STATE OF NORTH CAROLINA D EPARTMENT OF T RANSPORTATION PAT MCCRORY ANTHONY J. TATA GOVERNOR SECRETARY January 13, 2015 CONTRACT: DB00211 TIP: K-5101 WBS ELEMENT: 42229.3.FS1 FEDERAL-AID NO: NHPP-0070(173) COUNTY: Craven DESCRIPTION: Rest Area PRE-BID MEETING NOTES AND FOLLOW UP INFORMATION A Pre-Bid Conference was held for the above referenced project on Thursday, January 8, 2015. The following were in attendance: Name Company Sarah Lentine NCDOT – Division 2 Betty Caldwell NCDOT – Division 2 John Wells NCDOT – Division 2 Roadside Environmental Jeffery Gurganus NCDOT – Division 2 Roadside Environmental Vann Sparrow NCDOT – Division 2 Roadside Environmental Heather Causey NCDOT – Division 2 Construction Saundra Lively NCDOT – Division 2 Construction Tadd Davis NCDOT – Roadside Environmental Unit Tony Medlin NCDOT - Contractor Utilization & Certification John K. Farkas JKF Architecture Roland Cote Daniels & Daniels Construction Co. Inc George Lott L. A. Downey & Son, Inc. Tony Marshall Pro Construction, Inc. Todd Greenwood Blue Ridge Enterprises, Inc. Michelle Benton Sunland Builders Inc. Jimmy Dillahunt JE Dillahunt & Assoc. / Trader Construction Doug Broughton Calvin Davenport, Inc. Michael McKoy M & V Consulting and Contracts Terry L Carter Cadet Construction Billy Taylor Brydge and Lee Carl Martin Danco Builders MAILING ADDRESS: DIVISION TWO - OPERATIONS P.O. BOX 1587 GREENVILLE, NC 27835 TELEPHONE: (252) 439-2800 FAX: (252) 830-3325 WEBSITE: WWW.NCDOT.GOV LOCATION: 1704 N GREENE ST GREENVILLE, NC

STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION

PAT MCCRORY ANTHONY J. TATA GOVERNOR SECRETARY

January 13, 2015 CONTRACT: DB00211 TIP: K-5101 WBS ELEMENT: 42229.3.FS1 FEDERAL-AID NO: NHPP-0070(173) COUNTY: Craven DESCRIPTION: Rest Area

PRE-BID MEETING NOTES

AND FOLLOW UP INFORMATION

A Pre-Bid Conference was held for the above referenced project on Thursday, January 8, 2015. The following were in attendance:

Name Company Sarah Lentine NCDOT – Division 2 Betty Caldwell NCDOT – Division 2 John Wells NCDOT – Division 2 Roadside Environmental Jeffery Gurganus NCDOT – Division 2 Roadside Environmental Vann Sparrow NCDOT – Division 2 Roadside Environmental Heather Causey NCDOT – Division 2 Construction Saundra Lively NCDOT – Division 2 Construction Tadd Davis NCDOT – Roadside Environmental Unit Tony Medlin NCDOT - Contractor Utilization & Certification John K. Farkas JKF Architecture Roland Cote Daniels & Daniels Construction Co. Inc George Lott L. A. Downey & Son, Inc. Tony Marshall Pro Construction, Inc. Todd Greenwood Blue Ridge Enterprises, Inc. Michelle Benton Sunland Builders Inc. Jimmy Dillahunt JE Dillahunt & Assoc. / Trader Construction Doug Broughton Calvin Davenport, Inc. Michael McKoy M & V Consulting and Contracts Terry L Carter Cadet Construction Billy Taylor Brydge and Lee Carl Martin Danco Builders

MAILING ADDRESS: DIVISION TWO - OPERATIONS P.O. BOX 1587 GREENVILLE, NC 27835

TELEPHONE: (252) 439-2800 FAX: (252) 830-3325

WEBSITE: WWW.NCDOT.GOV

LOCATION: 1704 N GREENE ST

GREENVILLE, NC

Page 2: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

DB00211 Pre-Bid Meeting Page 2 of 4

Ms. Lentine began the meeting with general information regarding the bidding of Division Let Projects. She reviewed attachment #1, “Information for Bidders.” Common mistakes found on bids that were highlighted were;

• Leaving corporate seal off of the Execution of Bid form • Not having the Execution of Bid form Notarized • Incorrect math on the Itemized Proposal Sheet • Missing signatures of the Authorized Agent and Witness on Signature Sheet

Mr. Medlin then reviewed the attachment #2, regarding the use of DBE subcontractors. The items he highlighted were;

• How to find and use the Vendor Directory to search for DBE subcontractors • The difference between DBE, MBE, WBE, and HUB • Meeting contract goal requirements • Submission of a Good Faith Effort if contract goal is not met • Providing Letters of Intent from committed DBE subcontractors, after project is awarded • Other ways to meet criteria using Manufacturers (Producers), which count 100% of dollar

amount towards goal, or using Suppliers, which count 60% of dollar amount towards goal Ms. Lentine then drew attention to the following information in the Project Special Provisions;

• Codes, Permits and Inspections, page 10 o “All work under this contract shall conform to the North Carolina State Building

Code and other state, local and national codes as are applicable. The cost of all required inspection and permits shall be the responsibility of the Contractor.”

o “Inspection and certification of compliance by the NC Department of Insurance is required on the electrical work on the project.”

• Roof Guarantee, page 10 o “…the Contractor shall guarantee the materials and workmanship of the roofing

against defect due to faulty material, workmanship and negligence by Contractors for a period of twenty-four (24) months following final acceptance of the work…”

• Guarantee, page 12 o “The Contractor shall guarantee the materials and workmanship against defect

due to faulty materials or faulty workmanship or negligence for a period of twelve (12) months following the final acceptance of the work”

• Disadvantaged Business Enterprise (Divisions), page 25-33 o “ The following DBE goal for participation by Disadvantaged Business

Enterprises is established for this contract: Disadvantaged Business Enterprises 3.0%”

Page 3: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

DB00211 Pre-Bid Meeting Page 3 of 4

Ms. Lentine then opened the meeting up for questions. Question: What work code is required to be a prime contractor on this project? Answer: In order to bid on the project as a prime contractor, either work code Rest Area Building or Other – General Contractor for Vertical Construction are required. Please look your company up on our Vendor Directory to check your prequalification status. Additional Information (not provided at meeting): The work code numbers are “00400 – Rest Area Building” or “00099 – Other – General Contractor for Vertical Construction” Question: Is there a bid bond required for this project? Answer: There is no bid bond required for this project. Question: Are Level II Erosion Control Certifications required for this project? Answer: This project involves land disturbing activity and Level II Erosion Control Certifications will be required. Additional information (not provided at meeting): It was determined that since this project has less than 1 acre of disturbance there will not be a need for Level II Erosion Control Certifications. Question: Does the generator shown on plan sheet U1.3 come with an Automatic Switch? Answer: The plans state on sheet U1.3 that the generator will be provided “with service entry rated manual transfer switch”, there is no automatic switch. There were no further questions. Mr. Farkas stated that the contractors should take note that product substitutions will only be reviewed when they are received from a General Contractor only. They will not be reviewed when submitted by a producer or supplier. Mr. Wells provided the attachment #3, plan sheet with the trees to be removed numbered and a list with the description and size of each tree.

