8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 1/72
STANDARD
DET NORSKE VERITAS AS
The electronic pdf version of this document found through http://www.dnv.com is the officially binding version
DNV-DS-E403
Standard for Surface Diving Systems
JULY 2012
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 2/72
© Det Norske Veritas AS July 2012
Any comments may be sent by e-mail to [email protected]
This service document has been prepared based on available knowledge, technology and/or information at the time of issuance of this document, and is believed to reflect the best of contemporary technology. The use of this document by others than DNV is at the user's sole risk. DNV does not accept any liability or responsibility for loss or damages resulting fromany use of this document.
FOREWORD
DET NORSKE VERITAS (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property and the environment, at sea and onshore. DNV undertakes classification, certification, and other verification andconsultancy services relating to quality of ships, offshore units and installations, and onshore industries worldwide, andcarries out research in relation to these functions.
DNV service documents consist of among others the following types of documents:
— Service Specifications. Procedural requirements.
— Standards. Technical requirements. — Recommended Practices. Guidance.
The Standards and Recommended Practices are offered within the following areas:
A) Qualification, Quality and Safety Methodology
B) Materials Technology
C) Structures
D) Systems
E) Special Facilities
F) Pipelines and Risers
G) Asset Operation
H) Marine Operations
J) Cleaner EnergyO) Subsea Systems
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 3/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Changes – Page 3
CHANGES
General
This is a new document, incorporating requirements previously found in DNV-OS-E402.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 4/72
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 5/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Contents – Page 5
F 200 Physical protection.............................................................................................................................................. 29F 300 Ventilation and lighting ......................................................................................................................................29F 400 Electrical power supplies to the installed diving system....................................................................................29F 500 Structural fire protection.....................................................................................................................................29
Sec. 3 Pressure Vessels for Human Occupancy, Gas Storage and other Purposes............................... 30
A. Introduction ...................................................................................................................................................................30
A 100 Objectives ...........................................................................................................................................................30A 200 Scope...................................................................................................................................................................30A 300 Application..........................................................................................................................................................30A 400 References...........................................................................................................................................................30A 500 Procedural requirements, approval and certification .......................................................................................... 31A 600 Documentation.................................................................................................................................................... 31A 700 Survey and testing requirements during and after manufacture ......................................................................... 32A 800 Survey and testing requirements during and after assembly ..............................................................................32A 900 Marking and signboards...................................................................................................................................... 32A 1000 Materials ............................................................................................................................................................33
B. General Principles for Design of Chambers ................................................................................................................. 33B 100 General ................................................................................................................................................................ 33B 200 Design loads........................................................................................................................................................34B 300 Foundations for pressure vessels for human occupancy and for gas storage .....................................................34
B 400 Doors, hatches, windows, branches etc. ............................................................................................................. 34
C. Welded Pressure Vessels, Materials, Fabrication and Strength.................................................................................... 36C 100 Materials .............................................................................................................................................................36C 200 Fabrication ..........................................................................................................................................................36C 300 Fabrication tolerances.........................................................................................................................................36C 400 Structural analysis to determine strength............................................................................................................ 36C 500 Strength of vessels subjected to external pressure..............................................................................................36C 600 Flanges for windows...........................................................................................................................................36
D. Gas Cylinders ................................................................................................................................................................37D 100 General ................................................................................................................................................................ 37D 200 Heat treatment.....................................................................................................................................................37D 300 Tolerances and surface conditions...................................................................................................................... 37
E. Acrylic Plastic Windows...............................................................................................................................................37E 100 General ................................................................................................................................................................ 37E 200 Materials .............................................................................................................................................................37E 300 Manufacturers of cast material............................................................................................................................37E 400 Certification of cast material...............................................................................................................................37E 500 Certification of windows ....................................................................................................................................38E 600 Geometry and thickness...................................................................................................................................... 38E 700 Fabrication ..........................................................................................................................................................38E 800 In service inspection ...........................................................................................................................................38
Sec. 4 Life Support Systems including PIPING, Hoses, Valves, Fittings, Compressorsand Umbilicals .................................................................................................................................. 39
A. Introduction ...................................................................................................................................................................39A 100 Objectives ...........................................................................................................................................................39
A 200 Scope...................................................................................................................................................................39A 300 Application..........................................................................................................................................................39A 400 References...........................................................................................................................................................39A 500 Procedural requirements, approval and certification .......................................................................................... 39A 600 Documentation requirements..............................................................................................................................39A 700 Survey and testing requirements during and after manufacture ......................................................................... 40A 800 Survey and testing requirements during and after assembly ..............................................................................41A 900 Survey and testing requirements during and after installation............................................................................ 41A 1000 Materials, including components for gases containing elevated oxygen levels .................................................41
B. Gas Storage ...................................................................................................................................................................42B 100 Capacity .............................................................................................................................................................. 42B 200 Shut-off, pressure relief and drainage................................................................................................................. 42
C. Gas Distribution and Control System ...........................................................................................................................43C 100 General ................................................................................................................................................................ 43C 200 Control stands ..................................................................................................................................................... 43C 300 Basket and wet-bell (if wet-bell is employed) ....................................................................................................43C 400 Chambers ............................................................................................................................................................44C 500 Stand-by diver at surface ....................................................................................................................................44C 600 Nitrogen/oxygen mixing systems for direct supply for breathing ......................................................................44
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 6/72
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 7/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Contents – Page 7
Sec. 6 Fire Prevention, Detection and Extinction..................................................................................... 54
A. Introduction ...................................................................................................................................................................54A 100 Objective.............................................................................................................................................................54A 200 Scope...................................................................................................................................................................54A 300 Application..........................................................................................................................................................54A 400 References...........................................................................................................................................................54A 500 Procedural requirements, approval and certification .......................................................................................... 54
A 600 Documentation requirements..............................................................................................................................54A 700 Survey and testing requirements during and after manufacture ......................................................................... 54A 800 Survey and testing requirements during and after assembly ..............................................................................54A 900 Survey and testing requirements during and after installation............................................................................ 54A 1000 Markings and signboards ....................................................................................................................................55A 1100 Materials .............................................................................................................................................................55
B. Fire Protection...............................................................................................................................................................55B 100 Arrangement .......................................................................................................................................................55
C. Fire Detection and Alarm System.................................................................................................................................55C 100 “Outer area”........................................................................................................................................................55C 200 “Inner area”......................................................................................................................................................... 55C 300 Fault detection.....................................................................................................................................................56
D. Fire Extinguishing.........................................................................................................................................................56D 100 “Outer area”........................................................................................................................................................56D 200 “Inner area”......................................................................................................................................................... 56
E. Miscellaneous Equipment .............................................................................................................................................56E 100 Breathing apparatus and fire-fighter's outfit .......................................................................................................56E 200 Portable fire extinguishers ..................................................................................................................................57
Sec. 7 Launch and Recovery Systems (LARS) ......................................................................................... 58
A. Introduction ...................................................................................................................................................................58A 100 Objectives ...........................................................................................................................................................58A 200 Scope...................................................................................................................................................................58A 300 Application..........................................................................................................................................................58A 400 References...........................................................................................................................................................58
A 500 Procedural requirements, approval and certification .......................................................................................... 58A 600 Documentation.................................................................................................................................................... 58A 700 Survey and testing requirements during and after manufacture ......................................................................... 59A 800 Survey and testing requirements during and after assembly ..............................................................................59A 900 Survey and testing requirements during and after installation............................................................................ 59A 1000 Marking and signposts ........................................................................................................................................ 59A 1100 Materials ............................................................................................................................................................59
B. Design Principles ..........................................................................................................................................................59B 100 General ................................................................................................................................................................ 59B 200 Divers basket and wet-bell (when installed).......................................................................................................60B 300 Function ..............................................................................................................................................................60B 400 Recovery .............................................................................................................................................................61B 500 Power ..................................................................................................................................................................61B 600 Umbilical ............................................................................................................................................................62
C. Strength .........................................................................................................................................................................62C 100 Design loads........................................................................................................................................................62C 200 Dimensions ......................................................................................................................................................... 63C 300 Foundations for launch and recovery systems and lifting appliances................................................................. 63
Sec. 8 Instrumentation and Communication............................................................................................ 64
A. Introduction ...................................................................................................................................................................64A 100 Objective.............................................................................................................................................................64A 200 Scope...................................................................................................................................................................64A 300 Application..........................................................................................................................................................64A 400 References...........................................................................................................................................................64A 500 Procedural requirements, approval and certification .......................................................................................... 64A 600 Documentation.................................................................................................................................................... 64A 700 Survey and testing requirements during and after manufacture ......................................................................... 64A 800 Survey and testing requirements during and after assembly ..............................................................................64A 900 Survey and testing requirements during and after installation............................................................................ 64A 1000 Markings and signboards ....................................................................................................................................65A 1100 Materials ............................................................................................................................................................65
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 8/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Contents – Page 8
B. Instrumentation .............................................................................................................................................................65B 100 General ................................................................................................................................................................ 65B 200 Power supply to control and monitoring systems............................................................................................... 65B 300 Monitoring and inspection during operation ......................................................................................................65B 400 Pressure control system ......................................................................................................................................65B 500 Control stands ..................................................................................................................................................... 66B 600 Pressure indicators in wet-bell and chambers.....................................................................................................67B 700 Oxygen and carbon dioxide analysing systems in wet-bell and chambers......................................................... 67
B 800 Other gases.......................................................................................................................................................... 67B 900 Automatic environmental control systems (if employed)...................................................................................67
C. Communication.............................................................................................................................................................68C 100 General ................................................................................................................................................................ 68C 200 Visual observation of divers ...............................................................................................................................68C 300 Voice communication systems ...........................................................................................................................68
Sec. 9 Evacuation Systems.......................................................................................................................... 69
A. Introduction ...................................................................................................................................................................69A 100 Objectives ...........................................................................................................................................................69A 200 Scope...................................................................................................................................................................69A 300 Application..........................................................................................................................................................69A 400 References...........................................................................................................................................................69
A 500 Procedural requirements, approval and certification .......................................................................................... 69A 600 Documentation.................................................................................................................................................... 69A 700 Survey and testing requirements during and after manufacture ......................................................................... 69A 800 Survey and testing requirements during and after assembly ..............................................................................69A 900 Survey and testing requirements during and after installation............................................................................ 69A 1000 Marking and signboards...................................................................................................................................... 69A 1100 Materials ............................................................................................................................................................69
App. A Selection of Safety Objective........................................................................................................... 70
A. Introduction ...................................................................................................................................................................70A 100 General principles (informative)......................................................................................................................... 70
B. Trigger Questions.......................................................................................................................................................... 70B 100 Overall safety objective ......................................................................................................................................70
B 200 Assessment of risk .............................................................................................................................................. 70B 300 Technical innovation........................................................................................................................................... 71B 400 Contractors’ experience ......................................................................................................................................71B 500 Quality management systems .............................................................................................................................71
C. Systematic Review/Analysis ........................................................................................................................................71C 100 What to do and how? (informative) ....................................................................................................................71
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 9/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.1 – Page 9
SECTION 1GENERAL
A. Introduction
A 100 Objectives101 The objectives of this standard are to give criteria and guidance on design, fabrication, installation,testing and commissioning of SURFACE diving systems employing air or NITROX breathing medium.Procedural requirements for operation, maintenance, and re-qualification of diving systems are normallyspecified in the Classification rules but the technical requirements in this DNV standard do generally apply.
102 Further objectives of this standard are to:
a) provide an internationally acceptable standard of safety for SURFACE diving systems by definingminimum requirements for the design, materials, fabrication, installation, testing, commissioning,operation, repair, and re-qualification
b) serve as a technical reference document for classification and verification services
c) serve as a technical reference document in contractual matters between purchaser and contractor
d) serve as a guideline for designers, purchaser, and contractors.
103 The objectives of this section are to outline the functionality of the standard and the related codes,standards and recommended practices.
104 General guidance is provided as to the use and interpretation of the standard and text from IMO Code of Safety for Diving Systems, 1995 Resolution A.831 (19) is included for reference. In the IMO text, this code isreferred to as “the Code”.
105 The text from IMO Code of Safety for Diving Systems, 1995 Resolution A.831 (19) is included asnormative reference.
A 200 Scope
201 The scope is defined in each section for the various disciplines and may refer to standards that apply tothe discipline in general, such as for electrical systems. In these cases this DNV Standard (DS) only containsrequirements that are particular to SURFACE diving systems, whereas the generic requirements are given inthe referred rules, standard or code. The combined requirements shall then constitute the scope.
202 Requirements for the support vessels are given in DNV Rules for Classification of Ships Pt.5 Ch.16, suchas the requirements for floatation and positioning ability.
203 Where the Code requires that a particular fitting, material, appliance, apparatus, item or type of equipment should be fitted or carried in a system, or that any particular provision should be made, or any
procedure or arrangement complied with, the Administration may allow alternative arrangements in that system, provided that the Administration is satisfied that such alternatives are at least as effective as therequirements of the Code.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 1.5 Equivalents)The design of arrangements, systems and individual components may alternatively or supplementary to theStandard be based on recognized standards, codes, national regulations and other methods of safety and
strength evaluation than specified in the Standard. The basis shall be equivalent to the requirements given inthis Standard.
204 This section bears impact on all other sections.
A 300 Application
301 DSV-SURFACE is normally restricted to dmax (= maximum depth) < 60 msw (= metres sea water) andTop (= operating time) < 8 hours.
302 This standard applies to SURFACE diving systems for any location. The SURFACE diving system maythus be located on and operated from a ship, barge, mobile offshore platform, fixed offshore installation or anonshore site, in the latter case for training, research purposes and such.
However, the standard primarily applies to SURFACE diving systems used in the petroleum and natural gasindustries.
For application in other industries, special considerations may need to be agreed by the parties to the contractand or involved statutory regulators.
303 The SURFACE diving systems may be categorised as:
a) SURFACE diving systems with deck decompression chambers and a ladder or basket for deployment of divers
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 10/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.1 – Page 10
b) for ‘wet-bell’ deployment of divers
304 This standard is not applicable to SCUBA diving, closed bell operations utilising submersibledecompression chambers, Saturation diving systems, submersibles including atmospheric diving suits,submarines or submarine rescue systems.
A 400 Relation to other DNV rules and other codes and standards
401 The requirements in this standard are based on requirements given in DNV Rules for Classification of Ships, and principles outlined in DNV Standards (see B).
402 Where reference is made to codes other than DNV documents, the valid revision shall be taken as therevision that was current at the date of issue of this standard.
403 In case of conflict between requirements of this standard and a reference document, the requirements of this standard shall prevail.
404 This standard is intended to comply, as far as reasonably possible, with the requirements given in IMOCode of Safety for Diving Systems, 1995 Resolution A.831 (19).
405 There are no known major deviations to the IMO Code of Safety for Diving Systems, 1995 ResolutionA.831 (19) except those marked as non-applicable text.
Guidance note:Additional requirements for the SURFACE diving system may be applicable due to the statutory requirements givenin certain geographic areas, or onboard ships flying certain flags.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
A 500 Procedural
501 Procedural requirements are given under A500 in each relevant section.
A 600 Documentation
601 Documentation requirements are given under A600 in each relevant section.
A 700 Survey and testing requirements during and after manufacture and assembly
701 Survey and testing requirements during and after manufacture and assembly are given under A700 ineach relevant section and in DNV-RP-E401 Survey of Diving Systems.
A 800 Survey and testing requirements during and after installation
801 Survey and testing requirements during and after installation are given under A800 in each relevantsection and in DNV-RP-E401 Survey of Diving Systems.
A 900 Marking and signboards
901 Marking and signboard requirements are given under A900 in each relevant section.
A 1000 Materials
1001 Material specifications and requirements are given under A1000 in each relevant section.
B. References
B 100 Normative references
101 The latest revisions of the following Rules apply:
102 The latest revisions of the following DNV Service specifications apply:
Table B1 DNV Rules
Title
DNV Rules for Classification of Ships
Table B2 DNV Service Specifications
Reference Title
DNV-DSS-105 Rules for Certification and Verification of Diving Systems
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 11/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.1 – Page 11
103 The latest revisions of the following DNV Standards apply:
104 The latest revisions of the following DNV Recommended practices apply:
105 The latest revisions of the following DNV Standards for Certification and Classification notes apply:
106 The latest revisions of the following DNV Guidelines apply:
(Empty)
107 The latest revisions of the following other references apply:
Table B3 DNV Standards
Reference Title
DNV-OS-A101 Safety Principles and Arrangements
Table B4 DNV Recommended Practices
Reference Title
DNV-RP-A201 Plan Approval Documentation Types – Definitions
Table B5 DNV Standards for Certification and Classification notes
Title
Standard for Certification No. 2.22 Lifting Appliances
Table B6 Other normative references
Reference Title
ASME VIII Div.1 or Div. 2 1 ASME Boiler and Pressure Vessel Code
ASME PVHO-1 Safety Standard for Pressure Vessels for Human Occupancy
ASME PVHO-2 Safety Standard for Pressure Vessels for Human Occupancy in ServiceGuidelines for PVHO Acrylic Windows.
ASTM G93 Standard Practice for Cleaning Methods and Cleanliness Levels for Materialsand Equipment Used in Oxygen-Enriched Environments
API Codes for hoses
BS 5355 Specification for filling ratios and developed pressures for liquefiable and permanent gases.
EN 738-1, -2 and -3 Pressure regulators for use with medical gases
EN-1964-1 1 Transportable gas cylinders (part 1:1999, part 2:2001 or part 3:2000)
EN 1968 Periodic Inspection and testing of Seamless gas cylinders
EN ISO 11120 1 Gas cylinders - Refillable seamless steel tubes for compressed gas transport,of water capacity between 150 l and 3000 l - Design construction and testing(ISO 11120:1999):
EN 13445 1 Unfired pressure vessels
EN 1708-1 Welding - Basic weld joint details in steel
IMO Code of Safety for Diving Systems, 1995 Resolution A.831(19),
IMO MSC/Circ.645 of 6 June 1994 Guidelines for Vessels with dynamic positioning systemsIMO Resolution A.809(19) In reference to SOLAS Regulation III/6.2.1 and III/6.2.2.
IMO res. MSC.61(67) (FTP Code)
IMO resolution A.468 (XII) Code on noise levels onboard ships.
IEC No.79-10 International Electrotechnical Commission's Publication No.79-10, and IMO(MODU) Code chapter 6,
ISO 6385 Ergonomic Principles in the Design of Work Systems
ISO 9000 Guidance on the selection and use of quality systems, and
ISO 10013 Guidance on developing quality manuals.
ISO 10 380, BS6501 Flexible metallic hoses
ISO 10474 Steel and Steel Products - Inspection Documents /EN 10204 Metallic Products
- Types of Inspection Documents
ISO 13628-5 “Petroleum and natural gas industries – Design and operation of subsea production systems – Part 5: Subsea control umbilicals”
(NFPA) Codes National Fire Protection Agency
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 12/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.1 – Page 12
Guidance note:
The latest revision of the DNV documents may be found in the publication list at the DNV website www.dnv.com.For other sources see DNV-DSS-105 Appendix C.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
B 200 Informative references
B 300 Terminology and definitions
301 The Society signifies Det Norske Veritas AS.
302 The EC signifies the Executive Committee of the Society.
303 Auxiliary Verbal forms are given as follows:
304 “Shall/shall not”: is used to indicate requirements strictly to be followed in order to conform to thedocument and from which no deviation is permitted. In the cases where text from the IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey is used, the IMO use of “should” shall beinterpreted as “shall”.
305 “Should”: shall be used to indicate that among several possibilities one is recommended as particularlysuitable, without mentioning or excluding others, or that a certain course of action is preferred but notnecessarily required, or that (in the negative form) a certain possibility or course of action is deprecated but not
prohibited.306 “May/need not”: shall be used to indicate a course of action permissible within the limits of thedocument.
307 “Agreement”, “by agreement”: Unless otherwise indicated, this means agreed in writing between thesociety, manufacturers, builder and owner.
308 “Administration” means the Government of the State whose flag a ship or floating structure whichcarries a diving system is entitled to fly or in which the ship or floating structure is registered.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 1.3.1 )
309 As-built survey: Survey of the installed and completed diving system, which is performed to verify thatthe completed installation work meets the specified requirements, and to document deviations from the originaldesign, if any.
310 Basket: A divers basket (sometimes known as a stage) is a frame and mesh construction designed toaccommodate divers whilst they are lifted in and out of the water.
311 Bell: A diving bell is a frame incorporating a dome, and including appendages, for transfer of divers between the underwater work site and the deck or the surface chamber (TUP or DDC). In the context of thisstandard, “bell” is defined as an open bell/wet-bell. (See Open Bell, Closed Bell and Wet bell )
PD5500 1 Specification for Unfired Fusion Welded Pressure Vessels
SAE J 517, DIN EN 853, 856, 857 Rubber Hoses and Hose Assemblies
SOLAS 1974 with latest amendments 2 (International Convention for the Safety of Life at Sea).
1) Alternative codes and standards that shall be specified at the start of the project.
2) Relevant reference given in the text.
Table B7 Informative references
Reference Title
DNV-OS-D201 Electrical Systems and Equipment
DNV-OS-D202 Instrumentation and Telecommunication systemsDNV-OS-D301 Fire Protection
DNV-RP-A201 Plan Approval Documentation Types - Definitions
NORSOK Standard U-100 Manned Underwater Operations
EN 849 1 Transportable Gas Cylinders - Cylinder Valves - Specification and Type Testing
EN ISO 11114-3 2 Transportable Gas Cylinders - Compatibility of Cylinder and Valve Materials with GasContents - Part 3: Autogenous Ignition Test in Oxygen Atmosphere
EN ISO 2503 2 Gas Welding Equipment - Pressure Regulators for Gas Cylinders used in Welding, Cuttingand Allied Processes up to 300 bar
ILO Convention 133 Accommodation of crews
1) Alternative codes and standards that shall be specified at the start of the project.
2) Relevant reference given in the text.
Table B6 Other normative references (Continued)
Reference Title
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 13/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.1 – Page 13
312 “ Bottle” means a pressure container for the storage and transport of gases under pressure . (IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 1.3.2)
313 “Breathing gas/breathing mixture” means all gases/mixtures of gases which are used for breathing during diving operations.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 1.3.3 )
314 Builder : In the context of these rules, signifies the party contracted to build a diving system in
compliance with the Society's rules.315 Built In Breathing System (BIBS): A system of gas delivery to masks, located in the decompressionchambers, baskets and wet-bells. This system facilitates breathing in the event of a contaminated atmosphere,and allows for the use of therapeutic gases during decompression. (See Sec.4). BIBS may in rare cases beclosed circuit breathing systems (see CCBS definition) but are normally open circuit systems where the exhaledgas is dumped to atmosphere.
316 Case by case: When the case by case approval procedure is used, documentation of the design shall besubmitted for approval for each application as required in the applicable chapters of the rules. When the case
by case survey procedure is used, the survey shall be performed on the basis of approved design documentationfor the actual application and as required in the applicable sections of the rules. Compliance with the approveddesign documentation and applicable requirements will be documented by certificates as required in theapplicable sections of the rules.
