272.11 279.79 7.68 PAVEMENT RESURFACE 4,475 349 0 4,824

4 NHPPI 244.00 I255118 CASPER TO KAYCEETTT SECTION SOUTHBOUND LANE STRUCTURE NO. AJW, AKB 25 244.00 253.07 9.07 PAVEMENT REHABILITATION 9,994 780 0 10,774

FY TOTAL: 16.75 14,469 1,129 0 15,598

Transportation Projects Fiscal Year Future YearFederal State Other Total

4 STP-GM 299.17 I255109 KAYCEE TO BUFFALOCLEAR CREEK STRUCTURE UNDER I-90 25 299.17 299.17 0.00 STRUCTURE REPAIR 543 57 0 600

FY TOTAL: 0.00 543 57 0 600

Cost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

LRS IDBegin

RMEnd RM Length Character of Work

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Trans Comm Dist Project General Location Detail Location

Character of WorkCost $1000Aero Comm

Dist Location

Page 72 of 149

Page 78: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

LARAMIE COUNTY

KEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

N852005

N852004

N852003

1104015

I806207I806208I806209

W223004

I806204I806211

0211007

I251169

B171028

DR15574

I251170

I251168

I180021

1123001

DR152816738001

6738002

N561041 I180024

B191001

B181040

CD16103CD17102

Page 73 of 149

Page 79: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Laramie Fiscal Year 2018

Transportation Projects

Federal State Other Total

1 CD 101.97 CD17102 CHEYENNE

BETWEEN EVANS AVENUE AND AIRPORT PARKWAY NORTH TO CHEYENNE REGIONAL AIRPORT TERMINALLPA - CITY OF CHEYENNE 4026 101.97 101.97 0.00 COMMUNITY DEVELOPMENT 226 0 57 283

1 SSP-TO 18.98 I251169 INTERSTATE 25 NORTH CHEYENNE; CLOSURE GATE SIGNS/FLASHERS 25 18.98 18.98 0.00 SAFETY IMPROVEMENTS 0 196 0 196

1 STPU-CH 0.00 B171028 CHEYENNE

INTERSECTION PRAIRIE AVE AND FRONTIER MALL DRIVELPA-CITY OF CHEYENNE 4059 101.52 101.52 0.00 MODIFY INTERSECTION 1,629 0 171 1,800

1 SPR 0.00 B181040 LARAMIE COUNTY

* I-25 @ LITTLE BEAR INTERCHANGE; COUNTY ROAD 120; STATE PARK PROJECT NA 0.00 0.00 0.00 RECONSTRUCTION 0 500 0 500

1 DR 8.84 DR15574 INTERSTATE 25 TO INTERSTATE 80

CHEYENNE/I-25 & I-80 INTERCHANGESTRUCTURE AAS & M-AYY-O OVERHEAD SIGN 25 8.84 8.84 0.00 TRAFFIC SYSTEMS 0 0 90 90

1 NHPPI 362.00 I806204 CHEYENNE TO PINE BLUFFS

CENTRAL AVENUE-ARCHER INTERCHANGE/WESTBOUND LANE 80 362.00 372.40 10.40 PAVEMENT REHABILITATION 6,369 497 0 6,866

1 CD 0.00 CD16103 CHEYENNE

PATH CHICAGO BURLINGTON & QUINCY RAIL TRAILLPA - CITY OF CHEYENNE 20178 103.98 103.98 0.00 COMMUNITY DEVELOPMENT 200 0 50 250

1 STP-BR 0.94 6738001 CHEYENNE PARSLEY BLVD/BRIDGE OVER I-80 STRUCTURE NO. AZD 6738 0.94 0.94 0.00 STRUCTURE REPAIR 154 16 0 170

1 DR 0.94 DR15281 CHEYENNE PARSLEY BLVD/BRIDGE OVER I-80 STRUCTURE AZD 6738 0.94 0.94 0.00 STRUCTURE REPAIR 0 0 90 90

FY TOTAL: 10.40 8,578 1,209 458 10,245

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 74 of 149

Page 80: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Laramie Fiscal Year 2018

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transit Projects

Federal State Other Total1 CHEYENNE CHEYENNE CITY TRANSIT OPERATING 0 112 86 199

1 CHEYENNE CITY OF CHEYENNE OPERATING/ADMIN 232 0 24 257

1 PINE BLUFFS PINE BLUFFS SENIOR CENTER CAPITAL/OPERATING/ADMIN/PM 0 13 8 21

1 CHEYENNE WYOMING INDEPENDENT LIVING MOBILITY MANAGEMENT-URBAN 31 8 0 39

1 WYDOT RTAP FUNDING RTAP FUNDING 34 0 0 34

1 WYDOT STATE ADMINISTRATION ADMINISTRATION 360 0 0 360

1 WYDOT STATEWIDE PLANNING PLANNING PROJECTS 106 0 11 117

1 WYDOT 5310 STATEWIDE BALANCE-UNOBLIGATED VEHICLES/MOBILITY MGMT/OPER 136 0 34 170

1 WYDOT 5310 URBAN BALANCE-UNOBLIGATED VEHICLES/MOBILITY MGMT/OPER 178 0 44 222

1 WYDOT 5339 STATEWIDE BALANCE - UNOBLIGATED CAPITAL/BUS FACILITIES 2,199 0 524 2,723

1 WYDOT 5339 URBAN BALANCE-UNOBLIGATED CAPITAL/BUS FACILITIES 131 0 32 163

1 WYDOT WYDOT STATE FUNDING CAPITAL/OPERATING/ADMIN/PM 0 50 0 50

FY TOTAL: 3,406 183 764 4,353

5305d

STATE

STATE

5310

5311

5311

5305e

5310

5310

5339

5339

Funding Source Character of Work

Cost $1000

STATE

Trans Comm Dist Location Eligible Provider

Page 75 of 149

Page 81: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Laramie

Transportation Projects Fiscal Year 2019Federal State Other Total

1 STP 8.32 0211007 CHEYENNE HORSE CREEK ROAD/SOUTH LODGEPOLE CREEK SECTION 211 8.32 17.03 8.71 PAVEMENT REHABILITATION 2,074 218 0 2,292

1 STP-BR 0.00 1104015 PINE BLUFFS TO ALBINNORTH SECTION/WY 215 STRUCTURE NO. CRO & CRN 1104 0.00 0.00 0.00 BRIDGE REPLACEMENT 1,519 160 0 1,679

1 STPU-CH 0.00 B191001 LARAMIE COUNTY

DIVISION AVE BETWEEN COLLEGE AND WALLICK; WALLICK BETWEEN DIVISION & US 85 13910 99.56 99.81 0.25 NEW CONSTRUCTION 3,829 0 402 4,231

1 SCP-TC 35.30 N852003 CHEYENNE TO TORRINGTON GUN BARREL SOUTH 85 35.30 47.00 11.70 PAVEMENT REHABILITATION 0 4,470 0 4,470FY TOTAL: 20.66 7,422 4,848 402 12,672

Aeronautics Projects Fiscal Year 2019Federal State Other Total

1 CHEYENNERECONSTRUCT R/W 9/27, DESIGN 550 22 15 587

FY TOTAL: 550 22 15 587

Transportation Projects Fiscal Year 2020Federal State Other Total

1 HSIP 0.00 I251170 CHEYENNE * CHEYENNE MARGINAL 25 0.00 14.27 14.27 SAFETY IMPROVEMENTS 1,503 117 0 1,6201 NHPPI 372.40 I806209 CHEYENNE TO PINE BLUFFS HILLSDALE SECTION 80 372.40 382.30 9.90 PAVEMENT REHABILITATION 15,802 1,233 0 17,0351 SCP-TC 47.00 N852004 CHEYENNE TO TORRINGTON GUN BARREL NORTH 85 47.00 52.00 5.00 PAVEMENT REHABILITATION 0 2,386 0 2,3861 SCP-TC 52.00 N852005 CHEYENNE TO TORRINGTON MERIDEN 85 52.00 56.64 4.64 PAVEMENT REHABILITATION 0 2,234 0 2,234

FY TOTAL: 33.81 17,305 5,970 0 23,275

Character of WorkCost $1000Trans Comm

Dist Project General Location Detail Location LRS IDBegin

RMEnd RM Length

Character of WorkCost $1000Aero Comm

Dist Location

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 76 of 149

Page 82: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Laramie

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Aeronautics Projects Fiscal Year 2020Federal State Other Total

1 CHEYENNE RECONSTRUCT R/W 9/27 15,000 600 400 16,000

FY TOTAL: 15,000 600 400 16,000

Transportation Projects Fiscal Year 2021Federal State Other Total

1 NHPP 9.74 I180021 CHEYENNE WARREN AVE/LINCOLNWAY-24TH STREET 180 9.74 10.27 0.53 PAVEMENT REHABILITATION 1,255 132 0 1,387

1 NHPPI-PM 11.50 I251168 CHEYENNE TO CHUGWATERRANDALL AVENUE-HORSE CREEK INTERCHANGE 25 11.50 17.00 5.50 PAVEMENT REHABILITATION 2,546 268 0 2,814

1 NHPPI 357.70 I806211 LARAMIE TO CHEYENNEROUNDTOP - CENTRAL AVENUEINTERCHANGE 80 357.70 362.00 4.30 PAVEMENT REHABILITATION 2,041 159 0 2,200

1 SCP-TC 0.00 W223004 CHEYENNE TERRY RANCH RD/WY 223 223 0.00 5.69 5.69 PAVEMENT REHABILITATION 0 2,309 0 2,309FY TOTAL: 16.02 5,842 2,868 0 8,710

Aeronautics Projects Fiscal Year 2021Federal State Other Total

1 CHEYENNE ACQUIRE SRE (BLOWER) 1,000 40 27 1,067

FY TOTAL: 1,000 40 27 1,067

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Character of WorkCost $1000Aero Comm

Dist Location

Character of WorkCost $1000Aero Comm

Dist Location

Page 77 of 149

Page 83: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Laramie

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2022Federal State Other Total

1 NHPP 10.10 I180024 CHEYENNE * CENTRAL AVENUE/PERSHINGBOULEVARD-22ND STREET 180 10.10 10.70 0.60 PAVEMENT REHABILITATION 442 47 0 489

1 NHPPI 382.30 I806208 CHEYENNE TO PINE BLUFFSBURNS INTERCHANGESTRUCTURE NO. BAA, AZZ 80 382.30 393.40 11.10 PAVEMENT REHABILITATION 8,799 687 0 9,486

FY TOTAL: 11.70 9,241 734 0 9,975

Aeronautics Projects Fiscal Year 2022Federal State Other Total

1 CHEYENNE CONSTRUCT SRE BUILDING 1,000 40 27 1,067

1 PINE BLUFFSREHABILITATE WEST HANGAR APRON 600 40 27 667

1 PINE BLUFFSSEAL COAT AND MARK AIRSIDE PAVEMENTS 0 150 17 167

FY TOTAL: 1,600 230 70 1,900

Transportation Projects Fiscal Year 2023Federal State Other Total

1 STP 0.00 1123001 ARCHER TO HILLSDALE * I-80 SERVICE ROAD 1123 0.00 6.96 6.96 PAVEMENT RESURFACE 2,146 226 0 2,372

1 STP 0.94 6738002 CHEYENNE * I-80 PARSLEY BOULEVARDSTRUCTURE NO. AZD 6738 0.94 0.94 0.00 BRIDGE REPLACEMENT 1,971 207 0 2,178

1 NHPPI 393.40 I806207 CHEYENNE TO PINE BLUFFS PINE BLUFFS WEST 80 393.40 400.50 7.10 PAVEMENT REHABILITATION 6,559 512 0 7,071

1 NHPP 365.80 N561041 CHEYENNE US 30/PERSHING BOULEVARD/UPRR STRUCTURE 56 365.80 370.50 4.70 ADDITIONAL LANES 7,352 773 0 8,125

FY TOTAL: 18.76 18,028 1,718 0 19,746

Character of WorkCost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Character of WorkCost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length

Aero Comm Dist Location

Page 78 of 149

Page 84: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Laramie

Transportation Projects Fiscal Year 2018Federal State Other Total

1 SCP 359.60 I806212 INTERSTATE 25 TO INTERSTATE 80 * I-25 & I-80 INTERCHANGE 80 359.60 359.60 0.00 STUDIES 0 30 0 30FY TOTAL: 0.00 0 30 0 30

Character of WorkCost $1000

STATE TRANSPORTATION IMPROVEMENT PROJECTSPRELIMINARY ENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 79 of 149

Page 85: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

LINCOLN COUNTY

P113029

KEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

N121111

P113028

N121112N121113

1217001

N103110

N103102

CD17304

P112023

CD17306

N103103

N103112

12060081206007

N121114

CD16311

HR17301

Page 80 of 149

Page 86: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Lincoln Fiscal Year 2018

Transportation Projects

Federal State Other Total

3 CD 0.00 CD16311 THAYNE

THAYNE; WRIGHT STREET; VAN NOY PARKWAY LPA - TOWN OF THAYNE 14470 100.00 100.12 0.11 COMMUNITY DEVELOPMENT 115 0 29 144

3 CD 0.00 CD17304 AFTON

HWY 89, 3RD AVE, 5TH AVE, JEFERSON ST & 6TH AVELPA - TOWN OF AFTON 10 84.60 84.68 0.08 COMMUNITY DEVELOPMENT 230 0 57 287

3 HRRR 0.00 HR17301 LINCOLN COUNTY

VARIOUS LOCATIONS; CLARK LANE, ALLRED,SWIFT CREEK LANE, PINE CREEK, COKEVILLE-UTAH LINE, MUDDY STRING, CEDAR CREEK, THAYNE BEDFORD, STRAWBERRY CREEK, SHUTE CREEKLPA - LINCOLN COUNTY 7450 0.00 2.03 2.03 SAFETY IMPROVEMENTS 100 0 10 110

