Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
SCRAP VIEW ON ARROW A
SCALE 1 : 50
A
IFS PART No.DRAWING No.MATERIALDESCRIPTIONMASSQTYITEM
N/ASTA-014647SEE DRAWINGINSULATION SEQUENCE STAGE 1 - WJ126 11
N/AN/AN/ASMALL BORE PIPEWORK 12
N/AN/AN/A2" GL LINE - SMALL BORE PIPEWORK 13
N/AN/AN/AEFL CABLE AND DRUMS ASSEMBLY 24
1016279STA-014648VIKOTHERM P7INSULATION - GOOSNECK TRANSITION509.3 kg15
1016279STA-014648VIKOTHERM P7INSULATION R457 BEND557.9 kg16
1016279STA-014648VIKOTHERM P7INSULATION - XMT TRANSITION745 kg17
1069689STA-009825VIKOTHERM P7SMALL BORE TOOL MOUNTING INNER0.8 kg488
1069690STA-009826VIKOTHERM P7SMALL BORE TOOL MOUNTING OUTER
TYPE 1
5.2 kg129
1069691STA-009827VIKOTHERM P7SMALL BORE TOOL MOUNTING OUTER
TYPE 2
6.1 kg1210
1016279STA-014648VIKOTHERM P7FIELD JOINT MOULDING580.7 kg111
1016279STA-014648VIKOTHERM P7EFL DRUM OVERMOULD ARRANGEMENT265.8 kg212
1016279STA-014648VIKOTHERM P7FIELD JOINT MOULDING632.1 kg113
1070970T12005BS EN 10025 Gr S275GOOSENECK TO JUMPER INSULATION TIE
IN TOOL - CONFIG F
203 kg114
1070970T12005BS EN 10025 Gr S275GOOSENECK TO JUMPER INSULATION TIE
IN TOOL
155.2 kg115
1070063T11964BS EN 10025 Gr S275FIELD JOINT MOULD TOOL - CONFIG A131.6 kg116
1070062T11963BS EN 10025 Gr S275EFL DRUM OVERMOULD TOOL - CONFIG A90.4 kg217
N/AT11964 PANEL 01BS EN 10025 Gr S275T11964 PANEL 016.2 kg2818
IFS PART No.DRAWING No.MATERIALDESCRIPTIONMASSQTYITEM
N/AT11964 PANEL 02BS EN 10025 Gr S275T11964 PANEL 022.1 kg819
N/AT12005BS EN 10025 Gr S275T12005 PANEL 175.7 kg420
N/AT12005BS EN 10025 Gr S275T12005 PANEL 205.4 kg221
N/AT12005BS EN 10025 Gr S275T12005 PANEL 2913 kg122
N/AT12005BS EN 10025 Gr S275T12005 PANEL 2211.5 kg123
N/AT12005BS EN 10025 Gr S275T12005 PANEL 192.1 kg824
N/AT12005BS EN 10025 Gr S275T12005 PANEL 244.3 kg425
N/AT12005ALUMINIUM ALLOYT12005 CHANNEL INSERT 025.8 kg126
N/AT12005ALUMINIUM ALLOYT12005 CHANNEL INSERT 036.7 kg127
N/AT12005ALUMINIUM ALLOYT12005 CHANNEL INSERT 029.1 kg128
N/AT12005ALUMINIUM ALLOYT12005 CHANNEL INSERT 054.7 kg129
N/AT12005VIKOTHERM P7T12005 CHANNEL INSERT 045 kg130
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
A A
B B
C C
D D
E E
F F
G G
H H
TRELLEBORG OFFSHORE
PROJECT NUMBER DRAWING NUMBER ISSUE
IF IN DOUBT ASK.
DO NOT MANUALLY
DIMENSION OR ALTER.
