32
State of Standards and Standards in Development Ryan Stewart, NERC Manager of Standards Development Elsa Prince, NERC Manager of Standards Development FRCC Spring Workshops April 14-16, 2015

State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

Embed Size (px)

Citation preview

Page 1: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

State of Standards and

Standards in DevelopmentRyan Stewart, NERC Manager of Standards Development

Elsa Prince, NERC Manager of Standards Development

FRCC Spring Workshops

April 14-16, 2015

Page 2: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY2

• How we got to where we are today

• 2015 trends and expectations

• Current projects

• What lies ahead

Agenda Topics

Page 3: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY3

Progress on FERC Directives

Page 4: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY4

Progress on Paragraph 81 and Independent Experts Review Panel (IERP)

Page 5: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY5

Progress on Paragraph 81 and Independent Experts Review Panel (IERP)

Resolution Number Percent

Retired 110 46%

Modified 103 43%

Retained 25 11%

238

Page 6: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY6

• 2014-02 CIP V5 Revisions

• 2014-03 TOP/IRO Revisions

• 2014-01 DGR medium priority

• 2007-06 Protection System Coordination - PRC-027

• 2007-06.2 PRC-001

• 2008-02 UVLS (PRC-004)

• 2010-14.1 BAL-005 and BAL-006

• 2010-14.2 BAL-004 periodic review

• 2012-09 Implementation of IRO Periodic Review (IRO-006 and IRO-009)

• 2014-04 Physical Security Directives

• 2009-02 Real-time Monitoring and Analysis

• 2010-05.2 Phase 2 of Protection System Misoperations: RAS

2014 Projects Continuing Into 2015

Page 7: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY7

• Critical Infrastructure Protection Standards Version 5 Addressed five FERC directives

Adopted five standards: CIP-003-6, CIP-004-6, CIP-007-6, CIP-010-2, CIP-011-2

Filed February 13, 2015

• Dispersed Generation Resources High priority DGR standards previously Board approved and pending filing

at FERC

Adopted three standards: PRC-001-1.1(ii), PRC-019-2, PRC-024-2

Filed March 13, 2015

• Revisions to TOP/IRO Standards Eight standards previously adopted

Adopted one standard: TOP-001-3

Filed March 18, 2015

February 2015 Board Actions

Page 8: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY8

• 2014-04 Physical Security Directives (Order No. 804 directive)

• 2015-02 EOP-004, -005, -006 and -008 Periodic Review

• 2015-03 FAC-010, -011 and -014 Periodic Review

• 2015-04 Alignment of Glossary and ROP Terms

• 2007-17.4 PRC-005 Order No. 803 Directive

• 2010-04.1 MOD-031 Order No. 804 Directive

2015 New Projects

Page 9: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY9

July 1, 2015 MOD-032-1

October 1, 2015 CIP-014-1 (Physical Security)

January 1, 2016 FAC-001-2

FAC-002-2

NUC-001-3

TPL-001-4 requirements 2-6, 8

April 1, 2016 CIP V5

July 1, 2016 MOD-025-2

PER-005-2

PRC-019-1

PRC-024-1

July 1, 2017 MOD-033-1

Standards Subject to Future Enforcement

Page 10: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY10

• Deliberate pace of standards development Response to industry, NERC Board of Trustees, and NERC Standards

Committee

Relieve strain on scarce NERC and industry resources

Stagger postings and ballots for standards as well as presentations to the NERC Board for Adoption

• Steady State Standards Largely complete in 2015

• Enhanced Periodic Reviews Third or fourth quarter 2015

2015 Trends and Expectations

Page 11: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY11

PMOS Annual Planning Calendar

Page 12: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY12

Progress to Steady State

• February (3) 2014-02 CIP V5 Revisions

2014-03 TOP/IRO Revisions

2014-01 DGR medium priority

• May (3) 2008-02 UVLS (PRC-004)

2014-01 DGR medium priority

2014-04 Physical Security Directives

• August (3) 2010-14.2 BAL-004 periodic review

2015-02 EOP-004, -005, -006 and -008 periodic review

2007-17.4 PRC-005 Order No. 803 Directive

Page 13: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY13

Progress to Steady State

• November (7) 2010-14.1 BAL-005 and BAL-006

2012-09 Implementation of IRO Periodic Review (IRO-006 and IRO-009)

2015-03 FAC-010, -011 and -014 periodic review

2015-04 Alignment of Glossary and ROP Terms

2007-06.2 PRC-001

2010-04.1 MOD-031 Order No. 804 Directives

2007-06 Protection System Coordination (PRC-027)