Page 4: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

DB00211 Pre-Bid Meeting Page 4 of 4

There being no further business the meeting was adjourned.

Sincerely, Sarah Lentine Division Contract Officer

cc: Mr. Ed Eatmon, PE Mr. Bill Kincannon, PE Ms. Betty Caldwell, PE Mr. Tad Davis Mr. John Wells

Page 5: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Attachment #1

Page 6: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Information for Bidders: Bid Documents for NCDOT Division Let Projects

This document includes a checklist and examples of bidding documents. It is to be used as a resource for Bidders and does not replace or amend the proposal or the 2012 NCDOT Standard Specifications. It is the sole responsibility of the Bidder to ensure all bid documents are in accordance with the 2012 NCDOT Standard Specifications prior to their submission.

Page 7: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Bidder’s Checklist

Print the bid form furnished by NCDOT with the proposal. This shall be used and shall not be altered in

any manner. DO NOT SEPARATE THE BID FORM FROM THE PROPOSAL!

All entries on the bid form, including signatures, shall be written in ink.

Enter a unit price for every item on the bid form. The unit prices for the various contract items shall be written in figures. ***Unit Prices shall be rounded off by the bidder to contain no more than FOUR decimal places***

Enter the amount bid on the bid form for every item. The amount bid for each item shall be determined by multiplying each unit bid by the quantity for that item, and shall be written in figures in the "Amount Bid" column of the form. ***Check the math***

Enter the total amount bid. This shall be written in figures in the proper place on the bid form. The total amount shall be determined by adding the amounts bid for each item. ***Check the math***

Changes in any entry shall be made by marking through the entry in ink and making the correct entry adjacent thereto in ink. A representative of the Bidder shall initial the change in ink.

If the Bidder elects to prepare their bid by electronic means, and it is an option for the project, they must refer to the provision titled “COMPUTER BID PREPARATION” found in the proposal.

Fill out the proper Bid Execution Form. Bid Execution Form must be notarized. Corporations must seal the Bid Execution Form.

The bid shall be properly executed. All bids shall show the following information: Name of individual, firm, corporation, partnership, or joint venture submitting bid. Name and signature of individual or representative submitting bid and position or title. Name, signature, and position or title of witness. Completed attestation by Notary Public Bids submitted by corporations shall bear the seal of the corporation.

Fill out signature sheet completely and have representative and witness sign.

Fill out the DBE or MBE-WBE Worksheet. Follow the provision titled “DISADVANTAGED BUSINESS ENTERPRISE (DIVISIONS)” or “MINORITY BUSINESS ENTERPRISE AND WOMEN BUSINESS ENTERPRISE (DIVISIONS)” in the proposal, to fill out the worksheet.

Place the proposal with the bid sheet still attached in a sealed envelope. Refer to the Instruction to Bidders page in the proposal for the statement to display on the front of the sealed envelope.

If delivered by mail, the sealed envelope shall be placed in another sealed envelope and the outer

envelope shall be addressed as stated on the Instruction to Bidders page in the proposal.

Review the Instruction to Bidders page in the proposal.

1

Page 8: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

MBE-WBE Subcontractors

2

Page 9: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

M-3

Rev 11-4-13

LISTING OF MBE/WBE SUBCONTRACTORS Sheet ________ of ________

Firm Name and Address Circle One Item No. Item Description * Agreed upon

Unit Price ** Dollar Volume of Item

Name

MBE

Address

WBE

Name

MBE

Address

WBE

Name

MBE

Address

WBE

Name

MBE

Address

WBE

Name

MBE

Address

WBE

Name

MBE

Address

WBE

Name

MBE

Address

WBE

* The Dollar Volume shown in this column shall be the Actual Price Agreed Upon by the Prime Contractor and the MBE/WBE subcontractor, and these prices will be used to determine the percentage of the MBE/WBE participation in the contract. ** Dollar Volume of MBE/WBE Subcontractor Percentage of Total Contract Bid Price: If firm is a Material Supplier Only, show Dollar Volume as 60% of Agreed Upon Amount from Letter of Intent. If firm is a Manufacturer, show Dollar Volume as 100% of Agreed Upon Amount from Letter of Intent.

EXAMPLE3

Page 10: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

M-3

Rev 11-4-13

LISTING OF MBE/WBE SUBCONTRACTORS Sheet ________ of ________

Firm Name and Address Circle One Item No. Item Description * Agreed upon

Unit Price ** Dollar Volume of Item

Name

MBE

Address

WBE

Name

MBE

Address

WBE

Name

MBE

Address

WBE

Name

MBE

Address

WBE

Name

MBE

Address

WBE

Name

MBE

Address

WBE

* The Dollar Volume shown in this column shall be the Actual Price Agreed Upon by the Prime Contractor and the MBE/WBE subcontractor, and these prices will be used to determine the percentage of the MBE/WBE participation in the contract. ** Dollar Volume of MBE/WBE Subcontractor Percentage of Total Contract Bid Price:

** Dollar Volume of MBE Subcontractor $ ____________ MBE Percentage of Total Contract Bid Price ___________% ** Dollar Volume of WBE Subcontractor $ ____________ WBE Percentage of Total Contract Bid Price ___________%

If firm is a Material Supplier Only, show Dollar Volume as 60% of Agreed Upon Amount from Letter of Intent. If firm is a Manufacturer, show Dollar Volume as 100% of Agreed Upon Amount from Letter of Intent.