3 CD 0.00 CD17306 LINCOLN COUNTY PATHWAY ALONG HWY 233LPA - LINCOLN COUNTY 1202 1.41 2.65 1.24 COMMUNITY DEVELOPMENT 186 0 47 233

3 STP-E 84.73 P113029 LA BARGE LABARGE/US 189TREES, SHRUBS & LIGHTING 11 84.73 85.93 1.20 COMMUNITY DEVELOPMENT 95 0 10 105

3 NHPP 108.13 N103103 THAYNE TO ALPINE ETNA NORTH 10 108.13 117.38 9.25 ADDITIONAL LANES 13,335 1,401 0 14,7363 NHPP 0.00 N103112 IDAHO TO AFTON STATE LINE NORTH 10 55.00 57.00 2.00 FENCING 51 5 0 56

FY TOTAL: 15.91 14,112 1,406 153 15,671

Transit Projects

Federal State Other Total3 AFTON STAR VALLEY SENIORS CAPITAL/OPERATING/ADMIN/PM 0 15 8 23

3 THAYNE THAYNE SENIOR CENTER CAPITAL/OPERATING/ADMIN/PM 0 17 8 25

3 KEMMERER KEMMERER SENIOR CENTER CAPITAL/OPERATING/ADMIN/PM 0 15 7 22

3 KEMMERER KEMMERER SENIOR CENTERPURCHASE LIGHT-DUTY SMALL BUS 6 0 51 57

FY TOTAL: 6 47 73 126

Cost $1000

STATE

STATE

Funding Source Character of Work

STATE

5310

Trans Comm Dist Location Eligible Provider

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 81 of 149

Page 87: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Lincoln Fiscal Year 2018

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Aeronautics Projects

Federal State Other Total2 KEMMERER RELOCATE FUEL SYSTEM 450 30 20 500

FY TOTAL: 450 30 20 500

Character of WorkCost $1000Aero Comm

Dist Location

Page 82 of 149

Page 88: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Lincoln

Transportation Projects Fiscal Year 2019Federal State Other Total

3 SCP-TC 0.00 1206007 AUBURN TO AFTON AUBURN NORTH 1206 0.00 3.38 3.38 PAVEMENT REHABILITATION 0 879 0 8793 SCP-TC 3.38 1206008 AUBURN TO AFTON WY 238 1206 3.38 12.08 8.70 PAVEMENT REHABILITATION 0 7,659 0 7,6593 SCP-TC 34.53 P112023 KEMMERER KEMMERER STREETS/US 189 11 34.53 38.14 3.61 PAVEMENT REHABILITATION 0 1,697 0 1,697

FY TOTAL: 15.69 0 10,235 0 10,235

Aeronautics Projects Fiscal Year 2019Federal State Other Total

2 AFTONCONSTRUCT TAXILANE F & EXTEND TAXILANE B 300 20 13 333

2 KEMMERER ACQUIRE SRE 0 171 19 190

FY TOTAL: 300 191 32 523

Transportation Projects Fiscal Year 2020Federal State Other Total

3 NHPP 100.28 N103102 THAYNE TO ALPINE THAYNE NORTH 10 100.28 108.13 7.85 RECONSTRUCTION 20,467 2,151 0 22,6183 SCP-TC 57.00 N121111 KEMMERER TO GRANGER KEMMERER EAST 12 57.00 67.00 10.00 PAVEMENT REHABILITATION 0 5,913 0 5,913

FY TOTAL: 17.85 20,467 8,064 0 28,531

Aeronautics Projects Fiscal Year 2020Federal State Other Total

2 KEMMERER CONSTRUCT R/W 7/25, EA 150 10 7 167

FY TOTAL: 150 10 7 167

Character of WorkCost $1000Trans Comm

Dist Project General Location Detail Location LRS IDBegin

RMEnd RM Length

Character of WorkCost $1000Aero Comm

Dist Location

Character of WorkCost $1000Aero Comm

Dist Location

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 83 of 149

Page 89: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Lincoln

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2021Federal State Other Total

3 NHPP 45.43 1217001 BORDER JUNCTION TO IDAHO WY 89 1217 45.43 54.93 9.50 PAVEMENT REHABILITATION 4,177 439 0 4,6163 SCP-TC 64.00 N103110 IDAHO TO SMOOT SMOOT SOUTH 10 64.00 72.08 8.08 PAVEMENT REHABILITATION 0 3,157 0 3,1573 STP 41.40 P113028 KEMMERER TO LA BARGE OYSTER RIDGE 11 41.40 53.50 12.10 PAVEMENT REHABILITATION 5,224 549 0 5,773

FY TOTAL: 29.68 9,401 4,145 0 13,546

Aeronautics Projects Fiscal Year 2021Federal State Other Total

2 AFTONSEAL COAT AND MARK AIRSIDE PAVEMENTS 150 10 7 167

FY TOTAL: 150 10 7 167

Transportation Projects Fiscal Year 2022Federal State Other Total

3 NHPP 9.76 N121113BORDER JUNCTION TO SAGE JUNCTION COKEVILLE SECTION 12 9.76 21.30 11.54 PAVEMENT REHABILITATION 8,585 902 0 9,487

FY TOTAL: 11.54 8,585 902 0 9,487

Aeronautics Projects Fiscal Year 2022Federal State Other Total

2 AFTONREHABILITATE T/W A5 AND RELOCATE CONNECTOR T/W 800 53 36 889

2 KEMMERER CONSTRUCT R/W 7/25, DESIGN 300 20 13 333

FY TOTAL: 1,100 73 49 1,222

Character of WorkCost $1000

Character of WorkCost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length

Aero Comm Dist Location

Character of WorkCost $1000Aero Comm

Dist Location

Page 84 of 149

Page 90: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Lincoln

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2023Federal State Other Total

3 NHPP-RF 0.00 N121112 IDAHO TO SAGE JUNCTION US 30/WY 89 12 0.00 28.00 28.00 FENCING 1,487 156 0 1,6433 NHPP 64.00 N121114 KEMMERER TO GRANGER * OPAL WEST 12 64.00 71.00 7.00 PAVEMENT REHABILITATION 7,007 736 0 7,743

FY TOTAL: 35.00 8,494 892 0 9,386

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Page 85 of 149

Page 91: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Lincoln

Transportation Projects Fiscal Year 2018Federal State Other Total

3 CD 0.00 CD17307 STAR VALLEY RANCHSCHOOL TRAVEL PLANLPA - STAR VALLEY RANCH NA 0.00 0.00 0.00 COMMUNITY DEVELOPMENT 20 0 5 25

FY TOTAL: 0.00 20 0 5 25

STATE TRANSPORTATION IMPROVEMENT PROJECTSPRELIMINARY ENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 86 of 149

Page 92: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

NATRONA COUNTY

KEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

I254155

I254156

N341112

CN01064

N341113

N3411154123001

N212111

CN01065

N212112

N212115CD17203

N212118

I254162

0505019

I254159

N341116

W258024W253006

I254161I254160I254157

I254151I254164

N212121N212120

Page 87 of 149

Page 93: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Natrona Fiscal Year 2018

Transportation Projects

Federal State Other Total7 STPU 193.38 I254156 BAR NUNN WESTWINDS INTERCHANGE 25 193.38 194.70 1.32 NEW CONSTRUCTION 6,732 0 1,683 8,415

7 STP-PO 17.16 4123001 INTERSTATE 25 SERVICE ROAD/SALT CREEK HIGHWAY HOWARD-MCMURRY 4123 17.16 18.86 1.70 PAVEMENT RESURFACE 718 75 0 793

7 NHPP 184.06 0505019 CASPER HAT SIX ROAD 505 184.06 184.06 0.00 TRAFFIC SYSTEMS 221 23 0 244

7 CD 3.03 CD17203 CASPER MOUNTAIN ROAD/WY 251LPA - CITY OF CASPER 1301 3.03 4.48 1.45 COMMUNITY DEVELOPMENT 375 0 94 469

7 NHPP 116.50 N212118 CASPER POPLAR STREET/BNSF BRIDGE 21 116.50 116.82 0.32 STRUCTURE REPAIR 3,919 412 0 4,331FY TOTAL: 4.79 11,965 510 1,777 14,252

Transit Projects

Federal State Other Total

7 CASPER OPERATING 0 111 86 197

7 CASPER TOWN OF MILLS & EVANSVILLE OPERATING 0 110 84 194

7 CASPERPURCHASE TWO MEDIUM-DUTY MID SIZE BUSES 132 0 33 165

7 CASPER MISC CAPITAL-URBAN 24 0 6 30

7 CASPER CITY OF CASPER OPERATING/ADMIN 198 0 21 219

7 CASPER WYOMING INDEPENDENT LIVINGOPERATING-VOUCHER PROGRAM-URBAN 87 87 0 174

7 CASPER WYOMING INDEPENDENT LIVING ADMINISTRATION 159 0 0 159

7 CASPER WYOMING INDEPENDENT LIVINGMOBILITY MANAGEMENT - URBAN 27 7 0 34

FY TOTAL: 627 315 230 1,172

CASPER AREA TRANSPORTATION COALITION-CATC

CASPER AREA TRANSPORTATION COALITION-CATC

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Trans Comm Dist Location Eligible Provider

Funding Source Character of Work

Cost $1000

CASPER AREA TRANSPORTATION COALITION-CATC STATE

5310

STATE

5339

5339

5305d

5310

5311

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 88 of 149

Page 94: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Natrona Fiscal Year 2018

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Aeronautics Projects

Federal State Other Total

2 CASPER CONDUCT ARFF TRAINING 0 54 6 60

2 CASPER REHABILITATE TAXIWAY C 2,175 87 58 2,320

FY TOTAL: 2,175 141 64 2,380

Character of WorkCost $1000Aero Comm

Dist Location

Page 89 of 149

Page 95: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Natrona

Transportation Projects Fiscal Year 2019Federal State Other Total

7 STP-BROS 0.30 CN01064 NATRONA COUNTY COUNTY ROAD 106 7611 0.30 0.30 0.00 BRIDGE REPLACEMENT 1,134 0 119 1,2537 NHPPI 225.00 I254151 CASPER TO KAYCEE DISTRICT BOUNDARY SOUTH 25 225.00 240.00 15.00 ITS 1,531 119 0 1,6507 HSIP 0.00 I254157 CASPER CASPER MARGINAL 25 180.27 180.27 0.00 ITS 433 34 0 4677 NHPPI 192.22 I254162 CASPER TO KAYCEE ORMSBY SECTION 25 192.22 200.00 7.78 PAVEMENT REHABILITATION 7,682 600 0 8,2827 SCP-TC 87.89 N212115 MUDDY GAP TO CASPER ALCOVA SECTION 21 87.89 94.15 6.26 ADDITIONAL LANES 0 4,979 0 4,979

7 HSIP 110.95 N212120 CASPER

CY & ROBERTSON ROAD POPLAR & COLLINS WYOMING BLVD & 13TH 21 110.95 110.95 0.00 TRAFFIC SYSTEMS 941 99 0 1,040

FY TOTAL: 29.04 11,721 5,831 119 17,671

Aeronautics Projects Fiscal Year 2019Federal State Other Total

2 CASPER CONDUCT ARFF TRAINING 0 54 6 60

2 CASPERRECONSTRUCT/REHABILITATE PARKING LOT, PH I 0 980 245 1,225

2 CASPERREHABILITATE AND REPAIR APRON 9,375 375 250 10,000

2 CASPERRECONSTRUCT/REHABILITATE PARKING LOT, PH II 0 980 245 1,225

FY TOTAL: 9,375 2,389 746 12,510

Transportation Projects Fiscal Year 2020Federal State Other Total

7 NHPPI 210.90 I254155 CASPER TO KAYCEE HORSE RANCH CREEK NORTH 25 210.90 219.00 8.10 PAVEMENT REHABILITATION 8,208 641 0 8,8497 NHPPI 185.35 I254160 CASPER MARGINAL/WALSH DRIVE 25 185.35 186.45 1.10 BRIDGE REPLACEMENT 20,994 1,639 0 22,6337 NHPP 50.69 N341113 WALTMAN TO SHOSHONI US 20/26 34 50.69 75.00 24.31 ADDITIONAL LANES 3,911 411 0 4,322

FY TOTAL: 33.51 33,113 2,691 0 35,804

Cost $1000LRS ID

Begin RM

End RM Length Character of Work

Character of WorkCost $1000Aero Comm

Dist Location

Trans Comm Dist Project General Location Detail Location

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 90 of 149

Page 96: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Natrona

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Aeronautics Projects Fiscal Year 2020Federal State Other Total

2 CASPER ACQUIRE SRE 500 20 13 533

2 CASPER CONDUCT ARFF TRAINING 0 54 6 60

2 CASPERSEAL COAT AND MARK AIRSIDE PAVEMENTS 0 1,089 121 1,210

2 CASPER CONSTRUCT SRE BUILDING 338 14 9 360

2 CASPERRECONSTRUCT/REHABILITATE PARKING LOT, PH III 0 800 200 1,000

FY TOTAL: 838 1,976 349 3,163

Transportation Projects Fiscal Year 2021Federal State Other Total

7 STP-BROS 10.70 CN01065 NATRONA COUNTY COUNTY ROAD 402 5433 10.70 10.70 0.00 BRIDGE REPLACEMENT 591 0 62 653

7 NHPP 108.06 N212111 CASPER WEST BELT LOOP-ROBERTSON ROAD WY 220 21 108.06 110.90 2.84 PAVEMENT REHABILITATION 2,156 227 0 2,383

7 NHPP 72.14 N212112 MUDDY GAP TO CASPER PATHFINDER HILL WEST 21 72.14 81.30 9.16 ADDITIONAL LANES 3,905 410 0 4,315

7 NHPP 116.07 N212121 CASPER POPLAR-1ST STREET INTERCHANGE 21 116.07 116.57 0.50 MODIFY INTERSECTION 12,895 1,355 0 14,250