317 “Category A machinery spaces” are those spaces and trunks to such spaces as defined in the International Convention for the Safety of Life at Sea, 1974, as amended.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 1.3.20 )
318 Certificate: A document confirming compliance with the Society's rules or with other rules andregulations for which the Society has been authorized to act.
319 Certification: A service confirming compliance with applicable requirements on the date that the surveywas completed. Materials and components in DNV Classified SURFACE diving systems shall be certifiedaccording to the level of certification given in DNV-DSS-105.
320 Chamber: Surface decompression, pressure or compression chambers (see also DDC), hereafter calledthe chambers, and are pressure vessels for human occupancy.
321 Class: In the context of these rules, Class is assigned to and will be retained by the diving systemcomplying with applicable requirements of the Society's rules.
322 Classification: In the context of these rules, a service which comprises the development of independenttechnical standards for diving systems - and verifies compliance with the rules throughout the vessels' life.
323 Closed bell: A sealed submersible diving chamber (SDC) that locks on and off the chamber where thedivers decompress ( DDC ). Pressure differentials are retained by way of a closed door sealing the divers in at
pressures, elevated or lowered compared to the surrounding pressure. Closed bells are not covered by thisstandard. See DNV-DS-E402. (Note: currently under development, meanwhile use DNV-OS-E402).
324 Closed Circuit Breathing System (CCBS) ‘: A system for supply of breathing gas to the diver and savingof his exhaled gases for re-circulation after scrubbing and replenishing. (see Sec.4)
325 Commissioning : In relation to diving systems, refers to activities which take place after installation and prior to operation, comprising the tests and trials outlined in Sec.2 J.
326 Compact umbilical: Umbilical consisting of composite bundles of hoses, cables and strength membersin a braiding or sheathing. (See Sec.4)
327 Compartment: Part (s) of a chamber sufficiently large to contain at least one person and which may havean internal pressure different from adjacent compartments. (see Sec.3)
328 Construction phase: All phases during construction, including fabrication, installation, testing andcommissioning, up until the installation or system is safe and operable for intended use. In relation to divingsystems, this includes manufacture, assembly, testing, commissioning and repair.
329 Contractor : A party contractually appointed by the Purchaser to fulfil all, or any of, the activitiesassociated with design, construction and operation.
330 Control stations normally as defined in regulation 3 and referred to in regulation 20, chapter II-2 of theInternational Convention for the Safety of Life at Sea. Control stand or Control station is a control station inwhich one or more of the following control and indicator functions are centralized:
a) Indication and operation of all vital life support conditions, including pressure control
b) Visual observation, communication systems including telephones, audio-recording and microphones to public address systems
c) Disconnection of all electrical installations and Insulation monitoring
d) Provisions for calibration of and comparison between gas analysing
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 14/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.1 – Page 14
e) Indication of temperature and humidity in the inner area
f) Alarms for abnormal conditions of environmental control systems
g) Fixed fire detection and fire alarm systems
h) Ventilation fans
i) Automatic sprinkler, fire detection and fire alarm systems
j) Launch and recovery systems, including interlock safety functionsk) Operation and control of the hyperbaric evacuation system
331 Corrosion allowance: Extra wall thickness added during design to compensate for any reduction in wallthickness by corrosion (internally and externally) during operation.
332 Customer: Signifies the party who has requested the Society's service.
333 Deck Decompression Chamber (DDC): Deck mounted Pressure Vessel for Human Occupancy (PVHO)used for decompression. (See Sec.3)
334 “Depth” means the water depth or equivalent pressure to which the diver is exposed at any time during a dive or inside a surface compression chamber or a diving bell.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 1.3.6 )
335 Design: All related engineering to design the diving system, including both structural as well as material
and corrosion.336 Design life: The initially planned time period from initial installation or use until permanentdecommissioning of the equipment or system. The original design life may be extended after a re-qualification.
337 Design load : For PVHOs see Sec.3 B300/400 and for LARS see Sec.7 C100.
338 Design temperature, maximum: The highest possible temperature to which the equipment or system may be exposed to during installation and operation. Environmental as well as operational temperatures shall beconsidered.
Design temperature, minimum: The lowest possible temperature to which the equipment or system may beexposed to during installation and operation, irrespective of the pressure. Environmental as well as operationaltemperatures shall be considered.
Guidance note:
For LARS, the design temperature is defined in Standard for Certification 2.22 - Lifting Appliances.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
339 Designer : Signifies a party who creates documentation submitted to the Society for approval or information.
340 Diver heating: A system for actively heating the divers in the water or in the inner area.
341 Divers: Personnel subjected to higher ambient pressure than one atmosphere.
342 “Diving bell” means a submersible compression chamber, including its fitted equipment, for transfer of diving personnel under pressure between the work location and the surface compression chamber.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 1.3.7 )
343 “Diving system” means the whole plant and equipment necessary for the conduct of diving operations.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 1.3.8 )
Diving system (in DNV terms): The whole plant and equipment necessary for safe conduct of diving operationswhere compression and decompression of divers are taking place. For classification purposes, SURFACE
diving operations are categorized as dmax< 60 msw and Top< 8 hours where msw is metres of sea water 344 dmax: Maximum operating depth of the SURFACE diving system. This is the depth corresponding tothe maximum pressure for pressurizing divers. (For Classified systems this may be specified in the certificateand Data Sheet).
345 DSV : Class Notation in DNV representing ‘Diving Support Vessel'.
346 ECU : Environmental Control Unit. Maintains Temperature, reduces humidity and may include removalof carbon dioxide. (see Sec.4)
347 Enriched air : Nitrogen oxygen mixtures with elevated oxygen content. (See NITROX)
348 Equipment lock: A pressure tight independent lock mounted on the shell of the chamber providing themeans for locking in equipment necessary for the divers and the operation of the system. (See also Medical lock )
349 “ Evacuation system” means a system whereby divers under pressure can be safely evacuated from a ship
or floating structure to a position where decompression can be carried out.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 1.3.9 )
350 Fabrication: Activities related to the assembly of objects with a defined purpose. In relation to divingsystems, fabrication refers to e.g. deck decompression chambers, wet-bells, and pressure vessels for gasstorage, environmental control systems, launch and recovery systems etc.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 15/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.1 – Page 15
351 Fabricator : The party performing the fabrication (in this context, normally of windows for PVHOs).
352 Failure: An event affecting a component or system and causing one or both of the following effects:
— loss of component or system function — deterioration of functional capability to such an extent that the safety of the installation, personnel or
environment is significantly reduced
353 Fatigue: Cyclic loading causing degradation of the material.354 Flag administration: The maritime administration of a vessel's country of registry.
355 Gas: In the context of this standard, gas includes air, oxygen and Enriched air/NITROX .
356 Gas containers: Cylinders, bottles and pressure vessels for storage of pressurized gas. (see Sec.3 and 4)
357 Guidance notes: Contain advice which is not mandatory for the assignment or retention of class, but withwhich the Society, in light of general experience, advises compliance.
358 “Handling system” means the plant and equipment necessary for raising, lowering and transporting thediving bell between the work location and the surface compression chamber.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 1.3.10 ) (See Launch and recovery System-LARS)
359 “Hazardous areas” are those locations in which an explosive gas-air mixture is continuously present,
or present for long periods (zone O); in which an explosive gas-air mixture is likely to occur in normal operation (zone 1); in which an explosive gas-air mixture it not likely to occur, and if it does it will only exist for a short time (zone 2).(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 1.3.11 )
360 HAZOP ( HAZard and OPerability study): The application of a formal systematic critical examination tothe process and engineering intentions of new or existing facilities to assess the hazard potential of inadvertentoperation or malfunction of individual items of equipment and their consequential effects on the facility as awhole (Chemical Industries Association HAZOP Guide).
361 Hydro-test or Hydrostatic test : See Pressure test
362 Hyperbaric Evacuation System (HES): System for evacuating divers under pressure. This includes theHyperbaric Evacuation Unit (HEU), the launch and recovery and control systems. (See Sec.9)
363 Hyperbaric Rescue Vessel (HRV): IMO uses the term Hyperbaric Evacuation Unit (HEU). See above.
364 IACS: The International Association of Classification Societies.365 IMO: Signifies the International Maritime Organization.
366 Inner area: The areas which are inside the chambers. Interconnecting trunks are considered part of theinner area when the door is opened into the chamber.
367 Inspection: Activities such as measuring, examination, testing, gauging one or more characteristics of a product or service and comparing the results with specified requirements for determine conformity.
368 Installation (activity): The operations related to installing the equipment, diving system or supportstructure, e.g. mounting chambers, gas cylinders, ECUs, panels, interconnecting piping, launch and recoverysystems etc., including final testing and preparation for operation.
369 Installation Manual (IM): A document prepared by the Contractor to describe and demonstrate that theinstallation method and equipment used by the Contractor will meet the specified requirements and that the
results can be verified.370 ISO: Signifies the International Organisation for Standardization.
371 Launch and recovery system (LARS): The system and equipment necessary to launch and recover thedivers, the diver’s basket or wet-bell to the chambers as well as transport the divers between the surface supportunit and the underwater working site, including any guide rope systems and cursor systems. (See Sec.7)
372 Lay-up: A terminology used for diving systems that are out of commission. In this state the diving systemmay be installed on board or permanently stored on shore.
373 “ Life support system” means the gas supply, breathing gas system, decompression equipment,environmental control system and equipment required to provide a safe environment for the diving crew in thediving bell and the surface compression chamber under all ranges of pressure and conditions they may beexposed to during diving operations.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 1.3.12 )
Life support systems (in DNV terms): The systems comprising gas supply systems, breathing gas systems, pressure regulating systems, environmental control systems, and systems required to provide a safe habitat for the divers, in the basket, the wet-bell and the chamber compartments under normal conditions duringSURFACE diving operation. (See Sec.4)
374 “ Living compartment” means the part of the surface compression chamber which is intended to be used
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 16/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.1 – Page 16
as the main habitation for the divers during diving operations and which is equipped for such purpose.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 1.3.13 ) Living compartment (in DNV terms): A compartment which is intended to be used as the main habitation for the diversand which is equipped as such.
375 Load : Any action causing stress, strain, deformation, displacement, motion, etc. to the equipment or system.
376 Load effect : Effect of a single load or combination of loads on the equipment or system, such as stress,
strain, deformation, displacement, motion, etc.377 Load effect factor : The partial safety factor by which the characteristic load effect is multiplied to obtainthe design load effect.
378 Lot : A number of components from the same batch. E.g. same heat, the same heat treatment batch andwith the same dimensions.
379 “Main components” of a diving system include the surface compression chamber, diving bell, handling system and fixed gas storage facilities.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 1.3.14 )
380 Manufacture: Making of articles or materials, often in large volumes. In relation to diving systems, refersto activities for the production of pressure vessels, panel, and life support systems etc., performed under contracts from one or more Contractors.
381 Manufacturer: Signifies the entity that manufactures the material or product, or carries out part
production that determines the quality of the material or product, or does the final assembly of the product.382 “Mating device” means the equipment necessary for the connection and a disconnection of a diving bell to a surface compression chamber.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 1.3.15 )
383 “Maximum operating depth” of the diving system is the depth in metres or feet of seawater equivalent tothe maximum pressure for which the diving system is designed to operate.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 1.3.16 )
384 Medical lock : A pressure tight independent lock mounted on the shell of the chamber providing themeans for locking in provisions, medicine and equipment necessary for the divers and the operation of thesystem. (See also Equipment lock )
385 NDE level: The extent and acceptance criteria for the NDE of the components.
386 NITROX: Nitrogen oxygen mixtures with elevated oxygen content. (See Enriched air )
387 Nominal outside diameter: The specified outside diameter. This shall mean the actual outside diameter.
388 Nominal wall thickness: The specified non-corroded wall thickness, which is equal to the minimum steelwall thickness plus the manufacturing tolerance.
389 Normal cubic meters: (Nm3) is taken as cubic meters of gas at standard conditions of 0°C and 1.013 bar.
390 Open bell (also known as Wet bell): A suspended canopy chamber, open at the bottom like a moon poolstructure that is lowered underwater to operate as a stage for the divers with the advantage of providing an air
pocket for refuge and a space for communication outside the mask/helmet.
391 Operation, Incidental : Conditions that are not part of normal operation of the equipment or system. Inrelation to diving systems, incidental conditions may lead to incidental pressures.
392 Operation, Normal : Conditions that arise from the intended use and application of equipment or system,including associated condition and integrity monitoring, maintenance, repairs etc. In relation to diving systems,
this should include, start and finish of dives (pre- and post-dive checks), treatment of decompression-relatedincidents, gas transfer and changing out of consumables.
393 “Organization” means the International Maritime Organization (IMO).(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 1.3.17 )
394 Out of roundness: The deviation of the perimeter from a circle. This can be stated as ovalisation (%), or as local out of roundness, e.g. flattening, (mm).
395 Outer area: Those areas of the diving system that are exposed to atmospheric conditions duringoperation, i.e. outside the inner system and the room or area that surrounds or contains the diving system.
396 Ovalisation: The deviation of the perimeter from a circle. This has the form of an elliptic cross section.
397 Owner: Signifies the registered owner or manager of the diving system or any other organization or person who has assumed the responsibility for operation of the diving system and who on assuming suchresponsibility has agreed to take over all the duties and responsibilities.
398 Oxygen systems: Systems intended for a gas with a higher oxygen percentage than 25%.
399 Personal diving equipment: Equipment carried by the diver on his person including his tools, diving suit,diving helmet and self-contained breathing apparatus with gas bottles. This is normally not included in theSURFACE diving system specified in this standard.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 17/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.1 – Page 17
B 400 Terminology and definitions (continued)
401 Plan approval: Signifies a systematic and independent examination of drawings, design documents or records in order to verify compliance with the rules or statutory requirements. Plan approval will be carried outat the discretion of the Society, which also decides the extent and method of examination.
402 Planned Maintenance System (PMS): A system for planning and recording of maintenance activities.
403 Pressure control system: In relation to diving systems, this is the system for control of the pressure in the
various systems, comprising the pressure regulating system, pressure safety system and associated instrumentand alarm systems.
404 Pressure regulating system: In relation to diving systems, this is the system which ensures that,irrespective of the upstream pressure, a set pressure is maintained downstream (at a given reference point) for the component.
405 Pressure safety system: The system which, independent of the pressure regulating system, ensures thatthe allowable set pressure is not exceeded.
406 Pressure test : The hydrostatic pressure test initially performed at the manufacturer of the pressure vesselin accordance with requirements in the design code.
407 Pressure, Collapse: Characteristic resistance against external over-pressure.
408 Pressure, Design: In relation to diving system assemblies, this is the maximum internal pressure duringnormal operation, referred to a specified reference point, to which the component or system section shall be
designed. The design pressure must take account of the various pressurised components in the adjoiningsystems, and their relative design pressures.
409 Pressure, System test : In relation to diving systems, this is the internal pressure applied to the componentor system during testing on completion of installation work to test the diving system for tightness (normally
performed as hydrostatic testing).
410 “Pressure vessel” means a container capable of withstanding an internal maximum working pressure greater than or equal to 1 bar.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 1 3.18)
411 Purchaser : The owner or another party acting on his behalf, who is responsible for procuring materials,components or services intended for the design, construction, installation or modification of a SURFACEdiving system.
412 Quality Assurance (QA): Planned and systematic actions necessary to provide adequate confidence that
a product or service will satisfy given requirements for quality.
413 Quality Plan (QP): The document setting out the specific quality practices, resources and sequence of activities relevant to a particular product, project or contract. A quality plan usually makes reference to the partof the quality manual applicable to the specific case.
414 Quality system: Signifies both the quality management system and established production and control procedures.
415 Reliability: The probability that a component or system will perform its required function without failure,under stated conditions of operation and maintenance and during a specified time interval.
416 Re-qualification: The re-assessment of a design due to modified design premises and or sustained damage.
417 Resistance: The capability of a structure, or part of a structure, to resist load effects.
418 Risk : The qualitative or quantitative likelihood of an accidental or unplanned event occurring, considered
in conjunction with the potential consequences of such a failure. In quantitative terms, risk is the quantified probability of a defined failure mode times its quantified consequence.
419 Rules: All requirements adopted by the EC as the basis for classification.
420 Saturation diving: Once a diver becomes saturated with the gases that make decompression necessary,the diver does not need additional decompression. When the blood and tissues have absorbed all the gas theycan hold at that depth, the time required for decompression becomes constant. As long as the depth is notincreased, additional time on the bottom is free of any additional decompression. Saturation diving equipmentis not covered in this standard. Reference is given to DNV-DS-E402. (Note: currently under development,meanwhile use DNV-OS-E402).
421 Self Propelled Hyperbaric Lifeboat (SPHL): (see HEU and DNV-DS-E402 (Note: currently under development, meanwhile use DNV-OS-E402).)
422 Significant wave height : When selecting the third of the number of waves with the highest wave height,the significant wave height is calculated as the mean of the selection.
423 Specified Minimum Tensile Strength: The minimum tensile strength prescribed by the specification or standard under which the material is purchased.
424 Specified Minimum Yield Stress: The minimum yield stress prescribed by the specification or standardunder which the material is purchased.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 18/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.1 – Page 18
425 Submersible Decompression Chamber (SDC): Closed bell. (Not applicable to this standard. See DNV-DS-E402. Note: under development, meanwhile use DNV-OS-E402).
426 Suitable breathing gas: A gas or gas mixture that is breathable to divers for the pressure and durationthey are exposed to it. In the context of this standard, suitable breathing gases include air, oxygen and Enriched air/NITROX . NB. Pure Oxygen is NOT considered suitable for breathing in water.
427 Supplementary requirements: Requirements for material properties of component that are additional to
the basic requirements, and that are intended to apply to components used for specific applications.428 “Surface compression chamber” means a pressure vessel for human occupancy with means of controlling the pressure inside the chamber.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 1.3.5)
429 Survey: Signifies a systematic and independent examination of a diving system, materials, componentsor systems in order to verify compliance with the rules and/or statutory requirements. Surveys will be carriedout on the vessel, at the construction or repair site as well as at sub-suppliers and other locations at the discretionof the Society, which also decides the extent and method of control.
430 Tentative rules: Provisional requirements and/or guidelines to which the Society reserves the right tomake adjustments in order to obtain the intention reflected in the rules.
431 T op: Maximum operation time, i.e. the time from start of pressurization of the diver, until the diver is back to atmospheric conditions.
432 Transfer compartment: Compartment that is intended to be used for a lock-in or -out operation of divers between other compartments or outer area. Also known as TUP (Transfer Under Pressure)The diving system should be capable of allowing the safe transfer of a person under pressure from the diving bell to the surface compression chamber (and vice versa).(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.2.7)
433 Transferable diving system: A diving system designed to be easily transferable in one or more units andwhich may be installed on-board a ship, barge or offshore platform for a short period of time not exceeding oneyear. A transferable diving system may be assembled from different units into a particular configurationsuitable for a specific working operation.
434 Trunk : In the context of pressure vessels for human occupancy, trunk denotes the cylindrical spool-piececonnecting separate chambers. The maximum length of these cylindrical trunks is considered to be 1400 mm.In the context of separation of fire resistant enclosures to Category A machinery spaces, a trunk is a small
enclosed room defined in SOLAS Ch.II-2 Reg.9.2 Thermal and structural boundaries.
435 Type approval : is a procedure for plan approval. Type approval can be applied to products, groups of products, systems or retention survey. This procedure should normally be used for approval of standarddesigns. The type approval procedure may consist of the following elements: plan approval, initial survey, typetesting and issue of a type approval certificate. The type approval procedure used by DNV is described in DNVStandard for Certification No. 1.2.
436 Ultimate Tensile Strength (UTS): The measured ultimate tensile strength.
437 “Umbilical ” means the link between the diving support unit and the diving bell and may contain surveillance, communication and power supply cables, breathing gas and hot water hoses. The hoisting and lowering strength member may be part of the umbilical.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 1.3.19)Umbilical (in DNV terms): A link between support vessel and the divers, or the diving wet-bell, which may
contain gas hoses, hot water hose, power supply cables and communication cables. (See Sec.4)438 Verification: A service that signifies a confirmation through the provision of objective evidence(analysis, observation, measurement, test, records or other evidence) that specified requirements has been met.
439 Wet bell = Open bell
440 Witnessing : Signifies attending tests or measurements where the surveyors verify compliance withagreed test or measurement procedures.
441 Work : All activities to be performed within relevant contract(s) issued by Owner, Builder or Manufacturer.
442 Working weight: of the basket or wet-bell shall be taken as the maximum weight of the fully equipped basket or wet-bell, including each fully equipped diver of 200 kg. The load from this weight applies to:
a) launch and recovery in air, and b) launch and recovery submerged, combining the maximum negative buoyancy of the wire rope, umbilical
and basket or wet-bell at maximum operating depth
443 Yield Stress: The measured yield tensile stress.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 19/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.1 – Page 19
B 500 Abbreviations and symbols (guidance)
API American Petroleum Institute
ASME American Society of Mechanical Engineers
ASTM American Society for Testing and Materials
AUT Automatic Ultrasonic Testing
BIBS Built In Breathing System
BS* British Standard (Note: Now PD – Publicdocument)
CCBS Closed Circuit Breathing System
CE Conformité Européenne (European Conformity)
C-Mn Carbon Manganese
CRA Corrosion Resistant Alloy
DDC Deck Decompression Chamber
DNV Det Norske Veritas
DP Dynamic Positioning
DSV Diving Support Vessel
ECU Environmental Control Unit
EBW Electronic Beam WeldedFMEA Failure Mode Effect Analysis
HAZ Heat Affected Zone
HAZOP Hazard and Operability Study
HES Hyperbaric Evacuation System
HEU Hyperbaric Evacuation Unit
HFW High Frequency Welding
HPIC Hydrogen Pressure Induced Cracking
HRC Hyperbaric Rescue Chamber
HRV Hyperbaric Rescue Vessel
IM Installation Manual
IMO International Maritime Organisation
ISO International Organisation for Standardisation
KV Charpy value
LARS Launch and Recovery System
LBW Laser Beam Welded
MPQT Manufacturing Procedure Qualification Test
MPS Manufacturing Procedure Specification
MSA Manufacturing Survey Arrangement
NACE National Association of Corrosion Engineers
NDE Non-Destructive Examination
NDT (Non-Destructive Testing) see NDE
NPD Norwegian Petroleum Directorate (now PSA)
P ProductionPMS Planned Maintenance System
PSA Petroleum Safety Authority
Q Qualification
QA Quality Assurance
QC Quality Control
QP Quality Plan
QRA Quantitative Risk Analysis
ROV Remotely Operated Vehicle
SDC Submersible Decompression Chamber
TUP Transfer Under Pressure
UTS Ultimate Tensile StrengthWPS Welding Procedure Specification
YS Yield Stress
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 20/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.1 – Page 20
501 Symbols
C. Procedural Requirements
C 100 Certification and approval requirements
101 For Classification of SURFACE diving systems by DNV the certification of materials, components andsystems will be documented with certification requirements given in DNV-DSS-105.