EXAMPLE4

Page 11: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

M-3

Rev 11-4-13

LISTING OF MBE/WBE SUBCONTRACTORS Sheet __1_____ of _2______

Firm Name and Address Circle One Item No. Item Description * Agreed upon

Unit Price ** Dollar Volume of Item

Name TRUCKS N’ MORE

MBE

7 ASPHALT B25.0B (HAULING ONLY)

$5.00 $1000.00

Address 528 PARK LANE, SUNNY, NC

WBE 8 ASPHALT S9.5B (HAULING ONLY)

$5.00 $3000.00

Name NO EROSION INC

MBE

20 TEMP SILT FENCE $2.00 $2000.00

Address 75 BUSINESS PARK, SUNNY, NC

WBE 21 SEEDING AND MULCHING

$4500.00 $4500.00

Name

MBE

Address

WBE

Name

MBE

Address

WBE

Name

MBE

Address

WBE

Name

MBE

Address

WBE

Name

MBE

Address

WBE

* The Dollar Volume shown in this column shall be the Actual Price Agreed Upon by the Prime Contractor and the MBE/WBE subcontractor, and these prices will be used to determine the percentage of the MBE/WBE participation in the contract. ** Dollar Volume of MBE/WBE Subcontractor Percentage of Total Contract Bid Price: If firm is a Material Supplier Only, show Dollar Volume as 60% of Agreed Upon Amount from Letter of Intent. If firm is a Manufacturer, show Dollar Volume as 100% of Agreed Upon Amount from Letter of Intent.

EXAMPLE5

Page 12: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

M-3

Rev 11-4-13

LISTING OF MBE/WBE SUBCONTRACTORS Sheet __2_____ of ___2____

Firm Name and Address Circle One Item No. Item Description * Agreed upon

Unit Price ** Dollar Volume of Item

Name

MBE

Address

WBE

Name

MBE

Address

WBE

Name

MBE

Address

WBE

Name

MBE

Address

WBE

Name

MBE

Address

WBE

Name

MBE

Address

WBE

* The Dollar Volume shown in this column shall be the Actual Price Agreed Upon by the Prime Contractor and the MBE/WBE subcontractor, and these prices will be used to determine the percentage of the MBE/WBE participation in the contract. ** Dollar Volume of MBE/WBE Subcontractor Percentage of Total Contract Bid Price:

** Dollar Volume of MBE Subcontractor $ _4000.00___ MBE Percentage of Total Contract Bid Price __2.0_____% ** Dollar Volume of WBE Subcontractor $ _6500.00___ WBE Percentage of Total Contract Bid Price ___3.25___%

If firm is a Material Supplier Only, show Dollar Volume as 60% of Agreed Upon Amount from Letter of Intent. If firm is a Manufacturer, show Dollar Volume as 100% of Agreed Upon Amount from Letter of Intent.

EXAMPLE6

Page 13: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

DBE Subcontractors

7

Page 14: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

M-2

Rev 11-4-13

LISTING OF DBE SUBCONTRACTORS Sheet ________ of __________

Firm Name and Address Item No. Item Description * Agreed upon Unit Price

** Dollar Volume of Item

Name

Address

Name

Address

Name

Address

Name

Address

Name

Address

Name

Address

Name

Address

* The Dollar Volume shown in this column shall be the Actual Price Agreed Upon by the Prime Contractor and the DBE subcontractor, and these prices will be used to determine the percentage of the DBE participation in the contract. ** Dollar Volume of DBE Subcontractor Percentage of Total Contract Bid Price: If firm is a Material Supplier Only, show Dollar Volume as 60% of Agreed Upon Amount from Letter of Intent. If firm is a Manufacturer, show Dollar Volume as 100% of Agreed Upon Amount from Letter of Intent.

EXAMPLE8

Page 15: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

M-2

Rev 11-4-13

LISTING OF DBE SUBCONTRACTORS Sheet ________ of __________

Firm Name and Address Item No. Item Description * Agreed upon Unit Price

** Dollar Volume of Item

Name

Address

Name

Address

Name

Address

Name

Address

Name

Address

Name

Address

* The Dollar Volume shown in this column shall be the Actual Price Agreed Upon by the Prime Contractor and the DBE subcontractor, and these prices will be used to determine the percentage of the DBE participation in the contract.

** Dollar Volume of DBE Subcontractor $____________ Percentage of Total Contract Bid Price ___________%

** Dollar Volume of DBE Subcontractor Percentage of Total Contract Bid Price: If firm is a Material Supplier Only, show Dollar Volume as 60% of Agreed Upon Amount from Letter of Intent. If firm is a Manufacturer, show Dollar Volume as 100% of Agreed Upon Amount from Letter of Intent. EX

AMPLE9

Page 16: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

M-2

Rev 11-4-13

LISTING OF DBE SUBCONTRACTORS Sheet ___1____ of ___2______

Firm Name and Address Item No. Item Description * Agreed upon Unit Price

** Dollar Volume of Item

Name TRUCKS N’ MORE

6 ASPHALT B25.0B (HAULING ONLY)

$5.00 $1000.00

Address 528 PARK LANE, SUNNY, NC

7 ASPHALT S9.5B (HAULING ONLY)

$5.00 $3000.00

Name NO EROSION INC

20 TEMP SILT FENCE $2.00 $2000.00

Address 75-A BUSINESS PARK, SUNNY, NC

21 SEEDING AND MULCHING

$4500.00 $4500.00

Name

Address

Name

Address

Name

Address

Name

Address

Name

Address

* The Dollar Volume shown in this column shall be the Actual Price Agreed Upon by the Prime Contractor and the DBE subcontractor, and these prices will be used to determine the percentage of the DBE participation in the contract. ** Dollar Volume of DBE Subcontractor Percentage of Total Contract Bid Price: If firm is a Material Supplier Only, show Dollar Volume as 60% of Agreed Upon Amount from Letter of Intent. If firm is a Manufacturer, show Dollar Volume as 100% of Agreed Upon Amount from Letter of Intent.

EXAMPLE10

Page 17: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

M-2

Rev 11-4-13

LISTING OF DBE SUBCONTRACTORS Sheet __2_____ of ___2______

Firm Name and Address Item No. Item Description * Agreed upon Unit Price

** Dollar Volume of Item

Name

Address

Name

Address

Name

Address

Name

Address

Name

Address

Name

Address

* The Dollar Volume shown in this column shall be the Actual Price Agreed Upon by the Prime Contractor and the DBE subcontractor, and these prices will be used to determine the percentage of the DBE participation in the contract.

** Dollar Volume of DBE Subcontractor $_10,500.00__ Percentage of Total Contract Bid Price __5.2______%

** Dollar Volume of DBE Subcontractor Percentage of Total Contract Bid Price: If firm is a Material Supplier Only, show Dollar Volume as 60% of Agreed Upon Amount from Letter of Intent. If firm is a Manufacturer, show Dollar Volume as 100% of Agreed Upon Amount from Letter of Intent. EX

AMPLE11

Page 18: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

M-2

Rev 11-4-13

LISTING OF DBE SUBCONTRACTORS Sheet ________ of __________

Firm Name and Address Item No. Item Description * Agreed uponUnit Price

** Dollar Volume of Item

Name

Address

Name

Address

Name

Address

Name

Address

Name

Address

Name

Address

Name

Address

* The Dollar Volume shown in this column shall be the Actual Price Agreed Upon by the Prime Contractor and the DBEsubcontractor, and these prices will be used to determine the percentage of the DBE participation in the contract.