• 2016 (2) 2009-02 Real-time Monitoring

and Analysis

2010-05.2 Phase 2 of Protection System Misoperations: RAS

Page 14: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY14

• PRC-027-1 Coordination of Protection System Performance During Faults Addresses reliability objectives of Requirements R3 and R4 of PRC-001-1.1

o The coordination of Protection Systems during Faults

o The coordination new and existing Protection Systems

Corrects applicable entities to owners – TO, GO, and DP

Addresses the coordination of intra-entity Protection Systems

Requirements R1 and R2 mandate establishing and implementing a process to develop settings for BES Protection Systems to operate in the intended sequence during Faults and stipulates certain attributes that must be included in the process (R1 and R2)

Project 2007-06 – System Protection Coordination

Page 15: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY15

• PRC-027-1 is posted for comment and additional ballot April 1 - May 15, 2015 (additional ballot May 6-15, 2015)

• Voters must join new ballot pools in the SBS

• Industry webinar – April 27, 2015 at 2:00 P.M. Eastern

• SDT Meeting to respond to comments first week in June 2015

• Anticipated final ballot in June 2015

• Anticipated NERC Board adoption in August 2015

• Contact developer [email protected]

• Project web site: Project 2007-06 System Protection Coordination

Project 2007-06 – System Protection Coordination

Page 16: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY16

• Address FERC directives in Order No. 693

• Confirm applicable entities are appropriate E.g., NERC Functional Model

PRC-001-1.1 is applicable to the BA, GOP, and TOP

• Requirements Focus on the reliability aspects

Eliminate ambiguity

Identify other similar standards and requirements

Consider if appropriate for the PRC family of standards

Improve measurability

Project 2007-06.2 – Phase 2 of System Protection Coordination

Page 17: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY17

• Requirement R1 Is about knowledge of the intended operation of BES Protection Systems

Evaluating the benefits of PER-003 (Credentials) and PER-005 (Training)

Continue to determine applicability to BA

Working make clear what “knowledge” means

Goal is to ensure measurability of the Requirement

• Requirement R2 Is about notification of failures (i.e., degradation) and responding

Notifications may be covered by TOP-003-3 (Data Spec)

o R1 and R2, “Provisions for notification of current Protection System and Special Protection System status or degradation that impacts System reliability”

TOP-001-3 may address necessary action by the TOP

Continue to determine the degree to which the GOP should take action

Project 2007-06.2 – Phase 2 of System Protection Coordination

Page 18: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY18

• Requirement R5 Is about communicating in advance (i.e., planning ahead)

o Changes in load, generation, transmission system, etc. that impact Protection Systems

Continue to discuss how TOP-002-4 (Operations Planning) provides adequate performance

• Requirement R6 About monitoring and notification of Special Protection Systems (SPS)

The TOP/IRO petition acknowledged that monitoring of SPS is addressed by the adopted TOP-001-3

Consider how “notification” is covered by other standards

Will retire R6, if adequately covered

Project 2007-06.2 – Phase 2 of System Protection Coordination

Page 19: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY19

• FERC Order No. 804 directive on CIP-014-1 Remove the term “widespread” or propose modifications

Six-month deadline

Requires informational filing on “High Impact” control centers

• Team meeting January 2015

• Preliminary recommendations Remove the term “widespread” from:

o Purpose Statement

o Background Section

o Requirement R1 and the Rationale for Requirement R1

o The Guidelines and Technical Basis Section of the standard

Add guidance for Requirement R1

Project 2014-04 Physical Security

Page 20: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY20

• Posted February 20 to April 9, 2015 45-day comment and initial ballot period

• The standard passed the initial ballot and will be posted for final ballot on April 20 and presented to the NERC Board of Trustees in May, 2015 for adoption and subsequent filing with FERC

• The project has a deadline of July 27, 2015 to file a petition with FERC that addresses the directive

• Contact senior developer [email protected]

Project 2014-04 Physical Security

Page 21: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY21

• Periodic review of EOP-004, EOP-005, EOP-006, EOP-008

• Team meeting and technical conference February 2015

• Initial posting expected April 2015

• Preliminary recommendations EOP-004-2

o Revise Attachment 1 to improve clarity

EOP-005-2

o Reaffirm Requirements R7, R8, and R12

o Revise Requirement R6

– Add a Rationale Box to clarify “dynamic simulations”

o Withdraw Requirement R10

– Duplicative of proposed PER-005-2

Project 2015-02 Emergency Operations Periodic Review

Page 22: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY22

• Preliminary recommendations (continued) EOP-006-2

o Reaffirm Requirements R7, R8, R10

o Revise Requirement R1

– Unnecessary action

o Withdraw requirements R1 (three subparts) and R9

– Duplicative and redundant

EOP-008-1

o Revise Requirement R1

– Add clarity to the intended timeframe to restore primary control center functionality