102 In accordance with the DNV Rules for Classification of Ships Pt.1 Ch.1 Sec.4 B, the following types of documents apply:
a) Det Norske Veritas Certificate (NV):
A document validated and signed by a surveyor of the Society stating:
i) conformity with rule requirements
ii) that tests are carried out on the certified product itself and/or
iii) that tests are made on samples taken from the certified product itself
iv) that tests are performed in presence of the surveyor or in accordance with special agreements
b) Works Certificate (W):A document signed by the manufacturer stating:
i) conformity with rule requirements
ii) that tests are carried out on the certified product itself and/or
iii) that tests are made on samples taken from the certified product itselfiv) that tests are witnessed and signed by a qualified department of the manufacturers
c) Test Report (TR):A document signed by the manufacturer stating:
i) conformity with rule requirements
ii) that tests are carried out on samples from the current production
103 The applicable chapters and sections of the rules specify which of the above mentioned documents arerequired.
104 Where the rules require works certificate or test report, the surveyor may at any time require the tests to be carried out in his presence and/or that the surveyor check elements of the production control.
A = Cross section area
D = Nominal outside diameter
Dmax = Greatest measured inside or outside diameter
Dmin = Smallest measured inside or outside diameter
Di
= D - 2 tnom
= Nominal internal diameter
E = Young’s Modulus
f 0 =
H = Wave height
H s = Significant wave height
ID = Nominal inside diameter
O = Out of roundness, Dmax - Dmin
OD = Nominal outside diameter
T = Operating temperature
T max = Maximum design temperature
T min = Minimum design temperatureT nom = Nominal thickness
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 21/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.2 – Page 21
SECTION 2DESIGN PHILOSOPHY AND PREMISES –
SURFACE DIVING SYSTEMS
A. Introduction
A 100 Objectives
101 The objectives of this section are to present the safety philosophy applied in this standard, to identify and provide a basis for definition of relevant system design characteristics. These are, key issues required for design, construction, operation and re-qualification of SURFACE diving systems.
102 This section also refers to minimum requirements for documentation for design, manufacture,installation and some operational aspects.
A 200 Scope
201 The scope of this section is to outline the requirements for planning and documenting system philosophy,safety philosophy and the management of quality.
A 300 Application
301 This section applies to all SURFACE diving systems, which shall be built in accordance with thisstandard.
302 This section bears impact upon all other sections in this standard.
A 400 References
401 Reference to normative rules, codes and standards are given under A400 in each relevant section.
A 500 Procedural requirements, approval & certification
501 Approval and Certification requirements are given in DNV-DSS-105 Appendix A.
A 600 Documentation
601 For installation of diving systems on-board or at a site, reference is given to DNV Rules for Classification
of Ships Pt.5 Ch.16.602 Specific document requirement lists are given in A600 under each section.
603 For general requirements, see B.
A 700 Survey and testing requirements during and after manufacturing and assembly
701 The tests to be carried out are stated in A700 under each relevant section in this standard and in DNV-RP-E401. Additional tests may, however, be required.
702 When a diving system is built according to this standard, an inspector or surveyor shall verify that:
a) the design and scantlings comply with the approved plans and the requirements in this standard and other specified recognized standards, codes, and national regulations
b) that the materials and components are certified according to this standard and the terms of delivery
c) that the work is carried out in accordance with the specified fabrication tolerances and required quality of welds etc.
d) that all required tests are carried out
703 The inspection shall be carried out at the manufacturers and/or builder, during or after the manufacture/assembly. The extent and method of examination shall be agreed in the terms of delivery and the specifications.
704 Testing shall be in compliance with approved programmes.
A 800 Survey and testing requirements during and after installation
801 The tests to be carried out are stated in A800 under each relevant section in this standard and in DNV-RP-E401. Additional tests may, however, be required.
802 The diving system shall be tested at sea trials on-board according to an approved programme.
803 During the sea trials the normal launch and recovery system will be tested to the maximum depth. For SURFACE diving systems employing a “wet-bell” the bell shall be checked for leakage at depth, including gascylinders, piping and hoses.
804 Drills should be held to assure adequate access for the divers, and the ability to transfer an injured diver, tothe chamber, and to compress the chamber, within the time frame stipulated by the applied decompression tables.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 22/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.2 – Page 22
A 900 Marking and signboards
901 Marking and signboard requirements are given under A900 in each relevant section.
902 Labels (nameplates) of flame retardant material bearing clear and indelible markings shall be placed sothat all equipment necessary for operation (valves, detachable connections, switches, warning lights etc.) can
be easily identified. The labels are to be permanently fixed.
A 1000 Materials
1001 Material specifications and requirements are given under A1000 in each relevant section.
B. Documentation
B 100 General
101 For installation of diving systems on board, or at a site, reference is given to DNV Rules for Classification of Ships Pt.5 Ch.16.
102 This section specifies the general requirements for documentation during diving system design,manufacturing, fabrication, installation, commissioning and operation.Specific document requirement lists aregiven in A600 under each section. General requirements are given in DNV Rules for Classification of ShipsPt.0 Ch.3 Sec.1.
103 In accordance with quality system requirements, such as those outlined in ISO 9001:2008-4.4 (especially4.4.5) and 4.5 (especially 4.5.2), design output shall be documented and expressed in terms that can be verifiedand validated against design input requirements.The supplier shall establish and maintain documented procedures to control all documents and data.
104 All documentation requirements shall be reflected in a document register. The documentation shall cover design, manufacturing, fabrication, installation and commissioning. As a minimum, the register shall reflectactivities from the start of design to operation of the diving system.
105 The documentation shall be submitted to the relevant parties for acceptance, verification or informationas agreed in ample time before start of fabrication. Documentation pertaining to the system philosophy, conceptand manufacturing procedure specification, shall be submitted for approval and information at the start of the
project to enable systematic review.
106 Verified documentation shall be available at the work site before manufacturing commences.
B 200 Documentation of arrangement
201 List and information stating the following particulars for the diving system shall be included in theManufacturing Procedure Specification that shall be submitted at the start of the project:
a) Maximum operating depth dmax
b) Maximum operation time Top
c) Maximum number of divers in the basket(s) or wet-bell(s)
d) Maximum number of divers in the chamber(s)
e) Maximum operational sea-state
f) Extract from the operation manual, stating the operational procedures, which are to be the basis for thedesign. Plans showing general arrangement of the diving system, location and supporting arrangement
g) Plans showing the lay-out of control stand(s)
h) Proposed program for tests and trials of systems for normal operation and for emergency use
B 300 Documentation of installation
301 Detailed plans, drawings and procedures shall be prepared for all installation activities. The followingshall as a minimum be covered:
a) diving system location overview (planned or existing)
b) other vessel (or fixed location) functions and operations
c) list of diving system installation activities
d) alignment rectification
e) installation of supporting structuref) installation of interconnecting services
g) installation of protective devices
h) hook-up to support systems
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 23/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.2 – Page 23
i) as-built survey
j) final testing and preparation for operation
B 400 Documentation for systems in operation
401 Plans for diving system operation, inspection, maintenance and repair shall be prepared in a SurveyPlanning Document prior to start of operation. (See DNV-RP-E401) All operational aspects shall be consideredwhen selecting the diving system concept.
402 The diving system operational planning shall as a minimum cover:
a) organisation and management
b) start-up and shut-down (pre- and post-dive)
c) operational limitations
d) emergency operations
e) maintenance
f) corrosion control, inspection and monitoring
g) general inspection
h) special activities
403 In order to carry out periodical surveys, the minimum documentation shall include:
a) personnel responsible for the operation of diving system
b) history of diving system operation with reference to events which may have significance to design andsafety
c) a log of the total number of dives and hours of operation in the periods between annual surveys
d) records of new equipment installed and old equipment removed
e) the originally approved viewports for the system shall be included in the operational documentation
f) installation condition data as necessary for understanding diving system design and configuration, e.g. previous survey reports, as-built installation drawings and test reports
g) inspection, testing and maintenance schedules and their records
404 In case of mechanical damage or other abnormalities that might impair the safety, reliability, strengthand stability of the diving system, the following documentation shall, as a minimum, be prepared prior to start-up of the diving system:
a) description of the damage to the diving system, its sub-systems or components with due reference tolocation, type, extent of damage and temporary measures, if any
b) plans and full particulars of repairs, modifications and replacements, including contingency measures
c) further documentation with respect to particular repair, modification and replacement, as agreed upon inline with those for the manufacturing or installation phase
B 500 Documentation for systems in demobilisation
501 Demobilisation shall be planned and prepared and the evaluation shall include the following aspects:
a) safety aspects, during and after demobilisation
b) environmental aspects, e.g. pollution
c) impact on other structures
d) possible reuse of equipment at a later stage (re-qualification and certification)
Guidance note:
For diving systems that are transferred between vessels, the advantage of retaining Class in lay-up is found in the easeof mobilising on a new location.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
B 600 Filing of documentation
601 Maintenance of complete files of all relevant documentation during the life of the diving system is theresponsibility of the owner.
602 The engineering documentation shall be filed by the owner or by the engineering contractor for thelifetime of the system.
603 Design basis and key data for the diving system shall be filed for the lifetime of the system. This includes
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 24/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.2 – Page 24
documentation from design to start-up and also documentation from possible major repair or modification of the diving system.
604 Files to be kept from the operational and maintenance phases of the diving system shall, as a minimum,include final in-service inspection reports from start-up, periodical and special inspections, conditionmonitoring records, and final reports of maintenance and repair.
C. Safety Philosophy
C 100 General
101 The integrity of a SURFACE diving system constructed to this standard shall be ensured through a safety philosophy integrating the different parts.The objective of this standard is that the design, materials, fabrication, installation, commissioning, operation,repair, and re-qualification, of diving systems are safe and conducted with due regard to public safety and the
protection of the environment.
C 200 Safety objective
201 The purchaser/owner shall define an overall safety objective; planned, established and implemented,
covering all phases from conceptual development until demobilisation and scrapping. The safety objectiveshall address the main safety goals as well as establishing acceptance criteria for the level of risk acceptable tothe owner.
C 300 Systematic review
301 All work associated with the design, construction and operation of the diving system shall be such thatit ensures that the requirements in the safety philosophy are met. As a minimum, it shall ensure that no singlefailure shall lead to life-threatening situations for any person or to unacceptable damage to the facilities or theenvironment.
302 A systematic review or analysis shall be carried out at all phases in order to identify and evaluate theconsequences of single failures and series of failures in the diving system, such that necessary remedialmeasures can be taken. The extent of the review or analysis shall reflect the criticality of the diving system, thecriticality of a planned operation and previous experience with similar systems or operations. This review shall
identify the risk to the operation of the diving system and to the health and safety of personnel associated withit or in its vicinity.The scope of the review should be agreed upon.
303 Once the risks have been identified their extent can be reduced to a level as low as reasonably practicable by means of one or both of:
a) reduction in the probability of failure
b) mitigation of the consequences of failure
The result of the systematic review of these risks is measured against the safety objectives.
304 Special attention shall be given to the risk of fire and launch and recovery operations.
C 400 Quality management systems
401 Adequate quality management systems shall be implemented according to requirements in DNV Rulesfor Classification of Ships Pt.2 Ch.3 Sec.2B to ensure that gross errors in the work for diving system design,construction and operations are limited.
C 500 Inspection and test plans
501 The tabular description of the inspections and tests to be carried out during the work is frequently knownas the inspection and test plan (ITP).The following items shall be checked for inclusion within the Inspectionand Test Plan:
a) each inspection and test point and its relative location in the production cycle shall be shown
b) the characteristics to be inspected and tested at each point shall be identified
c) the use of sub-contractors shall be indicated and details of how the verification of sub-contractor’s qualityshall be carried out shall be shown
d) hold points established by the constructor, the operator or a third party, where witness or review of theselected inspection or test is required, shall be shown
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 25/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.2 – Page 25
D. SURFACE Diving System Philosophy
D 100 General
101 As far as reasonable and practicable, a diving system should be designed to minimize human error and constructed so that the failure of any single component (determined, if necessary, by an appropriate risk assessment) should not lead to a dangerous situation.(IMO Code of Safety For Diving Systems Chapter 2 Design, Construction and Survey 2.1.1)
Guidance note:
Whereas this is a general requirement for the systems, it is recognised that certain components cannot fulfil thisrequirement in and of themselves. A typical example of this is the Pressure Vessel for Human Occupancy with acrylicwindows and the umbilicals.In these cases the applicable standards will specify stringent safety factors. For other cases a formal safety assessmentmay be required.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
D 200 System integrity
201 All components in a diving system should be designed, constructed and tested in accordance withinternational or national standards * recognized by the Administration or proprietary specificationsacceptable to the Administration.
* Such as those of a recognized classification society which has rules for diving systems acceptable to the Administration.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.1.4)
202 SURFACE diving systems shall be designed, constructed and operated in such a manner that they:
a) fulfil the specified operational requirements
b) fulfil the defined safety objective and have the required support capabilities during planned operationalconditions
c) have sufficient safety margin against accidental loads or unplanned operational conditions
d) consider the possibility of changes in the operating conditions and criteria during the lifetime of the system
203 Any re-qualification deemed necessary due to changes in the design conditions shall take place in
accordance with provisions set out in each section of the standard.D 300 Essential services
301 Essential services are herein defined as those services that need to be in continuous operation for maintaining the diving system's functionality with regard to sustaining the safety, health and environment of the divers in a hyperbaric environment. This includes services required by the crew monitoring the divers.
302 Essential services shall be maintained for the period required by safely terminating the SURFACE divingoperation, including time for decompression of the divers.
303 For services supporting divers in the water, all services are essential. 20 minutes is considered to be theminimum time required ensuring that the divers are safely recovered to the wet-bell, or to the surface.
304 For services supporting divers in a wet-bell, all services are essential. 20 minutes is considered to be theminimum time required ensuring that the divers are safely recovered into the decompression chambers or to
the surface.305 For services supporting divers in the decompression chambers, all required services are essential. Thespecified maximum decompression schedule is considered to be the minimum time required ensuring that thedivers are safely brought to the surface.
D 400 Emergency services
401 Emergency services are herein defined as those services that are essential for safety in an emergencycondition. Examples of equipment and systems for emergency services include:
a) emergency lighting, including external strobe lighting on basket/wet-bell
b) emergency communication
c) emergency life support systems involving pressure containment, oxygen supplies and CO2 scrubbing
d) emergency heating/cooling systemse) condition monitoring of emergency batteries
f) alarm systems for the above emergency services
g) emergency launch and recovery of the wet-bell(s)/basket(s)/diver(s) (if electrical)
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 26/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.2 – Page 26
402 For services supporting divers in the water, all the above services may be considered emergency servicesand 20 minutes is considered to be the minimum time required to ensure that the divers are safely recovered inthe wet-bell or basket or to the surface.
403 For services supporting divers in a wet-bell, all the above services may be considered emergency servicesand 20 minutes is considered to be the minimum time required to ensure that the divers are safely recovered inthe decompression chambers or to the surface.
404 For services supporting divers in the decompression chambers, all the above services may be consideredemergency services with the exception of launch and recovery systems.
405 Services supporting hyperbaric evacuation system are considered statutory scope and therefore reviewedon a case by case basis according to instructions from the applicable Administration.
D 500 Non-important services
501 Non-important services are those which are not essential/emergency according to the above.
D 600 Layout and arrangement of the SURFACE diving system
601 All components in a diving system should be so designed, constructed and arranged as to permit easycleaning, disinfection, inspection and maintenance.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.1.6)
602 The layout of the diving system shall ensure protection from accidental damage and accessibility for safe
operation, maintenance and inspection.The diving system shall be so designed that the divers and assisting personnel are provided with safe andcomfortable operating conditions. Ergonomic principles shall be applied in the design of working systems. (i.e.in accordance with DNV-OS-D202 Ch.2 Sec.5 and ISO 6385.)
603 The elements of the SURFACE diving system shall be configured in such a way as to ensure that a clear access route is available from the LARS to the decompression chamber, with a distance as short as practicableand not more than that which provides enough time according to the maximum allowable surface intervalstipulated in the applied decompression tables.
D 700 Wet-bell – if installed
701 Wet-bells are not mandatory for the classification of SURFACE diving systems. However, if wet-bellsare employed, they shall meet the requirements for bells given in his standard.
702 A diving bell should provide a suitable environment and facilities for the persons who use it, having regard to the type and duration of the diving operation.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.3.3)
703 Diving bells should be so designed as to provide adequate space for the number of occupants envisaged,together with the equipment.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.3.5)
E. External and Internal Environmental Conditions
E 100 General
101 Diving systems and components thereof should be designed for the conditions under which they arecertificated to operate.
(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.1.2)102 Systems and components shall be designed for the environmental conditions given in the diving systemspecifications.Bells and baskets shall meet the environmental requirements for surface and submerged components.The specifications shall state the limitations on roll, maximum current etc. in order to avoid the basket/bellimpacting the ships side or getting trapped under bilge keel.
103 Environmental phenomena that might impair proper functioning of the system or cause a reduction of the reliability and safety of the system shall be considered in the MPS (including fixed and land-basedinstallations) as follows:
a) Wind and Tide
b) Waves and Currents
c) Air and sea temperatures and Ice
E 200 External operational conditions
201 Materials for diving system components should be suitable for their intended use.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.1.3)
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 27/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.2 – Page 27
202 Design inclinations shall be assumed according to Table E1 unless otherwise specified in the systemspecifications.
Guidance note:
For launch and recovery systems the operational design sea-state is given in Sec.7.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
203 Range of ambient temperature: -10°C to 55°C, unless otherwise specified. For greater temperatureranges, temperature protection shall be provided.
204 Humidity: 100%.205 Atmosphere contaminated by salt (NaCl): Up to 1 mg salt per 1 m3 of air, at all relevant temperaturesand humidity conditions.
E 300 Internal operational conditions (Inner area)
301 Range of ambient pressure is given by the design code or as a minimum range of 1 bar to 1.3 times the pressure corresponding to dmax with pressurisation and depressurisation rates as specified in Sec.4 C100,whichever is the greater range. This shall be applicable to materials and components installed in the PressureVessels for Human Occupancy.
302 Range of ambient temperature: 5°C to 55°C, unless otherwise specified.
Guidance note:
Ambient pressure and temperature is here understood to be the pressure and temperature of the environmentsurrounding the equipment or components utilised in the diving system.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
303 Relative humidity: Up to 100%.
304 Atmosphere contaminated by salt (NaCl): Up to 1 mg salt per 1 m3 of air, at relevant temperatures andhumidity conditions.
305 There shall be a limitation on maximum oxygen atmosphere content of 23.5% in manned divingchambers to ensure that the effects from fire-extinguishing systems / extinguishers have the intended effect.
306 A description of the internal conditions during storage, construction, installation, pressure testing andcommissioning shall be prepared. The duration of exposure to seawater or humid air, and the need for usingmeasures to control corrosion shall be considered.When choosing materials, paints etc. the potential for emission of hazardous compounds shall be considered.
307 Statutory requirements apply for determination of exposure limits such as:
a) American Conference of Governmental Industrial Hygienists, Documentation of the Threshold LimitValues and Biological Exposure
b) European Commission Directive on Occupational Exposure Limit Values
c) Health and Safety Executive Occupational Exposure Limits
d) NASA. Spacecraft maximum allowable concentrations for airborne contaminants (SMAC),1999.
e) ACGIH. TLVs and BEIs. Ohio: American Conference of Governmental Industrial Hygienists.
f) Segadal K, Djurhuus R, Roseth I. Implementation of a standard procedure for routine surveillance of chemical contamination of diving atmosphere during diving operations in 1995. Bergen: NorwegianUnderwater Technology Centre AS, 1995; NUTEC report no. 27-95.
g) Djurhuus R, Jakobsen K, Sundland H, Lindrup AG, Solheim E. Procedure for testing for off gassing frommaterials used in diving systems. (In Norwegian). Bergen: Norwegian Underwater Technology Centre AS,1994; NUTEC report no. 5-94.
h) Ahlen C. Cleaning and Disinfection of Operational Saturation Diving Systems. Recommendations for anIndustrial Standard. (In Norwegian). Trondheim: SINTEF, 1999; STF78 A99123.
Table E1 Design inclinations
Location Roll Permanent list Pitch Trim
Chambers and other surface installations:
On a ship +/-22.5° +/-15° +/-10° +/-5°
On a mobile offshore unit +/-15° +/-15°
Components in a basket or wet-bell +/-45° +/-22.5°
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 28/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.2 – Page 28
i) Ahlen C, Zahlsen K. FUDT-Bacteriology 1991. Disinfecting in hyperbaric environments. (In Norwegian).Trondheim: SINTEF, 1992; STF23 F92015.
Note that the exposure limits need to be translated into a form relative to the depth exposure and atmosphere.
308 In order to assess the need for internal corrosion control, including corrosion allowance and provisionfor inspection and monitoring, the following conditions shall be considered:
a) maximum and average operating temperature and pressure profiles of the components, and expectedvariations during the design life
b) expected content of dissolved salts in fluids, residual oxygen and active chlorine in sea water
c) chemical additions and provisions for periodic cleaning
d) provision for inspection of corrosion damage and expected capabilities of inspection tools (i.e. detectionlimits and sizing capabilities for relevant forms of corrosion damage)
e) the possibility of wear and tear, galvanic effects and effects in still water pools shall be considered
E 400 Submerged components
401 Range of ambient temperature: -2°C to 30°C.
Guidance note:
Ambient temperature may in this case fall outside the range stipulated. This shall be agreed on a case-by-case basis
and stated in the certificates.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
402 Range of ambient pressure: 1 bar to 1.3 times the pressure corresponding to maximum operating depth.Environmental requirements apply to submerged materials and components.
403 Salinity of ambient water: 35 parts per thousand.
404 The pressure equivalent to depth of seawater at 0°C with 3.5% salinity may be taken as 1.006 bar per 10 msw (meter seawater), as a mean value.
For saltwater, the density may be taken to vary as follows:
— 0.05% increase for each 100 m of depth increase — 0.4% increase for an increase in salinity from 3.5% to 4.0% — 0.3% decrease for an increase in temperature from 10°C to 20°C
405 For the selection and detailed design for external corrosion control, the conditions relating to theenvironment shall be defined.
F. Installation of diving system on support vessel or fixed structure
F 100 Location
101 Requirements for installation of diving systems on diving support vessels are given in DNV Rules for Classification of Ships Pt.5 Ch.16. When some essential requirements are repeated here, it is in recognition of the possible mobilisation at locations not covered by the DNV Rules for Classification of Ships.