7 SCP-TC 21.24 N341112 CASPER TO SHOSHONI NATRONA EAST 34 21.24 30.06 8.82 ADDITIONAL LANES 0 6,036 0 6,0367 NHPP 3.87 N341116 CASPER TO MILLS * WY 220 JUNCTION 34 3.87 10.37 6.50 PAVEMENT RESURFACE 1,582 166 0 1,7487 NHPP 8.07 W258024 CASPER * WYOMING BOULEVARD 258 8.07 9.90 1.83 PAVEMENT RESURFACE 352 37 0 389

FY TOTAL: 29.65 21,481 8,231 62 29,774

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Cost $1000Aero Comm Dist Location Character of Work

Page 91 of 149

Page 97: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Natrona

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Aeronautics Projects Fiscal Year 2021Federal State Other Total

2 CASPER CONDUCT ARFF TRAINING 0 54 6 60

2 CASPERCONSTRUCT GA HANGAR APRON, PH I 0 600 400 1,000

2 CASPER UPGRADE LIGHTING T/W B, C 1,175 47 31 1,253

2 CASPERCONSTRUCT GA HANGAR APRON, DESIGN 0 60 40 100

FY TOTAL: 1,175 761 477 2,413

Transportation Projects Fiscal Year 2022Federal State Other Total

7 NHPPI 200.00 I254159 CASPER TO KAYCEE

HORSE RANCH CREEK SOUTH BOTH LANES STRUCTURE NO. AJA, AIZ, DOI 25 200.00 210.41 10.41 PAVEMENT REHABILITATION 11,383 888 0 12,271

7 NHPPI 186.45 I254161 GLENROCK TO CASPER CASPER MARGINAL 25 186.45 188.89 2.44 PAVEMENT REHABILITATION 7,319 571 0 7,890

7 NHPP 30.06 N341115 CASPER TO SHOSHONI NATRONA WEST-POWDER RIVER 34 30.06 39.60 9.54 PAVEMENT REHABILITATION 6,100 641 0 6,741FY TOTAL: 22.39 24,802 2,100 0 26,902

Aeronautics Projects Fiscal Year 2022Federal State Other Total

2 CASPER IMPROVE CARGO AREA 1,175 47 31 1,253

2 CASPER CONDUCT ARFF TRAINING 0 54 6 60

2 CASPERCONSTRUCT GA HANGAR APRON, PH II 0 345 230 575

2 CASPERUPGRADE ARFF TRAINING FACILITY 0 101 25 126

FY TOTAL: 1,175 547 293 2,014

Character of WorkCost $1000Aero Comm

Dist Location

Begin RM

End RM Length Character of Work

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Cost $1000Aero Comm Dist Location Character of Work

Page 92 of 149

Page 98: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Natrona

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2023Federal State Other Total

7 NHPPI 227.12 I254164 CASPER TO JOHNSON COUNTY * COUNTY LINE SOUTH 25 227.12 234.85 7.73 PAVEMENT RESURFACE 1,389 108 0 1,497FY TOTAL: 7.73 1,389 108 0 1,497

Begin RM

End RM Length Character of Work

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Page 93 of 149

Page 99: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

NIOBRARA COUNTY

KEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

N403008

N403007

Page 94 of 149

Page 100: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Niobrara Fiscal Year 2018

Transportation Projects

Federal State Other Total6 NHPP 55.63 N403008 LUSK TO VAN TASSELL EAST SECTION 39 55.63 63.23 7.60 RECONSTRUCTION 9,479 996 0 10,475

FY TOTAL: 7.60 9,479 996 0 10,475

Transit Projects

Federal State Other Total6 LUSK NIOBRARA SENIOR CITIZENS CAPITAL/OPERATING/ADMIN/PM 0 27 16 43

FY TOTAL: 0 27 16 43

Funding Source Character of WorkSTATE

Cost $1000Trans Comm Dist Location Eligible Provider

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 95 of 149

Page 101: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Niobrara

Transportation Projects Fiscal Year 2019Federal State Other Total

6 SCP-TC 41.71 N403007 LUSK TO VAN TASSELL WEST SECTION 39 41.71 55.69 13.98 PAVEMENT REHABILITATION 0 15,028 0 15,028FY TOTAL: 13.98 0 15,028 0 15,028

Aeronautics Projects Fiscal Year 2020Federal State Other Total

3 LUSKSEAL COAT & MARK AIRSIDE PAVEMENTS 0 126 14 140

3 LUSKCONSTRUCT GA TERMINAL BUILDING 600 40 27 667

FY TOTAL: 600 166 41 807

Character of WorkCost $1000Aero Comm

Dist Location

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 96 of 149

Page 102: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

PARK COUNTY

Powell

To

2200

1502013

KEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

CN11072

CN11073

1502014

N311098N311099

N311000

N332033

N332035

N332036

1500018

N311097

N291066

N311101N311102

CN11074

Page 97 of 149

Page 103: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Park Fiscal Year 2018

Transportation Projects

Federal State Other Total4 RHC-P 0.00 CN11072 PARK COUNTY * COUNTY ROAD 2AB 095112L 7790 8.10 8.10 0.00 RAILROAD 226 0 25 2515 STP 101.51 1502014 CODY TO MONTANA CODY NORTH 1502 101.51 109.10 7.59 PAVEMENT REHABILITATION 3,303 347 0 3,650

5 NHPP 45.72 N311098YELLOWSTONE NATIONAL PARK TO CODY TUNNEL PULL OUT 31 45.72 45.72 0.00 PARKING 134 14 0 148

5 SSP-TO 27.80 N311099YELLOWSTONE NATIONAL PARK TO CODY US 14, 16, 20 WEST OF CODY 31 27.80 27.80 0.00 SAFETY IMPROVEMENTS 0 165 0 165

5 SSP-TO 52.95 N311100 CODY

17TH & STAMPEDE/SHERIDAN & 11TH SHERIDAN & 12TH, 13TH,14TH, 15TH & 16TH8TH & BECK 31 52.95 52.95 0.00 SAFETY IMPROVEMENTS 0 77 0 77

FY TOTAL: 7.59 3,663 603 25 4,291

Transit Projects

Federal State Other Total5 CODY CODY COUNCIL ON AGING CAPITAL/OPERATING/ADMIN/PM 0 71 45 116

5 POWELLOPERATING-VOUCHER-PROG-STATEWIDE 78 78 0 156

5 POWELL ADMINISTRATION 114 0 0 114

5 POWELLMOBILITY MANAGEMENT - STATEWIDE 60 15 0 75

5 MEETEETSE MEETEETSE RECREATION DISTRICT CAPITAL/OPERATING/ADMIN/PM 0 9 4 14

5 POWELL POWELL SENIOR CENTER CAPITAL/OPERATING/ADMIN/PM 0 65 45 109

FY TOTAL: 252 238 93 583

5310

STATE

STATE

Funding Source Character of Work

Cost $1000

STATE

WYOMING SERVICES FOR INDEPENDENT LIVING

WYOMING SERVICES FOR INDEPENDENT LIVINGWYOMING SERVICES FOR INDEPENDENT LIVING

5310

5311

Location Eligible Provider

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Trans Comm Dist

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 98 of 149

Page 104: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Park Fiscal Year 2018

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Aeronautics Projects

Federal State Other Total4 CODY EXPAND COMMERCIAL APRON 1,370 55 37 1,461

4 CODYCONDUCT PLANNING STUDY, MASTER PLAN 400 0 27 427

4 POWELL RELOCATE ACCESS ROAD 150 0 17 167

FY TOTAL: 1,920 55 80 2,055

Cost $1000Character of Work

Aero Comm Dist Location

Page 99 of 149

Page 105: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Park

Transportation Projects Fiscal Year 2019Federal State Other Total

5 STP 6.54 1500018 MEETEETSE MEETEETSE-PITCHFORK/WOOD RIVER WEST SECTION 1500 9.17 11.39 2.22 PAVEMENT REHABILITATION 2,296 241 0 2,537

5 RHC 0.00 CN11073 PARK COUNTY * COUNTY ROAD 10/POWELL090686J 7312 6.98 6.98 0.00 RAILROAD 41 0 41 82

5 RHC 0.00 CN11074 PARK COUNTY * LANE 17 099010G 8001 0.03 0.03 0.00 RAILROAD 43 0 43 865 SCP-TC 58.00 N332035 MEETEETSE TO CODY MEETEETSE RIM SECTION 33 58.00 62.98 4.98 PAVEMENT REHABILITATION 0 2,876 0 2,876

FY TOTAL: 7.20 2,380 3,117 84 5,581

Aeronautics Projects Fiscal Year 2019Federal State Other Total

4 CODYSEAL COAT AND MARK AIRSIDE PAVEMENT 0 250 28 278

4 CODYEXTEND ACCESS ROAD AND EXPAND AUTO PARKING 1,000 40 27 1,067

4 POWELLSEAL COAT AND MARK AIRSIDE PAVEMENTS 0 209 23 232

FY TOTAL: 1,000 499 78 1,576

Transportation Projects Fiscal Year 2020Federal State Other Total

5 NHPP 51.78 N311097 CODY US 14/16/20 31 51.78 52.96 1.18 PAVEMENT MAINTENANCE 1,898 199 0 2,0975 NHPP 74.00 N332033 MEETEETSE TO CODY CODY SOUTH 33 74.00 81.21 7.21 PAVEMENT REHABILITATION 5,641 593 0 6,234

FY TOTAL: 8.39 7,539 792 0 8,331

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Character of WorkCost $1000Aero Comm

Dist Location

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 100 of 149

Page 106: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Park

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Aeronautics Projects Fiscal Year 2020Federal State Other Total

4 CODYREHABILITATE WILDLIFE FENCING 1,000 40 27 1,067

FY TOTAL: 1,000 40 27 1,067

Transportation Projects Fiscal Year 2021Federal State Other Total

5 STP 115.12 1502013 CODY TO MONTANA PAT O'HARA CREEK SECTION 1502 115.12 118.47 3.35 RECONSTRUCTION 2,400 252 0 2,652FY TOTAL: 3.35 2,400 252 0 2,652

Aeronautics Projects Fiscal Year 2021Federal State Other Total

4 CODY MARK AIRSIDE PAVEMENT 0 120 13 133

4 POWELL EXTEND T/W A TO R/W 13 750 50 33 833

FY TOTAL: 750 170 47 967

Transportation Projects Fiscal Year 2022Federal State Other Total

5 NHPP 5.37 N291066 CODY TO RALSTON * SHOSHONE RIVER BRIDGE 29 5.37 7.48 2.11 PAVEMENT REHABILITATION 1,412 148 0 1,5605 NHPP 51.80 N332036 MEETEETSE TO CODY MEETEETSE NORTH 33 51.80 58.00 6.20 PAVEMENT REHABILITATION 2,180 229 0 2,409

FY TOTAL: 8.31 3,592 377 0 3,969

Character of WorkCost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Trans Comm Dist Project General Location Detail Location

Begin RM

End RM LengthLRS ID

Character of WorkCost $1000Aero Comm

Dist Location

Cost $1000Aero Comm Dist Location Character of Work

Page 101 of 149

Page 107: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Park

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2023Federal State Other Total

5 NHPP 60.90 N311101 CODY TO GREYBULL * EAGLE PASS SECTION 31 60.90 75.72 14.82 PAVEMENT REHABILITATION 6,895 725 0 7,6205 NHPP 36.41 N311102 YELLOWSTONE TO CODY * BUFFALO BILL RESERVIOR 31 36.41 41.69 5.28 PAVEMENT REHABILITATION 2,353 247 0 2,600

FY TOTAL: 20.10 9,248 972 0 10,220

Begin RM

End RM Length Character of Work

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Page 102 of 149

Page 108: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

PLATTE COUNTY

CN08080

CN08077

CN08081

I252167

I252168

0109027

CN08082

CD16202

KEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

I252166

I252159I252158

N271037

I252169

Page 103 of 149

Page 109: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Platte Fiscal Year 2018

Transportation Projects

Federal State Other Total

1 NHPPI 97.49 I252158 DWYER JUNCTION TO GLENDOCASSA INTERCHANGE SOUTHBOUND LANE 25 97.49 100.86 3.37 PAVEMENT REHABILITATION 6,184 483 0 6,667

1 NHPPI 97.49 I252159 DWYER JUNCTION TO GLENDOCASSA INTERCHANGE NORTHBOUND LANE 25 97.49 100.86 3.37 PAVEMENT REHABILITATION 7,517 587 0 8,104

1 NHPPI-GM 55.00 I252167 CHUGWATER MARGINAL 25 55.00 57.00 2.00 SLIDE REPAIR 557 43 0 600

1 CD 0.00 CD16202 WHEATLAND PHASE 2 & 3 PATHWAY LPA - TOWN OF WHEATLAND NA 0.00 0.00 0.00 COMMUNITY DEVELOPMENT 500 0 125 625

1 RHC 0.00 CN08080 PLATTE COUNTY * COUNTY ROAD 140 245508F 8082 2.05 2.05 0.00 RAILROAD 41 0 41 82

1 RHC 0.00 CN08081 PLATTE COUNTY * COUNTY ROAD 42 COTTONWOOD 0245570R 8023 8.59 8.59 0.00 RAILROAD 41 0 41 82

1 RHC 0.00 CN08082 PLATTE COUNTY *BORDEAUX 245483M NA 0.00 0.00 0.00 RAILROAD 51 51 0 102FY TOTAL: 8.74 14,891 1,164 207 16,262

Transit Projects

Federal State Other Total1 WHEATLAND SERVICES FOR SENIORS CAPITAL/OPERATING/ADMIN/PM 0 61 32 92