• Contact developer [email protected]

Project 2015-02 Emergency Operations Periodic Review

Page 23: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY23

• Project includes three standards (FAC-010, FAC-011, and FAC-014)

• Review team conclusions: Determination of SOLs in the Planning Horizon provides little or no reliability

benefit Recommend retiring FAC-010-3

o TPL-001-4 provides comprehensive planning requirements

Defined terms SOL and IROL are not consistently understood in Real-time operations Recommend revised definitions and clear delineation of requirements for establishing various types of limits (Voltage, Voltage stability, transient stability)

Project 2015-03 Periodic Review of SOL Standards

Page 24: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY24

• Preliminary recommendations Revisions are needed to satisfy FERC Directive for communicating SOLs to

Transmission Owners (Order No. 777)

Requirements should be consolidated into a single standard

• PRT will post recommendations and a draft Standards Authorization Request for 45-day comment period in May

• Contact developer [email protected]

Project 2015-03 System Operating Limits Periodic Review

Page 25: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY25

• Implement recommended revisions to IRO-006-EAST and IRO-009-1 that resulted from Project 2012-09 – IRO Five-Year Review Team

• IRO Five-Year Review Team reviewed IRO-003-2, IRO-004-2, IRO-005-4, IRO-006-5, IRO-006-East, IRO-008-1, IRO-009-1 and IRO-010-1a and posted eight draft recommendations for a 45-day industry comment period that ended on September 20, 2013.

• All standards were recommended for revision except IRO-006-5, which was affirmed by the team and presented to the Board in Feb 2014 for approval recommendations.

Project 2015-06 Implement IRO Five-Year Review Recommendations

Page 26: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY26

• Project 2014-03 – Revisions to TOP and IRO Standards seeks to retire IRO-003-2, IRO-004-2, IRO-005-4, IRO-008-1 and IRO-010-1a. As a result, only IRO-006-East and IRO-009-1 remain in need of revision.

• The Standards Committee approved a slate of drafting team members on April 6, 2015.

• IRO Drafting Team meeting scheduled at Florida Reliability Coordinating Council (FRCC) offices in Tampa, FL, April 28-30, 2015

• The revised standards are planned to be posted for an initial comment and ballot period May 2015.

• Contact developer [email protected]

Project 2015-06 Implement IRO Five-Year Review Recommendations

Page 27: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY27

• Measured, in-depth review to improve quality and content of standards

• Look for opportunities to make standards more concise Verify content is appropriate to be included in a standard

Builds on Independent Experts’ work with industry input

• Plan to be developed by end of Q2 2015 Topic will be discussed at the May Board and MRC meetings from policy

input discussion

• No mandated timeline

Enhanced Periodic Reviews

Page 28: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY28

• Recognizes current trend at NERC Smaller drafting and review teams of 6-10 members

Active observers

Engaged industry throughout standard development process

• Essential part of standards development The ballot is an inefficient barometer of industry position

Ad hoc groups have more influence early in the process

Teams often more receptive to comments during early phases of development

Communication bond among industry, teams, NERC, and FERC

Industry Outreach

Page 29: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY29

• Highlights one Risk Element from 2015 Compliance Monitoring and Enforcement Implementation Plan

• Provides training on associated standards

• Third Thursday of every month starting in April

• Starts at 1 pm Eastern

Risk Elements Webinar Series

Page 30: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY30

Subject Date

Uncoordinated Protection Systems April 16, 2015

Monitoring and Situational Awareness May 21, 2015

Infrastructure Maintenance June 18, 2015

Protection System Misoperation July 16, 2015

Workforce Capability August 20, 2015

Long Term Planning and System Analysis September 17, 2015

Extreme Physical Events October 15, 2015

Threats to Cyber Systems November 19, 2015

Risk Elements Webinar Series

Page 31: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY31

Risk Elements Webinar Series

Page 32: State of Standards and Standards in Development - frcc.com · PDF file•2007-06 Protection System Coordination ... and NERC Standards Committee ... •SDT Meeting to respond to comments

RELIABILITY | ACCOUNTABILITY32