Guidance note:
For containerised systems, the 2012 edition of DNV Standard for Certification 2.7.2 “Offshore Service Containers”may be used.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
102 Provision should be made to ensure that the diving system and auxiliary equipment are securely fastened to the ship or floating structure and that adjacent equipment is similarly secured. Consideration should be
given to the relative movement between the components of the system. In addition, the fastening arrangements should be able to meet any required survival conditions of the ship or floating structure.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.8.3)
103 The diving system and breathing gas storage facilities should not be sited in machinery spaces if themachinery is not associated with the diving system. Where, due to the requirements of diving operations,
systems are sited in hazardous areas, the electrical equipment should comply with the requirements for suchequipment in hazardous areas. Diving systems should not be permitted in hazardous areas designated as zone
O.(IMO Code Of Safety For Diving Systems Chapter 2 Design, Construction and Survey 2.6.6)
104 Piping systems carrying mixed gas or oxygen under high pressure should not be arranged insideaccommodation spaces, engine rooms or similar compartments.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.5.11)
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 29/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.2 – Page 29
105 Oxygen bottles should not be stored near flammable substances.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.6.5)
F 200 Physical protection
201 When any part of the diving system is sited on deck, particular consideration should be given to providing reasonable protection from the sea, icing or any damage which may result from other activities onboard the ship or floating structure.
(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.8.2)202 The diving system shall be so located that surface diving operations shall not be affected by propellers,thrusters or anchors. Information clearly indicating thruster positions, and permissible umbilical lengths, over the operating depth range of the system, shall be posted in Dive Control.
Guidance note:
Some national regulations will limit the length of umbilicals so that the diver, or his umbilical, cannot be drawn intothe propellers or thrusters. Requirements to the use of 'wet-bell' may also apply in some regions. It is assumed that theOperator provides, and follows, an effective umbilical management procedure whenever carrying out surface demanddiving operations from a DP vessel.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
F 300 Ventilation and lighting
301 The diving system and breathing gas facilities should be arranged in spaces or locations which areadequately ventilated and provided with suitable electric lighting.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.8.1)Outer area situated in enclosed spaces shall be fitted with separate mechanical ventilation with minimum 8 air changes per hour.
302 Oxygen bottles should be installed in a well-ventilated location.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.6.4)Containers for oxygen shall be stored in open air or in rooms exclusively intended for oxygen. The rooms shall
be separated from adjacent spaces and ventilated according to requirements in Sec.6 and shall be fitted with anaudio-visible oxygen alarm, at a manned control station.
303 For SURFACE diving systems installed on support vessels classed as FiFi I, gas storage shall be protected from overheating in the event of fire fighting close to heat radiation. Vessel Class Notation FiFi shall be suspended during diving operations, unless extraordinary measures are implemented.
F 400 Electrical power supplies to the installed diving system
401 Equipment in the power supply to essential and emergency consumers, as defined in D300 and D400,see also Sec.5 B500, shall normally be located above the uppermost continuous deck and accessible from opendeck.
F 500 Structural fire protection
501 Spaces in the interior of ships or floating structures in which the diving system or its auxiliary equipment is carried should be provided with structural fire protection in a way similar to control stations * bounding main zones.* “Control stations” as defined in regulation 3 and referred to in regulation 20, chapter II-2 of the
International Convention for the Safety of Life at Sea, 1974.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.9.2)
502 Compliance shall be based on the defined zones as given in the applicable fire integrity table in SOLASReg. II-2/9.
503 Vessel Class Notation FiFi shall be suspended during diving operations, unless extraordinary measuresare implemented.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 30/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.3 – Page 30
SECTION 3PRESSURE VESSELS FOR HUMAN OCCUPANCY,
GAS STORAGE AND OTHER PURPOSES
A. Introduction
A 100 Objectives
101 Pressure vessels are designed and manufactured to internationally recognised codes and standards. Theobjectives of this section are to give additional requirements that relate to the function of these pressure vesselsin a diving system.
A 200 Scope
201 The following scope of work is included in the requirements of this section:
a) conceptual and detailed design of pressure vessels for human occupancy, for gas storage and for other purposes
b) manufacturing of such pressure vessels
c) quality control during manufacturing and fabrication of such pressure vessels including documentationrequirements
d) load conditions
e) interlock arrangements for doors and hatches
202 ASME PVHO-1 “Safety Standard for Pressure Vessels for Human Occupancy” shall be used for designof acrylic plastic windows, regardless of which standard is used for the design of the pressure vessel.
203 Welding of pressure vessels and general workmanship requirements are given in the relevant rules, codesand standards.
204 Installation of pressure vessels is specified as general requirements found in Sec.2 F. Further requirements for installation are given in DNV Rules for Classification of Ships Pt.5 Ch.16.
A 300 Application
301 This section applies to all pressure vessels in SURFACE diving systems designed to comply with thisstandard. Note that in addition to this standard, and the applied design standards, further national requirementsmay apply.
302 “Closed” bells are not required for SURFACE diving systems and consequently not included in theapplication of this standard. If closed bells are employed, the complete diving system shall comply with therelevant requirements given in DNV-DS-E402. (Note: currently under development, meanwhile use DNV-OS-E402).
303 This section has impact upon Sec.9, insofar as it provides the basis for design of the pressure vessels inthe hyperbaric evacuation system.
A 400 References
401 For quantitative design parameters and functional requirements, reference is made to relevant standards
and guidelines, including normative references given in Sec.1B and DNV Rules for Classification of Ships.402 All pressure vessels for human occupancy shall be designed, constructed and tested according to one of the following codes and standards:
a) EN 13445 “Unfired pressure vessels”.
b) ASME PVHO-1, referencing ASME VIII Div.1 or 2 “Boiler and Pressure Vessel Code”
403 Pressure vessels for human occupancy shall be classified in the highest category in the applied code or standard.
404 Other codes and standards may be evaluated and accepted on a case by case basis.
405 All pressure vessels for human occupancy shall be certified, as required in A500.
406 All windows in pressure vessels for human occupancy shall be certified in accordance with ASME-
PVHO-1.407 Gas cylinders shall be designed, constructed and tested according to one of the following standards,norms or directives:
a) EN-1964-1 Transportable gas cylinders (part 1:1999, part 2:2001 or part 3:2000)
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 31/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.3 – Page 31
b) EN ISO 11120 Gas cylinders - Refillable seamless steel tubes for compressed gas transport, of water capacity between 150 l and 3000 l - Design construction and testing
408 Other codes and standards may be evaluated and accepted on a case by case basis.
Guidance note:
For permanent installations within EU, the directives apply as regulations. (ref. EU directive 1999/36/EEC.)
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
A 500 Procedural requirements, approval and certification
501 Approval and Certification requirements are given in DNV-DSS-105 Appendix A.
502 Pressure vessels shall be produced by manufacturers approved for such production and certified when:
where:
p = design pressure in bar V = volume in m3
503 Smaller pressure vessels shall be certified if they provide an essential function in the system.
Guidance note:
Cylinders on-line in a system providing breathing gas to the divers will be considered essential.---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
A 600 Documentation
601 For installation of diving systems on-board or at a site, reference is given to DNV Rules for Classificationof Ships Pt.5 Ch.16. Further references with regards to general requirements are given in Sec.2 of this standard.
602 Pressure vessels shall be documented as follows:
Plans showing structural arrangement, dimensions, welding seams, attachments and foundations of thechamber and other pressure vessels, with details of doors, locks (medical locks and equipment locks), view
ports, penetrations, flanged and welded connections.
Plans showing expansion allowances under working conditions for interconnected multi-vessel systems – if applicable.
Documents stating:
a) Grade of material
b) Welding methods, type and size of filler metal
c) Design pressure
d) Particulars of heat treatment
e) Fabrication tolerances
f) Extent and type of non-destructive testing of welded connections
g) Type of thermal insulation materials and particulars, i.e.: flammability and specific heat conductivity
h) Drawings and specifications of all windows with detailed drawings and specifications of the penetration
which the appropriate window is to fit. It shall be determined that the tolerances are sufficient includinggaskets, O-rings and retainer rings
i) Calculations of thicknesses and or stresses
j) Fatigue evaluation and if necessary fatigue analysis
For seamless steel gas cylinders and vessels:
a) Plans showing proposed dimensions and details such as valves and safety devices shall be made for eachtype and size of vessel.
Details shall include:
a) Production method
b) Heat treatment
Material specifications for the completed vessel with information on the following:
a) Chemical composition
b) Tensile strength
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 32/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.3 – Page 32
c) Yield strength
d) Elongation
e) Impact test values
f) Brinell hardness
The following particulars shall be provided for information:
a) Type of gas
b) Filling pressure at 15°C
c) Safety Relief Valve setting
d) Weight of empty vessel and volumetric capacity
e) Material protection
A 700 Survey and testing requirements during and after manufacture
701 Requirements and guidance on inspection and monitoring associated with the production of pressurevessels can be found in the applied standard and DNV-RP-E401.
702 For welded pressure vessels the following tests have to be carried out in addition to the tests specified inthe applied design code or standard:
a) all butt welds in diving chambers shall be radiographed over their full length
b) branches and reinforcement of openings, including all weld connections to the shell, shall be subjected to100% magnetic particle testing
703 When the applied code or standard for welded pressure vessels requires heat treatment of dished endsafter hot or cold forming, mechanical testing may be required after the final heat treatment.
704 The details between intermediate heads and cylindrical shells of chambers may be done in accordancewith requirements given in,
a) EN 1708-1:1999 Welding - Basic weld joint details in steel Table 9:Internal diaphragms and separators, or
b) ASME Section VIII - Division I Fig. UW-13.1.
705 Welded pressure vessels and seamless steel gas containers for internal pressure shall be hydrostatic testedto an internal pressure in accordance with the design code. Each compartment in chambers shall be testedseparately. In addition pressure test shall be performed with test pressure in each chamber simultaneously.
706 Pressure vessels for external pressure shall, in addition to the internal pressure testing, be hydrostatictested to an external pressure in accordance with the design code.
707 Acrylic plastic windows shall be tested in accordance with ASME PVHO-1a-Article 7.
708 For seamless gas cylinders production tests shall be carried out in accordance with the requirementsgiven in the applied code or standard. Further production tests, and required attendance during testing, may begiven in the specifications.
709 Gas cylinders shall be cleaned and sealed according to accepted industry standards.
A 800 Survey and testing requirements during and after assembly
801 The gas storage and chambers shall be tested for leakage at low pressures and the maximum working pressure.
A 900 Marking and signboards
901 All gas containers shall be marked with a consistent colour code visible from the valve end, showing thename, chemical formula of the gas it contains and the percentage of each gas. Piping systems shall be markedwith a colour code, and there shall be a chart posted in the control room explaining the code.
Table A1 For piping systems and gas storage bottles/pressure vessels the following colour codeshould be used:
Name (Symbol) Colour code
Oxygen Nitrogen
AirCarbon dioxide
(O2)(N2)
(Air)(CO2)
WhiteBlack
White and blackGrey
In addition, each bottle/pressure vessel should be marked with the name and symbol given above of the gases it contains.The marking and colour coding of the gas storage bottles should be visible from the valve end.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.6.9)
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 33/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.3 – Page 33
902 Each gas container shall be permanently and legibly marked on the collar or neck ring (where thethickness of the material is greater than the design minimum) as follows:
a) The design code
b) the manufacturer's mark or name
c) the manufacturer's serial number
d) the test pressure (bar) and date of hydrostatic teste) surveyor's mark and identification
f) settled pressure (bar) at 15°C
g) volumetric capacity of the container, in litres
h) tare weight, i.e. the mass of the container including valve, in kg
In addition marking of gas content shall be carried out according to Table A1.
903 Other pressure vessels shall be permanently and legibly marked at a suitable location in accordance withthe requirements in the design code. As a minimum the following information shall be present:
a) The design code
b) the manufacturer's mark or name
c) the manufacturer's serial number
d) the test pressure (bar) and date of hydrostatic test
e) the maximum working pressure
f) the inspection body’s mark and identification
g) the maximum set pressure of the Safety Relief Valves
A 1000 Materials
1001 Material specifications and selection associated with the production of pressure vessels are given in theapplied codes and standards (EN/ASME) and/or in DNV Rules for Classification of Ships.
1002 Areas of steel pressure vessels that can be subjected to corrosion shall be protected by approved means.'The surface of the window seats cavity shall be protected against corrosion.
1003 Windows mounted on chambers shall be protected to avoid damage by impact and to prevent chemicals,which can deteriorate the acrylic plastic, to come in contact with the window from the outside.
Guidance note:
Many solvents for paints, acetone and other agents will deteriorate the acrylic plastic and reduce the strengthsignificantly.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
1004 All penetrators in pressure vessels for human occupancy shall be designed to minimise corrosion fromany fluid passing through them.
Guidance note:
In some cases this requirement may best be met by the use of a sleeve passing through the hull penetration.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
1005 Paints, cabling and other materials shall be considered for toxic or noxious properties.
B. General Principles for Design of Chambers
B 100 General
101 A diving system should, as a minimum, include either one surface compression chamber with two separate compartments, or two interconnected separate chambers so designed as to permit ingress or egressof personnel while one compartment or chamber remains pressurized. All doors should be designed so that locking mechanisms, if provided, can be operated from both sides.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.2.1)
102 Where a surface compression chamber is to be used (-omitted, non-applicable text-), it should be so
arranged as to allow most divers to stand upright and to stretch out comfortably on their bunks. The smaller of the two compartments should be large enough for at least two persons. One of these compartments should be a living compartment.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.2.2).
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 34/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.3 – Page 34
For SURFACE diving systems the minimum inner dimensions measured as free height above the deck platesin the middle of the chamber, shall be 170 cm This may be less if the chamber is only used for stand-by
purposes and if national regulations allow it.
Guidance note:
Statutory requirements may require larger dimensions.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
103 A surface compression chamber should provide a suitable environment and facilities for the persons whouse it, having regard to the type and duration of the diving operation. (-Omitted, non-applicable text-).(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.2.6)
104 Wet-bells, if employed, and SURFACE diving baskets shall be of adequate size, be equipped to cater for the number of divers intended to man them and be equipped for handling unconscious or injured divers.
B 200 Design loads
201 The design pressure for pressure vessels shall not be less than that corresponding to the maximumoperating pressure as defined in the specifications given in the MPS.
202 The design load is normally to correspond to the design pressure applied for at least 5000 load cyclesunless otherwise agreed and specified.
203 The effects of the following loads shall be considered and shall be taken into account - if significant.
Reference is given to DNV Rules for Ships Pt.3 Ch.1 Sec.3 (Principles) & Sec.4:
a) Dynamic loads due to movements of the support vessel
b) Local loads
c) Loads due to restrictions in expansions
d) Loads due to weight of content during normal operation and pressure testing
e) Loads due to rough handling
f) The stress evaluation shall apply the distortion theory (von Mises’ criterion)
Guidance note:
Multipurpose vessels may carry relatively heavy deck loads, which can cause stresses and strains on the mountingsof the diving system components. If this cannot be avoided through design of the installed diving system, it should be
monitored during such operations.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
B 300 Foundations for pressure vessels for human occupancy and for gas storage
301 The pressure vessels with foundations shall be designed for a static inclination of 30° in any directionwithout exceeding the allowable stresses as specified in the design code.
302 Suitable foundations and supporting structures shall be provided to withstand a collision force acting onthe pressure vessels corresponding to one half the weights of the pressure vessels in the forward direction andone quarter the weight of the pressure vessels in the aft direction.
303 The loads mentioned in 201 and 202 need not to be combined with each other or with wave-inducedloads.
B 400 Doors, hatches, windows, branches etc.
401 The living compartment and other compartments intended to be used for decompression should have alock through which provisions, medicine and equipment may be passed into the chamber while its occupantsremain under pressure.(IMO Code Of Safety For Diving Systems Chapter 2 Design, Construction and Survey 2.2.3)
402 Doors and hatches for human transportation shall in general be a minimum diameter of 600 mm.
Guidance note:
For doors and hatches in between chambers, standard pipe with nominal bore 24" may be acceptable.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
403 The medical locks shall be large enough to allow lock-in and lock -out of CO 2 absorption material andnecessary supplies for the divers.
Guidance note:
National rules and requirements may be more stringent and thereby take precedence (i.e. Norwegian PetroleumDirectorate).
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 35/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.3 – Page 35
404 Means enabling the doors to be opened from either side shall be provided.
Guidance note:
As the above requirement also applies to the internal doors in chambers, it does follow that locking devises are notallowed on the pressurised side of these doors unless they can be operated from the other side. 'Clip' locks arefrequently used on these doors to prevent slamming due to the vessels movement in the sea. However, the 'clip' settingmust be such that they can be pushed/pulled open from either side without the use of excessive force.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
405 Locks should be designed to prevent accidental opening under pressure and, where necessary, interlocks should be provided for this purpose.(IMO Code Of Safety For Diving Systems Chapter 2 Design, Construction and Survey 2.2.4)
406 For:
a) doors
b) hatches
c) mating arrangements
d) pressurised locks and trunks
e) pressurised containers
f) accompanying equipment under pressurewhere opening or unintentional pressure drop may entail danger or cause injury, the closing mechanisms shall
be physically secured by locking mechanisms (interlocks).
This applies to units which do not seal by pressure and includes, but is not limited to:
a) equipment locks
b) medical locks
c) soda lime (CO2 scrubber) containers for external regeneration of the chamber environments (if fitted)
d) mating arrangements between hyperbaric evacuation units and escape trunks where these are installed
407 The closing mechanisms with accompanying locking mechanisms shall be arranged so that:
a) opening cannot take place unless the pressures are equal on both sides or unless the pressures in the unitsare at ambient level
b) correct position of the closing mechanisms and the locking mechanisms shall be ensured before it is possible to apply pressure
c) the pressures in the units, shall directly control the locking mechanisms, and
d) the penetrators and piping for pressure sensing shall be arranged so that blockage is avoided
Guidance note:
Reference is given to ASME PVHO-1 with sub reference to ASME VIII D1 UG-35.2(b)(1) and EN 13445-5 C.5.7.3.2.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
408 Trunks between doors shall be equipped with pressure equalising valves. Penetrators for pressureequalising shall be arranged so that blockage is avoided.
409 Each pressure compartment should have view ports to allow observation of all occupants from theoutside.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.2.5)
410 Windows shall be protected against impact. Impact protection may be provided by:
a) recessing the external surface of the window at least 50 mm below the surrounding structure
b) one or more external bumpers extending across the window
411 Where mountings are secured by studs, these shall have full thread holding in the shell for a length of atleast one diameter. Holes for studs shall not penetrate the shell.
412 Damage control plugs may be provided to enable the divers to seal off windows to prevent damage or leakage developing.
413 For pressure vessels where fatigue can be a possible mode of failure, attention shall be given to the possible adverse effects of the following design features:
a) pad type reinforcement of openings
b) set-on branches
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 36/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.3 – Page 36
c) partial penetration welds of branches
414 For structures that are not covered by the pressure vessel design code, the butt weld and filled weld shall be designed to take shear based on 1.5 times the maximum differential pressure that can exist. The allowablestress value for the butt weld shall be 70% of the nominal design stress for the shell material and that of the filletweld 50%. The area of the butt weld in shear shall be taken as the width at the root of the weld times the lengthof the weld. The area of the fillet weld shall be taken as the minimum leg dimension times the length of the weld.
C. Welded Pressure Vessels, Materials, Fabrication and Strength
C 100 Materials
101 Steel grades shall comply with the applied design code and standard.
102 Other material grades may be acceptable after special consideration. In such cases, additional testing may be required and qualification procedures shall be reconsidered.
103 Materials for main pressure retaining parts are to be certified.
104 Stainless steel cladding, stainless steel tubes, fittings etc. which are welded to pressure vessels of non-stainless steel shall be of a stabilised or low-carbon grade. Acceptable grades are given in the applicablestandards or in DNV Rules for Classification of Ships Pt.2 Ch.2 Sec.4.
C 200 Fabrication
201 Pressure vessels for diving systems shall be manufactured by works approved by a recognised body, for the production of the type of pressure vessels being delivered.For systems classed by the Society, this shall be according to the Society’s approval programme.
202 Welding shall be carried out according to approved drawings.Qualification of welders, welding procedure specifications, welding procedures and testing shall be accordingto the applied design code or standard.
203 The outside diameter of the head skirt shall have a close fit to the cylinders.
204 The surface dimensions and finish of seals for hatches and windows are generally to comply with thetolerances specified by the manufacturers of the windows and the sealing systems. The fitting and installationof the window to the flange shall be according to the requirements given in ASME PVHO-1.
C 300 Fabrication tolerances
301 Fabrication tolerances are to meet the requirements in the applied codes and standards.
302 Local tolerance requirements for ring frames are given in DNV-DS-E402 Sec.3 (Note: currently under development, meanwhile use DNV-OS-E402), for vessels subject to external pressure – if applicable.
C 400 Structural analysis to determine strength
401 In the design of pressure vessels including accessories such as doors, hinges, closing mechanisms and penetrators, the effects of rough handling and accidents should be considered in addition to design parameters such as pressure, temperature, vibration, operating and environmental conditions.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.1.5)
402 Pressure vessels shall be documented by structural analysis for specified design conditions according tothe applied codes and standards.
403 For details not covered by the applied codes and standards, finite element analysis may be acceptable if properly planned, modelled and documented.Alternatively, by applying strain gauges, stress measurements may be carried out according to an approved
programme and shall be properly documented. The tests shall be planned, and carried out during the first pressure test.
404 Fatigue evaluation and, if necessary, fatigue analysis shall be carried out for the number of full pressurecycles and non-pressure loads given in the specification. The evaluation and analysis shall be carried outaccording to the applied design code and standard. Reference is given to DNV Rules for Ships Pt.3 Ch.1 Sec.3(Principles) & Sec.4.
C 500 Strength of vessels subjected to external pressure
501 Refer to DNV-DS-E402 Sec.3 if applicable. (Note: currently under development, meanwhile use DNV-
OS-E402)
C 600 Flanges for windows
601 Flanges for windows with conical seating shall have dimensions preventing the flange deformations toexceed the following limits when window and pressure vessel is subjected to the design pressure:
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 37/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.3 – Page 37
a) radial: 0.002 times the smaller diameter of the acrylic plastic window, and
b) angular: 0.5°
D. Gas Cylinders
D 100 General101 The materials applied in the manufacture of gas cylinders shall be certified.
102 Special attention should be paid to the design and choice of material for the construction of pressurevessels containing oxygen.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.4.1)
103 Shell thickness shall meet the criteria given in the applied code or standard for test pressure. The working pressure for a given geographical area is given by reference to a standard such as BS 5355 Specification for filling ratios and developed pressures for liquefiable and permanent gases.
104 Corrosion allowance shall be specified in the terms of delivery reflecting the intended use of the gascylinder, but shall not be less than 1 mm.
D 200 Heat treatment
201 Heat treatment shall follow the requirements given in the applied code or standard, and shall bedocumented.
D 300 Tolerances and surface conditions
301 Tolerances and surface condition shall meet the criteria given in the applied code or standard, and shall be documented in the design documentation. If the applied code or standard does not specify requirements for tolerances and surface conditions, then it may be necessary to specify this in the diving systems specifications.