MODELLED BY DRAWING STATUS
SCALE UNITS U.N.O. SHEET SIZE
PROJECTION
TITLE
CUSTOMER
PROJECT
FRIEDLANDER INDUSTRIE CONGO
MOHO NORD
INSULATION SEQUENCE STAGE 2 - WJ126
PRODUCTION WELL JUMPER - Z SHAPE - POST METROLOGY
DBT REVIEW
W13737 STA-014648 WIP
SHEET 1 OF 6
THIS DOCUMENT CONTAINS CONFIDENTIAL INFORMATION. ALL RIGHTS (INCLUDING COPYRIGHT,
CONFIDENTIAL INFORMATION , TRADE SECRETS AND DESIGN RIGHTS) ARE OWNED BY
TRELLEBORG OFFSHORE UK LTD. NO USE OR DISCLOSURE IS TO BE MADE WITHOUT PRIOR
WRITTEN PERMISSION OF TRELLEBORG OFFSHORE UK LTD. COPYRIGHT 2018 TRELLEBORG
OFFSHORE UK LIMITED. ALL RIGHTS RESERVED.
1 : 50
mm/[in]
A1
www.trelleborg.com/offshore
NOTES:
1. ITEM 5, 6 & 7 ARE COMPLETED BEFORE FINAL INSTALLATION OF
2" GL LINE - ITEM 3.
2. ITEM 2 (SMALL BORE PIPES) ARE INSTALLED AFTER
STAGE 1 INSULATION.
3. GENERAL TOLERANCE ARE AS PER TABLE.
4. IF IN DOUBT ASK.
5. SEE SHEET 6 FOR TYPICAL JOINT DETAILS.
STAGE 1 & SMALL BORE PIPEWORK
REFERENCE DRAWINGS:
INSULATION SEQUENCE STAGE 1 - WJ126 - STA-014647
PRODUCTION WELL JUMPER - Z
SHAPE - POST METROLOGY
INSULATION SEQUENCE STAGE 3 - WJ126 - STA-014649
PRODUCTION WELL JUMPER - Z
SHAPE - POST METROLOGY
PRODUCTION WELL JUMPER - WJ126 - CG-MHN-24-E044-000062 REV 0.0
Z SHAPE -GENERAL ARRANGEMENT
& ISOMETRIC VIEWS
XMT SIDE
MANIFOLD SIDE
MANIFOLD SIDE
XMT SIDE
(
9
0
°
)
1
2
1 01/02/2018 FIRST ISSUE DBT ASV RH
ISSUE DATE DESCRIPTION DRAWN CHK`D APPR`D
(
8
9
.
7
°
)
ABOVE
0
30
120
250
500
1000
2
3
4
5
6
2000
UP TO AND
INCLUDING
TOLERANCE
mm
1.5
.3%
2000
1000
30
250
120
500
NOMINAL DIMENSION (mm)
GENERAL MOULDING TOLERANCES
BASED ON DIN ISO 2768-v (VERY COARSE CLASS)
VIEW ON ARROW B
VIEW ON ARROW C
SECTION E-E
(SMALL BORE MOUNTING ARRANGEMENT)
TYPICAL 16 No. PLACES TOTAL
SCALE 1 : 20
SECTION D-D
SCALE 1 : 50
DETAIL AE
INSERT DETAILS INSIDE TOOL PANELS
SCALE 1 : 25
BEND TOOL PANEL DETAIL
SCALE 1 : 20
B
C
E
E
D
D
AE
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
A A
B B
C C
D D
E E
F F
G G
H H
TRELLEBORG OFFSHORE
PROJECT NUMBER DRAWING NUMBER ISSUE
IF IN DOUBT ASK.
DO NOT MANUALLY
DIMENSION OR ALTER.
MODELLED BY DRAWING STATUS
SCALE UNITS U.N.O. SHEET SIZE
PROJECTION
TITLE
CUSTOMER
PROJECT
FRIEDLANDER INDUSTRIE CONGO
MOHO NORD
INSULATION SEQUENCE STAGE 2 - WJ126
PRODUCTION WELL JUMPER - Z SHAPE - POST METROLOGY
DBT REVIEW
W13737 STA-014648 WIP
SHEET 2 OF 6
THIS DOCUMENT CONTAINS CONFIDENTIAL INFORMATION. ALL RIGHTS (INCLUDING COPYRIGHT,
CONFIDENTIAL INFORMATION , TRADE SECRETS AND DESIGN RIGHTS) ARE OWNED BY
TRELLEBORG OFFSHORE UK LTD. NO USE OR DISCLOSURE IS TO BE MADE WITHOUT PRIOR
WRITTEN PERMISSION OF TRELLEBORG OFFSHORE UK LTD. COPYRIGHT 2018 TRELLEBORG
OFFSHORE UK LIMITED. ALL RIGHTS RESERVED.
