Starting Up MineSight for Your Coal Mine Project. Start MineSight 3D. On the Splash Screen Click the Browse Button to go to the start of Your project. Click Browse A directory structure Comes up for you To maneuver to your Starting directory. Click on Ok to Start the Program and Project. - PowerPoint PPT Presentation

Citation preview

Page 1: Starting Up MineSight for Your Coal Mine Project

Starting Up MineSight for Your Coal Mine Project

Page 2: Starting Up MineSight for Your Coal Mine Project

Start MineSight 3D

Page 3: Starting Up MineSight for Your Coal Mine Project

On the Splash Screen Click the Browse Button to go to the start of Your project

Click Browse

A directory structureComes up for youTo maneuver to yourStarting directory

Page 4: Starting Up MineSight for Your Coal Mine Project

Click on Ok to Start the Program and Project

Page 5: Starting Up MineSight for Your Coal Mine Project

It Asks You for Permission to Start a Resources Folder for the Project

Say Yes

Page 6: Starting Up MineSight for Your Coal Mine Project

It Asks You for Dimension Information in a Project Settings Folder

It needs to knowWhetherMeasuresAre metricOr English(ie – Imperial)

For an IllinoisCoal projectThey areProbablyimperial

Page 7: Starting Up MineSight for Your Coal Mine Project

Next it needs the Area Covered by Your Project

For our project the Minimums areEasting 2882667Northing 801997Elevation -100

The Maximums areEasting 2903787Northing 815177Elevation 500

Why these limits? – because that is where the data set for this projectIs located

Page 8: Starting Up MineSight for Your Coal Mine Project

Last Thing is Cell Size

Since coal entries areOn average 20 feetWide a a basic cut is20 feet or maybe 40With automation 20By 20 is a good size.(21.12 is because1000 is max number ofBlocks in a direction.19 is # seams we have)

After completing inputClick ok

Page 9: Starting Up MineSight for Your Coal Mine Project

The Program Opens(The next thing we need is a Project Control File)

Go theMineSight tabTo startMineSightCompass(a collection ofPrograms)

Page 10: Starting Up MineSight for Your Coal Mine Project

Pick Compass from the Pull Down Menu

Page 11: Starting Up MineSight for Your Coal Mine Project

You Get a Love Note About No Project File Found

The note tellsYou what to do

If you know theFile is thereThen move onAnd pick theFile

We know its notThere so we willGo on and pickFile/New Project

Click OK

Page 12: Starting Up MineSight for Your Coal Mine Project

On the Compass Screen Pick File

Then pick new fromThe drop down menu

Then pick PCF(you are creatingA project control fileFor MineSight toKeep track of yourProject in)

Page 13: Starting Up MineSight for Your Coal Mine Project

It Wants to Know Where to Store the File

Browse to yourProject directoryThat you choseAnd then clickOk

Page 14: Starting Up MineSight for Your Coal Mine Project

The Program Begins an Interactive Screen to Get Information from You

You will need toPick imperial unitsAgain(enter 1)

Page 15: Starting Up MineSight for Your Coal Mine Project

Each Choice Has a Pull Down List of Options

A 3D block modelDivides the worldInto blocks

A GSM just modelsThings like coalSeams(We pick GSM)

Page 16: Starting Up MineSight for Your Coal Mine Project

More Inputs

Pick a shortName for yourProject(I thoughtCoal wasAppropriate)

Pick the type ofProject from thePull downMenu (I’m goingTo go for coal)

Page 17: Starting Up MineSight for Your Coal Mine Project

Also Pick A Project Description

This projectExplanation goesTo every reportHeading youPrint out so don’tGet cute orObscene in anUnprofessionalway

When you finishA screen pushThe forwardArrow.

Page 18: Starting Up MineSight for Your Coal Mine Project

The Next Screen Wants to Know What You Want to Call the Layers in your Model

Last time I Checked mostCoal peopleLiked to call themSeams.

Page 19: Starting Up MineSight for Your Coal Mine Project

Next Screen Repeat the Dimensions Information

We will not beRotatingCoordinates(sometimes weWant to line ourReserves modelUp with someNatural geologicDirection)

Page 20: Starting Up MineSight for Your Coal Mine Project

We are Putting in Our Project Dimensions Twice?

The differenceHere is you areSetting up howThe computerModel of theCoal blocks willBe divided up.

Before you wereSimply telling theComputer whatArea your projectWould be locatedIn.

Page 21: Starting Up MineSight for Your Coal Mine Project

Next Screen Wants Us to Label Each Seam in our Model

The label is whatYou want theProgram to call it

The seam codeIs a number toRepresent thatSeam(your drill holeFiles will tip theProgram off thatThe seam hasBeen encounteredBy giving thisCode number)

Page 22: Starting Up MineSight for Your Coal Mine Project

When You Click Forward this time the procedure runs creating a

report and the Project Control File

Page 23: Starting Up MineSight for Your Coal Mine Project

The Report File is Ascii based and is found in your project directory

Creating aProject controlFile is routine101

Its output file isCalledRpt101.la(Rpt is forReport – theNumber is theProgram thatGenerated it –La is the oldName for aPrinter file)