E
N
D
O
F
P
H
A
S
E
3
S
T
A
R
T
O
F
P
H
A
S
E
1
GV
GV
IC
ER
ER
FH
CT
V
M2
M1
LP
LP
LP
LP
RS
RS
MK
TL
TL
TL
BN
BN
RS
RS
BO
X
NP
NP
MH
MH
MH
MH
GY
KO
KO
KO
KO
KO
P
P
P
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
GY
MH
GY
MH
MH
GY
KO
MH
GY
GY
GY
GY
KO
GY
KO
GY
GY
KO
KO
KO
KO
PE
KO
KO
KO
GY
KO
KO
HT
14m
HT
14m
BT
ST
AY
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
RS
RS
RS
RS
RS
RS
RS
RS
RS
RS
MK
MK
MK
MK
MK
MK
MK
MK
MK
MK
TL
TL
TL
TL
TL
BN
BN
BN
BN
BN
CB
RS
RS
CB
CB
RS
RS
NP
NP
CB
NP
RS
NP
MK
CB
NP
RS
RS
RS
RS
TP
TP
TP
TP
TP
RS
IC
IC
IC
IC
IC
IC
IC
IC
IC
IC
IC
IC
IC
IC
IC
IC
IC
IC
IC
IC
M1
MM
4
DT
3
MM
2
DT
4
MM
1
MM
3
T1
CC
T
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
FH
GV
GV
GV
GV
GV
GV
GV
GV
GV
GV
GV
S1
M1
TP
TP
TP
LC75
RLC65
RLC67
RLC71
RLC73
RLC66
RLC69
BF
S
T
A
R
T
O
F
P
H
A
S
E
1
E
N
D
O
F
P
H
A
S
E
3
ST
AR
T O
F P
HA
SE
3
ST
AR
T O
F P
HA
SE
3
NOTES
1. ALL WORKS SHALL BE CARRIED OUT IN ACCORDANCE WITH THE SPECIFICATION FOR
HIGHWAYS WORKS.
2. ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE NOTED.
3. TRIAL HOLES ARE TO BE CARRIED OUT TO CHECK FOR LOCATION OF SERVICES AND CARRY
OUT SAFE WORKING PROCEDURES PRIOR TO EXCAVATION.
4. ALL SETTING OUT TO BE AGREED ON SITE WITH THE ENGINEER.
5. DRAWINGS TO BE READ IN CONJUNCTION WITH SCC STANDARD DETAIL DRAWINGS SERIES
1000.
6. ALL LIGHTING COLUMN REFERENCE NUMBERS TO BE VERIFIED ON SITE.
LEGEND
PROPOSED CONCRETE EDGING KERBS (RF1)
PROPOSED HALF BATTERED KERBS (HB1)
PROPOSED DROPPER KERBS (HB3)
PROPOSED BULL NOSED DROPPED KERBS (BN)
PROPOSED BUFF BLISTER TACTILE PAVING
PROPOSED CORDUROY PAVING
PROPOSED KERB INLET GULLY
REMOVE EXISTING BOLLARD
PROPOSED ROAD MARKINGS
RELOCATED ROAD SIGNS
PROPOSED SIGN TO TSRGD DIAGRAM 956
PROPOSED SIGN TO TSRGD DIAGRAM 966
PROPOSED FOOTWAY WIDENING INTO
VERGE FOR SHARED FACILITY
PROPOSED CARRIAGEWAY CONSTRUCTION
OVER EXISTING FOOTWAY
PROPOSED RE-PROFILED GRASS VERGE
RELOCATED LIGHTING COLUMNS
PROPOSED BUS SHELTER
PROPOSED BUS FLAG
LCEXISTING LIGHTING COLUMNS
RLC
CARRIAGEWAY RESURFACE
(40mm DEPTH)
KGY
EXISTING UTILITY COVERS/INSPECTION
CHAMBERS TO BE RAISED/LOWERED TO
SUIT NEW FINISHED LEVELS
PROPOSED FOOTWAY CONSTRUCTION OVER
EXISTING CARRIAGEWAY
PROPOSED CONCRETE BUS LAY BY -
CONCRETE BRUSH SURFACE WITH
EXPANSION JOINTS AT 10M INTERVAL
TRANSVERSE AND LONGITUDINAL LENGTH
OF LAY BY WITH DOWEL BARS
EXISITNG FOOTWAY TO BE RESURFACED
REMOVE OLD LIGHTING COLUMNSOLP
EXISTING KERBS TO BE RAISED
PROPOSED RED BLISTER TACTILE PAVING
PROPOSED HALF BATTERED KERBS (HB2)
PROPOSED FOOTWAY BOLLARD
PROPOSED CHUTE GULLY
CGY
RBL
EXISTING GRASS VERGE
PROPOSED ELECTRICAL SUPPLY
TO BUS SHELTER
PROPOSED ANTI SKID SURFACING
BUS STOP MARKINGS TO TSRGD DIAGRAM
1025.1 & 1025.4
Classification
Rev.
No.
Sheet
Contract
Drawing No.
Project No.
Notes
DateSig.
ApprDateSig.ChkdDateSig.Drwn
Rev. Description
North Point Project
Drawing
Date
Date
DateApproved by
originator
Checked by
Drawn by
Scale
20050
100 1500
A1
File Name:
Sig.
Sig.
Sig.
Surrey County Council LA 076872 2002.
lead to prosecution or civil proceedings.'
reproduction infringes Crown copyright and may
Stationery Office C Crown copyright. Unauthorised
permission of the Controller of Her Majesty's
`Based upon the Ordnance Survey mapping with the
SHEET OF
A RAISED TABLE REMOVED EQ 19/2/2018 EQ 19/2/2018 DD 20/2/2018
B RSA2 AMENDMENTS & SIGNAL LAYOUT CHANGES EQ 10/6/2018 EQ 10/6/2018 DD 11/6/2018
C CARRIAGEWAY RESURFACE DEPTH CHANGED EQ 22/8/2018 DD DD
D KERB RADIUS LINE ALIGNMENT (CARRIAGEWAY WIDENING AREA) AT
JUNCTION PARK ROAD
MS 09/10/2018 DD DD