** Dollar Volume of DBE Subcontractor Percentage of Total Contract Bid Price: If firm is a Material Supplier Only, show Dollar Volume as 60% of Agreed Upon Amount from Letter of Intent. If firm is a Manufacturer, show Dollar Volume as 100% of Agreed Upon Amount from Letter of Intent.

NONE

1 2

12

Page 19: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

M-2

Rev 11-4-13

LISTING OF DBE SUBCONTRACTORS Sheet ________ of __________

Firm Name and Address Item No. Item Description * Agreed uponUnit Price

** Dollar Volume of Item

Name

Address

Name

Address

Name

Address

Name

Address

Name

Address

Name

Address

* The Dollar Volume shown in this column shall be theActual Price Agreed Upon by the Prime Contractor and the DBE subcontractor, and these prices will be used to determine the percentage of the DBE participation in the contract.

** Dollar Volume of DBE Subcontractor $____________

Percentage of Total Contract Bid Price ___________%

** Dollar Volume of DBE Subcontractor Percentage of Total Contract Bid Price: If firm is a Material Supplier Only, show Dollar Volume as 60% of Agreed Upon Amount from Letter of Intent. If firm is a Manufacturer, show Dollar Volume as 100% of Agreed Upon Amount from Letter of Intent.

2 2

0

0

NONE

13

Page 20: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Execution of Bid Forms

14

Page 21: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Contract No. ______________ Rev. 4-19-11

County __________________

EXECUTION OF BID

NON-COLLUSION AFFIDAVIT, DEBARMENT CERTIFICATION AND GIFT BAN CERTIFICATION

CORPORATION

The person executing the bid, on behalf of the Bidder, being duly sworn, solemnly swears (or affirms) that neither he, nor any official, agent or employee of the bidder has entered into any agreement, participated in any collusion, or otherwise taken any action which is in restraint of free competitive bidding in connection with any bid or contract, that the bidder has not been convicted of violating N.C.G.S. § 133-24 within the last three years, and that the Bidder intends to do the work with its own bonafide employees or subcontractors and is not bidding for the benefit of another contractor.

In addition, execution of this bid in the proper manner also constitutes the Bidder's certification of status under penalty of perjury under the laws of the United States in accordance with the Debarment Certification attached, provided that the Debarment Certification also includes any required statements concerning exceptions that are applicable.

N.C.G.S. § 133-32 and Executive Order 24 prohibit the offer to, or acceptance by, any State Employee of any gift from anyone with a contract with the State, or from any person seeking to do business with the State. By execution of any response in this procurement, you attest, for your entire organization and its employees or agents, that you are not aware that any such gift has been offered, accepted, or promised by any employees of your organization.

SIGNATURE OF CONTRACTOR

Full name of Corporation

Address as Prequalified Attest By

Secretary/Assistant Secretary President/Vice President/Assistant Vice President Select appropriate title Select appropriate title

Print or type Signer's name Print or type Signer's name

CORPORATE SEAL

AFFIDAVIT MUST BE NOTARIZED Subscribed and sworn to before me this the _____ day of _____________________ 20__.

Signature of Notary Public of ____________________________County State of ______________________________ My Commission Expires:________________

NOTARY SEAL EXAMPLE15

Page 22: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Contract No. DZ00010 Rev. 4-19-11

County Place

EXECUTION OF BID NON-COLLUSION AFFIDAVIT, DEBARMENT CERTIFICATION AND GIFT BAN CERTIFICATION

CORPORATION The person executing the bid, on behalf of the Bidder, being duly sworn, solemnly swears (or affirms) that neither he, nor any official, agent or employee of the bidder has entered into any agreement, participated in any collusion, or otherwise taken any action which is in restraint of free competitive bidding in connection with any bid or contract, that the bidder has not been convicted of violating N.C.G.S. § 133-24 within the last three years, and that the Bidder intends to do the work with its own bonafide employees or subcontractors and is not bidding for the benefit of another contractor.

In addition, execution of this bid in the proper manner also constitutes the Bidder's certification of status under penalty of perjury under the laws of the United States in accordance with the Debarment Certification attached, provided that the Debarment Certification also includes any required statements concerning exceptions that are applicable.

N.C.G.S. § 133-32 and Executive Order 24 prohibit the offer to, or acceptance by, any State Employee of any gift from anyone with a contract with the State, or from any person seeking to do business with the State. By execution of any response in this procurement, you attest, for your entire organization and its employees or agents, that you are not aware that any such gift has been offered, accepted, or promised by any employees of your organization.

SIGNATURE OF CONTRACTOR Big Time Corp.

Full name of Corporation

800 Office Blvd, Place, NC Address as Prequalified

Attest BySecretary/Assistant Secretary President/Vice President/Assistant Vice President

Select appropriate title Select appropriate title

Sally Smith John Williams Print or type Signer's name Print or type Signer's name

CORPORATE SEAL

AFFIDAVIT MUST BE NOTARIZED

Subscribed and sworn to before me this the

__1__ day of ___January____________ 20__.

Signature of Notary Public

of ________Place________________County

State of _______NC_____________________

My Commission Expires:__12/31/16_________

NOTARY SEAL

15EXAMPLE16

Page 23: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Contract No. ______________ Rev. 4-19-11

County __________________

EXECUTION OF BID

NON-COLLUSION AFFIDAVIT, DEBARMENT CERTIFICATION AND GIFT BAN CERTIFICATION

PARTNERSHIP The person executing the bid, on behalf of the Bidder, being duly sworn, solemnly swears (or affirms) that neither he, nor any official, agent or employee of the bidder has entered into any agreement, participated in any collusion, or otherwise taken any action which is in restraint of free competitive bidding in connection with any bid or contract, that the bidder has not been convicted of violating N.C.G.S. § 133-24 within the last three years, and that the Bidder intends to do the work with its own bonafide employees or subcontractors and is not bidding for the benefit of another contractor. In addition, execution of this bid in the proper manner also constitutes the Bidder's certification of status under penalty of perjury under the laws of the United States in accordance with the Debarment Certification attached, provided that the Debarment Certification also includes any required statements concerning exceptions that are applicable. N.C.G.S. § 133-32 and Executive Order 24 prohibit the offer to, or acceptance by, any State Employee of any gift from anyone with a contract with the State, or from any person seeking to do business with the State. By execution of any response in this procurement, you attest, for your entire organization and its employees or agents, that you are not aware that any such gift has been offered, accepted, or promised by any employees of your organization.