FY TOTAL: 0 61 32 92

Aeronautics Projects

Federal State Other Total1 WHEATLAND RECONSTRUCT R/W, PH I 3,800 253 169 4,222

1 WHEATLAND RECONSTRUCT R/W, PH II 0 1,620 180 1,800

1 WHEATLANDACQUIRE LAND FOR STANDARDS, PH II 0 117 13 130

1 WHEATLANDSEAL COAT AND MARK PAVEMENTS 0 44 11 55

FY TOTAL: 3,800 2,034 373 6,207

Character of WorkCost $1000Aero Comm

Dist Location

Funding Source Character of WorkSTATE

Cost $1000Trans Comm Dist Location Eligible Provider

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 104 of 149

Page 110: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Platte

Transportation Projects Fiscal Year 2019Federal State Other Total

1 STP-BROS 44.00 CN08077 PLATTE COUNTY COUNTY ROAD CN8-204 5083 44.00 44.00 0.00 BRIDGE REPLACEMENT 593 0 62 6551 NHPPI 58.40 I252168 CHUGWATER TO WHEATLAND CHUGWATER NORTH 25 58.40 68.97 10.57 PAVEMENT RESURFACE 1,623 127 0 1,750

FY TOTAL: 10.57 2,216 127 62 2,405

Aeronautics Projects Fiscal Year 2019Federal State Other Total

1 GUERNSEY REHABILITATE APRON AND T/W 0 174 43 217

FY TOTAL: 0 174 43 217

Aeronautics Projects Fiscal Year 2020Federal State Other Total

1 WHEATLANDCONDUCT PLANNING STUDY, MASTER PLAN 300 20 13 333

FY TOTAL: 300 20 13 333

Transportation Projects Fiscal Year 2022Federal State Other Total

1 NHPPI 109.11 I252166 WHEATLAND TO DOUGLASGLENDO MARGINAL SOUTHBOUND LANE 25 109.11 114.78 5.67 PAVEMENT REHABILITATION 5,595 437 0 6,032

1 SCP-TC 15.51 N271037 GUERNSEY TO FORT LARAMIE US 26 27 15.51 18.50 2.99 PAVEMENT REHABILITATION 0 3,283 0 3,283FY TOTAL: 8.66 5,595 3,720 0 9,315

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Aero Comm Dist Location Character of Work

Cost $1000

Aero Comm Dist Location Character of Work

Cost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 105 of 149

Page 111: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Platte

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Aeronautics Projects Fiscal Year 2022Federal State Other Total

1 WHEATLAND REHABILITATE APRON, PH I 300 20 13 333

1 WHEATLANDSEAL COAT AND MARK AIRSIDE PAVEMENTS 0 249 28 277

1 WHEATLAND REHABILITATE APRON, PH II 0 240 60 300

FY TOTAL: 300 509 101 910

Transportation Projects Fiscal Year 2023Federal State Other Total

1 STP 45.10 0109027 BOSLER TO WHEATLAND * WY 312 JUNCTION 109 45.10 52.20 7.10 PAVEMENT REHABILITATION 2,694 283 0 2,9771 NHPPI 109.11 I252169 GLENDO * NORTHBOUND LANE 25 109.11 114.78 5.67 PAVEMENT REHABILITATION 6,051 472 0 6,523

FY TOTAL: 12.77 8,745 755 0 9,500

Aero Comm Dist Location Character of Work

Cost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Page 106 of 149

Page 112: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

SHERIDAN COUNTY

KEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

I901117I901116

N372041

I901120

B184031

CN03045

CN03044

CN03046

CD17408CD16415

N372045

P601033 1708012

Page 107 of 149

Page 113: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Sheridan Fiscal Year 2018

Transportation Projects

Federal State Other Total

4 RHQ-SL18 0.00 B184031 CLEARMONT CLEARMONT; MEADE AVEBIG HORN SUBDIVISION 16453 99.97 99.97 0.00 RAILROAD 0 385 0 385

4 RHC-P 0.00 CN03044 SHERIDAN COUNTY * COUNTY ROAD 173/TAYLOR ROAD 098817M 8240 0.05 0.05 0.00 RAILROAD 226 0 25 251

4 RHC-P 0.00 CN03045 SHERIDAN COUNTY * COUNTY ROAD 114 098818U 8224 1.19 1.19 0.00 RAILROAD 181 0 20 2014 RHC-P 0.00 CN03046 SHERIDAN COUNTY * COUNTY ROAD 1211 098824X 8270 13.15 13.15 0.00 RAILROAD 181 0 20 201

4 CD 0.00 CD17408 DAYTON MAIN STREET & TONGUE RIVER ROAD LPA - TOWN OF DAYTON 37 82.79 83.45 0.66 COMMUNITY DEVELOPMENT 478 0 120 598

4 CD 0.00 CD16415 SHERIDAN

SHERIDAN - DOME LOOP TO WOODLAND PARK; SOUTH TO FLEMING BLVDLPA - CITY OF SHERIDAN 60 26.03 27.36 1.33 COMMUNITY DEVELOPMENT 225 0 56 281

FY TOTAL: 1.99 1,291 385 241 1,917

Transit Projects

Federal State Other Total

4 SHERIDAN CAPITAL/OPERATING/ADMIN/PM 0 72 33 105

4 SHERIDAN CAPITAL/OPERATING/ADMIN/PM 307 0 170 477

4 SHERIDANPURCHASE MEDIUM-DUTY MID SIZE BUS 7 0 61 68

4 SHERIDAN PLANNING PROJECT 45 0 5 50

FY TOTAL: 359 72 269 700

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Trans Comm Dist Location Eligible Provider

Funding Source

REHABILITATION ENTERPRISES OF NE WYOMING

SHERIDAN SR CENTER - GOOSE CREEK TRANSITSHERIDAN SR CENTER - GOOSE CREEK TRANSIT

SHERIDAN SR CENTER - GOOSE CREEK TRANSIT

STATE

5305e

5311

5310

Cost $1000Character of Work

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 108 of 149

Page 114: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Sheridan Fiscal Year 2018

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Aeronautics Projects

Federal State Other Total

5 SHERIDAN REHABILITATE EDGE LIGHTING 700 28 19 747

5 SHERIDAN REHABILITATE EDGE LIGHTING 0 255 28 283

FY TOTAL: 700 283 47 1,030

Character of WorkCost $1000Aero Comm

Dist Location

Page 109 of 149

Page 115: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Sheridan

Transportation Projects Fiscal Year 2019Federal State Other Total

4 NHPPI 5.00 I901116 MONTANA TO RANCHESTER RANCHESTER NORTH 90 5.00 10.47 5.47 PAVEMENT REHABILITATION 7,077 552 0 7,629FY TOTAL: 5.47 7,077 552 0 7,629

Aeronautics Projects Fiscal Year 2019Federal State Other Total

5 SHERIDAN

COMMERCIAL TERMINAL BUILDING 1,500 60 40 1,600

5 SHERIDAN

COMMERCIAL TERMINAL BUILDING 0 572 143 715

FY TOTAL: 1,500 632 183 2,315

Aeronautics Projects Fiscal Year 2020Federal State Other Total

5 SHERIDAN REPAIR R/W 15 SAFETY AREA 1,000 40 27 1,067

5 SHERIDANSEAL COAT AND MARK AIRSIDE PAVEMENTS 0 578 64 642

5 SHERIDANSEAL COAT AND MARK LANDSIDE PAVEMENT 0 45 5 50

FY TOTAL: 1,000 663 96 1,759

Character of WorkCost $1000

Character of WorkCost $1000Aero Comm

Dist Location

Aero Comm Dist Location

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 110 of 149

Page 116: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Sheridan

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2021Federal State Other Total

4 NHPPI 33.60 I901120 SHERIDAN TO BUFFALOPRAIRIE DOG SECTION WESTBOUND LANE 90 33.60 45.10 11.50 PAVEMENT REHABILITATION 5,403 422 0 5,825

4 SCP-TC 89.07 N372041 RANCHESTER TO INTERSTATE 90 BNRR SEPARATION 37 89.07 89.96 0.89 BRIDGE REPLACEMENT 0 10,096 0 10,096FY TOTAL: 12.39 5,403 10,518 0 15,921

Aeronautics Projects Fiscal Year 2021Federal State Other Total

5 SHERIDANREHABILITATE TAXIWAY (AB INTERSECTION) 169 7 5 180

5 SHERIDAN REHABILITATE RUNWAY 6/24 0 1,574 393 1,967

5 SHERIDAN REHABILITATE TAXIWAY 0 192 48 240

FY TOTAL: 169 1,772 446 2,387

Transportation Projects Fiscal Year 2022Federal State Other Total

4 NHPPU 25.94 1708012 SHERIDAN COFFEEN AVENUE 60 25.94 29.31 3.37 RECONSTRUCTION 13,236 1,391 0 14,6274 NHPPI 0.00 I901117 MONTANA TO RANCHESTER MONTANTA LINE SOUTH 90 0.00 5.00 5.00 PAVEMENT REHABILITATION 4,781 373 0 5,154

FY TOTAL: 8.37 18,017 1,764 0 19,781

Character of WorkCost $1000Aero Comm

Dist Location

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Page 111 of 149

Page 117: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Sheridan

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Aeronautics Projects Fiscal Year 2022Federal State Other Total

5 SHERIDAN CONSTRUCT T/W A, DESIGN & EA 250 0 17 267

5 SHERIDANRECONSTRUCT TAXIWAYS A2 AND A3 0 970 243 1,213

5 SHERIDANMARK AIRSIDE PAVEMENTS - MATERIALS ONLY 0 47 5 52

FY TOTAL: 250 1,017 264 1,532

Transportation Projects Fiscal Year 2023Federal State Other Total

4 NHPP 22.97 P601033 SHERIDAN MAIN-DOW-BURKITT 60 22.97 23.51 0.54 PAVEMENT RESURFACE 8,374 880 0 9,254FY TOTAL: 0.54 8,374 880 0 9,254

Character of WorkCost $1000Aero Comm

Dist Location

Begin RM

End RM Length Character of Work

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Page 112 of 149

Page 118: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Sheridan

Transportation Projects Fiscal Year 2018Federal State Other Total

4 NHPP 38.00 N372045BURGESS JUNCTION TO BIG HORN COUNTY

OFF ROAD VEHICLE TRAIL WITHIN RIGHT OF WAY 37 38.00 47.00 9.00 ENVIRONMENTAL 23 2 0 25

FY TOTAL: 9.00 23 2 0 25

STATE TRANSPORTATION IMPROVEMENT PROJECTSPRELIMINARY ENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 113 of 149

Page 119: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

SUBLETTE COUNTYKEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

1800015

P114037

N132106

CD16309

CD17305

N132018

Page 114 of 149

Page 120: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Sublette Fiscal Year 2018

Transportation Projects

Federal State Other Total

3 CD 0.00 CD16309 PINEDALE PINEDALE; VARIOUS LOCATIONS LPA - CITY OF PINEDALE 25723 100.54 101.20 0.65 COMMUNITY DEVELOPMENT 188 0 47 235

3 CD 0.00 CD17305 BIG PINEY BIG PINEY; WY 350/PINEY DRIVE 1800 0.45 1.08 0.63 COMMUNITY DEVELOPMENT 84 0 21 1053 SCP-TC 119.50 P114037 BIG PINEY TO DANIEL COTTONWOOD CREEK 11 119.50 127.40 7.90 PAVEMENT REHABILITATION 0 3,134 0 3,134

FY TOTAL: 9.18 272 3,134 68 3,474

Transit Projects

Federal State Other Total3 PINEDALE RENDEZVOUS POINTE CAPITAL/OPERATING/ADMIN/PM 0 47 27 73

3 BIG PINEY S.W. SUBLETTE COUNTY PIONEERS CAPITAL/OPERATING/ADMIN/PM 0 16 8 24

FY TOTAL: 0 62 35 97

Aeronautics Projects

Federal State Other Total

2 PINEDALERECONSTRUCT N GA APRON, DESIGN 300 20 13 333

2 BIG PINEYUPGRADE R/W 13/31 ELECTRICAL SYSTEM 750 50 33 833

FY TOTAL: 1,050 70 47 1,167

Cost $1000

Aero Comm Dist Location Character of Work

Cost $1000

Funding Source Character of WorkSTATE

STATE

Trans Comm Dist Location Eligible Provider

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 115 of 149

Page 121: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Sublette

Transportation Projects Fiscal Year 2019Federal State Other Total

3 NHPP 120.18 N132106 DANIEL JUNCTION TO HOBACK RIM SOUTH 13 120.18 128.90 8.72 PAVEMENT REHABILITATION 3,306 347 0 3,653FY TOTAL: 8.72 3,306 347 0 3,653

Aeronautics Projects Fiscal Year 2019Federal State Other Total

2 PINEDALE RECONSTRUCT N GA APRON 2,300 153 102 2,556

2 PINEDALE CONSTRUCT SRE BUILDING 0 333 37 370

FY TOTAL: 2,300 486 139 2,926

Aeronautics Projects Fiscal Year 2020Federal State Other Total

2 BIG PINEY INSTALL HELIPADS 150 0 17 167

2 PINEDALE REHABILITATE R/W, DESIGN 150 10 7 167

FY TOTAL: 300 10 23 333

Aeronautics Projects Fiscal Year 2021Federal State Other Total

2 PINEDALE REHABILITATE R/W 3,650 243 162 4,056

FY TOTAL: 3,650 243 162 4,056

Character of WorkCost $1000

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Aero Comm Dist Location

Aero Comm Dist Location

Cost $1000

Aero Comm Dist Location Character of Work

Cost $1000

Character of Work

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 116 of 149

Page 122: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Sublette

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2022Federal State Other Total

3 SCP-TC 0.25 1800015 BIG PINEY BIG PINEY WEST/WY 350 1800 0.25 5.06 4.81 PAVEMENT REHABILITATION 0 3,749 0 3,749FY TOTAL: 4.81 0 3,749 0 3,749

Transportation Projects Fiscal Year 2023Federal State Other Total

3 NHPP 112.60 N132018 DANIEL JUNCTION TO BONDURANT * MUDDY CREEK 13 112.60 119.50 6.90 PAVEMENT REHABILITATION 3,083 324 0 3,407FY TOTAL: 6.90 3,083 324 0 3,407