E. Acrylic Plastic Windows
E 100 General
101 The following requirements apply to windows made from cast stock of unlaminated polymethyl
methacrylate plastics, in the following denoted acrylic plastic, with a design life of 10 years, suitable for:
a) 10.000 load cycles
b) sustained temperatures in the range specified by the end user and not less than specified by ASME PVHO-1
c) pressurisation or depressurisation rates not exceeding 10 bar/second
d) use in environments that cannot cause chemical or physical deterioration of the acrylic plastic (i.e. resistantagainst saltwater and gases used in life support systems)
E 200 Materials
201 Materials for acrylic plastic windows shall be manufactured and tested in accordance with ASMEPVHO-1 “Safety Standard for Pressure Vessels for Human Occupancy”.
E 300 Manufacturers of cast material
301 Manufacturers wishing to supply cast acrylic plastic for diving systems, shall be approved for such production. The material shall have an approved chemical composition and to be produced, heat treated andtested according to the ASME PVHO-1 “Safety Standard for Pressure Vessels for Human Occupancy”.Approval shall be granted on the basis of a thorough test of material from the current production and a reportafter inspecting the works, and verification of QA and QC against requirements given in ASME PVHO-1.
E 400 Certification of cast material
401 Each delivery of cast material shall be accompanied by a certificate issued by the manufacturer. Thecertificate shall (as a minimum) contain the following:
a) name and address of manufacturer
b) certificate number and date
c) designation of productd) numbers and dimensions of the pieces covered by the certificate
e) material test results and properties
f) signature
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 38/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.3 – Page 38
402 The following text shall be printed in the right uppermost corner of the certificate:
“This certificate will be accepted by (approval body) on the basis of completed approval tests and the (approval body’s) surveillance of production control and products. The manufacturer guarantees that the product meetsthe requirements of (approval body) and that inspection and tests have been carried out in accordance with(code or standard)”.
403 The cast material shall be marked with the manufacturer's name and with the number and date of the
certificate.404 If a later edition of the ASME standard requires further documentation and markings, the ASMErequirements shall be met.
E 500 Certification of windows
501 Each batch of acrylic plastic windows used in diving systems shall have a certificate issued by theapproval body, showing the test results and the annealing conditions according to the applicable forms givenin ASME PVHO-1.
502 Each window shall have an identification marked on it for traceability. Identification of each windowshall include; design pressure, maximum temperature, initials for 'P.V.H.O.', window fabricator's identificationmark, fabricators serial number and year of fabrication.
503 For ease of viewing, the above information shall be located on the windows seating surface with anindelible marker. Acceptable marking methods are given in ASME PVHO-1.
504 Stamping or marking that can cause crack propagation is not permitted.
E 600 Geometry and thickness
601 Windows shall be of the standard designs according to the ASME PVHO-1 “Safety standard for pressurevessels for human occupancy”.
602 O-ring grooves shall not be located in window bearing surfaces serving primarily as support or in theacrylic window itself.
E 700 Fabrication
701 The included conical angle of the seating surface of a window shall be within +0.25/ -0,00 degrees of thenominal value.
702 The deviation of a spherical window from an ideal sphere shall be less than 0.5% of the specified nominal
external radius of the spherical section.703 Each window shall be annealed after all forming and polishing operations are completed. The annealing
process shall be according to the annealing schedule in ASME PVHO-1.
704 During the manufacturing process each window shall be equipped with identification and a manufacture process rider for recording of all pertinent data.
E 800 In service inspection
801 In service inspection and testing shall be carried out in accordance with requirements given in ASMEPVHO-2 guidelines.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 39/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.4 – Page 39
SECTION 4LIFE SUPPORT SYSTEMS INCLUDING PIPING, HOSES, VALVES,
FITTINGS, COMPRESSORS AND UMBILICALS
A. Introduction
A 100 Objectives
101 The objectives of this section are to specify requirements for life support systems, including pipes hosesvalves, fittings, compressors and umbilicals, serving SURFACE diving systems. General requirements for
piping systems are given in DNV Rules for Classification of Ships Pt.4 Ch.6.
A 200 Scope
201 Requirements for installation are given in Sec.2 F.
202 This section is giving guidance on:
a) conceptual and detailed design of life support systems
b) manufacturing of life support systems
c) quality control during manufacturing and fabrication of components and subsystems for life supportsystems
203 Key issue requirements for gas distribution capacities, environmental conditioning and oxygen systems.
204 Design and acceptance criteria including capacities for gas storage, choice of valves and fittings for certain applications, environmental control parameters and breathing resistance for CCBS (if fitted).
205 Requirements for the design of oxygen systems aimed at reducing the hazards posed by flash fires.
206 Limitations on the use of hoses except hoses used in umbilicals are given.
207 Requirements to ensure safe arrangements in pressurised systems and control stations and requirementsfor pipes, hoses, valves and fittings are given.
208 Requirements for shut off valves, pressure relief and drainage aimed at ensuring the safeguard of personnel and plant, as are the requirements for alarm systems.
A 300 Application
301 This section applies to all SURFACE diving systems.
302 This section has an impact on all other sections in this standard. This section applies to all systemsessential for the safe operation of the diving system.
A 400 References
401 For installation of diving systems on-board or at a site, reference is given to DNV Rules for Classificationof Ships Pt.5 Ch.16 and Sec.2 F of this standard.
402 Manufacturing standards applicable to individual components shall be supplementary to this standard.
403 Further references are given to:
a) DNV Rules for Classification of Ships Pt.4 Ch.6. b) DNV Rules for Classification of Ships Pt.5 Ch.16
c) EN 738-1, -2 and -3:1997/1998 “Pressure regulators for use with medical gases”
d) EN 849:1996, EN ISO 11114-3:1997 and EN ISO 2503:1998 (informative)
e) DNV-DS-E402 (Note: currently under development, meanwhile use DNV-OS-E402)
f) ASTM G93 Standard Practice for Cleaning Methods and Cleanliness Levels for Materials and EquipmentUsed in Oxygen-Enriched Environments
A 500 Procedural requirements, approval and certification
501 Approval and Certification requirements are given in DNV-DSS-105 Appendix A.
A 600 Documentation requirements
601 Life support systems shall be documented as follows:
a) Plans showing schematic arrangement of all piping systems.
b) Documents stating:
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 40/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.4 – Page 40
i) material specifications
ii) maximum working pressure
iii) dimensions and thickness
iv) contained fluids
v) type of valves and fittings
vi) specifications of flexible hosesc) Component lists, with specifications on make and type and documentation on any tests carried out on all
equipment used in the life support system. Plans showing cross-section and giving particulars on materialsand dimensions of umbilical.
d) Plans (diagrams) showing arrangement and giving specifications of the gas storage and supply (gas banks,compressors, boosters etc.).
e) Plans showing the arrangement and giving specifications on environmental control systems and equipment(heating, CO2-absorption, circulation), diving crew facilities and drainage systems.
f) Determination showing the heat and cooling consumption for the system under specified environmentaltemperatures.
g) Description of proposed cleaning procedure for breathing gas system.Pipes, Hoses, Valves, Fittings,
Compressors and Umbilicals shall be documented as follows:h) Plans and specifications showing suitability of the Flexible hose in relation to its intended use. For
information, documentation of tests which have been carried out, as required.
i) Plans and specifications giving particulars of Umbilical conductors, minimum breaking load and minimumdiameter of pulley and drums. For information, specification of max. design loads, elastic properties andweight per unit length.
j) Documentation of tests verifying the properties listed above and as required by K.
A 700 Survey and testing requirements during and after manufacture
701 In addition to the test requirements here, detailed requirements are found in DNV-RP-E401.
702 Testing during manufacture shall be in accordance with applicable manufacturing codes for the particular component.
703 In systems conducting oxygen, all materials in contact with this gas shall be oxygen shock testedaccording to EN 738-1, -2 and -3:1997/1998 “Pressure regulators for use with medical gases” or equivalentstandard applicable to the particular component. (See also EN 849:1996, EN ISO 11114-3:1997 and EN ISO2503:1998 in informative references)
704 For piping systems of copper, copper alloys and austenitic steels with chromium-nickel content above22%, the test can be waived.
Guidance note:
Oxygen pressure shock tests are described in the standards referred to. However, the test includes the following principles:
Commercial grade oxygen (99% pure) test gas is applied as follows for 3 identical test specimens:
The test pressure is not less than the design pressure.
The test specimen is preheated to 60°C and exposed to a gas pressure shock up to the specified test pressure with test
gas preheated to 60°C.Each test consists of 20 pressure shocks at approximately 30 seconds intervals. The total exposure time to each
pressure shock is 10 seconds, and the gas pressure is released after each shock. The pressure increase rate during each pressure shock is obtained by a valve with an opening time less than 10 milliseconds.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
705 Compressors shall be tested for the gas types, pressure and delivery rate intended. The tests shallincorporate measurements of humidity and possible, contaminants in the gas delivered.
706 Compressor components subjected to pressure shall be hydrostatic tested in accordance with the designcode.
707 Closed circuit breathing system (CCBS – if fitted) shall be tested according to DNV-DS-E402. (Note:currently under development, meanwhile use DNV-OS-E402).
708 Flexible hoses shall be tested as specified in F.709 Umbilicals shall be tested as specified and as follows:
a) Each hose for use in umbilical shall be pressure tested to 1.5 times the design pressure before fitting in theumbilical. After hose end fittings have been mounted, a gas leakage test to design pressure shall be performed.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 41/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.4 – Page 41
b) A pressure test to the design pressure of all hoses simultaneously and verification of the specified properties by insulation tests of electrical conductors as well as impedance measurements of signal cables to specified properties shall be carried out.
c) Samples of the completed umbilicals shall be tested according to a manufacturer’s test programmecomplying with relevant requirements in the design code.
d) The test programme shall as a minimum include tensile testing and fatigue testing to 5000 load cycles
without the umbilical showing any sign of permanent deformation of electrical conductors and or significant permanent deformations of other parts.
A 800 Survey and testing requirements during and after assembly
801 Hydrostatic testing of piping systems shall be in accordance with the technical requirements and as for corresponding pipe class in breathing gas systems pertaining to Class I piping systems.
802 Piping for the life support systems shall be pressure tested to 1.5 times the maximum working pressure.Hydraulic systems may, however, be tested to the smaller of 1.5 times the maximum working pressure, or 70
bar in excess of the maximum working pressure.
803 Piping systems conducting gas in life support systems shall be cleaned in accordance with an approvedcleaning procedure conforming to requirements given in ASTM G93-96 Standard Practice for CleaningMethods and Cleanliness Levels for Materials and Equipment Used in Oxygen-Enriched Environments
804 Piping systems intended to be used in breathing gas and oxygen systems shall be tested for purity in
accordance with requirements given in ASTM G93-96.The tests shall comprise:
a) measurement of contamination of the cleaning agent used at the last stage of the cleaning
b) tests for possible traces of cleaning agents left in the piping system
805 The gas storage and life support systems for gas shall be tested for leakage at low pressures and themaximum working pressure.
806 Life support systems for normal and emergency operation shall be tested for proper functioning.
This includes:
a) sanitary
b) diver heating
807 For the environmental control and monitoring system the failure conditions shall be simulated asrealistically as possible, if practicable by letting the monitored parameters pass the alarm and safety limits.Alarm and safety limits shall be checked.
808 For the automatic control systems the normal alterations of the parameters shall be imposed and thefunctions of the system tested. A copy of the approved test program shall be completed with final set pointsand endorsed by the Surveyor.
A 900 Survey and testing requirements during and after installation
901 Support systems on-board the surface installations, significant for the safety of the diving system, arealso to be tested.
902 During the sea trials the normal launch and recovery system will be tested to the maximum depth. For
SURFACE diving systems employing a “wet-bell” the life support systems shall be checked for leakage.A 1000 Materials, including components for gases containing elevated oxygen levels
1001 Materials used in the breathing gas system shall not produce noxious, toxic or flammable products.
1002 Precautions shall be taken to avoid galvanic corrosion.
1003 Non-metallic materials retaining pressurised gas shall be considered for gas-permeability.
1004 Oxygen and gases with an oxygen volume percentage higher than 25 per cent should be stored in bottlesor pressure vessels exclusively intended for such gases.(IMO Code Of Safety For Diving Systems Chapter 2 Design, Construction and Survey 2.4.2)
1005 Piping systems containing gases with more than 25 per cent oxygen should be treated as systemscontaining pure oxygen.(IMO Code Of Safety For Diving Systems Chapter 2 Design, Construction and Survey 2.5.15)
1006 All materials used in oxygen systems should be compatible with oxygen at the working pressure and flow rate.(IMO Code Of Safety For Diving Systems Chapter 2 Design, Construction and Survey 2.5.7)Materials and components fitted in oxygen systems shall be of types especially designed and tested for this
purpose.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 42/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.4 – Page 42
1007 The use of high-pressure oxygen piping should be minimized by the fitting of pressure reducing devices,as close as practicable to the storage bottles.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.5.8) The pressure in the oxygen systems shall be reduced at storage to the minimum pressure necessary for proper operation.
Guidance note:
A maximum pressure of 40 bar will normally be accepted.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
1008 Hoses for oxygen should, as far as practicable, be of fire-retardant construction.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.5.10)
1009 Oxygen systems with pressure greater than 1.72 bar must have slow opening shutoff valves except pressure boundary shutoff valves.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.5.16 )Shut-off valves for oxygen shall be of types which need several turns to close. On chamber penetrators, ballvalves may be accepted for emergency use only.
1010 Oxygen dumped from the diving system shall be ducted to a safe dumping place.
B. Gas Storage
B 100 Capacity
101 There shall be a permanently installed gas storage plant or suitable space for portable gas containers. Thesize of the containers or space shall be sufficient to provide the divers with adequate quantities of gases for operation at maximum operating depth for both normal and emergency modes.
102 The minimum gas storage capacity of fixed installed gas containers or space for portable gas containersintended for emergency operations shall be sufficient to:
a) Pressurise the inner area twice and the transfer compartments once more to maximum depth, dmax, withsuitable breathing gas, and ventilate the chamber as required
b) maintain a proper oxygen partial pressure in the inner area and supply for masks for at least 24 hours.For pure oxygen, the minimum volume may be taken as 2 Nm3 for each diver where 1 Nm3 is given as 1
cubic metre of the gas at 0°C and 1.013 bar standard condition.
c) conduct two emergency dives to dmax
103 For emergency use of masks required by 102b) there shall be sufficient facilities to supply adequatequantities of gases. The facilities shall be capable of providing a relevant delivery rate both at maximum depthand during decompression. Adequate quantities shall be determined for the applicable operation, but not lessthan 2 m3 at the pressure of the inner area with an oxygen partial pressure between 0.18 and 1.25 bar for eachdiver.
104 The storage capacity for emergency gas shall be provided in separate containers, and shall not beincluded in the containers for current gas supply.
105 If applicable, the wet-bell shall have self-contained emergency gas storage with a minimum capacity tosupply the divers for the duration of their in-water stops prior to surfacing.
B 200 Shut-off, pressure relief and drainage
201 All surface compression chambers and diving bells which may be pressurized separately should be fitted with overpressure alarms or pressure relief valves. If pressure relief valves are fitted, a quick-operating manual shut off valve should be installed between the chamber and the pressure relief valve and should bewired opened with a frangible wire. This valve should be readily accessible to the attendant monitoring theoperation of the chamber. All other pressure vessels and bottles should be fitted with a pressure relief device.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.5.5)
202 Pressure vessels shall be fitted with over pressure relief devices and shut off valves.
203 Pressure vessels without individual shut-off valves and with: pV < 50, installed in groups with a total pV < 100, can have a common overpressure relief device and shut-off valve.
p = design pressure in bar
V = volume in m3
(standard conditions)204 For gas storage of breathing gases and oxygen, the pressure relief device shall be a safety valve. Safetyvalves shall be set to open at a pressure approx. 3% above the developed pressure at 55°C, based on filling thecylinders at 15°C to maximum filling pressure. The total relieving capacity shall be sufficient to maintain thesystem pressure at not more than 110% of design pressure. Developed pressure under above-mentioned
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 43/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.4 – Page 43
conditions may be taken as given in reference to a standard such as BS 5355 Specification for filling ratios anddeveloped pressures for liquefiable and permanent gases.
205 Containers where water can accumulate shall be provided with drainage devices. (E.g. volume tanks andfilters).
C. Gas Distribution and Control SystemC 100 General
101 Each surface compression chamber and diving bell should be fitted with adequate equipment for supplying and maintaining the appropriate breathing mixtures to its occupants at all depths down to maximumoperating depth. When adding pure oxygen to the chamber, a separate piping system should be provided.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.6.1)
102 In addition to the system mentioned in 2.6.1 each surface compression chamber (-omitted, non-applicable text-) should contain a separately controlled built-in breathing system for oxygen, therapeutic gasor bottom mix gas with at least one mask per occupant stored inside each separately pressurized compartment and means should be provided to prevent any dangerous accumulation of gases.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.6.2)
In addition to the above stipulated masks, there shall be one spare mask installed in each compartment.
103 The gas distribution system consists of all components and piping necessary for distribution of gas for normal and emergency operations.
104 Piping for gas and electrical cables shall be separated.
105 Filters and automatic pressure reducers shall be so arranged that they can be isolated without interruptingvital gas supplies.
106 Valves in piping systems to masks, and divers in water shall be so arranged that:
a) leaking valves cannot cause unintentional gas mixtures
b) oxygen cannot unintentionally be supplied to other piping systems than that intended for oxygen
107 Gases vented from the diving system should be vented to the open air away from sources of ignition, personnel or any area where the presence of those gases could be hazardous.
(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.5.13)
C 200 Control stands
201 Requirements for instrumentation are given in Sec.8.
202 The control stands shall have means for:
a) choice between gas storage containers
b) pressurising and pressure regulation of each compartment independently
c) decompression of each compartment independently
d) equalising the pressure between compartments
e) controlling oxygen and mix gas supply to masks in each individual compartment
f) controlling gas supply to the divers and the wet-bell if applicableC 300 Basket and wet-bell (if wet-bell is employed)
301 The diving bell should be designed with a self-contained breathing gas system capable of maintaining a satisfactory concentration of breathing gas for the occupants for a period (-omitted, non-applicable text-) at its maximum operating depth.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.6.3)
302 There shall be two independent supplies of gas to the divers and, if applicable, the wet-bell umbilical.
303 The diver(s) shall have, in addition to their normal umbilical supply, an independent self-containedemergency supply from the basket or wet-bell. The emergency supply in a basket may be by means of reducedair from a cylinder mounted in the basket.
304 The breathing gas system supplying the personal umbilical to the stand-by diver in the wet-bell, whenwet-bell is employed, shall be arranged for an alternative supply, independent of the lock-out diver(s)'s normalsupply. The wet-bell’s on-board gas supply may be accepted for this purpose.
305 The wet-bell, if employed, shall be equipped with a valve operated exhausts and shall be fitted with aspring-loaded valve that closes when the valve handle is released.
306 The wet-bell shall be equipped with masks corresponding to the number of divers plus one. The masks
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 44/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.4 – Page 44
shall be arranged for supply from normal and emergency supply alternatively. Diving masks and divinghelmets with gas supply are accepted as masks.
C 400 Chambers
401 The distribution system to each compartment shall facilitate:
a) two independent alternatives for pressurisation with a minimum pressurisation rate of 2 bar/minute to 2 bar
and at 1 bar/minute thereafter b) depressurisation with a decompression rate in accordance with specified decompression tables (e.g. US
NAVY diving tables)
c) maintenance of a suitable breathing atmosphere in the inner area
d) supply of suitable breathing gas for masks
e) exhaust from masks intended for oxygen if a closed circuit breathing gas system is not used
402 Each compartment shall be equipped with breathing masks corresponding to the maximum number of divers for which the chamber is rated plus one. Other compartments shall have at least 2 masks.
403 The masks shall be permanently connected or easily connectable to piping systems for supply of thegases according to B103.
404 The exhaust sides of the masks intended for oxygen shall be connected to external dump, or to be of aclosed circuit type.
405 The mask systems shall be secured against inadmissible pressure drop on the exhaust side.
406 The gas supply system shall be arranged to ensure homogenous gas content in the inner area.
C 500 Stand-by diver at surface
501 A system for supply of life support to a stand-by diver at surface shall be arranged independent from thedivers' supply, and shall meet the requirements for the normal diver’s supply.
C 600 Nitrogen/oxygen mixing systems for direct supply for breathing
601 Systems for mixing of nitrogen and oxygen for subsequent direct supply for breathing shall be automatic,to have an automatic control system, an automatic alarm system and an automatic safety system.
602 The safety system shall be independent of the control system and shall incorporate changing of thesupply automatically to a premixed suitable breathing gas if tolerances are exceeded. The safety system shallensure a constant delivery of suitable breathing gas to the diver during all operating conditions, taking intoaccount the characteristics of components in the systems such as response time for gas analysers etc.
603 As an alternative to 602, the inclusion of a large volume tank is considered to provide an equivalent levelof safety as that prescribed by the requirements for 'automation' and 'independence'. The remainingrequirements shall be met. The volume tank shall be such that the prescribed tolerances for partial pressuresdownstream are not deviated from within the first hour after the analysers have alerted the operator that theupstream mixture is out of the tolerated range. The Alarm shall be audio-visual at a manned control station.
604 The control system shall keep the mixture at a pre-set value within prescribed tolerances. Maximumtolerances: +/- 0.03 bar, partial pressure O2.
605 If the mixing system is arranged as a closed circuit breathing system (CCBS), it shall meet the
requirements for such systems given in DNV-DS-E402 (Note: under development, meanwhile use DNV-OS-E402 Sec.4).
D. Diver’s Heating and Environmental Conditioning in Chambers
D 100 General
101 A diving system should include adequate plant and equipment to maintain the divers in safe thermal balance during normal operations.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.6.7)
D 200 Heating of divers in the water
201 Divers may employ insulated suits and not require active heating. In this case, calculations, or vendor information, shall be submitted for information.
202 When required, the divers shall have a normal heating system with controls and capacity sufficient tomaintain given temperatures for the divers in the water according to specified diving tables. The heating systemshall be fitted with a temperature indicator.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 45/72
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 46/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.4 – Page 46
107 All systems shall be provided with means of manually relieving the pressure.
108 Filters shall be provided on the high-pressure side of gas systems.
F. Hoses
F 100 General101 Flexible hoses, except for umbilicals, should be reduced to a minimum.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.5.9)
102 Flexible hoses shall not replace fixed piping.
103 In addition to umbilicals, short lengths (up to 2 m) of flexible hose may be used when necessary to admitrelative movements between machinery and fixed piping systems. For assemblies incorporating speciallyapproved hoses and securing arrangements, lengths up to 5m may be permitted if fixed piping is not practicable.In such cases, securing arrangements shall be in place at 1m intervals of the length of the hose. In addition tothe couplings, the hoses shall be secured in such a way as to prevent the hose from whip lashing in the eventthat the coupling fails. When applicable, couplings shall incorporate bends so that kinks in the hoses areavoided.