SIGNATURE OF CONTRACTOR

Full Name of Partnership

Address as Prequalified

By

Signature of Witness Signature of Partner

Print or type Signer's name Print or type Signer's name

AFFIDAVIT MUST BE NOTARIZED Subscribed and sworn to before me this the _____ day of _____________________ 20__.

Signature of Notary Public of ____________________________County State of ______________________________ My Commission Expires:________________

NOTARY SEAL EXAMPLE17

Page 24: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Contract No. DZ00010 Rev. 4-19-11

County Place

EXECUTION OF BID NON-COLLUSION AFFIDAVIT, DEBARMENT CERTIFICATION AND GIFT BAN CERTIFICATION

PARTNERSHIP

The person executing the bid, on behalf of the Bidder, being duly sworn, solemnly swears (or affirms) that neither he, nor any official, agent or employee of the bidder has entered into any agreement, participated in any collusion, or otherwise taken any action which is in restraint of free competitive bidding in connection with any bid or contract, that the bidder has not been convicted of violating N.C.G.S. § 133-24 within the last three years, and that the Bidder intends to do the work with its own bonafide employees or subcontractors and is not bidding for the benefit of another contractor.

In addition, execution of this bid in the proper manner also constitutes the Bidder's certification of status under penalty of perjury under the laws of the United States in accordance with the Debarment Certification attached, provided that the Debarment Certification also includes any required statements concerning exceptions that are applicable.

N.C.G.S. § 133-32 and Executive Order 24 prohibit the offer to, or acceptance by, any State Employee of any gift from anyone with a contract with the State, or from any person seeking to do business with the State. By execution of any response in this procurement, you attest, for your entire organization and its employees or agents, that you are not aware that any such gift has been offered, accepted, or promised by any employees of your organization.

SIGNATURE OF CONTRACTOR Williams-Taylor Contracting

Full Name of Partnership

100 Oak Lane, Place, NC Address as Prequalified

BySignature of Witness Signature of Partner

Sally Smith John Williams Print or type Signer's name Print or type Signer's name

AFFIDAVIT MUST BE NOTARIZED

Subscribed and sworn to before me this the

__1__ day of ___January____________ 2015.

Signature of Notary Public

of _____Place____________________County

State of ________NC____________________

My Commission Expires:__12/31/16________

NOTARY SEAL EXAMPLE18

Page 25: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Contract No. ______________ Rev. 4-19-11

County __________________

EXECUTION OF BID

NON-COLLUSION AFFIDAVIT, DEBARMENT CERTIFICATION AND GIFT BAN CERTIFICATION

LIMITED LIABILITY COMPANY The person executing the bid, on behalf of the Bidder, being duly sworn, solemnly swears (or affirms) that neither he, nor any official, agent or employee of the bidder has entered into any agreement, participated in any collusion, or otherwise taken any action which is in restraint of free competitive bidding in connection with any bid or contract, that the bidder has not been convicted of violating N.C.G.S. § 133-24 within the last three years, and that the Bidder intends to do the work with its own bonafide employees or subcontractors and is not bidding for the benefit of another contractor. In addition, execution of this bid in the proper manner also constitutes the Bidder's certification of status under penalty of perjury under the laws of the United States in accordance with the Debarment Certification attached, provided that the Debarment Certification also includes any required statements concerning exceptions that are applicable. N.C.G.S. § 133-32 and Executive Order 24 prohibit the offer to, or acceptance by, any State Employee of any gift from anyone with a contract with the State, or from any person seeking to do business with the State. By execution of any response in this procurement, you attest, for your entire organization and its employees or agents, that you are not aware that any such gift has been offered, accepted, or promised by any employees of your organization.

SIGNATURE OF CONTRACTOR

Full Name of Firm

Address as Prequalified

Signature of Witness Signature of Member/Manager/Authorized Agent

Select appropriate title

Print or type Signer's name Print or type Signer's Name

AFFIDAVIT MUST BE NOTARIZED Subscribed and sworn to before me this the _____ day of _____________________ 20__.

Signature of Notary Public of ____________________________County State of ______________________________ My Commission Expires:________________

NOTARY SEAL

EXAMPLE19

Page 26: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Contract No. DZ00010 Rev. 4-19-11

County Place

EXECUTION OF BID NON-COLLUSION AFFIDAVIT, DEBARMENT CERTIFICATION AND GIFT BAN CERTIFICATION

LIMITED LIABILITY COMPANY

The person executing the bid, on behalf of the Bidder, being duly sworn, solemnly swears (or affirms) that neither he, nor any official, agent or employee of the bidder has entered into any agreement, participated in any collusion, or otherwise taken any action which is in restraint of free competitive bidding in connection with any bid or contract, that the bidder has not been convicted of violating N.C.G.S. § 133-24 within the last three years, and that the Bidder intends to do the work with its own bonafide employees or subcontractors and is not bidding for the benefit of another contractor.

In addition, execution of this bid in the proper manner also constitutes the Bidder's certification of status under penalty of perjury under the laws of the United States in accordance with the Debarment Certification attached, provided that the Debarment Certification also includes any required statements concerning exceptions that are applicable.

N.C.G.S. § 133-32 and Executive Order 24 prohibit the offer to, or acceptance by, any State Employee of any gift from anyone with a contract with the State, or from any person seeking to do business with the State. By execution of any response in this procurement, you attest, for your entire organization and its employees or agents, that you are not aware that any such gift has been offered, accepted, or promised by any employees of your organization.

SIGNATURE OF CONTRACTOR

Driver Trucking, LLC Full Name of Firm

123 Park Lane, Place, NC Address as Prequalified

Signature of Witness Signature of Member/Manager/Authorized Agent Select appropriate title

Jane Driver John Driver Print or type Signer's name Print or type Signer's Name

AFFIDAVIT MUST BE NOTARIZED

Subscribed and sworn to before me this the

_1___ day of ____January___________ 2015.

Signature of Notary Public

of _______Place__________________County

State of _________NC___________________

My Commission Expires:__12/31/16_________

NOTARY SEAL

EXAMPLE20

Page 27: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Contract No. ______________ Rev. 4-19-11

County __________________

EXECUTION OF BID

NON-COLLUSION AFFIDAVIT, DEBARMENT CERTIFICATION AND GIFT BAN CERTIFICATION

JOINT VENTURE (2) or (3)

The person executing the bid, on behalf of the Bidder, being duly sworn, solemnly swears (or affirms) that neither he, nor any official, agent or employee of the bidder has entered into any agreement, participated in any collusion, or otherwise taken any action which is in restraint of free competitive bidding in connection with any bid or contract, that the bidder has not been convicted of violating N.C.G.S. § 133-24 within the last three years, and that the Bidder intends to do the work with its own bonafide employees or subcontractors and is not bidding for the benefit of another contractor.