Project LengthEnd RM Character of Work

Cost $1000

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

General Location Detail Location LRS IDBegin

RMTrans Comm

Dist

Page 117 of 149

Page 123: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

I803146I802200

SWEETWATER COUNTY

I803147

I802204B123014

I802201

I802205I802199

I802220

N131056

I802206

KEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

B183016

CD16308

Page 118 of 149

Page 124: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Sweetwater Fiscal Year 2018

Transportation Projects

Federal State Other Total2 NHPPI 120.32 I802200 ROCK SPRINGS TO RAWLINS POINT OF ROCKS WEST 80 120.32 130.00 9.68 PAVEMENT RESURFACE 16,495 1,734 0 18,229

2 NHPPI 186.62 I803146 CRESTON JUNCTION TO RAWLINSCOUNTY LINE WEST EASTBOUND LANE 80 186.62 199.05 12.43 PAVEMENT REHABILITATION 8,332 650 0 8,982

2 CD 0.00 CD16308 GREEN RIVER

GREEN RIVER; E TETON BLVD & BRIDGER DR; W TETON BLVD & CROSS BOW DR & CUMORAH WAYLPA - CITY OF GREEN RIVER 17045 101.51 101.51 0.00 ADA IMPROVEMENTS 134 0 33 167

2 HSIP 0.00 B183016 TRANSPORTATION DISTRICT 3 ROCK SPRINGS STREETSGRANT/CENTER/DEWAR 53 104.54 104.54 0.00 TRAFFIC SYSTEMS 995 105 0 1,100

FY TOTAL: 22.11 25,956 2,489 33 28,478

Transit Projects

Federal State Other Total

2 ROCK SPRINGS CAPITAL/OPERATING/ADMIN/PM 460 0 260 720

FY TOTAL: 460 0 260 720

Aeronautics Projects

Federal State Other Total

2 ROCK SPRINGS CONSTRUCT GA TERMINAL, PH III 0 110 73 183

FY TOTAL: 0 110 73 183

Trans Comm Dist Location Eligible Provider

5311SWEETWATER COUNTY TRANSIT AUTHORITY - STAR

Cost $1000

Aero Comm Dist Location Character of Work

Cost $1000

Funding Source Character of Work

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 119 of 149

Page 125: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Sweetwater

Aeronautics Projects Fiscal Year 2019Federal State Other Total

2 ROCK SPRINGSREHABILITATE T/W A & B AND UPGRADE LIGHTING 2,500 100 67 2,667

2 ROCK SPRINGSACQUIRE CONSTANT FRICTION MEASURING EQUIPMENT 0 4 0 5

FY TOTAL: 2,500 104 67 2,671

Transportation Projects Fiscal Year 2020Federal State Other Total

2 NHPPI 77.34 I802205 GRANGER TO GREEN RIVERLA BARGE INTERSECTION WEST; WESTBOUND LANE 80 77.34 83.00 5.66 PAVEMENT REHABILITATION 9,619 751 0 10,370

FY TOTAL: 5.66 9,619 751 0 10,370

Aeronautics Projects Fiscal Year 2020Federal State Other Total

2 GREEN RIVERCONSTRUCT WILDLIFE FENCE AND GATE 0 332 37 369

2 ROCK SPRINGSACQUIRE SRE AND UPGRADE BEACON 675 27 18 720

2 ROCK SPRINGS

COMMERCIAL TERMINAL, DESIGN 325 13 9 347

2 ROCK SPRINGSCONSTRUCT FUEL SYSTEM, SITE PREPARATION 0 192 48 240

FY TOTAL: 1,000 564 112 1,676

Cost $1000

Trans Comm Dist

Aero Comm Dist

Character of Work

Character of Work

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Cost $1000Aero Comm Dist Location

Begin RM

End RM LengthProject General Location Detail Location LRS ID

Location

Character of WorkCost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 120 of 149

Page 126: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Sweetwater

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2021Federal State Other Total

2 NHPPI 107.65 I802204 ROCK SPRINGS TO RAWLINS ROCK SPRINGS EAST 80 107.65 120.30 12.65 PAVEMENT REHABILITATION 23,947 1,869 0 25,816FY TOTAL: 12.65 23,947 1,869 0 25,816

Aeronautics Projects Fiscal Year 2021Federal State Other Total

2 ROCK SPRINGSREHABILITATE AND EXPAND COMMERCIAL TERMINAL, PH I 0 570 143 713

2 ROCK SPRINGSREHABILITATE R/W 3/21 AND T/W LIGHTING 0 156 17 173

2 ROCK SPRINGSREHABILITATE AND EXPAND COMMERCIAL TERMINAL, PH I 1,000 40 27 1,067

2 ROCK SPRINGSSEAL COAT AND MARK PAVEMENTS 0 360 40 400

FY TOTAL: 1,000 1,126 226 2,352

Transportation Projects Fiscal Year 2022Federal State Other Total

2 NHPP 57.04 I802206 EVANSTON TO GREEN RIVER * COUNTY LINE WEST 80 57.04 65.42 8.38 PAVEMENT REHABILITATION 16,670 1,301 0 17,9712 NHPPI 138.00 I803147 ROCK SPRINGS TO RAWLINS BITTER CREEK SECTION 80 138.00 143.00 5.00 PAVEMENT REHABILITATION 11,901 929 0 12,830

FY TOTAL: 13.38 28,571 2,230 0 30,801

End RM Length

Cost $1000Aero Comm Dist Location

Character of WorkCost $1000Trans Comm

Dist Project General Location Detail Location

Begin RM Character of Work

Begin RM

End RM LengthLRS ID

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Character of Work

Page 121 of 149

Page 127: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Sweetwater

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Aeronautics Projects Fiscal Year 2022Federal State Other Total

2 ROCK SPRINGSREHABILITATE AND EXPAND COMMERCIAL TERMINAL, PH II 0 613 153 767

2 ROCK SPRINGSREHABILITATE AND EXPAND COMMERCIAL TERMINAL, PH II 1,000 40 27 1,067

FY TOTAL: 1,000 653 180 1,833

Transportation Projects Fiscal Year 2023Federal State Other Total

2 NHPPI 83.00 I802201 GRANGER TO GREEN RIVER GREEN RIVER WEST 80 83.00 86.00 3.00 PAVEMENT MAINTENANCE 1,692 178 0 1,8702 NHPP 21.50 N131056 ROCK SPRINGS TO FARSON US 191 13 21.50 32.70 11.20 PAVEMENT REHABILITATION 3,902 410 0 4,312

FY TOTAL: 14.20 5,594 588 0 6,182

Transportation Projects Fiscal Year Future YearFederal State Other Total

2 STPU-RO 0.00 B123014 ROCK SPRINGS INTERCHANGE ROAD NA 0.00 0.00 0.00 RECONSTRUCTION 18,389 0 1,933 20,3222 NHPPI-PM 92.14 I802199 GREEN RIVER TO ROCK SPRINGS GREEN RIVER EAST 80 92.14 99.37 7.23 PAVEMENT MAINTENANCE 1,155 90 0 1,245

2 NHPPI 101.16 I802220 ROCK SPRINGS I-80 INTERCHANGE & INTERCHANGE RD STR NO. APR 80 101.16 101.16 0.00 RECONSTRUCTION 16,934 1,322 0 18,256

FY TOTAL: 7.23 36,478 1,412 1,933 39,823

Character of Work

Begin RM

End RM Length Character of Work

Begin RM

End RM Length Character of Work

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Cost $1000

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Aero Comm Dist Location

Page 122 of 149

Page 128: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

TETON COUNTY

KEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

2001018

N104079N104066

N104092

0C22034

HR17302

CD16310

CD14007

2000058

Page 123 of 149

Page 129: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Teton Fiscal Year 2018

Transportation Projects

Federal State Other Total

3 CD 0.00 CD14007 JACKSON

JACKSON/US 26/89LPA - TOWN OF JACKSONLOCAL OVERMATCH $775,000 NA 0.00 0.00 0.00 COMMUNITY DEVELOPMENT 320 0 775 1,095

3 CD 0.00 CD16310 TETON VILLAGE

TETON VILLAGE ROAD MCCOLLISTER TO GRANITE LOOP ROAD AND VILLAGE DRIVE LPA - TETON VILLAGE ASSOCIATION 8651 0.03 0.29 0.26 COMMUNITY DEVELOPMENT 89 0 22 111

3 STP 0.00 2001018 WILSON TO TETON VILLAGE TETON VILLAGE ROAD/WY 390 2001 0.00 7.71 7.71 PAVEMENT REHABILITATION 2,642 278 0 2,920

3 STP-BROS 5.92 0C22034 TETON COUNTY CATTLEMEN'S BRIDGE GROS VENTRE/CR #22-4/STR NO. DEK 8649 5.92 6.08 0.16 BRIDGE REPLACEMENT 3,156 0 332 3,488

3 HRRR 0.00 HR17302 TETON COUNTY ALTA SKI HILL ROADLPA - TETON COUNTY 8659 0.00 8.00 8.00 ITS 81 0 9 90

FY TOTAL: 16.13 6,288 278 1,138 7,704

Transit Projects

Federal State Other Total3 JACKSON SENIOR CENTER OF JACKSON HOLE CAPITAL/OPERATING/ADMIN/PM 0 32 19 52

3 JACKSON CHILDREN'S LEARNING CENTER CAPITAL/OPERATING/ADMIN/PM 0 23 18 41

3 JACKSON TOWN OF JACKSON - START CAPITAL/OPERATING/ADMIN/PM 1,747 0 913 2,660

3 JACKSON TOWN OF JACKSON - STARTPURCHASE HEAVY-DUTY LARGE BUS 360 0 90 450

3 JACKSON TOWN OF JACKSON - STARTPURCHASE MEDIUM-DUTY MID SIZE BUS 60 0 15 75

3 JACKSON ALLTRANS INTERCITY BUS OPERATING 401 0 308 708

FY TOTAL: 2,568 56 1,362 3,986

STATE

Funding Source Character of Work

Cost $1000

STATE

5311f

5311

5339

5339

Trans Comm Dist Location Eligible Provider

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 124 of 149

Page 130: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Teton Fiscal Year 2018

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Aeronautics Projects

Federal State Other Total

2 JACKSONRECONSTRUCT COMMERCIAL APRON, PH VI 3,000 120 80 3,200

2 JACKSONCONSTRUCT SRE/ARFF BUILDING, PH III 3,200 128 85 3,413

FY TOTAL: 6,200 248 165 6,613

Character of WorkCost $1000Aero Comm

Dist Location

Page 125 of 149

Page 131: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Teton

Transportation Projects Fiscal Year 2019Federal State Other Total

3SIB-ACNHPP 141.59 N104066 HOBACK TO JACKSON SNAKE RIVER SOUTH SECTION 10 141.59 145.05 3.46 RECONSTRUCTION 36,912 3,879 0 40,791

3 NHPP-E 141.70 N104079 HOBACK TO JACKSON SNAKE RIVER SOUTH SECTION 10 141.70 145.50 3.80 COMMUNITY DEVELOPMENT 244 0 26 270FY TOTAL: 7.26 37,156 3,879 26 41,061

Aeronautics Projects Fiscal Year 2019Federal State Other Total

2 JACKSON

REHABILITATE ACCESS ROAD AND IMPROVE LANDSIDE STORM DRAINAGE 1,600 64 43 1,707

2 JACKSON REHABILITATE RUNWAY, DESIGN 600 0 40 640

FY TOTAL: 2,200 64 83 2,347

Transportation Projects Fiscal Year 2020Federal State Other Total

3 NHPP 148.71 N104092 JACKSON TO HOBACK JACKSON SOUTH 10 148.71 151.92 3.21 PAVEMENT REHABILITATION 2,345 246 0 2,591FY TOTAL: 3.21 2,345 246 0 2,591

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

LocationAero Comm

Dist

Trans Comm Dist Project General Location Detail Location

Character of WorkCost $1000

Cost $1000LRS ID

Begin RM

End RM Length Character of Work

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 126 of 149

Page 132: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Teton

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Aeronautics Projects Fiscal Year 2020Federal State Other Total

2 JACKSONACQUIRE SRE (TOW BEHIND BROOMS) 0 765 85 850

2 JACKSON REHABILITATE RUNWAY 7,200 288 192 7,680

2 JACKSONCONDUCT PLANNING STUDY, MASTER PLAN 500 0 33 533

FY TOTAL: 7,700 1,053 310 9,063

Aeronautics Projects Fiscal Year 2021Federal State Other Total

2 JACKSONACQUIRE SRE (TRACTOR AND BROOM) 0 765 85 850

2 JACKSON MARK AIRSIDE PAVEMENTS 0 108 12 120

2 JACKSON REHABILITATE TAXIWAY 4,200 168 112 4,480

2 JACKSON

REHABILITATE ACCESS ROAD AND IMPROVE LANDSIDE STORM DRAINAGE 0 397 397 794

FY TOTAL: 4,200 1,438 606 6,244

Aeronautics Projects Fiscal Year 2022Federal State Other Total

2 JACKSON RECONSTRUCT GA APRON 2,200 88 59 2,347

FY TOTAL: 2,200 88 59 2,347

Aero Comm Dist Location

Cost $1000Character of Work

Cost $1000

Character of WorkCost $1000

LocationAero Comm

Dist

Aero Comm Dist Location Character of Work

Page 127 of 149

Page 133: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Teton

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2023Federal State Other Total

3 STP 3.76 2000058 JACKSON TO WILSON WY 22 2000 3.76 4.06 0.30 RECONSTRUCTION 17,277 1,816 0 19,093FY TOTAL: 0.30 17,277 1,816 0 19,093

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Page 128 of 149

Page 134: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Teton

Transportation Projects Fiscal Year 2018Federal State Other Total

3 SCP 5.50 2000056 WILSON TO IDAHO LOWER VEHICLE ARRESTOR 2000 5.50 7.00 1.50 SAFETY IMPROVEMENTS 0 200 0 200FY TOTAL: 1.50 0 200 0 200