104 Flexible hoses with couplings shall be certified. For diving systems classed by the Society, the approval
shall be according to DNV Rules for Classification of Ships Pt.4 Ch.6.105 The bursting pressure of synthetic hoses shall be according to Standard for Certification No. 2.9 TA
programme 5-791.70 and 5-791.80.
106 Hot water hoses shall be designed for conveyance of fluids of temperatures not less than 100°C
107 Flexible metallic hoses shall comply with ISO 10 380, BS6501 or equivalent. These types of hoses shallnot be installed in systems subject to excessive vibrations or movements.
108 Flexible synthetic hoses shall comply with SAE J 517, DIN EN 853, 856, 857 or equivalent. The internaloil resistance test may be omitted for hoses intended for gas and water only.
G. Valves
G 100 Valve design101 Pressure ratings for valves shall be in accordance with a recognised national standard.
102 Design and arrangement of valves shall be such that open and closed positions are clearly indicated.
103 Valves are normally to be closed by clockwise rotation.
G 200 Chamber valves
201 Exhaust lines should be fitted with an anti-suction device on the inlet side.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.5.12)
202 All pipe penetrations on chambers should be fitted with two shut off devices as close to the penetrationas practicable. Where appropriate, one device should be a non-return valve.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.5.4)
203 All pipe penetrations in the chambers shall be fitted with external and internal shut-off valves mounteddirectly on the shell plating. Valves may be mounted close to chamber shells, provided that the piping betweenthe chamber and valve is well protected and has a minimum thickness according to the rules.
204 In addition to the requirements in 203 all penetrations for lines designed for gas distribution (e.g. supply,exhaust and equalisation) shall be fitted with non-return valves or flow fuses as appropriate for the direction of gas flow. Lines specifically designed for non-distribution purposes (e.g. analysis) shall be kept to the minimuminternal diameter possible and limited to a maximum of 5 mm.
205 The piping between externally mounted non-return valve or flow-fuse and the external shut-off valveshall be well protected and have minimum thickness according to E.
206 The compartments shall be fitted with a safety relief valve or a visual and audible overpressure alarmalerting the operators at the control station. National standards and/or regulations may stipulate requirementsfor safety relief valves, and shall be followed in these cases.
207 Penetrations for safety valves shall be provided with shut-off valves on both sides of the shell plating.These shut off valves shall be sealed in the open position. Any safety valves shall be set to open at a pressureof approx. 3% above the design pressure.
208 Valves in chambers designed for holding water (i.e. hyperbaric training centres) shall be considered ineach case.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 47/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.4 – Page 47
H. Fittings and Pipe Connections
H 100 Detachable connections
101 Bite and compression type couplings and couplings with brazing, flared fittings, welding cones andflange connections shall be designed according to a recognised standard.
I. Pressure Regulators
I 100 General
101 Pressure regulators shall have more than one full rotation from fully closed to fully opened position.
102 Automatic pressure reducers for breathing apparatuses shall be fitted.
J. Compressors
J 100 General
101 Compressors shall be certified. (Ref. DNV Rules for Classification of Ships Pt.4 Ch.5 Sec.4)
102 Compressors shall be equipped with all the accessories and instrumentation which are necessary for effective and dependable operation.
103 Compressors shall be designed for the gas types, pressure rating and delivery rates as specified by theoperation and so designed that the gas is protected against contamination by lubricants.
104 The content of contaminants in delivered air from compressors shall not exceed acceptance criteria givenin EN 12021 or equivalent standard.
105 Suitable protection shall be provided around moving parts, and the Safety Relief Valves shall exhaust toa safe place.
K. Umbilicals
K 100 General101 Umbilicals shall be designed, tested and certified in accordance with relevant sections of the most recentedition of ISO 13628-5 “Petroleum and natural gas industries – Design and operation of subsea productionsystems – Part 5: Subsea control umbilicals”. The relevant sections of the standard shall be agreed in acompliance matrix when the signed request for certification of the umbilicals is received by DNV.
K 200 Hoses
201 Hoses for umbilicals shall comply with the requirements given in F. Hoses intended for operation witha larger external pressure than the internal pressure, shall be able to withstand 1.5 times this pressure differencewithout collapsing or shall be able to collapse without signs of permanent deformation.
K 300 Electrical cables
301 Electrical cables for umbilicals shall comply with requirements given for umbilicals in Sec.5.
302 The minimum average thickness of insulating walls and temperature classes shall be in accordance withDNV Rules for Classification of Ships Pt.4 Ch.8.
K 400 Sheathing
401 Any sheathing of a compact umbilical shall be of a design which avoids build-up of an inside gas pressure in the event of a small leakage from a hose.
K 500 Strength members
501 The strength members of umbilicals shall have sufficient stiffness to avoid plastic yielding of electricalconductors at design load, and shall be properly secured.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 48/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.5 – Page 48
SECTION 5ELECTRICAL SYSTEMS
A. Introduction
A 100 Objectives101 The objectives of this section are to emphasise the special needs associated with the design andmanufacture of SURFACE diving systems. General requirements for electrical systems and components aregiven in DNV Rules for Classification of Ships Pt.4 Ch.8.
A 200 Scope
201 DNV Rules for Classification of Ships Pt.4 Ch.8 and special needs associated with the design andmanufacture of diving systems.
202 The key issues are identified in:
a) the service definitions by defining “essential”, “emergency” and “non-important” services in Sec.2 D
b) the power supply systems and capacity by specifications for emergency supply
c) cables and penetratorsd) documentation requirements
203 Material specification is included for insulation of cables in the inner area.
204 Design criteria for electrical penetrators are outlined. Philosophy on earthing is specified, in that hullreturn is not allowed.
A 300 Application
301 This section applies to all SURFACE diving systems.
302 This section bears impact on Sec.2 (location of SURFACE diving system in hazardous zones), Sec.4,Sec.6, Sec.7, Sec.8 and Sec.9.
A 400 References
401 Recognised production standards include those provided by the International Electro technicalCommission (IEC).
402 The following codes and standards are applicable:
a) DNV Rules for Classification of Ships Pt.4 Ch.8
b) Relevant IEC equipment construction and design standards referred to
c) IMCA “Code of practice for the safe use of electricity underwater”
d) DNV Standard DNV-OS-D201 “Electrical Installations” - Informative
A 500 Procedural requirements, approval and certification
501 Procedural requirements, Approval and Certification requirements are given in DNV-DSS-105
Appendix A.A 600 Documentation
601 For installation of diving systems on-board or at a site, reference is given to DNV Rules for Classificationof Ships Pt.5 Ch.16. Further references with regards to general requirements are given in Sec.2 of this standard.
602 A system philosophy with general arrangement and where the equipment is placed shall be submittedearly on in the project.
603 Single line distribution system diagrams for the whole installation. The diagrams shall give informationon full load, cable types and cross sections, and make, type and rating of fuse- and switchgear for all distributioncircuits.
604 Calculations on load balance, including emergency consumption and battery capacities.
605 Complete multi-wire diagrams, preferably key diagrams, of control and alarm circuits for all motors or
other consumers.606 A list of ALARMS and Monitoring Parameters shall be submitted for information.
607 Plans showing arrangements of batteries with information about their make, type and capacity.
608 Plans showing arrangement and single line diagrams of the communication system.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 49/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.5 – Page 49
609 Complete list of components and documentation on any tests carried out on all electrical equipment to be permanently installed within the chamber - and the wet-bell (if applicable).
A 700 Survey and testing requirements during and after manufacture
701 In addition to the test requirements given here, detailed requirements are found in DNV-RP-E401.
702 A test for insulation resistance shall be applied to every circuit between all insulated poles and earth, and between individual insulated poles. A minimum value of 1 megaohm shall be attainable.
703 Main and emergency power supplies shall be tested.
704 Electrical penetrators shall be tested at the manufacturers as specified below. Tests shall be made between each conductor and screen and tests shall be carried out on penetrators from the same production batch. The tests shall be carried out in the sequence they are listed. The penetrators shall show no sign of deficiency during and after the testing.
705 Tests to be carried out include:
a) a voltage test, by applying 1 kV plus twice the design voltage for 1 minute between each conductor andscreen separately
b) a hydrostatic test to a pressure of twice the design pressure, repeated 5 times
c) a gas leakage test with the cables cut and open with air to twice the design pressure
d) an insulation test to 5 Megaohms at the design pressure, applying saltwater A 800 Survey and testing requirements during and after assembly
801 Survey and testing during and after assembly shall be carried out according to an approved inspectionand test procedure proposed by the builder in compliance with applicable requirements in DNV Rules for Classification of Ships Pt.4 Ch.8 Sec.10D. Inspection and Testing .
A 900 Survey and testing requirements during and after installation
901 Survey and testing during and after installation shall be carried out according to an approved inspectionand test procedure proposed by the builder in compliance with applicable requirements in DNV Rules for Classification of Ships Pt.4 Ch.8 Sec.10D. Inspection and Testing .
902 During the sea trials the normal launch and recovery system will be tested to the maximum depth. For SURFACE diving systems employing a “wet-bell” the electrical systems shall be checked for proper function.
A 1000 Markings and signboards
1001 Markings and signboards according to DNV Rules for Classification of Ships Pt.4 Ch.8 Sec.3E
A 1100 Materials
1101 Materials shall comply with DNV Rules for Classification of Ships Pt.4 Ch.8.
B. System Design
B 100 Design principles
101 The electrical systems and installations supplying Essential, Emergency and Normal services related tothe divers and or the diving operation, shall meet the requirements for such services as defined in Sec.2 E,
102 Electrical circuits and equipment used in water shall be considered in each separate case and inaccordance with IMCA D 045, R015 “Code of practice for the safe use of electricity underwater”. Provisionsshall be made to reduce the possible fault currents, to which a diver can be exposed, to a harmless level.
103 The location of rechargeable battery installations are considered a hazardous area and shall be carefullyconsidered during the conceptual design of the diving system lay-out early in the project, in compliance withDNV Rules for Classification of Ships Pt.4 Ch.8 Sec.2 I400.
B 200 System voltages
201 For installations within the inner area (see definitions under Sec.1D), the following maximum systemvoltages are permitted:
a) The chamber:
i) For power and heating equipment: max. 250 V A.C. if protected against accidental touching or insulation failures and fitted with a trip device.
ii) For lighting, socket outlets, portable appliances and other consumers supplied by flexible cables andfor communication and instrumentation equipment: max. 30 V D.C. These systems shall be supplied
by isolating transformers.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 50/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.5 – Page 50
b) The wet-bell (when applicable):
i) For all electrical equipment, voltages will be accepted up to max 30 V D.C., and shall be supplied byisolating transformers.
ii) Higher voltages than specified above may be acceptable upon special consideration, providedadditional precautions are taken in order to obtain an equivalent safety standard, e.g.: by use of earthfault circuit breakers.
B 300 Main electric power supply system
The electrical systems and installations supplying essential services related to the divers and or the divingoperation as defined in Sec.2 D, shall be supplied from a main and an emergency or transitional source of power as required by DNV-Rules for Classification of Ships Pt.4 Ch.8.
B 400 System functionality and design
401 The distribution system shall be such that, the failure of any single component cannot influence or setother services out of function for longer periods.
The capacity of the main source of power shall be able to provide power to all normal and essential servicesaccording to Sec.2E, and shall be included in the services to be supplied by the main source of power asdescribed in DNV Rules for Classification of Ships Pt.4 Ch.8 Sec.2B and interpreting SOLAS Ch. II-1/40.1.1.
402 The capacity of emergency source of power shall be able to provide power to all emergency servicesaccording to Sec.2E, and shall be included in the services to be supplied by the emergency source of power asdescribed in DNV Rules for Classification of Ships Pt.4 Ch.8 Sec2C and interpreting SOLAS Ch. II-1/43.2.
403 The emergency source of power and the emergency power distribution shall be capable of handling peak loads.
404 Power supplies required for the operation of life support systems and other essential services shall besufficient for the life-support duration in order to cater for safe termination of the diving operation.
405 Each compression chamber shall be provided with a main and emergency source of lighting sufficientfor the life-support time and of sufficient luminosity to allow the occupants to read gauges and operate essentialsystems within the chamber. Ingress of adequate light through the windows may be accepted as emergencylighting when appropriate.
B 500 Emergency power supply system501 In the event of failure of the main source of electrical power supply to the diving system an independent
source of electrical power should be available for the safe termination of the diving operation. It is admissibleto use the ship's emergency source of electrical power as an emergency source of electrical power if it has
sufficient electrical power capacity to supply the diving system and the emergency load for the vessel at the same time.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.10.2)
502 The alternative source of electrical power should be located outside the machinery casings to ensure its functioning in the event of fire or other casualty causing failure to the main electrical installation.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.10.3)
503 The diving system shall have a source of emergency power and an emergency power supply systemindependent of the main source of power and the main power supply system, as required by DNV Rules for
Classification of Ships Pt.4 Ch.8 that outlines the SOLAS II-1 Part D Regulation 43 requirements.504 The emergency source of power shall be a self-contained, independent source of power. It shallimmediately supply at least those services specified as emergency consumers in Sec.2 D and shall be either:
a) a generator, driven by a suitable prime mover, or
b) an accumulator battery, or
c) the ship's emergency switchboard, or
d) a combination of the above
505 Where this source of power is a generator, it shall be started automatically upon failure of the electricalsupply from the main source and shall be automatically connected within 45 sec., thereby providing emergencyservices.
506 Where this source of power is an accumulator battery, it shall be automatically connected to anemergency power supply system in the event of failure of the main source of electrical power. It shall becapable of carrying the maximum emergency load for a time specified under Sec.2E without excessive voltagedrop, carrying the emergency electrical load without recharging while maintaining the voltage of the batterythroughout the discharge period within 12% above or below its nominal voltage.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 51/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.5 – Page 51
B 600 Transitional source
601 The following consumers shall be provided with transitional power (Uninterrupted Power Supplies):
a) condition monitoring of emergency batteries
b) emergency lighting, including external strobe lighting on basket/wet-bell
c) emergency communication
d) alarm systems for the emergency services
602 If other emergency consumers must be available in the switchover period from main to emergency power, either for operational reasons or to avoid malfunction of the service, a transitional power source (battery backup) for these consumers shall be provided. The capacity of this transitional power shall be minimum 30minutes. (See SOLAS II-1 Part D Regulation 43 para.4.)
B 700 Battery systems
701 Batteries shall not normally be installed within the inner areas in the chambers.
702 Battery housings shall be provided with adequate and unobstructed ventilation to open air in accordancewith DNV Rules for Classification of Ships Pt.4 Ch.8 Sec.2 I400, so that an accumulation of generatedflammable gases is avoided. The ventilation intake shall be fed into the lower parts and the outlet arranged inthe uppermost part of the housing.
B 800 Electric power distribution
801 All switchboards shall be designed, constructed, tested and certified in accordance with the requirementsgiven in DNV Rules for Classification of Ships Pt.4 Ch.8.
802 If the main power to the diving system is supplied from a distribution board, this board shall have twoindependent supply circuits from different sections of the main switchboard or separate power supplies.
803 Control gear in the inner area shall normally not be fitted. However, special arrangement may beacceptable after consideration in each case, based on special precautions.
804 Devices for easy disconnection of all electrical installations in the decompression chambers in anemergency situation shall be fitted. These devices shall be located on the control stand. It shall be possible todisconnect each chamber separately.
805 Emergency circuits wiring is considered to be an essential component in the diving system and shall
therefore be fire proofed in accordance with the requirements in Sec.2 E800 when supplies are sourced fromoutside the outer area.
Guidance note:
Allowances are given to IEC 60331 cables protected by A0 division trays or piping.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
806 Fuses or circuit breakers shall not be installed within chambers and wet-bells, except for emergency battery powered supply circuits.
Guidance note:
Installation inside may be arranged as mentioned above, however, fuse-gear shall not be operable by divers
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
B 900 Lighting901 Each surface compression chamber and diving bell should have adequate means of normal and emergency lighting to allow an occupant to read gauges and operate the system within each compartment.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.10.4)
B 1000 Vessel arrangement
1001 Requirements for system placement and arrangement are given in Sec.2 F.
C. Equipment in general
C 100 General requirements
101 All electrical equipment and assemblies shall be designed and arranged in order to minimise the risk of fire, explosion, electrical shock, emission of toxic gases to personnel, and galvanic action of the surfacecompression chamber or wet-bell.
102 The electric power supply arrangement shall be designed to minimise the risk of electrical capacitydepletion as a result of a fault.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 52/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.5 – Page 52
C 200 Environmental requirements
201 All electrical equipment and installation, including power supply arrangements, should be designed for the environment in which they will operate to minimize the risk of fire, explosion, electrical shock and emissionof toxic gases to personnel, and galvanic action of the surface compression chamber or diving bell.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.10.1)
202 The electrical equipment and installations, including power supply arrangements, shall be constructed
and installed to operate satisfactorily under all environmental conditions for which the diving system isdesigned. Reference is given to DNV Rules for Classification of Ships Pt.4 Ch.8 Sec.2.
203 Electrical equipment within the compression chamber shall be designed for hyperbaric use, oxygen-enriched atmospheres, high humidity levels and marine application. Reference is made to:
a) DNV Rules for Classification of Ships Pt.4 Ch.8
b) NFPA53M (National Fire Protection Agency) “Manual on Fire Hazards in Oxygen-Enriched Atmospheres1990”,
c) IMCA D 045 “Code of practice for the safe use of electricity underwater”, and
d) IMCA D 041 “Use of battery operated equipment in hyperbaric conditions”.
204 All materials of submerged systems shall be such that their electrical and mechanical properties are notinfluenced by water absorption.
C 300 Termination and cable penetrations
301 All electrical penetrators in pressure containing structures shall be purpose designed, certified and shall be arranged with separate fittings.
302 Penetrators in pressure vessels shall be gas and water-tight even in the event of damage to the connectingcables.
C 400 Earthing
401 Electrical systems with hull return shall not be applied. Electrical distribution systems shall haveinsulated neutral (IT).
402 All pressure vessels for human occupancy (PVHOs) shall be provided with earthing connection devicesfor external main protective earth bonding.
403 In the water, all metal enclosures shall be earthed by means of a copper earth conductor incorporated inthe supply cable, with cross-section at least of the same size as the supply conductors and not less than 1 mm2.For cables having metal wire braid or armour this may alternatively be used as earth conductor, provided thatthe braiding cross section is sufficient.
C 500 Insulation
501 Each insulated supply system, including the secondary side of step-down or isolating transformers (or converters) shall be provided with an automatic insulation monitoring device, actuating switch-off and alarm
by insulation faults. Alarm only may be used if a sudden switch-off of the equipment may cause danger for thedivers. This insulation monitoring shall be continuous.
502 The indicator shall be located at the control stand.
Guidance note:
Protection against insulation failures may be achieved by double insulated apparatus or earth fault circuit breakers.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
D. Miscellaneous Equipment
D 100 General
101 Electric motors placed in the inner area shall be provided with overload alarms or be inherently safe. Thealarms may be initiated by over current, or by temperature detector in the motor itself. The normal over current
protections (short circuit protection) on the motors shall also be in place.
Guidance note:
The requirement provides safety against overheating, with the possible development of toxic gasses, and or danger of
flash fire in oxygen enriched environments. In special cases there may be other risks involved in overheating of themotors. However, if the motor is considered inherently safe, the requirement for the overload alarms may be revoked.This is considered preferable in cases where the number of alarms should be kept at a minimum so as to avoid stressfuloperating conditions and or confusion.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 53/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.5 – Page 53
102 Pressure resistant enclosures in the inner area or on the wet-bell shall be designed for 1.3 times the design pressure of the diving system. Tests shall be carried out with gas or water as applicable.
D 200 Lighting equipment – inner area
201 Protection against possible bursting of electrical bulbs shall be in place.
E. Cables
E 100 Application
101 Cables for use in the outer area shall comply with DNV Rules for Classification of Ships Pt.4 Ch.8. Allcables shall have an earthed braiding or screen around the conductors and be equipped with an insulating outer sheet.
102 Cables for use in the inner area shall comply with the requirements in 101 above, with exception to thematerials used. The materials shall be designed for the purpose of being installed into a hyperbaric atmosphere.The cables in the inner area shall be halogen free and shall not give off toxic, noxious or flammable gases evenwhen overheated. Dismantled ends of insulated conductors shall be protected with sleeves of a non-combustible material (e.g. glass fibre weave). Ordinary ship cables with insulation of a halogenated material(e.g. P.V.C.) shall not be accepted. Synthetic insulation materials based on P.T.F.E. (Polytetrafluoroethylene)may be accepted.
103 Flexible cables for transmission of electrical power and signals from the surface support to the divers inthe water and the wet-bell shall be constructed as “dry-core cable” (i.e. water shall not reach the insulation of the individual conductors).
104 The submerged cables shall be able to withstand an external hydrostatic pressure of 1.3 times the actualexternal pressure.
105 Unless installed in pipes, electrical cables shall be readily accessible for visual inspection.
106 Tensile loads shall not be transferred to the electrical cables.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 54/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.6 – Page 54
SECTION 6FIRE PREVENTION, DETECTION AND EXTINCTION
A. Introduction
A 100 Objective101 The objectives of this section are to specify additional requirements for fire protection servingSURFACE diving systems. General requirements for fire protection are given in DNV Rules for Classificationof Ships Pt.4 Ch.10.
A 200 Scope
201 Compliance with DNV Rules for Classification of Ships Pt.4 Ch.10. Issues relating to installation on- board a support vessel are given in Sec.2F
202 Key issues are identified through requirements for materials, insulation and separation from adjacentspaces, sprinkler systems and extinction agents. Reductions of hazards are ensured through these issues.
A 300 Application
301 These requirements apply to all DSV-SURFACE systems. However, some systems may be located on
open deck. In these cases the requirements for insulation against adjacent spaces and requirements for sprinkler systems may be more lenient.
302 This section bears impact on Sec.5 (build-up of static electricity, degree of protection provided byenclosure IP for equipment on chambers covered by sprinkler systems, power to alarms) and Sec.9.
A 400 References
401 For quantitative design parameters and functional requirements, reference is made to the relevantstandards and guidelines, including DNV Rules for Classification of Ships Pt.4 Ch.10.
402 In addition supplementary information is found in the National Fire Protection Agency Codes' chapterson hyperbaric systems and oxygen enriched environments.
403 Requirements applicable to the support vessel are given in SOLAS.
404 Further references are given to:
a) DNV Rules for Classification of Ships Pt.5 Ch.16
b) IMO res. MSC.61(67) (FTP Code)
c) DNV Standard OS-A101 “Safety Principles and Arrangements” Sec.4.
d) IMO Res. MSC/Circ.848 MSC.98(73) (FSS Code)
A 500 Procedural requirements, approval and certification
501 Procedural requirements, Approval and Certification requirements are given in DNV-DSS-105Appendix A.
A 600 Documentation requirements
601 For installation of diving systems on-board or at a site, reference is given to DNV Rules for Classification
of Ships Pt.5 Ch.16. Further references with regards to general requirements are given in Sec.2 of this standard.602 Fire prevention, detection and extinction shall be documented as follows:
a) A List of all materials to be installed in the inner area, where possible with data on and or evaluation of flammability in conditions under which the materials can be used.
b) Plans and specifications of fire detection, fire alarm and fire extinction equipment for both the inner andouter area.