In addition, execution of this bid in the proper manner also constitutes the Bidder's certification of status under penalty of perjury under the laws of the United States in accordance with the Debarment Certification attached, provided that the Debarment Certification also includes any required statements concerning exceptions that are applicable.

N.C.G.S. § 133-32 and Executive Order 24 prohibit the offer to, or acceptance by, any State Employee of any gift from anyone with a contract with the State, or from any person seeking to do business with the State. By execution of any response in this procurement, you attest, for your entire organization and its employees or agents, that you are not aware that any such gift has been offered, accepted, or promised by any employees of your organization.

SIGNATURE OF CONTRACTOR

Instructions: 2 Joint Venturers Fill in lines (1), (2) and (3) and execute. 3 Joint Venturers Fill in lines (1), (2), (3) and (4) and execute. On Line (1), fill in the name of the Joint Venture Company. On Line (2), fill in the name of one of the joint venturers and execute below in the appropriate manner. On Line (3), print or type the name of the other joint venturer and execute below in the appropriate manner. On Line (4), fill in the name of the third joint venturer, if applicable and execute below in the appropriate manner.

(1) Name of Joint Venture

(2) Name of Contractor Address as Prequalified Signature of Witness or Attest By Signature of Contractor Print or type Signer's name Print or type Signer's name If Corporation, affix Corporate Seal and

(3) Name of Contractor Address as Prequalified Signature of Witness or Attest By Signature of Contractor Print or type Signer's name Print or type Signer's name If Corporation, affix Corporate Seal and

(4) Name of Contractor (for 3 Joint Venture only) Address as Prequalified Signature of Witness or Attest By Signature of Contractor Print or type Signer's name Print or type Signer's name

If Corporation, affix Corporate Seal

NOTARY SEAL NOTARY SEAL NOTARY SEAL Affidavit must be notarized for Line (2) Affidavit must be notarized for Line (3) Affidavit must be notarized for Line (4) Subscribed and sworn to before me this Subscribed and sworn to before me this Subscribed and sworn to before me this _____day of______________________ 20___ _____day of ____________________ 20___ ____day of ___________________ 20_____ ____________________________________ ____________________________________ ____________________________________ Signature of Notary Public Signature of Notary Public Signature of Notary Public of ____________________________County of ____________________________County of ____________________________County State of ______________________________ State of _______________________________ State of ______________________________ My Commission Expires:________________ My Commission Expires:_________________ My Commission Expires:________________

EXAMPLE21

Page 28: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Contract No. DZ00010 Rev. 4-19-11

County Place

EXECUTION OF BID NON-COLLUSION AFFIDAVIT, DEBARMENT CERTIFICATION AND GIFT BAN CERTIFICATION

JOINT VENTURE (2) or (3) The person executing the bid, on behalf of the Bidder, being duly sworn, solemnly swears (or affirms) that neither he, nor any official, agent or employee of the bidder has entered into any agreement, participated in any collusion, or otherwise taken any action which is in restraint of free competitive bidding in connection with any bid or contract, that the bidder has not been convicted of violating N.C.G.S. § 133-24 within the last three years, and that the Bidder intends to do the work with its own bonafide employees or subcontractors and is not bidding for the benefit of another contractor.

In addition, execution of this bid in the proper manner also constitutes the Bidder's certification of status under penalty of perjury under the laws of the United States in accordance with the Debarment Certification attached, provided that the Debarment Certification also includes any required statements concerning exceptions that are applicable.

N.C.G.S. § 133-32 and Executive Order 24 prohibit the offer to, or acceptance by, any State Employee of any gift from anyone with a contract with the State, or from any person seeking to do business with the State. By execution of any response in this procurement, you attest, for your entire organization and its employees or agents, that you are not aware that any such gift has been offered, accepted, or promised by any employees of your organization.

SIGNATURE OF CONTRACTORInstructions: 2 Joint Venturers Fill in lines (1), (2) and (3) and execute. 3 Joint Venturers Fill in lines (1), (2), (3) and (4) and execute. On Line (1), fill in the name of the Joint Venture Company. On Line (2), fill in the name of one of the joint venturers and execute below in the appropriate manner. On Line (3), print or type the name of the other joint venturer and execute below in the appropriate manner. On Line (4), fill in the name of the third joint venturer, if applicable and execute below in the appropriate manner.

(1) Company One - Two Name of Joint Venture

(2) Company OneName of Contractor

1 Elm Street, Place. NC Address as Prequalified

Signature of Witness or Attest By Signature of Contractor Sally Smith Tom Won

Print or type Signer's name Print or type Signer's name

If Corporation, affix Corporate Seal and

(3) Company Two Name of Contractor

2 Maple Street, Place, NC Address as Prequalified

Signature of Witness or Attest By Signature of Contractor John Williams Tim Too

Print or type Signer's name Print or type Signer's name

If Corporation, affix Corporate Seal and

(4) Name of Contractor (for 3 Joint Venture only)

Address as Prequalified

Signature of Witness or Attest By Signature of Contractor

Print or type Signer's name Print or type Signer's name

If Corporation, affix Corporate Seal NOTARY SEAL NOTARY SEAL NOTARY SEAL Affidavit must be notarized for Line (2) Affidavit must be notarized for Line (3) Affidavit must be notarized for Line (4) Subscribed and sworn to before me this Subscribed and sworn to before me this Subscribed and sworn to before me this __1__day of___January___________ 2015_ __1__day of ___January__________ 20_15 ____day of ___________________ 20_____ ____________________________________ ____________________________________ ____________________________________Signature of Notary Public Signature of Notary Public Signature of Notary Public of _____Place___________________County of ______Place__________________County of ____________________________County State of _______NC_____________________ State of __________NC___________________ State of ______________________________ My Commission Expires:___12/31/16 ______ My Commission Expires:___12/31/16 _______ My Commission Expires:________________

EXAMPLE22

Page 29: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Contract No. ______________ Rev. 4-19-11

County __________________

EXECUTION OF BID

NON-COLLUSION AFFIDAVIT, DEBARMENT CERTIFICATION AND GIFT BAN CERTIFICATION

INDIVIDUAL DOING BUSINESS UNDER A FIRM NAME The person executing the bid, on behalf of the Bidder, being duly sworn, solemnly swears (or affirms) that neither he, nor any official, agent or employee of the bidder has entered into any agreement, participated in any collusion, or otherwise taken any action which is in restraint of free competitive bidding in connection with any bid or contract, that the bidder has not been convicted of violating N.C.G.S. § 133-24 within the last three years, and that the Bidder intends to do the work with its own bonafide employees or subcontractors and is not bidding for the benefit of another contractor. In addition, execution of this bid in the proper manner also constitutes the Bidder's certification of status under penalty of perjury under the laws of the United States in accordance with the Debarment Certification attached, provided that the Debarment Certification also includes any required statements concerning exceptions that are applicable. N.C.G.S. § 133-32 and Executive Order 24 prohibit the offer to, or acceptance by, any State Employee of any gift from anyone with a contract with the State, or from any person seeking to do business with the State. By execution of any response in this procurement, you attest, for your entire organization and its employees or agents, that you are not aware that any such gift has been offered, accepted, or promised by any employees of your organization.