STATE TRANSPORTATION IMPROVEMENT PROJECTSPRELIMINARY ENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 129 of 149

Page 135: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

UINTA COUNTYKEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

P111013 I801182

P1610262104001

CN19036

2100023

P511019

Page 130 of 149

Page 136: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Uinta Fiscal Year 2018

Transportation Projects

Federal State Other Total3 SCP-TC 0.00 2104001 MOUNTAIN VIEW TO MILLBURNE WY 411 2104 0.00 4.04 4.04 PAVEMENT REHABILITATION 0 2,378 0 2,378

FY TOTAL: 4.04 0 2,378 0 2,378

Transit Projects

Federal State Other Total3 EVANSTON UINTA SENIOR CITIZENS CAPITAL/OPERATING/ADMIN/PM 0 37 21 57

3 EVANSTON WYTRANS RTAP FUNDING 66 0 0 66

FY TOTAL: 66 37 21 123

Aeronautics Projects

Federal State Other Total2 FORT BRIDGER RECONSTRUCT APRON, PH I 726 48 32 807

FY TOTAL: 726 48 32 807

Cost $1000

Aero Comm Dist Location Character of Work

Cost $1000

Funding Source Character of WorkSTATE

5311

Trans Comm Dist Location Eligible Provider

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 131 of 149

Page 137: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Uinta

Transportation Projects Fiscal Year 2019Federal State Other Total

3 NHPPI 49.06 I801182 LYMAN TO GRANGER COUNTY LINE WEST 80 49.06 57.04 7.98 PAVEMENT REHABILITATION 14,670 1,145 0 15,815FY TOTAL: 7.98 14,670 1,145 0 15,815

Aeronautics Projects Fiscal Year 2019Federal State Other Total

2 EVANSTON RECONSTRUCT GA APRON, PH IV 450 30 20 500

2 EVANSTON RECONSTRUCT GA APRON 0 380 20 400

FY TOTAL: 450 410 40 900

Transportation Projects Fiscal Year 2020Federal State Other Total

3 STP-BROS 1.00 CN19036 UINTA COUNTY

BRIDGE OVER SUPLHUR CREEK, COUNTY ROAD 19-159; STR NO. FKL 8702 1.00 1.00 0.00 BRIDGE REPLACEMENT 318 0 33 351

3 SCP-TC 10.23 P111013LAZEART JUNCTION TO KEMMERER MUDDY CREEK 11 10.23 18.42 8.19 PAVEMENT REHABILITATION 0 2,486 0 2,486

FY TOTAL: 8.19 318 2,486 33 2,837

Transportation Projects Fiscal Year 2021Federal State Other Total

3 STP 2.46 2100023 EVANSTON TO UTAH HILLIARD FLAT 2100 2.46 12.84 10.38 PAVEMENT REHABILITATION 3,905 410 0 4,3152 STPU 4.32 P511019 EVANSTON * HARRISON DRIVE 51 4.32 4.94 0.62 PAVEMENT REHABILITATION 905 95 0 1,000

FY TOTAL: 11.00 4,810 505 0 5,315

Character of WorkCost $1000Begin

RMEnd RM Length

Cost $1000

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Character of WorkCost $1000Aero Comm

Dist Location

Trans Comm Dist Project General Location Detail Location

Trans Comm Dist Project General Location Detail Location

LRS ID

Begin RM

End RM Length Character of WorkLRS ID

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 132 of 149

Page 138: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Uinta

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Aeronautics Projects Fiscal Year 2021Federal State Other Total

2 EVANSTONSEAL COAT AND MARK AIRSIDE PAVEMENT 0 349 39 388

2 EVANSTON REHABILITATE RUNWAY, DESIGN 150 10 7 167

FY TOTAL: 150 359 45 555

Aeronautics Projects Fiscal Year 2022Federal State Other Total

2 FORT BRIDGER EXPAND APRON 600 0 67 667

2 EVANSTON REHABILITATE RUNWAY 4,150 277 184 4,611

FY TOTAL: 4,750 277 184 4,611

Transportation Projects Fiscal Year 2023Federal State Other Total

3 STP 110.63 P161026 MOUNTAIN VIEW TO LONE TREE WY 414 16 110.63 120.00 9.37 PAVEMENT REHABILITATION 2,438 256 0 2,694FY TOTAL: 9.37 2,438 256 0 2,694

Trans Comm Dist

Character of WorkCost $1000

Aero Comm Dist Location

Aero Comm Dist Location

Character of WorkCost $1000

Character of WorkCost $1000

Project General Location Detail Location LRS IDBegin

RMEnd RM Length

Page 133 of 149

Page 139: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

WASHAKIE COUNTY

N361062

N361068

KEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

2202021

2200019

2203017

Page 134 of 149

Page 140: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Washakie Fiscal Year 2018

Transit Projects

Federal State Other Total5 TENSLEEP TENSLEEP SENIOR CENTER CAPITAL/OPERATING/ADMIN/PM 0 22 10 31

5 WORLAND WASHAKIE COUNTY SENIOR CENTER CAPITAL/OPERATING/ADMIN/PM 0 49 25 74

5 WORLAND WASHAKIE COUNTY SENIOR CENTER BUS GARAGE PROJECT 192 0 48 240

FY TOTAL: 192 71 83 345

Aeronautics Projects

Federal State Other Total

4 WORLAND RECONSTRUCT WILDLIFE FENCE 300 20 13 333

FY TOTAL: 300 20 13 333

STATE

5339

STATE

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Location Eligible Provider

Funding Source Character of Work

Cost $1000

Cost $1000Aero Comm Dist Location Character of Work

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 135 of 149

Page 141: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Washakie

Transportation Projects Fiscal Year 2019Federal State Other Total

5 STP 0.50 2203017 TEN SLEEP BIG TRAILS SECTION 2203 0.50 15.00 14.50 PAVEMENT MAINTENANCE 724 76 0 800

5 NHPP 18.53 N361062 WORLAND TO TEN SLEEPLITTLE COTTONWOOD CREEK SECTION 36 18.53 23.74 5.21 PAVEMENT REHABILITATION 2,924 307 0 3,231

FY TOTAL: 19.71 3,648 383 0 4,031

Aeronautics Projects Fiscal Year 2019Federal State Other Total

4 WORLAND MARK AIRSIDE PAVEMENT 0 226 25 251

FY TOTAL: 0 226 25 251

Transportation Projects Fiscal Year 2020Federal State Other Total

5 NHPP 26.76 N361068 WORLAND TO BUFFALO TEN SLEEP EAST 36 26.76 34.08 7.32 PAVEMENT REHABILITATION 2,908 306 0 3,214FY TOTAL: 7.32 2,908 306 0 3,214

Aeronautics Projects Fiscal Year 2020Federal State Other Total

4 WORLAND ACQUIRE MOWING EQUIPMENT 0 139 15 154

FY TOTAL: 0 139 15 154

Character of WorkCost $1000Aero Comm

Dist Location

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Trans Comm Dist Detail Location LRS ID

Begin RM Character of Work

Cost $1000Project General Location

End RM Length

Character of WorkCost $1000Trans Comm

Dist

Character of WorkCost $1000Aero Comm

Dist Location

Detail Location LRS IDProject General LocationEnd RM Length

Begin RM

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 136 of 149

Page 142: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Washakie

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2021Federal State Other Total

5 STP 4.14 2202021 WORLAND TO MANDERSONWEST RIVER ROAD SECTION3 STRUCTURES 2202 4.14 5.50 1.36 BRIDGE REPLACEMENT 2,262 238 0 2,500

FY TOTAL: 1.36 2,262 238 0 2,500

Aeronautics Projects Fiscal Year 2022Federal State Other Total

4 WORLAND WIDEN TAXILANE C 600 40 27 667

FY TOTAL: 600 40 27 667

Transportation Projects Fiscal Year 2023Federal State Other Total

5 STP 0.00 2200019 GOOSEBERRY CREEK ROAD * WY 431 2200 0.00 5.00 5.00 PAVEMENT RESURFACE 1,357 143 0 1,500FY TOTAL: 5.00 1,357 143 0 1,500

Aero Comm Dist Location Character of Work

Cost $1000

LengthTrans Comm

Dist

Trans Comm Dist Detail Location LRS ID

Begin RM

End RMDetail Location LRS IDProject General Location Character of Work

Cost $1000

Character of WorkCost $1000

Project General LocationEnd RM Length

Begin RM

Page 137 of 149

Page 143: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

WESTON COUNTYKEY TO FY - 2018 STIP

2018

FUTURE

TRANSIT

AERONAUTICS

N855047

N442077

N855049

N491006CD16414

2303017

CM17409

Page 138 of 149

Page 144: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Weston Fiscal Year 2018

Transportation Projects

Federal State Other Total

6 CM 0.00 CM17409 WESTON COUNTY GRIEVES ROADLPA - WESTON COUNTY 8912 0.00 15.00 15.00 ENVIRONMENTAL 190 0 48 238

6 CD 0.00 CD16414 NEWCASTLE

US 16 WEST ALONG NEWCASTLE COUNTRY CLUB TO SADDLE SUBDIVISION LPA - CITY OF NEWCASTLE 44 247.45 247.67 0.22 COMMUNITY DEVELOPMENT 225 0 56 281

6 SCP-TC 246.59 N442077 NEWCASTLE NEWCASTLE MARGINAL 44 246.59 250.82 4.23 PAVEMENT REHABILITATION 0 6,010 0 6,0106 RHC 1.079 N491006 NEWCASTLE * US 16/MAIN STREET 064920E 49 1.08 1.08 0.00 RAILROAD 51 0 51 102

FY TOTAL: 19.45 466 6,010 155 6,631

Transit Projects

Federal State Other Total6 NEWCASTLE WESTON COUNTY SENIOR CENTER CAPITAL/OPERATING/ADMIN/PM 0 79 45 124

FY TOTAL: 0 79 45 124

Funding Source Character of WorkSTATE

Cost $1000Trans Comm Dist Location Eligible Provider

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 139 of 149

Page 145: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Weston

Transportation Projects Fiscal Year 2019Federal State Other Total

6 STP 0.00 2303017 FOUR CORNERS TO SUNDANCE WY 585 2303 0.00 9.75 9.75 PAVEMENT REHABILITATION 2,852 300 0 3,152FY TOTAL: 9.75 2,852 300 0 3,152

Aeronautics Projects Fiscal Year 2019Federal State Other Total

5 NEWCASTLEEXPAND HANGAR APRON AND TAXILANE 450 0 50 500

FY TOTAL: 450 0 50 500

Transportation Projects Fiscal Year 2020Federal State Other Total

6 NHPP 229.30 N855047 NEWCASTLE TO FOUR CORNERS NEWCASTLE NORTH 85 229.30 237.04 7.74 PAVEMENT REHABILITATION 3,376 355 0 3,731FY TOTAL: 7.74 3,376 355 0 3,731

Aeronautics Projects Fiscal Year 2020Federal State Other Total

5 NEWCASTLE MARK AIRSIDE PAVEMENTS 0 90 10 100

FY TOTAL: 0 90 10 100

Begin RM

End RM Length Character of Work

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Character of WorkCost $1000

Character of WorkCost $1000Aero Comm

Dist Location

Aero Comm Dist Location

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 140 of 149

Page 146: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Weston

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2021Federal State Other Total

6 NHPP 202.56 N855049 LUSK TO NEWCASTLE US 85 85 202.56 215.50 12.94 PAVEMENT REHABILITATION 6,242 656 0 6,898FY TOTAL: 12.94 6,242 656 0 6,898

Aeronautics Projects Fiscal Year 2022Federal State Other Total

5 NEWCASTLE EXTEND WILDLIFE FENCE 450 30 20 500

FY TOTAL: 450 30 20 500

Character of WorkCost $1000

Aero Comm Dist Location Character of Work

Cost $1000

Begin RM

End RM Length

Trans Comm Dist Project General Location Detail Location LRS ID

Page 141 of 149

Page 147: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Various Fiscal Year 2018

Transportation Projects

Federal State Other TotalM STP-PM 0.00 B182025 TRANSPORTATION DISTRICT 2 VARIOUS LOCATIONS 25 174.00 174.27 0.27 PAVEMENT MAINTENANCE 2,262 238 0 2,500

M HSIP 0.00 B183032 TRANSPORTATION DISTRICT 3 I-80 VARIOUS LOCATIONSEPOXY STRIPING 13 2.30 2.30 0.00 SAFETY IMPROVEMENTS 707 55 0 762

M STP-BR 0.00 B184020 TRANSPORTATION DISTRICT 4 VARIOUS LOCATIONS 90 169.43 169.53 0.10 STRUCTURE REPAIR 724 76 0 800M NHPPI-GM 220.00 I254163 CASPER TO KAYCEE I-25 25 220.00 260.00 40.00 DRAINAGE REPAIR 784 61 0 845M CMP-PM 0.00 B182038 TRANSPORTATION DISTRICT 2 * VARIOUS LOCATIONS 253 0.00 10.90 10.90 PAVEMENT MAINTENANCE 0 200 0 200

M GCP 0.00 B189137 STATEWIDE * MISCELLANEOUS RAILROAD WORK 25 12.70 12.70 0.00 RAILROAD 0 100 0 100

M CD 0.00 CD16901 STATEWIDE NON-INFRASTRUCTURE PROJECT 25 12.70 12.70 0.00 COMMUNITY DEVELOPMENT 40 0 0 40M STP 0.00 FS18001 STATEWIDE * FOREST SERVICE OFFICER 25 12.70 12.70 0.00 STUDIES 140 15 0 155

M STP-BR 0.00 IS18001 STATEWIDE * BRIDGE INSPECTION ON-SYSTEM 25 12.70 12.70 0.00 STUDIES 1,517 159 0 1,676

M STP-BROS 0.00 IS18002 STATEWIDE * BRIDGE INSPECTION OFF SYSTEM 25 12.70 12.70 0.00 STUDIES 495 52 0 547

M CM 0.00 IT18001 STATEWIDE * INTELLIGENT TRANSPORTATION SYSTEM 25 12.70 12.70 0.00 STUDIES 5,899 620 0 6,519

M STP-BR 0.00 MS18001 STATEWIDE * BRIDGE MANAGEMENT SYSTEM 25 12.70 12.70 0.00 STUDIES 270 28 0 298

M NRT 0.00 NRT1801 STATEWIDE

* NATIONAL RECREATIONAL TRAILS LPA-WYO STATE PARKS & CULTURAL RESOURCES 25 12.70 12.70 0.00 COMMUNITY DEVELOPMENT 84 0 21 105