A 700 Survey and testing requirements during and after manufacture
701 In addition to the test requirements given here, detailed requirements are found in DNV-RP-E401.
A 800 Survey and testing requirements during and after assembly
801 The fire detection, fire alarm and fire extinction systems in the inner areas shall be tested for proper
function according to specifications.
A 900 Survey and testing requirements during and after installation
901 For requirements relating to installation of diving systems, refer to Sec.2 and DNV Rules for Classification of Ships Pt.5 Ch.16.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 55/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.6 – Page 55
902 Structural fire protection shall be documented and surveyed visually.
903 The fire detection, fire alarm and fire extinction systems in the outer areas shall be tested for proper function according to specifications.
A 1000 Markings and signboards
1001 Markings and signboards shall be posted according to the relevant requirements.
A 1100 Materials
1101 All materials and equipment used in connection with the diving system should be, as far as is reasonably practicable, of fire-retardant type in order to minimize the risk of fire and sources of ignition.(IMO Code Of Safety For Diving Systems Chapter 2 Design, Construction and Survey 2.9.1)
1102 The use of combustible materials shall be avoided wherever possible. Combustible materials includematerials which may be brought to explode, or burn independently in the resulting gas environment, applicableto the outer area air at a pressure of 1 bar or the inner area at applicable gas mixtures and maximum pressure.
1103 Structural components, furniture and knobs, paints, varnishes and adhesives applied to these, shall beof non-hazardous materials., i.e. they shall be tested in accordance with relevant parts of IMO res. MSC.61(67)(FTP Code) or other acknowledged standard.
Guidance note:
In order to comply with 602, materials for use in inner area should be tested at an elevated pressure. Where suchmaterials are not available, fitting a fixed fire extinguishing system in the inner area may be considered as analternative.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
1104 Materials and arrangements shall, wherever possible, be made so as to avoid build-up of staticelectricity and to minimise the rise of spark production due to electrical failures or combination of materials.In inner areas without electrical equipment, the furniture and floors of electrically conductor materials may beused. For inner areas where electrical equipment is used, the materials and arrangements shall be made so asto minimise faulty contact with earthed metalwork.
B. Fire Protection
B 100 Arrangement
101 When applicable, Control rooms for SURFACE diving systems located in hazardous zone 2 shall complywith the requirements given in DNV Standard OS-A101 “Safety Principles and Arrangements” Sec.4.Other control stands, essential to the function of the diving system, shall be protected such that the controls may
be maintained whilst the divers are being evacuated in the event of a fire.
102 SURFACE diving systems shall have structural fire protection according to the requirements given inSec.2 E800 and Sec.2 F500.
103 Liquid fuel burning machines shall be fitted with either alarms or shut-off valves to ensure that day-tanks,if fitted, cannot be filled to overflow.
104 Oxygen dumped from the diving system shall be ducted for dumping at a safe place.
C. Fire Detection and Alarm System
C 100 “Outer area”
101 Interior spaces containing diving equipment such as surface compression chambers, diving bells, gas storage, compressors and control stands should be covered with an automatic fire detection and alarm systemand a suitable fixed fire-extinguishing system.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.9.3)
102 When situated in enclosed spaces the “outer area” shall be equipped with automatic fire detection andalarm system complying with DNV Rules for Classification of Ships Pt.4 Ch.10. The section or loop of detectors covering the “outer area” shall not cover other spaces.
C 200 “Inner area”
201 The “inner area” shall be equipped with automatic fire detection and alarm system complying with DNVRules for Classification of Ships Pt.4 Ch.10. The section or loop of detectors covering the “inner area” shallnot cover other spaces.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 56/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.6 – Page 56
C 300 Fault detection
301 Provisions shall be made for warning of faults; e.g., voltage failure, broken line, earth fault, etc., in thefire alarm and detection system.
D. Fire Extinguishing
D 100 “Outer area”
101 When situated in enclosed spaces, the “outer area” shall be equipped with a fixed, manually actuated fireextinguishing system with such a layout as to cover the complete system.
102 The extinguishing system shall be either:
a) a pressure water spraying system approved for use in machinery spaces of cat.A, or
b) a gas system approved for use in machinery spaces of cat. A
103 If a gas system is selected, the agent shall be of a type not hazardous to humans in the concentrationforeseeable in the protected space. The concentration shall be below the NOAEL as defined in IMO MSC/Circ.848 as amended.
104 When pressure vessels are situated in enclosed spaces, a manually actuated water spray system having an application rate of 10 l/m2/per minute of the horizontal projected area should be provided to cool and
protect such pressure vessels in the event of external fire. When pressure vessels are situated on open decks, fire hoses may be considered as providing the necessary protection.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.9.5)
105 If water supply for object protection of pressure vessels and water-based fixed fire extinguishing systemsare connected to the mother-vessel’s fire pumps, both pressure and capacity (required application rate) shall beconfirmed. In addition to required capacity for the diving system, the mother-vessel’s fire pumps shall inaddition be capable of delivering two jets of water supplied trough 52 mm dia. fire hoses with 19 mm nozzles.
106 When situated on open deck, the outer area shall be provided with fire extinguishing equipment, whichshall be considered in each case.
D 200 “Inner area”
201 Each compartment in a surface compression chamber should have a suitable means of extinguishing a fire in the interior which would provide rapid and efficient distribution of the extinguishing agent to any part of the chamber.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.9.6)
202 The “inner area” shall be equipped with a fixed, manually actuated fire extinguishing system with sucha layout as to cover the compartments. It shall be possible to actuate the extinguisher both from within thecompartments and from outside.
203 The extinguishing agent for the “inner area” shall be rechargeable without depressurising, and provisionsshall be made for possible discharge of less than the total supply of extinguishing agent
204 The extinguishing agent shall be water, unless an approved alternative exists.
205 Fixed water-mist systems for inner area shall have minimum capacity of 2 shots of 2 min. duration withthe required application rate. Response time upon activation shall follow NFPA99, maximum 3 sec.
E. Miscellaneous Equipment
E 100 Breathing apparatus and fire-fighter's outfit
101 Breathing apparatus are required for control stations manned during recovery of the divers.
102 It shall be possible to carry out work and to communicate effectively in the control room even if there isno normal breathable atmosphere in the room. Release of dangerous quantities or mixtures of gas from chamber or gas plant shall never take place in the control room.
103 A complete set of fire-fighter's outfit complying with DNV Rules for Classification of Ships Pt.4 Ch.10/FSS Code Ch.3.2 for each person required for operation of the diving system during a fire should be providedin a location close to the main control stands. The sets may be included in the other sets on-board but shall beadditional to those required by SOLAS Reg. II-2/10.10.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 57/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.6 – Page 57
Guidance note:
Fire-fighter's outfit is recommended in consideration of the time it may take for recovery of the divers from the water.The operator(s) of the diving system may be exposed to hot environments which render evacuation impossible unlessthey are protected whilst performing their work.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
E 200 Portable fire extinguishers
201 Portable fire extinguishers of approved types and designs should be distributed throughout the spacecontaining the diving system. One of the portable fire-extinguishers should be stowed near the entrance to that
space.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.9.4)
202 Portable fire extinguishers shall be of approved type and comply with FSS Code Ch.4. For “inner area”hyperbaric extinguishers shall be of approved type, containing non-toxic medium and certified for themaximum depth rating of the chamber in which they are placed.
203 Portable fire extinguishers shall be distributed throughout the space containing the diving system so thatno point in the space is more than 10 m walking distance from an extinguisher.
204 One of the portable fire extinguishers shall be fitted near each entrance.
205 A portable fire extinguisher shall be fitted at the control stand.
206 Spare charges or extinguishers shall be provided on-board - 100% for the first 10, and 50% for remainingextinguishers.
207 The same type of portable extinguisher shall be used throughout the system. Compatibility with theremaining extinguishers, used elsewhere on the vessel, is recommended for extinguishers used in the outer area.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 58/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.7 – Page 58
SECTION 7LAUNCH AND RECOVERY SYSTEMS (LARS)
A. Introduction
A 100 Objectives101 The objectives of this section are to specify additional requirements for lifting appliances servingSURFACE diving systems. General requirements for lifting appliances are given in DNV Standard for Certification No. 2.22 Lifting Appliances (Sec.9), incorporating specific requirements for lifting of personnel.
A 200 Scope
201 Launch and recovery systems shall be certified compliant with statutory requirements applicable to theFlag State where the support vessel is registered, geographic area of operation and terms of delivery.
202 Key issues are identified through requirements for alternative recovery of divers.
203 Limitations are given in the rating of the launch and recovery systems with respect to a given, specified,sea-state.
204 Load conditions may need to be estimated through the use of calculations such as DNV-DS-E402 (Note:
under development, meanwhile use DNV-OS-E402) Appendix A or equivalent.
205 Requirements for testing are given in A700.
A 300 Application
301 These requirements apply to all SURFACE diving systems.
302 This section applies to all launch and recovery systems. However, requirements for launch and recoveryof diver’s baskets may be more lenient with respect to emergency recovery, if it is possible for the surfacesupplied divers to ascend independent of the diver’s basket.
303 This section has impact on the requirements for strength with respect to deck loading on the supportvessel and to the services from the support vessel.
A 400 References
401 For quantitative design parameters and functional requirements, reference is made to relevant standardsand guidelines, including DNV Standard for Certification No. 2.22 Lifting Appliances.
402 Further references are given to:
a) DNV-DS-E402 (Note: under development, meanwhile use DNV-OS-E402) Appendix A or equivalent
b) DNV Rules for Classification of Ships Pt.5 Ch.16
c) ILO Convention No. 152
A 500 Procedural requirements, approval and certification
501 Procedural requirements, Approval and Certification requirements are given in DNV-DSS-105Appendix A.
502 Launch and recovery systems shall normally be certified by a competent person as lifting appliances inaccordance with the procedures applicable for the system and compliant with ILO Convention No. 152.Operational limitations shall be stated in an appendix to the certificate. For DNV Classed diving systems a CG2certificate will be issued by DNV for the LARS.
A 600 Documentation
601 For installation of diving systems on-board or at a site, reference is given to DNV Rules for Classificationof Ships Pt.5 Ch.16. Further references with regards to general requirements are given in Sec.2 of this standard.
602 Launch and recovery systems shall be documented as a lifting appliance in accordance with DNVStandard for Certification No. 2.22 Lifting Appliances. In addition, plans and supplementary documentationshall be made available as follows:
a) Plans showing the arrangement of the launch and recovery system with specifications of loads, anddimensions of strength members.
b) Plans showing the function of the systems, and giving particulars of the systems. The plans shall show aschematic arrangement of the hydraulic or pneumatic piping systems and specification of controls and
power supply.
c) Calculation of the design load according to C100.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 59/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.7 – Page 59
d) Calculation of necessary design load for umbilical and guide ropes.
e) Plans and specification of structural parts, ropes, sockets, blocks, sheaves, winches, and emergency ascentarrangement for the basket or wet-bell.
f) Specifications of materials and welds, and extent of non-destructive testing.
g) Specifications of wire ropes and their end connections.
h) Specification of safety devices (limit switches, automatic stop of operating handle, automatic locking of
winch in case of power failure, etc.).
i) Plans and specifications for systems used for emergency ascent of the divers and retrieval of the basket or wet-bell.
j) Information on specification of working weight, displacement and stability of the basket or wet-bell, withall hydrostatic properties accounted for.
A 700 Survey and testing requirements during and after manufacture
701 In addition to the test requirements given here, detailed requirements are found in DNV Standard for Certification No. 2.22 Lifting Appliances and DNV-RP-E401.
A 800 Survey and testing requirements during and after assembly
801 Basket/Wet-bell
a) The working weight shall be ascertained
b) The stability in normal and emergency modes shall be tested
802 Launch and recovery systems shall be subjected to tests for structural strength and for function and power.
803 A static load test to a load equal to the design load shall be carried out.
804 Functional and power testing of normal and emergency systems shall be carried out with a functional testload of 1.25 times the working weight in the most unfavourable position. It shall be demonstrated that thesystems are capable of carrying out all motions in a safe and smooth manner.
805 Monitoring of functional parameters during the tests, e.g. pressure peaks in hydraulic systems may berequired.
A 900 Survey and testing requirements during and after installation901 During the sea trials the normal launch and recovery system shall be tested with the working weight of the basket or wet-bell to the maximum depth.
902 A recovery test of the basket or wet-bell shall be carried out simulating emergency operations conditions.
A 1000 Marking and signposts
1001 The launch and recovery system shall, in an easily visible place, be fitted with a nameplate giving thefollowing particulars:
a) identification number
b) static test load
c) functional test load
d) working weighte) surveyor's mark and identification
1002 The above loads shall be specified for each subsystem involved.
A 1100 Materials
1101 Materials shall be compliant with the requirements given in DNV Standard for Certification No. 2.22Lifting Appliances.
B. Design Principles
B 100 General
101 Where the following IMO requirements refer to “bell” they shall also apply to divers’ baskets in thecontext of this standard.
102 A diving system should be equipped with a main handling system to ensure safe transportation of thediving bell between the work location and the surface compression chamber.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.7.1)
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 60/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.7 – Page 60
103 Connection of the main lift wire to basket (or wet bell) shall have two retaining means for the removable pin.
104 For diving operations where there are no hull obstructions near the diving site, and the freeboard is lessthan 2 metres, one of the following options shall be utilised:
a) wet bell or diving basket(s) including equipment for the deployment of a surface standby diver
b) ladder which extends at least 2 metres below the surface in calm water. The ladder shall have sufficientholds under and above water and on deck level to allow the diver to step easily onto the deck. In additiona dedicated arrangement e.g. a crane, A-frame or davit, certified for lifting of personnel, with sufficientreach shall be present to recover an incapacitated diver from the water by a safety harness onto the deck
105 For diving operations where there are obstructions at the diving site, and/or a freeboard of more than 2metres, one of the following options shall be utilised:
a) wet bell including equipment for the deployment of a surface standby diver
b) two diving baskets – one for the diver(s) and one for the standby diver
B 200 Divers basket and wet-bell (when installed)
201 A diving bell should:
.1 be provided with adequate protection against mechanical damage during handling operation
.2 be equipped with one extra lifting point designed to take the entire dry weight of the bell including ballast and equipment as well as the weight of the divers staying on in the bell..3 be equipped with means whereby each diver using the bell is able to enter and leave it safely as well as withmeans for taking an unconscious diver up into a dry bell..4 (Omitted text not applicable for SURFACE diving).(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.3.1)
Guidance note:
The above IMO requirements for bells shall also apply to divers’ baskets in this case. Note that the design and location of the extra lifting fastening needs to be considered in view of the need to bring a basket or wet-bell close to the surface decompression chamber.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
202 Internally there shall be an attachment for lifting of divers into the wet-bell or basket, if assisted recovery
is required in the particular design.
203 Each diving bell should have view ports that as far as practicable allow an occupant to observe diversoutside the bell.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.3.4)The canopy of wet bells, if employed, shall be provided with windows that as far as practicable allow theoccupants to observe diving and lifting operations outside the wet-bell.
B 300 Function
301 The handling system should enable smooth and easily controllable handling of the diving bell.(IMO Code Of Safety For Diving Systems Chapter 2 Design, Construction and Survey 2.7.3) The normal launch and recovery system shall be designed for a safe, smooth and easily controllabletransportation of the divers in the design sea-state.
302 The lowering of diving bells under normal conditions should not be controlled by brakes, but by the drive system of the winches.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.7.4)
303 If the energy supply to the handling system fails, brakes should be engaged automatically.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.7.5)Manoeuvring systems shall be arranged for automatic stop when the operating handle is not operated (deadman’s handle).
304 Hoisting systems shall be fitted with a mechanical brake, which shall be engaged automatically when thehoisting motor stops. In the event of failure of the automatic brake a secondary means shall be provided to
prevent the load from falling. This may be manual in operation and should be simple in design.
305 The launch and recovery system shall be designed so that the systems are locked in place if the energysupply fails or is switched off.
306 If the hoisting rope can enter the drum with an angle exceeding 2° from the right angle to the drum axis(the “fleet angle”), a spooling arrangement shall be fitted. The rope launch and recovery system shall not permitropes to squeeze in between, or introduce permanent deformation to ropes in underlying layers on the drum.
307 The hoisting system shall be equipped with a “line-out” device showing the amount of wire that isspooled off the drum and a device which stops the basket or wet-bell at its lowermost and uppermost positions.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 61/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.7 – Page 61
Guidance note:
Line-out monitoring is also needed when diving in certain adverse conditions, such as zero visibility. In suchconditions it will be necessary to monitor line-out in order to safely carry out surface diving operations. When thediver is out of the stage, it should be possible to match the diver’s depth with the depth of the stage.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
308 Travelling cranes and trolleys shall be equipped with mechanical stops at their end positions. The system
shall be equipped with limit switches preventing the launch and recovery of the wet-bell or basket outside of the launch and recovery area. A-frames shall be arranged with stops to prevent luffing-out beyond themaximum design angle.
309 Precautions shall be taken to avoid exceeding the design load in any part of the launch and recoverysystem including hoisting ropes and umbilical due to:
a) large capacity of the power unit
b) motions of the supporting vessel when the basket/wet-bell or weights are caught or held by suction to thesea floor
c) failure on umbilical winch during launching of wet-bell
310 Structural members of the launch and recovery system might be subjected to forces imposed by separate
units of a power system (e.g. A-frame tilted by hydraulic actuator on each leg.). The structural members aretherefore either to be strong enough to sustain the resulting forces when one of the power units fails, or the power units shall be synchronised and an automatic alarm and stop system shall be activated when thesynchronising is out of set limits.
311 Hydraulic power units shall be dedicated to the lifting appliance and not shared with other consumers,such as hydraulic driven tools.
312 Where direct visual monitoring of the winch drums from the winch control station is not practical, TVmonitoring shall be fitted.
313 Primary and emergency lighting in all critical launch and recovery areas shall be provided.
B 400 Recovery
401 In the event of single component failure of the main handling system, an alternative means should be
provided whereby the bell can be returned to the surface compression chamber. In addition, provisions should be made for emergency retrieval of the bell if the main and alternative means fail. (-omitted, non-applicabletext-).(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.7.6)There shall be at least one normal system (primary) and two (secondary and tertiary) mutually independentemergency means for recovery of the divers with return to the chambers. The alternative means shall complywith the same requirements for load strength as the main system if the basket/wet-bell is part of the recovery.
402 The two emergency means shall be arranged as follows:
a) One emergency system (secondary) may be made for recovery by aid of the normal hoisting or guiderope(s). This system shall be independently powered from the normal system, and shall incorporate alltransportation necessary to transport the divers to the surface chamber.
b) One system (considered secondary) shall also provide an arrangement for stopping the basket or wet-bellfrom falling or descending, in the event of failure in the primary lifting wire.
403 Another emergency system, (tertiary), may be that the diving system is equipped with a separate launchand recovery system and a second basket or wet-bell. Provisions shall be available for recovery of the diversto the chambers.Alternatively this other emergency system (tertiary) may consist of an arrangement that permits the divers freeascend and shall incorporate all means necessary to transport the divers to the chamber. Where appropriate, theemergency recovery may incorporate a ladder if the freeboard and distance to the chamber allows for this.
404 The time taken to bring the diver(s) from 10 msw in the water until 10 msw equivalent in the chamber should not exceed 5 minutes in any of the three modes of recovery.
405 Guide wire equipment may, in addition to ensuring controlled movements of the basket or wet-bell in thewater, function as a secondary means of recovery.
B 500 Power
501 The hoisting power system shall be designed and tested to lift and manoeuvre a load of 1.25 times theworking weight of the basket or wet-bell. This requirement is to ensure there is enough power to handle the
basket or wet-bell under normal wave conditions.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 62/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.7 – Page 62
502 Handling systems and mating devices should enable easy and firm connection or disconnection of adiving bell (-omitted, non-applicable text-), even under conditions where the support ship or floating structureis rolling, pitching or listing to predetermined degrees.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.7.7)
503 The power of horizontal transportation systems shall be designed and tested for safe launch and recoveryat list and trim as specified in C104 and Sec.2 E200.
504 The strength of the mechanical brake for the hoisting system shall be based on holding of the design load.After the static test, however, the brake may be adjusted to the working weight of the basket or wet-bell plus40%.
B 600 Umbilical
601 The length of the umbilicals, shall, as a minimum, allow an excursion of the basket or wet-bell to:
a) dmax plus 5%, or
b) actual bottom depth plus 5%
602 The termination points, where the umbilicals enter connectors and/or penetrators, shall not be subjectedto significant loads or flexing.
603 The ultimate tensile strength of the umbilicals shall not be less than twice the maximum load expectedduring normal and emergency operations.
C. Strength
C 100 Design loads
101 The handling system should be designed with adequate safety factors considering the environmental and operating conditions, including the dynamic loads which are encountered while handling the diving bell through the air-water interface.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.7.2)
Reference is given to DNV Rules for Ships Pt.3 Ch.1 Sec.3 (Principles) & Sec.4.
102 The minimum design load shall be taken as 2.2 times the working weight of the basket or wet-bell. For exposed launching, typically over the side or stern of vessels, the design load shall be estimated as the largestmost probable, resultant load over 24 hours in the operational design sea-state due to the following:
a) working weight of basket or wet-bell and structural members of the launch and recovery system
b) dynamical amplification due to list, trim and motion of the vessel
c) roll angles up to +/- 22.5 degrees
d) operation and response of the launch and recovery system
e) hydrodynamic forces
f) jerks in the hoisting ropes and impact on the system
103 The working weight of the basket or wet-bell shall be taken as the maximum weight of the fully equipped basket or wet-bell, including each fully equipped diver of 200 kg. The load from this weight applies to:
a) launch and recovery in air, and b) launch and recovery submerged, combining the maximum negative buoyancy of the wire rope, umbilical
and basket or wet-bell at maximum operating depth
104 In locked positions on a vessel, the launch and recovery system shall have a structural strength at leastsufficient for the environmental conditions described in Sec.2. In addition to the motions and accelerations inthe operational design sea-state, the minimum inclinations given in Table C1 shall be taken into account:
105 Dynamic loads due to start, stop, or a slack wire rope followed by a jerk, and hydrodynamic loads shall be estimated. Approximate estimates of expected dynamic loads during launch and recovery of diving basketor wet-bell and any connected cursor from a vessel which is stationary and heading in the main direction of incoming waves in the design sea-state are given in DNV-DS-E402 Appendix A (Note: currently under development, meanwhile use DNV-OS-E402).