SIGNATURE OF CONTRACTOR

Name of Contractor Individual name

Trading and doing business as

Full name of Firm

Address as Prequalified

Signature of Witness Signature of Contractor, Individually

Print or type Signer's name Print or type Signer’s name

AFFIDAVIT MUST BE NOTARIZED

Subscribed and sworn to before me this the _____ day of _____________________ 20__.

Signature of Notary Public of ____________________________County State of ______________________________ My Commission Expires:________________

NOTARY SEAL EXAMPLE23

Page 30: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Contract No. DZ00010 Rev. 4-19-11

County Place

EXECUTION OF BID NON-COLLUSION AFFIDAVIT, DEBARMENT CERTIFICATION AND GIFT BAN CERTIFICATION

INDIVIDUAL DOING BUSINESS UNDER A FIRM NAME

The person executing the bid, on behalf of the Bidder, being duly sworn, solemnly swears (or affirms) that neither he, nor any official, agent or employee of the bidder has entered into any agreement, participated in any collusion, or otherwise taken any action which is in restraint of free competitive bidding in connection with any bid or contract, that the bidder has not been convicted of violating N.C.G.S. § 133-24 within the last three years, and that the Bidder intends to do the work with its own bonafide employees or subcontractors and is not bidding for the benefit of another contractor.

In addition, execution of this bid in the proper manner also constitutes the Bidder's certification of status under penalty of perjury under the laws of the United States in accordance with the Debarment Certification attached, provided that the Debarment Certification also includes any required statements concerning exceptions that are applicable.

N.C.G.S. § 133-32 and Executive Order 24 prohibit the offer to, or acceptance by, any State Employee of any gift from anyone with a contract with the State, or from any person seeking to do business with the State. By execution of any response in this procurement, you attest, for your entire organization and its employees or agents, that you are not aware that any such gift has been offered, accepted, or promised by any employees of your organization.

SIGNATURE OF CONTRACTOR Name of Contractor John Driver

Individual name

Trading and doing business as Driver Trucking

Full name of Firm

123 Park Lane, Place, NC Address as Prequalified

Signature of Witness Signature of Contractor, Individually

Jane Driver John Driver Print or type Signer's name Print or type Signer’s name

AFFIDAVIT MUST BE NOTARIZED Subscribed and sworn to before me this the

___1_ day of ___January____________ 2015.

Signature of Notary Public

of _______Place_________________County

State of _______NC____________________

My Commission Expires:___12/31/16______

NOTARY SEAL EXAMPLE24

Page 31: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Contract No. ______________ Rev. 4-19-11

County __________________

EXECUTION OF BID

NON-COLLUSION AFFIDAVIT, DEBARMENT CERTIFICATION AND GIFT BAN CERTIFICATION

INDIVIDUAL DOING BUSINESS IN HIS OWN NAME The person executing the bid, on behalf of the Bidder, being duly sworn, solemnly swears (or affirms) that neither he, nor any official, agent or employee of the bidder has entered into any agreement, participated in any collusion, or otherwise taken any action which is in restraint of free competitive bidding in connection with any bid or contract, that the bidder has not been convicted of violating N.C.G.S. § 133-24 within the last three years, and that the Bidder intends to do the work with its own bonafide employees or subcontractors and is not bidding for the benefit of another contractor. In addition, execution of this bid in the proper manner also constitutes the Bidder's certification of status under penalty of perjury under the laws of the United States in accordance with the Debarment Certification attached, provided that the Debarment Certification also includes any required statements concerning exceptions that are applicable. N.C.G.S. § 133-32 and Executive Order 24 prohibit the offer to, or acceptance by, any State Employee of any gift from anyone with a contract with the State, or from any person seeking to do business with the State. By execution of any response in this procurement, you attest, for your entire organization and its employees or agents, that you are not aware that any such gift has been offered, accepted, or promised by any employees of your organization.

SIGNATURE OF CONTRACTOR

Name of Contractor Print or type Individual name

Address as Prequalified

Signature of Contractor, Individually Print or type Signer's Name

Signature of Witness

Print or type Signer’s name

AFFIDAVIT MUST BE NOTARIZED

Subscribed and sworn to before me this the _____ day of _____________________ 20__.

Signature of Notary Public of ____________________________County State of ______________________________ My Commission Expires:________________

NOTARY SEAL EXAMPLE25

Page 32: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Contract No. DZ00010 Rev. 4-19-11

County Place

EXECUTION OF BID NON-COLLUSION AFFIDAVIT, DEBARMENT CERTIFICATION AND GIFT BAN CERTIFICATION

INDIVIDUAL DOING BUSINESS IN HIS OWN NAME

The person executing the bid, on behalf of the Bidder, being duly sworn, solemnly swears (or affirms) that neither he, nor any official, agent or employee of the bidder has entered into any agreement, participated in any collusion, or otherwise taken any action which is in restraint of free competitive bidding in connection with any bid or contract, that the bidder has not been convicted of violating N.C.G.S. § 133-24 within the last three years, and that the Bidder intends to do the work with its own bonafide employees or subcontractors and is not bidding for the benefit of another contractor.

In addition, execution of this bid in the proper manner also constitutes the Bidder's certification of status under penalty of perjury under the laws of the United States in accordance with the Debarment Certification attached, provided that the Debarment Certification also includes any required statements concerning exceptions that are applicable.

N.C.G.S. § 133-32 and Executive Order 24 prohibit the offer to, or acceptance by, any State Employee of any gift from anyone with a contract with the State, or from any person seeking to do business with the State. By execution of any response in this procurement, you attest, for your entire organization and its employees or agents, that you are not aware that any such gift has been offered, accepted, or promised by any employees of your organization.