M NRT 0.00 NRT1802 STATEWIDE

* NATIONAL RECREATIONAL TRAILS LPA-WYO STATE PARKS & CULTURAL RESOURCES 25 12.70 12.70 0.00 COMMUNITY DEVELOPMENT 54 0 14 68

M NRT 0.00 NRT1803 STATEWIDE

* NATIONAL RECREATIONS TRAILS LPA-WYO STATE PARKS & CULTURAL RESOURCES 25 12.70 12.70 0.00 COMMUNITY DEVELOPMENT 1,031 0 258 1,289

M STP 0.00 PM18001 STATEWIDE * PAVEMENT MANAGEMENT 25 12.70 12.70 0.00 STUDIES 559 59 0 618M STP-PM 0.00 B181009 TRANSPORTATION DISTRICT 1 VARIOUS LOCATIONS 26 18.16 22.16 4.00 PAVEMENT MAINTENANCE 679 71 0 750M STP-PM 0.00 B182024 TRANSPORTATION DISTRICT 2 VARIOUS LOCATIONS 21 97.30 102.93 5.63 PAVEMENT MAINTENANCE 1,357 143 0 1,500

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 142 of 149

Page 148: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Various Fiscal Year 2018

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects

Federal State Other TotalM STP-PM 0.00 B183014 TRANSPORTATION DISTRICT 3 VARIOUS LOCATIONS 10 94.77 97.10 2.33 PAVEMENT MAINTENANCE 2,642 278 0 2,920M STP-PM 0.00 B184018 TRANSPORTATION DISTRICT 4 VARIOUS LOCATIONS 600 5.60 11.35 5.75 PAVEMENT RESURFACE 1,810 190 0 2,000M STP-PM 0.00 B184019 TRANSPORTATION DISTRICT 4 VARIOUS LOCATIONS 90 177.00 185.00 8.00 PAVEMENT MAINTENANCE 670 70 0 740M STP 0.00 B184021 TRANSPORTATION DISTRICT 4 VARIOUS LOCATIONS 85 230.00 230.00 0.00 SAFETY IMPROVEMENTS 181 19 0 200

M STP-SF 0.00 B185003 TRANSPORTATION DISTRICT 5 US 26, US 20/26, WY 28, WY 135, WY 296, WY 789/US 287 14 37.50 37.50 0.00 FENCING 550 58 0 608

M STP-GM 0.00 B185034 TRANSPORTATION DISTRICT 5

US 20 & WY 32CULVERT CLEANING & SIPHON VALVE 34 168.60 168.60 0.00 DRAINAGE REPAIR 452 48 0 500

M HSIP 0.00 B189027 STATEWIDE VARIOUS LOCATIONS 20 0.00 41.14 41.14 SAFETY IMPROVEMENTS 860 90 0 950

M HSIP 0.00 B189028 STATEWIDE VARIOUS LOCATIONS IN DISTRICTS 1 AND 4 26 3.45 42.04 38.59 SAFETY IMPROVEMENTS 633 67 0 700

M HSIP 0.00 B189029 STATEWIDE VARIOUS LOCATIONS IN DISTRICT 1 AND 5 56 361.45 361.45 0.00 SAFETY IMPROVEMENTS 1,493 157 0 1,650

M PEG 0.00 PEG1831 TRANSPORTATION DISTRICT 3 VARIOUS LOCATIONS 13 2.30 2.30 0.00 GENERAL MAINTENANCE 0 1,500 0 1,500M PEG 0.00 PEG1851 TRANSPORTATION DISTRICT 5 * VARIOUS LOCATIONS 34 196.42 196.42 0.00 GENERAL MAINTENANCE 0 600 0 600

3 SSP-TO 0.00 B183033 TRANSPORTATION DISTRICT 3 I-80 RM 34.90/US 89 RM 82.98ROAD CLOSURE & LUMINAIRES 80 34.89 34.89 0.00 SAFETY IMPROVEMENTS 0 240 0 240

M HSIP 0.00 B189026 STATEWIDE DIST 1 AND 4; VARIOUS LOCATIONS EPOXY STRIPING 25 12.70 12.70 0.00 SAFETY IMPROVEMENTS 704 74 0 778

M SCP 0.00 TRFSN18 INTERSTATE 25 TO INTERSTATE 90

VARIOUS LOCATIONS ON I-25 & I-90 AND ASSOCIATED INTERCHANGES 25 3.70 3.70 0.00 GENERAL MAINTENANCE 0 135 0 135

M HSIP 0.00 B179108 STATEWIDE VARIOUS LOCATIONSSIGNAL CONTROLLERS NA 0.00 0.00 0.00 SAFETY IMPROVEMENTS 1,674 176 0 1,850

M HSIP 0.00 B189004 VARIOUS LOCATIONS GILLETTE AND JACKSON STREETS 10 151.92 151.92 0.00 SAFETY IMPROVEMENTS 538 57 0 595

M STIC 0.00 B189039 STATEWIDE PAPERLESS CONSTRUCTION MANAGEMENT SYSTEM 25 12.70 12.70 0.00 STUDIES 100 25 0 125

M STP 0.00 B179105 STATEWIDE DYNAMIC MESSAGE SIGNS NA 0.00 0.00 0.00 ITS 1,616 170 0 1,786M STP 0.00 B179106 STATEWIDE WYOLINK TOWERS NA 0.00 0.00 0.00 SAFETY IMPROVEMENTS 15,926 1,674 0 17,600

M HRRR 0.00 HRRR018 STATEWIDE

* HIGH RISK RURAL ROAD LPA UW TECHNOLOGY TRANFSER CENTER NA 0.00 0.00 0.00 SAFETY IMPROVEMENTS 181 19 0 200

FY TOTAL: 156.71 46,632 7,524 293 54,449

Detail Location LRS IDBegin

RMEnd RM Length Character of Work

Cost $1000Trans Comm Dist Project General Location

Page 143 of 149

Page 149: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Various Fiscal Year 2018

STATE TRANSPORTATION IMPROVEMENT PROJECTSCONSTRUCTION

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transit Projects

Federal State Other TotalVARIOUS CAPITAL/OPERATING/ADMIN/PM 4,745 0 2,824 7,569

VARIOUS CAPITAL/OPERATING/ADMIN/PM 325 0 0 325

VARIOUS CAPITAL/OPERATING/ADMIN/PM 0 1,306 860 2,166

VARIOUS CAPITAL/OPERATING/ADMIN/PM 0 200 0 200

VARIOUS VEHICLES/MOBILITY MGMT/OPER 210 93 198 501

VARIOUS VEHICLES/MOBILITY MGMT/OPER 82 0 0 82

VARIOUS VEHICLES/MOBILITY MGMT/OPER 217 102 44 363

VARIOUS VEHICLES/MOBILITY MGMT/OPER 107 0 0 107

VARIOUS ADMINISTRATION 633 0 0 633

VARIOUS STATEWIDE TRAINING 99 0 0 99

VARIOUS CONTRACT-SERVICE & MRKTG 949 0 810 1,759

VARIOUS CONTRACT-SERVICE & MRKTG 106 0 0 106

VARIOUS OPERATING/ADMIN 430 0 45 476

VARIOUS PLANNING 287 0 30 317

VARIOUS CAPITAL/BUS FACILITIES 3,175 0 794 3,969

VARIOUS CAPITAL/BUS FACILITIES 287 0 72 358

FY TOTAL: 11,650 1,701 5,678 19,028

Cost $1000

STATE

5311

5311

STATE

Funding Source Character of Work

Trans Comm Dist Location Eligible Provider

SECTION 5305e - STATEWIDE PLANNING

5311f

5305d

5305e

5310

5310

5310

5310

5311

5311

5311f

STATE ADMINISTRATION

RTAP PROGRAM

INTERCITY BUS PROGRAM

INTERCITY BUS PROGRAM - EST CARRYOVER FY17

SECTION 5305d - METROPOLITAN PLANNING

SECTION 5339 CAPITAL PROGRAM - STATEWIDE

SECTION 5339 CAPITAL PROGRAM - URBAN5339

5339

SECTION 5311 TRANSIT PROGRAM

SECTION 5311 TRANSIT PROGRAM - EST CARRYOVER FY17

WYOMING PUBLIC TRANSIT

WYOMING PUBLIC TRANSIT - EST CARRYOVER FY17

SECTION 5310 PROGRAM - STATEWIDESECTION 5310 PROGRAM - STATEWIDE CARRYOVER

SECTION 5310 PROGRAM - URBANSECTION 5310 PROGRAM - URBAN CARRYOVER

Page 144 of 149

Page 150: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Various

Transportation Projects Fiscal Year 2019Federal State Other Total

M STP-PM 0.00 B181007 TRANSPORTATION DISTRICT 1 VARIOUS LOCATIONS 1123 7.88 16.03 8.15 PAVEMENT RESURFACE 1,357 143 0 1,500M STP-PM 0.00 B181008 TRANSPORTATION DISTRICT 1 VARIOUS LOCATIONS 212 3.47 5.36 1.89 PAVEMENT MAINTENANCE 2,262 238 0 2,500M STP-PM 0.00 B181010 TRANSPORTATION DISTRICT 1 VARIOUS LOCATIONS 80 357.00 362.00 5.00 PAVEMENT MAINTENANCE 1,493 157 0 1,650M CMP-PM 0.00 B181035 TRANSPORTATION DISTRICT 1 VARIOUS LOCATIONS 417 0.00 1.47 1.47 PAVEMENT RESURFACE 0 92 0 921 SCP-TC 0.00 B182023 TRANSPORTATION DISTRICT 2 VARIOUS LOCATIONS 1604 0.09 11.91 11.82 PAVEMENT RESURFACE 0 878 0 878

M STP-BR 0.00 B183012 TRANSPORTATION DISTRICT 3 STR NO. ANA, ANB, AMI, ANF, ANE, ANG, AMG 80 18.29 18.29 0.00 STRUCTURE REPAIR 1,694 178 0 1,872

M STP-PM 0.00 B183013 TRANSPORTATION DISTRICT 3 VARIOUS LOCATIONS 10 97.08 97.25 0.17 PAVEMENT RESURFACE 2,262 238 0 2,500M STP-PM 0.00 B183015 TRANSPORTATION DISTRICT 3 VARIOUS LOCATIONS 80 0.00 28.00 28.00 PAVEMENT MAINTENANCE 1,313 138 0 1,451

M NHPP-BR 0.00 B191004 TRANSPORTATION DISTRICT 1 STRUCTURE NO. EAI, EAJ, BUY, ABE, ABF 180 9.37 9.37 0.00 STRUCTURE REPAIR 3,167 333 0 3,500

M STP-PM 0.00 B191012 TRANSPORTATION DISTRICT 1 VARIOUS LOCATIONS 23. 401.96 401.96 0.00 PAVEMENT MAINTENANCE 452 48 0 500

M STP-BR 0.00 B192017 TRANSPORTATION DISTRICT 2 STRUCTURE NO. DEZ, DDA, DCR, DCP, ACE, CZK, CZI, CZJ, AFM 254 0.60 0.60 0.00 STRUCTURE REPAIR 1,131 119 0 1,250

M STP-PM 0.00 B193018 TRANSPORTATION DISTRICT 3 VARIOUS LOCATIONS 13 2.30 2.30 0.00 PAVEMENT MAINTENANCE 3,077 323 0 3,400M STP-PM 0.00 B193019 TRANSPORTATION DISTRICT 3 VARIOUS LOCATIONS 13 2.30 2.30 0.00 PAVEMENT MAINTENANCE 1,810 190 0 2,000M STP-PM 0.00 B194021 TRANSPORTATION DISTRICT 4 VARIOUS LOCATIONS 334 0.00 0.00 0.00 PAVEMENT RESURFACE 905 95 0 1,000M STP-PM 0.00 B194022 TRANSPORTATION DISTRICT 4 VARIOUS LOCATIONS 334 0.00 0.00 0.00 PAVEMENT MAINTENANCE 543 57 0 600M STP-GM 0.00 B194023 TRANSPORTATION DISTRICT 4 VARIOUS LOCATIONS 334 0.00 0.00 0.00 SAFETY IMPROVEMENTS 271 29 0 300M STP-BR 0.00 B195008 TRANSPORTATION DISTRICT 5 VARIOUS LOCATIONS 34 196.42 196.42 0.00 STRUCTURE REPAIR 1,810 190 0 2,000

M STP-GM 0.00 B195009 TRANSPORTATION DISTRICT 5 VARIOUS LOCATIONS; DMS SIGNS 34 196.42 196.42 0.00 ITS 1,335 140 0 1,475

5 STP-RF 0.00 B195010 TRANSPORTATION DISTRICT 5 VARIOUS LOCATIONSRIGHT OF WAY FENCING 31 56.50 62.50 6.00 FENCING 1,086 114 0 1,200

M STP-GM 0.00 B195016 TRANSPORTATION DISTRICT 5 VARIOUS LOCATIONS 34 196.42 196.42 0.00 PAVEMENT MAINTENANCE 452 48 0 500M HSIP 0.00 B199002 STATEWIDE VARIOUS LOCATIONS 25 12.70 12.70 0.00 SAFETY IMPROVEMENTS 1,380 145 0 1,525

M HSIP 0.00 B199003 STATEWIDE VARIOUS LOCATIONS IN DISTRICT 2 AND 4 85 93.46 93.46 0.00 SAFETY IMPROVEMENTS 1,403 147 0 1,550