Table C1 Permanent inclinations
Vessel type Permanent list Permanent trim
Ship 5° 2°
Semi-submersible 3° 3°
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 63/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.7 – Page 63
Guidance note:
In the case of transferable systems, there will be a wide variety of potential support vessels and installation options.It stands to reason that these diving systems are delivered with a set design load and owners need to apply the DNV-OS-E402 Appendix A calculations to set the parameters for operating capability so that this may be entered into acertificate appendix for the particular installation. In practice the allowable operational loads may be regulated by loadmonitoring, as is done on modern diving systems. The Appendix A tool for estimating design loads, entered in asimple spread sheet, may be used to estimate sea states where the design load is given as a set value. The ship relatedvariables can be altered when the estimation is carried out for a new installation on a different location.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
C 200 Dimensions
201 The minimum safety factor for steel wire ropes shall be 4 compared to Design Load defined in C100.Minimum safety factor for synthetic fibre wire ropes shall be 5 compared to Design Load defined in C100.
Guidance note:
Note that a SF of 4 times the minimum design load of 2.2 gives a SF of 8.8.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
202 Blocks, sheaves, shackles etc. shall comply with recognised national codes. Drums and pulley diametersshall correspond to the type of rope. For steel wire ropes this diameter shall not be taken less than specified bythe rope manufacturer, and normally not less than 18 times the rope diameter. In the case of cross hauling, such
equipment shall fulfil the same requirements for strength as the rest of the launch and recovery system.203 Structural members shall be fabricated from certified materials and shall be designed with safety against:
a) excessive yielding
b) buckling
c) fatigue fracture, and
d) shall be in accordance with technical requirements in DNV Standard for Certification No. 2.22 LiftingAppliances, or equivalent accepted standards
C 300 Foundations for launch and recovery systems and lifting appliances
301 Foundations for launch and recovery systems and lifting appliances shall be determined according toDNV Rules for Classification of Ships Pt.3 Ch.3 Sec.5 or according to other recognised standards.
302 The dynamic coefficient shall be taken as 2.2 or more when the lifting appliance is used for launch andrecovery manned objects such as wet-bells, baskets or Hyperbaric Evacuation Systems. For other liftingappliances, not used for lifting people, the dynamic coefficient shall be 1.5 or more.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 64/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.8 – Page 64
SECTION 8INSTRUMENTATION AND COMMUNICATION
A. Introduction
A 100 Objective101 The objectives of this section are to emphasise the special needs associated with the design andmanufacture of diving systems. General requirements for instrumentation and communication systems andcomponents are given in DNV Rules for Classification of Ships Pt.4 Ch.9.
A 200 Scope
201 Recognised production standards include those provided by the International Electro technicalCommission (IEC).
202 Material specification is included for insulation of cables in the inner area.
A 300 Application
301 These requirements apply to all SURFACE diving systems.
302 This section bears impact on Sec.2 (location of SURFACE diving system in hazardous zones), Sec.4,Sec.6, Sec.7 and Sec.9.
A 400 References
401 The following codes and standards are applicable:
— DNV Rules for Classification of Ships Pt.4 Ch.9 — DNV Rules for Classification of Ships Pt.4 Ch.9 Sec.3 B 200 Electrical power distribution — DNV Rules for Classification of Ships Pt.4 Ch.8 Sec.2 H 100 Control system — Relevant IEC equipment construction and design standards — DNV Standard DNV-OS-D202 “Instrumentation and Telecommunication systems” - Informative
A 500 Procedural requirements, approval and certification
501 Procedural requirements, Approval and Certification requirements are given in DNV-DSS-105Appendix A.
A 600 Documentation
601 For installation of diving systems on-board or at a site, reference is given to DNV Rules for Classificationof Ships Pt.5 Ch.16. Further references with regards to general requirements are given in Sec.2 of this standard.
602 The following document requirements assume a non-complex system. For complex instrumentation and/or communication systems, scope shall be agreed on a case by case basis at the start of the project.
603 For instrumentation and communication systems the following shall be documented:
a) Complete key diagrams, of control and alarm circuits for all motors or other consumers.
b) Plans showing arrangements of batteries with information about their make, type and capacity.
c) Plans showing arrangement and single line diagrams of the communication system.
d) Complete list of components and documentation on any tests carried out on all equipment to be permanently installed within the chamber and the wet-bell.
A 700 Survey and testing requirements during and after manufacture
701 In addition to the test requirements given here, detailed requirements are found in DNV-RP-E401.
702 The correct calibration of all essential instrumentation (compartment pressure gauges, gas analysisinstruments etc.) shall be checked.
A 800 Survey and testing requirements during and after assembly
801 Communication shall be tested after assembly, for proper function.
802 Control and monitoring system shall be tested according to an approved test procedure.
A 900 Survey and testing requirements during and after installation
901 During the sea trials the normal launch and recovery system will be tested to the maximum depth. For SURFACE diving systems employing a “wet-bell” the communication system shall be tested.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 65/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.8 – Page 65
A 1000 Markings and signboards
1001 Markings and signboards shall be posted according to the relevant requirements in DNV Rules for Classification of Ships Pt.4 Ch.8 Sec.3 E.
A 1100 Materials
1101 Equipment, including enclosures, shall meet the environmental requirements given in DNV Rules for Ships Pt.4 Ch.9 Sec.5.
B. Instrumentation
B 100 General
101 A diving system should include the control equipment necessary for safe performance of diving operations.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.1.7)
102 In general, instrumentation shall comply with the relevant requirements in DNV Rules for Classificationof Ships Pt.4 Ch.9.
B 200 Power supply to control and monitoring systems
201 Power supply requirements for control and monitoring systems shall comply with the principles given inDNV Rules for Classification of Ships Pt.4 Ch.9.
202 Where instrumentation requires power supplies, this shall be designed on the basis of the system philosophy and redundancy philosophy as applicable. Requirements for essential, emergency and normalservices are given in Sec.2 D.
B 300 Monitoring and inspection during operation
301 Parameters that could jeopardise the safety of the divers, and or violate the integrity of a diving system,shall be monitored and evaluated with a frequency that enables remedial actions to be carried out before
personal harm is done or the system is damaged.
Guidance note:
As a minimum the monitoring and inspection frequency should be such that the diving system, and consequently the
SURFACE diving operation, shall not be endangered due to any realistic degradation or deterioration that may occur between two consecutive inspection intervals.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
302 Instrumentation may be required when visual inspection or simple measurements are not considered practical or reliable, and available design methods and previous experience are not sufficient for a reliable prediction of the performance of the system.
303 The various pressures in a diving system shall not exceed the design pressures of the components duringnormal steady-state operation.
B 400 Pressure control system
401 A pressure control system is be used to prevent the internal pressures at any point in the diving systemrising to excessive levels, or falling below prescribed levels. The pressure control system comprises the
pressure regulating systems, pressure safety systems and associated instrumentation and alarm systems.402 The purpose of the pressure regulating system is to maintain the operating pressures within acceptablelimits during normal operation. The set pressures of the pressure regulating system shall be such that the localoperational pressures are not exceeded at any point in the diving system. Due account shall be given to thetolerances of the pressure regulating system and the associated instrumentation.
403 The purpose of the pressure safety systems is to protect the systems during abnormal conditions, e.g. inthe event of failure of the pressure regulating systems. The pressure safety systems shall operate automaticallyin accordance with the “fail safe” principles and with set pressures such that there is a low probability for:
a) the internal pressure at any point in the diving system to exceed the design pressure (maximum operating pressure), and for
b) the unintentional loss of pressure at any point in the diving system to fall below set values
404 The diving system may be divided into sections with different design pressures provided the pressurecontrol system ensures that; for each section, the local operational pressure cannot be exceeded during normaloperations and that the design pressure cannot be exceeded during abnormal operation.The pressure control shall also ensure that unwanted loss of pressure in one section does not occur as a resultof an abnormal condition in another section.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 66/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.8 – Page 66
B 500 Control stands
501 With reference to requirements in Sec.4 and DNV Rules for Classification of Ships Pt.4 Ch.9 Sec.6, thedesign of control rooms shall consider ergonomics such as communication and a systematic arrangement of equipment, according to a documented traffic flow chart. Further, it should be ensured that noise or other disturbance when working does not occur. Control stands for diving operations shall therefore be separatedfrom the control stations associated with the other operations on board.
502 The diving system should be so arranged as to ensure that centralized control of the safe operation of the system can be maintained under all weather conditions.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.11.1)
503 Indication and operation of all vital life support conditions to and from the divers, the chamber(s) andthe wet-bell(s) shall be arranged at a single control stand. The control stand shall be equipped for easy operationand control of the diving system. There shall be schematic indication of gas flow lines.
504 A surface compression chamber should be equipped with such valves, gauges and other fittings as arenecessary to control and indicate the internal pressure and safe environment of each compartment from outsidethe chamber at a centralized position.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.5.2)
505 The control stands shall also have indicators showing continuously:
— the pressure in the surface mounted gas containers connected — the pressure after all pressure reducers — the pressure in each chamber compartment — the pressure (depth) at each divers location — the pressure at the wet-bell (if employed)
506 Pressure indicators on the control stand for the divers, the wet-bell and chamber compartments shall bearranged for a possible comparison between each other or with a permanently installed master indicator. If cross-connections are incorporated, these shall be arranged in such a way as to give the operators an indicationwhen cross-connection is being conducted.
507 Instrumentation for pressure measuring for the divers, the wet-bell and chamber compartments shall havean accuracy of +/-0.3% of full scale. In addition, to facilitate accurate decompression, pressure indicators for the chambers shall facilitate depth measurements with an accuracy of +/-0.25 msw. in the depth range from 30
msw. to 0. The accuracy of other instruments for pressure measuring shall be +/-1% of full scale.508 The control stands shall also have a system for continuous indication of:
a) oxygen content in each compartment individually
b) oxygen content in the supply to the:
i) umbilicals
ii) compartments
iii) masks in compartments
509 The monitoring systems shall be fitted with audible and visual high and low level alarm.
510 A list of the essential gauges in the system shall be posted at the control stand.
511 Permanent provisions for calibration of, and comparison and back-up between, oxygen analysinginstruments shall be arranged on the control stand.
512 There shall be an audio-visual gas flow indicator in the oxygen supply to the chambers, when applicable.
513 The control stands shall have a system for regular indication of carbon dioxide content in eachcompartment individually.
Table B1 As a minimum, facilities should be provided at the central control position to monitor thevalues of the following parameters for each occupied compartment:
ParametersCompartments
Surface compression chamber Diving bell
Pressure or depth *1 Yes Yes *2
Temperature *1 Yes
Humidity Yes
Oxygen partial pressure *1 Yes Yes
CO2 partial pressure Yes Yes
*1/ These parameters should be indicated continuously.*2/ Pressure or depth (omitted non-applicable text) outside bell should be indicated.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.11.2)
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 67/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.8 – Page 67
514 There shall be systems for indication of temperature and humidity in the inner area displayed at thecontrol stand.
515 Alarms for abnormal conditions are required at the control stand, if automatic environmental controlsystems are arranged for regulation of gas composition, pressure and temperature in the inner area.
B 600 Pressure indicators in wet-bell and chambers
601 Valves, gauges and other fittings should be provided outside the bell as necessary to control and indicatethe pressure and safe environment within the diving bell.(omitted text)(IMO Code Of Safety For Diving Systems Chapter 2 Design, Construction and Survey 2.5.3)
602 A wet-bell shall contain local equipment to monitor important parameters in all situations, such as depth, pressure of gas supply from surface, pressure of on-board emergency gas supply
603 The chamber compartments shall be fitted with indicators visible to the divers inside, showing internal pressure.
604 Means shall be provided for isolating all pressure indicators without interrupting vital functions in thegas distribution system. If isolation is incorporated, these shall be arranged in such a way as to give theoperators an indication when isolation is being conducted.
B 700 Oxygen and carbon dioxide analysing systems in wet-bell and chambers
701 Provision should be made within the bell for an independent means of monitoring oxygen and carbondioxide levels.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.11.3)In the case of diving in a wet-bell, this is only required when risk evaluation according to given locations andoperations reveal a need for monitoring these parameters locally in the wet-bell.
702 Oxygen analysing systems shall have an accuracy of at least +/-0.015 bar partial pressure oxygen.
703 The chamber compartments shall have independent oxygen analysers inside.
704 Carbon dioxide analysing systems shall have an accuracy of +/-0.001 bar partial pressure.
705 Carbon dioxide gas mixture for calibration shall be available.
B 800 Other gases801 Where breathing gas is supplied directly from running compressors, a means of analysing the air for Carbon Monoxide shall be provided for continuous monitoring - incorporating audio/visual alarm.
802 The instrumentation for systems intended for other gases than air and oxygen mixes shall be consideredin each case, including Hydrogen Sulphide.
803 Diving shall not take place if CO and/or H2S are present, and there shall be a system for shutting downintakes of air into the diving system in cases where these gases may be present.
Guidance note:
Operations in connection with exploration of oil may require instrumentation for the analysis of hydrocarbon gasesand H2S.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
804 Calibration gases shall be available for each relevant gas mix.
B 900 Automatic environmental control systems (if employed)
901 The following requirements apply when systems for automatic regulation of gas composition, pressureand temperature in the inner area are installed.
902 The design principles given in DNV Rules for Classification of Ships Pt.4 Ch.9, apply on a general basis.
903 The most probable failure in the systems shall result in the least critical of any possible new conditions(fail to safety).
904 Automatic control systems shall keep process variables within the limits specified during normalworking conditions and the alarm systems shall be activated when the limits are exceeded.
905 Alarm at the control stand is required for abnormal conditions. The alarm system is also to be activated by failures in the alarm system circuitry. The alarm system shall be independent of the automatic control systemso that failure in one of the systems cannot inhibit operation of the other system.
906 A manual back-up system for the automatic control system is required.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 68/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.8 – Page 68
C. Communication
C 100 General
101 Communications systems shall comply with the relevant requirements given in DNV Rules for Classification of Ships Pt.5 Ch.16.
C 200 Visual observation of divers
201 Visual observation of divers in each compartment shall be possible.
C 300 Voice communication systems
301 Voice communication should be hard-wired, especially when critical operations are coordinated.
302 The communication system should be arranged for direct two-way communication between the control stand and:
— diver in water — diving bell — each compartment of the chambers — diving system handling positions — dynamic positioning room — bridge, ship's command centre or drilling floor
(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.12.1)
303 Communication systems shall be arranged for direct voice communication between the control stand andother control stations as needed. If a crane is employed during diving operations, there shall be directcommunications with the crane operator.
304 Alternative means of communication with divers in the surface compression chamber and diving bell should be available in emergency.(IMO Code of Safety for Diving Systems Chapter 2 Design, Construction and Survey 2.12.2)
305 The control stand for the divers in the water shall be provided with equipment for audio-recording of allcommunications with the divers.
306 Special consideration applies when portable equipment is used for mandatory two way voicecommunication on-board. SOLAS V Reg.17 – EMC – applies regarding this use in the bridge.
Guidance note:Mandatory two way voice communication equipment:DNV will accept UHF equipment without a valid DNV type approval certificate if the yard issues a Declaration sayingthat the same UHF systems are also installed on other vessels, so far have not received negative feedback from theowners, and that the yard agrees to take full responsibility for the UHF systems. This kind of acceptance is so-called“case by case” approval, meaning that DNV might not accept the systems in the future if new information comes tolight that prevents such acceptance.
---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 69/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
Sec.9 – Page 69
SECTION 9EVACUATION SYSTEMS
A. Introduction
A 100 Objectives101 The objective of this section is to inform that requirements for evacuation systems are regulated by theMaritime Administrations and/or shelf state authorities.
A 200 Scope
201 The scope of work is according to instructions from the Maritime administration.
A 300 Application
301 This section applies to all DSV-SURFACE systems where SOLAS requirements may be applied if practicably possible. These requirements may also be applicable as Flag State, or Shelf state, requirements. Theauthorities are then contacted as part of the ISM audits or the Safety Case.
A 400 References
a) SOLAS
b) IMO Guidelines for Hyperbaric Evacuation
c) DNV-DS-E404 (standard under development)
A 500 Procedural requirements, approval and certification
501 Procedural requirements, Approval and Certification requirements are given in DNV-DS-E404 andDNV Rules for Ships Pt.5 Ch.16 Sec.7.
A 600 Documentation
601 Contingency plans with details of responsibilities, equipment, systems and escape routes.
A 700 Survey and testing requirements during and after manufacture
701 (See DNV-DS-E404)A 800 Survey and testing requirements during and after assembly
801 (See DNV-DS-E404)
A 900 Survey and testing requirements during and after installation
901 (See DNV-DS-E404)
A 1000 Marking and signboards
1001 (See DNV-DS-E404)
A 1100 Materials
1101 (See DNV-DS-E404)
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 70/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
App.A – Page 70
APPENDIX ASELECTION OF SAFETY OBJECTIVE
A. Introduction
A 100 General principles (informative)101 The selection of the safety objective depends on the criticality of each of the elements that have an impacton the management of risks to the diving system.
102 Certification shall direct greatest effort at those elements of the diving system where the risk is highestand whose failure or reduced performance will have the most significant impact on safety and environmentalrisks.
103 Suitable selection factors include, but are not limited to, the:
a) overall safety objectives for the diving system
b) assessment of the risks associated with the diving and the measures taken to reduce these risks
c) degree of technical innovation in the diving system
d) experience of the contractors in carrying out the work e) quality management systems of the owner and it’s contractors.
104 Due to the diversity of various diving systems, their contents, their degree of innovation, the geographiclocation, etc.; it is not possible to give precise guidelines on how to decide what safety objective is appropriatefor each particular diving system.Therefore, guidance is given as a series of questions that should be answered when deciding the appropriatesafety objective for a diving system. This list is not exhaustive and other questions should be added to the listif appropriate for a particular diving system.
105 It must be emphasised that the contribution of each element should be judged qualitatively and or quantitatively. Wherever possible quantified risk assessment data should use to provide a justifiable basis for any decisions made.
106 Depending of the stage of the project, the activities may not have taken place yet in which case the
questions can also be posed in another form, i.e. “Is …. planned to be?”
B. Trigger Questions
B 100 Overall safety objective
a) Does the safety objective address the main safety goals?
b) Does the safety objective establish acceptance criteria for the level of risk acceptable to the owner?
c) Is this risk (depending on the diving and its location) measured in terms of human injuries as well asenvironmental, economic and political consequences?
B 200 Assessment of risk
a) Has a systematic review been carried out to identify and evaluate the probabilities and consequences of failures in the diving system?
b) Has this review judged the contribution of each element qualitatively and or quantitatively and used, where possible, quantified risk assessment data to provide a justifiable basis for any decisions made?
c) Does the extent of the review reflect the criticality of the diving system, the planned operation and previousexperience with similar diving systems?
d) Does this review identify the risk to the operation of the diving system and to the health and safety of personnel associated with it or in its vicinity?
e) Has the extent of the identified risks been reduced to a level as low as reasonably practicable by means of one or both of:
f) Reduction in the probability of failure?g) Mitigation of the consequences of failure?
h) Has the result of the systematic review of the risks been measured against the owner’s safety objective?
i) Has the result of this review been used in the selection of the appropriate certification activity?
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 71/72DET NORSKE VERITAS AS
DNV Standard DNV-DS-E403, July 2012
App.A – Page 71
B 300 Technical innovation
a) Has the degree of technical innovation in the diving system been considered?
b) Has it been considered that risks to the diving are likely to be greater with a high degree of technicalinnovation than with a diving designed, manufactured and installed to well-known criteria in well-knownwaters?
c) Have factors been considered in the selection of the appropriate certification such as:
— Degree of difficulty in achieving technical requirements? — Knowledge of similar diving systems? — Effect of the new diving system on the area or vessel?
B 400 Contractors’ experience
a) Has the degree of risk to the diving system been considered where design, construction or installationcontractors are inexperienced?
b) Has the degree of risk been considered where the contractors are experienced but not in similar work?
c) Has the degree of risk been considered where the work schedule is tight?
B 500 Quality management systems
a) Have all parties involved in the diving system implemented an adequate quality management system toensure that gross errors in the work are limited?
b) Do these parties include the:
i) Owner
ii) Design contractor
iii) Construction contractors
iv) Sub-contractors
v) Installation contractor
vi) Operator (when relevant)
c) Do the factors being considered when evaluating the adequacy of the quality management system include:
i) Whether or not an ISO 9000 or equivalent certified system is in place?
ii) Results from external audits?
iii) Results from internal audits?
iv) Experience with contractors’ previous work?
v) Project work force familiarity with the quality management system?
C. Systematic Review/Analysis
C 100 What to do and how? (informative)
101 Submitted so called “ FMEAs,” reveal that there appears to be a misconception of how to approach theSystematic Review required in Sec.2.
102 Hazards identification and risk assessment involves a series of steps as described in DNV-OS-A101Appendix B for Formal Safety Assessment and includes: Identification of the hazard, Reduction of thelikelihood & Reduction of the consequence. Alternative standards include ISO 17776:2000(E) that may alsogive adequate guidance.
103 The correct choice of tools, in the correct order, is paramount to a systematic review and ISO 17776 -“4.5 Selection of structured review techniques” and “Annex B” - describes this.
104 When the tool is chosen, it is important to report the results of the analysis in the appropriate format for the chosen tool:
a) It makes no sense reporting a HAZID in the format of a FMEA, or vice versa.
b) The safety objectives need to be clearly defined and verifiable.
c) The scope of the analysis and boundaries of the diving system shall be clearly defined.
d) The actions given in the analysis when dealing with failures are critical to safety. Operating procedures andcrew familiarisation/Handover procedures should be reviewed to ensure crew can adequately handle thefailure scenarios should they occur.
8/11/2019 Standard for Surface Diving Systems
http://slidepdf.com/reader/full/standard-for-surface-diving-systems 72/72
DNV Standard DNV-DS-E403, July 2012
App.A – Page 72
e) Failure modes where maintenance is listed as either detection or mitigation should be collated as a table for input into the planned maintenance system.
f) Is there anything else on the vessel which may impact the system? ICE Class, Helideck, Well Intervention etc.
g) It should also be shown who was involved in the preparation of the analysis.
105 A typical, but not exhaustive, list of hazards/failures includes:
a) outer or inner area fire b) releases with potential to result in fires
c) explosions, and/or toxic hazards
d) loss of pressure containment
e) contamination of living environment
f) loss of power to the diving system
g) failure of handling systems
h) loss of communication to/from the diving system
106 Note that correct syntax is required to effectuate a correct order of identification and evaluation of failures.
a) A correct syntax in this case would be: “Failure A may lead to serious consequences therefore Mitigation X is implemented to arrive at less serious (consequences and/or probability) = Risk.”
b) Wrong syntax is frequently stated as: “Failure A will not lead to serious consequences because of Mitigation X”. As this type of syntax is reversible (“ Because of Mitigation X Failure A does not lead to seriousconsequence”), it frequently leads to an improper view of the risk and an early termination of the analysis
process.