SIGNATURE OF CONTRACTOR Name of Contractor John Driver

Print or type Individual name

123 Park Lane, Place, NC Address as Prequalified

Signature of Contractor, Individually

John DriverPrint or type Signer's Name

Signature of Witness

Jane Driver Print or type Signer’s name

AFFIDAVIT MUST BE NOTARIZED Subscribed and sworn to before me this the

__1__ day of __January_____________ 2015.

Signature of Notary Public

of _____Place___________________County

State of ________NC___________________

My Commission Expires:____12/31/16_____

NOTARY SEAL EXAMPLE26

Page 33: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Itemized Proposal Sheet

27

Page 34: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Line#

AmountQuantity Unit CostDescriptionSec#

Item Number

Page 1 of 1I TEMIZED PROPOSAL FOR CONTRACT NO. DB#####

ROADWAY ITEMS

----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Lump Sum L.S.800 0000100000-N MOBILIZATION0001

SY

----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

15,840607 1297000000-E MILLING ASPHALT PAVEMENT, ***"DEPTH(2")

0002

SY

----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

2,816607 1308000000-E MILLING ASPHALT PAVEMENT, ***"TO ******"(0" TO 2")

0003

TON

----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

2,059610 1519000000-E ASPHALT CONC SURFACE COURSE,TYPE S9.5B

0004

TON

----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

514610 1523000000-E ASPHALT CONC SURFACE COURSE,TYPE S9.5C

0005

TON ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

154620 1575000000-E ASPHALT BINDER FOR PLANT MIX0006

Total Amount Of Bid For Entire Project :

EXAMPLE28

Page 35: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Line#

AmountQuantity Unit CostDescriptionSec#

Item Number

Page 1 of 1I TEMIZED PROPOSAL FOR CONTRACT NO. DB#####

ROADWAY ITEMS

----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Lump Sum L.S.800 0000100000-N MOBILIZATION0001

SY

----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

15,840607 1297000000-E MILLING ASPHALT PAVEMENT, ***"DEPTH(2")

0002

SY

----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

2,816607 1308000000-E MILLING ASPHALT PAVEMENT, ***"TO ******"(0" TO 2")

0003

TON

----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

2,059610 1519000000-E ASPHALT CONC SURFACE COURSE,TYPE S9.5B

0004

TON

----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

514610 1523000000-E ASPHALT CONC SURFACE COURSE,TYPE S9.5C

0005

TON ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

154620 1575000000-E ASPHALT BINDER FOR PLANT MIX0006

Total Amount Of Bid For Entire Project :

$15,000.00

$79,200.00

$22,528.00

$51,475.00

$12,850.00

$77,000.00

$5.00

$8.00

$25.00

$25.00

$500.00

$258,053.00

EXAMPLE29

Page 36: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Signature Sheet

30

Page 37: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

CONTRACTOR _______________________________________________________________________________

ADDRESS ___________________________________________________________________________________

___________________________________________________________________________________

Federal Identification Number _____________________ Contractors License Number _______________________

Authorized Agent _________________________________ Title ________________________________________

Signature __________________________________________________________ Date ______________________

Witness _________________________________________ Title ________________________________________

Signature __________________________________________________________ Date ______________________

Point of Contact for Post-Bid Inquiries (e.g., Letters of Intent, Insurance, Bonds, Contract Execution):

Name _________________________________________________

Email _________________________________________________

Phone _________________________________________________

THIS SECTION TO BE COMPLETED BY NC DEPARTMENT OF TRANSPORTATION

This bid has been reviewed in accordance with Article 103-1 of the Standard Specifications for Roads and Structures 2012.

Reviewed by NCDOT________________________________________ Date______________ Division Contract Officer

Accepted by NCDOT ________________________________________ Date______________ Division Engineer

EXAMPLE31

Page 38: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

CONTRACTOR ____Big Time Corp._________________________________________________________

ADDRESS ___800 Office Blvd, Place, NC ________________________________________________

___________________________________________________________________________________

Federal Identification Number __12-3456789_______ Contractors License Number ___1234_________________

Authorized Agent __John Williams__________________ Title ___Vice President__________________________

Signature __________________________________________________________ Date ____01/01/2015______

Witness ___Sally Smith___________________________ Title ___Secretary______________________________

Signature __________________________________________________________ Date ____01/01/2015_______

Point of Contact for Post-Bid Inquiries (e.g., Letters of Intent, Insurance, Bonds, Contract Execution):

Name ____John Williams_________________________________

Email [email protected]_________________________

Phone ___252-252-2522____________________________________

THIS SECTION TO BE COMPLETED BY NC DEPARTMENT OF TRANSPORTATION

This bid has been reviewed in accordance with Article 103-1 of the Standard Specifications for Roads and Structures 2012.

Reviewed by NCDOT________________________________________ Date______________ Division Contract Officer

Accepted by NCDOT ________________________________________ Date______________ Division Engineer

EXAMPLE32

Page 39: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Attachment #2

Page 40: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION
Page 41: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Directory of Transportation Firms

• Where can I find the Directory?

https://partner.ncdot.gov/VendorDirectory/default.html/

• How do I use it? • What does everything mean?

Page 42: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Directory of Transportation Firms (Certification Acronyms)

• DBE (Disadvantaged Business Enterprise) • MBE (Minority Business Enterprise) • WBE (Women Business Enterprise) • SBE (Small Business Enterprise) • ACDBE (Airport Concessionaire DBE) • SPSF (Small Professional Services Firm) • HUB (Historically Underutilized Business)

Page 43: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION
Page 44: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION
Page 45: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION
Page 46: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION
Page 47: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

DBE/MBE/WBE Listing of Subcontractors

Page 48: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Written confirmation indicating the DBE/MBE/WBE firm intended to perform work on this contract

Commitment from DBE/MBE/WBE firm for estimated quantities and unit prices( * This amount needs to equal or exceed the amount listed on the DBE/MBE/WBE listing form for that firm.)

Signed affirmation by the prime contractor and the subcontractor that the listed DBE / MBE/ WBE firm will perform work on the contract

Letter of Intent to Perform as Subcontractor

Page 49: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Goal Compliance Letter

Page 50: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

DBE Replacement Form

Page 51: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

About Certification: Please call Tony Medlin @ (919)508-1938 About Prequalification: Please call Kalliopi Piersma @ (919)707-4813

Page 52: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Attachment #3

Page 53: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION
Page 54: STATE OF NORTH CAROLINA D EPARTMENTOFTRANSPORTATION

Map ID# Name Diameter General Location1 Oak 20" At sidewalk by planting on North side2 Pine 21" Right of walk North of bldg.3 Pine 21" Left of building4 Pine 25" Left of building5 Pine 18" Left of building6 Pine 25" Left of building7 Oak 14" Left behind walk8 Oak 25" Left side of walk to truck lot9 Pine 28" Behind building

10 Pine 21" Right of building behind walk11 River Birch 10" Right of building; tree has 2-10" trunks12 Oak 25" Right front of building13 Pine 23" Right front of building14 Pine 22" Right side by picnic table15 Oak 13" At North parking in planting16 Pine 25" By sidewalk in front of Rest Area