M HSIP 0.00 B199005 STATEWIDE VARIOUS LOCATIONS 14 24.41 68.15 43.74 SAFETY IMPROVEMENTS 860 90 0 950M HSIP 0.00 B199006 STATEWIDE VARIOUS LOCATIONS 101 0.00 9.12 9.12 SAFETY IMPROVEMENTS 633 67 0 700M HSIP 0.00 B199007 STATEWIDE VARIOUS LOCATIONS 25 12.70 12.70 0.00 SAFETY IMPROVEMENTS 611 64 0 675M PEG 0.00 PEG1931 TRANSPORTATION DISTRICT 3 * VARIOUS LOCATIONS 13 2.30 2.30 0.00 GENERAL MAINTENANCE 0 1,500 0 1,500M PEG 0.00 PEG1951 TRANSPORTATION DISTRICT 5 * VARIOUS LOCATIONS 34 196.42 196.42 0.00 GENERAL MAINTENANCE 0 1,000 0 1,000

FY TOTAL: 115.37 31,307 6,761 0 38,068

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Page 145 of 149

Page 151: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Various

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2020Federal State Other Total

M STP 0.00 B193020 TRANSPORTATION DISTRICT 3

VARIOUS LOCATIONS VARIABLE SPEED LIMIT/WEB CAM FLASHING SIGNS/ROAD WEATHER INFO 352 8.00 8.50 0.50 ITS 905 95 0 1,000

M STP-PM 0.00 B201001 TRANSPORTATION DISTRICT 1 * VARIOUS LOCATIONS 23 401.96 401.96 0.00 PAVEMENT RESURFACE 452 48 0 500M STP-PM 0.00 B201002 TRANSPORTATION DISTRICT 1 * VARIOUS LOCATIONS 23 401.96 401.96 0.00 PAVEMENT MAINTENANCE 452 48 0 500M STP-PM 0.00 B201003 TRANSPORTATION DISTRICT 1 * VARIOUS LOCATIONS 23 401.96 401.96 0.00 PAVEMENT MAINTENANCE 1,176 124 0 1,300M STP-PM 0.00 B201004 TRANSPORTATION DISTRICT 1 * VARIOUS LOCATIONS 23 401.96 401.96 0.00 PAVEMENT MAINTENANCE 452 48 0 500M STP-BR 0.00 B201005 TRANSPORTATION DISTRICT 1 * VARIOUS LOCATIONS 23 401.96 401.96 0.00 STRUCTURE REPAIR 1,717 180 0 1,897M STP-BR 0.00 B201006 TRANSPORTATION DISTRICT 1 * VARIOUS LOCATIONS 23 401.96 401.96 0.00 STRUCTURE REPAIR 1,357 143 0 1,500M HSIP 0.00 B201007 TRANSPORTATION DISTRICT 1 * 23 401.96 401.96 0.00 SAFETY IMPROVEMENTS 244 26 0 270M STP-PM 0.00 B202008 TRANSPORTATION DISTRICT 2 * VARIOUS LOCATIONS 25 186.79 186.79 0.00 PAVEMENT RESURFACE 1,357 143 0 1,500M STP-PM 0.00 B202009 TRANSPORTATION DISTRICT 2 * VARIOUS LOCATIONS 25 186.79 186.79 0.00 PAVEMENT MAINTENANCE 905 95 0 1,000

M STP-BR 0.00 B202010 TRANSPORTATION DISTRICT 2 * STRUCTURE NO. CZT, ACI, ACO, DCO, DCQ, CZJ, CZP, CEY, DZQ 25 39.24 39.24 0.00 STRUCTURE REPAIR 4,796 504 0 5,300

M STP-PM 0.00 B202011 TRANSPORTATION DISTRICT 2 * VARIOUS LOCATIONS 25 186.79 186.79 0.00 PAVEMENT MAINTENANCE 2,262 238 0 2,500M HSIP 0.00 B202012 TRANSPORTATION DISTRICT 2 * 25 186.79 186.79 0.00 SAFETY IMPROVEMENTS 244 26 0 270M STP-PM 0.00 B203016 TRANSPORTATION DISTRICT 3 * VARIOUS LOCATIONS 13 2.30 2.30 0.00 PAVEMENT MAINTENANCE 2,488 262 0 2,750M STP-PM 0.00 B203017 TRANSPORTATION DISTRICT 3 * VARIOUS LOCATIONS 13 2.30 2.30 0.00 PAVEMENT MAINTENANCE 905 95 0 1,000M STP-PM 0.00 B203018 TRANSPORTATION DISTRICT 3 * VARIOUS LOCATIONS 13 2.30 2.30 0.00 PAVEMENT RESURFACE 2,106 221 0 2,327

3 STP-BR 0.00 B203019 TRANSPORTATION DISTRICT 3 * STRUCTURE NO. BOP, BSH, CVI, BRK, BQT, BQU, CRV, FCJ 10 153.98 153.98 0.00 STRUCTURE REPAIR 1,015 107 0 1,122

2 STP-BR 0.00 B203020 TRANSPORTATION DISTRICT 3 * STRUCTURE NO. APQ, APP, ARF, ARE, CWL, CVL, CXU, BKC 1900 0.54 0.54 0.00 STRUCTURE REPAIR 3,036 319 0 3,355

M HSIP 0.00 B203021 TRANSPORTATION DISTRICT 3 * VARIOUS LOCATIONS 13 2.30 2.30 0.00 SAFETY IMPROVEMENTS 244 26 0 270

M STP-BR 0.00 B204025 TRANSPORTATION DISTRICT 4

* STRUCTURE NO. BBU, BCM, BCO, BCQ BFC, BFG, BCN, BCP, BDZ, BFF, DHR, FQA 90 23.54 23.54 0.00 STRUCTURE REPAIR 3,154 331 0 3,485

M HSIP 0.00 B204027 TRANSPORTATION DISTRICT 4 * VARIOUS LOCATIONS 334 0.00 0.00 0.00 SAFETY IMPROVEMENTS 244 26 0 2705 STP-PM 0.00 B205013 TRANSPORTATION DISTRICT 5 * VARIOUS LOCATIONS 34 196.42 196.42 0.00 PAVEMENT MAINTENANCE 452 48 0 500

M STP-BR 0.00 B205014 TRANSPORTATION DISTRICT 5 * STRUCTURE NO. DIY, CYU, CCB, BRM, CJI, CXC 34 196.42 196.42 0.00 STRUCTURE REPAIR 2,968 312 0 3,280

M HSIP 0.00 B205015 TRANSPORTATION DISTRICT 5 * VARIOUS LOCATIONSTHERMOPLASTIC MARKINGS 34 196.42 196.42 0.00 SAFETY IMPROVEMENTS 244 26 0 270

M HSIP 0.00 B209028 STATEWIDE * VARIOUS LOCATIONSEPOXY STRIPING 25 12.70 12.70 0.00 SAFETY IMPROVEMENTS 995 105 0 1,100

M HSIP 0.00 B209029 STATEWIDE * VARIOUS LOCATIONS 25 12.70 12.70 0.00 SAFETY IMPROVEMENTS 814 86 0 900M HSIP 0.00 B209030 STATEWIDE * VARIOUS LOCATIONS 25 12.70 12.70 0.00 SAFETY IMPROVEMENTS 407 43 0 450

FY TOTAL: 0.50 35,391 3,725 0 39,116

Begin RM

End RM Length Character of Work

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Page 146 of 149

Page 152: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Various

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2021Federal State Other Total

M NHPPI 0.00 B184036 TRANSPORTATION DISTRICT 4 VARIOUS LOCATIONS I-90 90 0.00 16.34 16.34 ITS 2,287 179 0 2,466

M STP-BR 0.00 B212002 TRANSPORTATION DISTRICT 2

* STRUCTURE NO. AFJ, AFU, AFT, AGB, AGY, BMA, AHM, CWZ, ADQ, ACQ, CUE 25 137.41 137.41 0.00 STRUCTURE REPAIR 5,488 577 0 6,065

M STP-BR 0.00 B214003 TRANSPORTATION DISTRICT 4

* STRUCTURE NO. BMS, BFS, CFW, DHZ, CRA, CFG, BJH, BJL, DHU, DHY, DHN, CDR, BGE, BJP 60 22.89 22.89 0.00 STRUCTURE REPAIR 4,954 521 0 5,475

5 STP-RF 0.00 B215001 TRANSPORTATION DISTRICT 5 * VARIOUS LOCATIONS; SOUTH END OF DISTRICT; FENCING 20 90.40 95.29 4.89 FENCING 452 48 0 500

M STP-BR 0.00 B215004 TRANSPORTATION DISTRICT 5 * STRUCTURE NO. EWJ, CCE, FDF, CBW, EWN 30 79.61 79.61 0.00 STRUCTURE REPAIR 1,882 198 0 2,080

2 STP 0.00 P181007 CRESTON JUNCTION TO BAGGS I-80 JUNCTION SOUTH 18 0.00 10.00 10.00 PAVEMENT REHABILITATION 3,947 415 0 4,362FY TOTAL: 31.23 19,010 1,938 0 20,948

Transportation Projects Fiscal Year 2022Federal State Other Total

M STP-BR 0.00 B222001 TRANSPORTATION DISTRICT 2 * STRUCTURE NO. AEE, CZX, CZW, ADA, DCE, AJG 25 126.13 126.13 0.00 STRUCTURE REPAIR 4,018 422 0 4,440

M STP-BR 0.00 B224002 TRANSPORTATION DISTRICT 4

* STRUCTURE NO. EOP, BFE, DAL, DAU, BIT, BBT, BFR, DAK, BIS, FPA, DGD, CUO, DBD 90 1.79 1.79 0.00 STRUCTURE REPAIR 4,389 461 0 4,850

M STP-BR 0.00 B225003 TRANSPORTATION DISTRICT 5 * STRUCTURE NO. CPX, CXK, CXL, CXM, DDC, FJC, CAH 15 16.13 16.13 0.00 STRUCTURE REPAIR 2,434 256 0 2,690

FY TOTAL: 0.00 10,841 1,139 0 11,980

Begin RM

End RM Length Character of Work

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Begin RM

End RM Length Character of Work

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Page 147 of 149

Page 153: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Various

STATE TRANSPORTATION IMPROVEMENT PROJECTSENGINEERING

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Wyoming Department of Transportation 5300 Bishop Blvd Cheyenne, WY 82009

Transportation Projects Fiscal Year 2023Federal State Other Total

M STP-BR 0.00 B232001 TRANSPORTATION DISTRICT 2

* STRUCTURE NO. DCS, DCU, ADG, ADI, ADL, BUC, BUD, ACF, DCN, DCT, DCY, AKH, AKI, DFE, DFL, FDC, CNW 21 57.62 57.62 0.00 STRUCTURE REPAIR 7,619 801 0 8,420

M STP-BR 0.00 B234002 TRANSPORTATION DISTRICT 4 * STRUCTURE NO. EWU, DBJ, DAI, BGO, LIM, DIJ, CHL 36 47.00 47.00 0.00 STRUCTURE REPAIR 5,660 595 0 6,255

M STP-BR 0.00 B235003 TRANSPORTATION DISTRICT 5 * STRUCTURE NO. FUV 1502 100.53 100.53 0.00 STRUCTURE REPAIR 2,090 220 0 2,3105 NHPP 142.00 N343045 THERMOPOLIS TO WORLAND * SLOPE FLATTENING 34 142.00 148.00 6.00 GRADING 1,810 190 0 2,000

FY TOTAL: 6.00 17,179 1,806 0 18,985

Begin RM

End RM Length Character of Work

Cost $1000Trans Comm Dist Project General Location Detail Location LRS ID

Page 148 of 149

Page 154: State Transportation Improvement STIP 18 Program Commission Districts ... PHIL SCHMIDT - CASPER 7 3 4 RICK NEWTON - BUFFALO ... Projects dealing with at-grade railroad crossings

Illustrative Projects

The following list includes projects that could be considered if Wyoming were to receive additional funding thereby allowing the State to proceed with these projects if deemed necessary. The focus of the projects listed below is on freight and economic issues the State faces, and is illustrative only.

The I-25/I-80 Interchange in Cheyenne area carries a high volume of traffic serving local, regional, and national travel needs.Projected increases in future traffic will exceed the design capacity of this interchange and adjacent interchanges. Withouttransportation improvements, this continued growth will further deteriorate traffic operations, increase congestion and delay, andincrease crash potential. A study was completed in 2008 indicated the project could be built in four phases. The study included thisinterchange and interchanges in the immediate area that would be affected.

There is a need to continue to provide additional truck parking along I-80 at various locations. Several areas between Evanstonand Rock Springs would benefit from additional truck parking as well as between Rock Springs and Rawlins. The area betweenRawlins and Laramie has severe winter weather conditions and providing additional truck parking in this area would increase safety,especially during winter months.

In general, a snow fence study of the I-80 corridor across Wyoming has identified locations where additional new snow fence isrecommended. The snow fence helps reduce the crash potential during adverse weather and assists in allowing I-80 to remainopen. This allows freight to continue to move across Wyoming in a safe and economical manner. A similar study was completedfor US 287 south from Laramie. Both routes are NHS and carry higher volumes of traffic with high percentages of trucks.

Several of our bridges near truck services and/or major destinations are either older or requiring some geometric improvement toaccommodate traffic, particularly for freight movements.

Traffic studies have indicated that additional truck climbing lanes are warranted in some areas of the I-80 corridor due to theincreasing freight movements on this corridor. These climbing lanes reduce congestion and improve the overall level of service forI-80.

Provide passing lanes to improve safety, mobility and reduce congestion on various 2-lane state highways. Projects will betargeted at those corridors that are experiencing high traffic/truck volumes that have a large mix of commercial and industrialvehicles.

Widening of tunnels through the Wind River Canyon in Fremont County

Casper - Reconstruct Midwest Avenue from Center Street to WY 220, with the intent to relieve congestion throughout downtownwhile at the same connecting three major economic areas through improved multimodal facilities, including roads, trails and publictransit. $15.3 million; contingent upon local receiving Tiger Grant