1 : 50
mm/[in]
A1
www.trelleborg.com/offshore
TOOLING STAGE 2A
NOTES:
1. FOR NOTES SEE SHEET 1.
2. SEE SHEET 6 FOR TYPICAL JOINT DETAILS.
(1212)
(395)
(575)
(438)
(1212)
(1927)(1434)
(1457)
(100) O
VE
RLA
P
(100) (100)
(1434)
14
25
20
23
18
18
24
21
24
29
27
30
26
28
15
14
1089 10 8 9
22
10
8
8
9
MANIFOLD SIDE
XMT SIDE
XMT SIDE
MANIFOLD SIDE
(310)
(445)(457)
(55)
(462)
(500) (500)
(55)
SECTION G-G
SCALE 1 : 30
SECTION H-H
SCALE 1 : 10
SECTION J-J
SCALE 1 : 10
SECTION K-K
SCALE 1 : 30
SECTION L-L
SCALE 1 : 10
SECTION M-M
SCALE 1 : 10
SECTION N-N
SCALE 1 : 10
VIEW ON ARROW P
SCALE 1 : 30
SECTION R-R
SCALE 1 : 10
SECTION T-T
SCALE 1 : 15
VIEW ON ARROW U
SCALE 1 : 30
SECTION V-V
SCALE 1 : 10
SECTION W-W
SCALE 1 : 15
G
G
H
H
J
J
K
K
L L
M
M
N
N
P
R
R
T
T
U
VV
W
W
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
A A
B B
C C
D D
E E
F F
G G
H H
TRELLEBORG OFFSHORE
PROJECT NUMBER DRAWING NUMBER ISSUE
IF IN DOUBT ASK.
DO NOT MANUALLY
DIMENSION OR ALTER.
MODELLED BY DRAWING STATUS
SCALE UNITS U.N.O. SHEET SIZE
PROJECTION
TITLE
CUSTOMER
PROJECT
FRIEDLANDER INDUSTRIE CONGO
MOHO NORD
INSULATION SEQUENCE STAGE 2 - WJ126
PRODUCTION WELL JUMPER - Z SHAPE - POST METROLOGY
DBT REVIEW
W13737 STA-014648 WIP
SHEET 3 OF 6
THIS DOCUMENT CONTAINS CONFIDENTIAL INFORMATION. ALL RIGHTS (INCLUDING COPYRIGHT,
CONFIDENTIAL INFORMATION , TRADE SECRETS AND DESIGN RIGHTS) ARE OWNED BY
TRELLEBORG OFFSHORE UK LTD. NO USE OR DISCLOSURE IS TO BE MADE WITHOUT PRIOR
WRITTEN PERMISSION OF TRELLEBORG OFFSHORE UK LTD. COPYRIGHT 2018 TRELLEBORG
OFFSHORE UK LIMITED. ALL RIGHTS RESERVED.
1 : 50
mm/[in]
A1
www.trelleborg.com/offshore
INSULATION STAGE 2A
220
()
(168.3) PIPE
(58)
NOTES:
1. FOR NOTES SEE SHEET 1.
2. SEE SHEET 6 FOR TYPICAL JOINT DETAILS.
63 2
2°
249
6084Ø
608 4
63 2
250
60 2
608 4
364
33
(265)
(331)
5964Ø
122
4
1
0
1214
1283
684
4
1
0
1216
1456
457
55
(986)
1325.5
55
33
(265)
(331)
4974
187.5
375
4
309.5
122
674
457 600
(71)
(72)
MANIFOLD SIDE
XMT SIDE
XMT SIDE
MANIFOLD SIDE
344
5
6
7
668
5
6
600 931
4974
5964Ø
375
4
187.5
309.5
2°
249
SECTION Y-Y
SCALE 1 : 20
SECTION AA-AA
SCALE 1 : 35
Y Y
AA AA
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
A A
B B
C C
D D
E E
F F
G G
H H
TRELLEBORG OFFSHORE
PROJECT NUMBER DRAWING NUMBER ISSUE
IF IN DOUBT ASK.
DO NOT MANUALLY
DIMENSION OR ALTER.
MODELLED BY DRAWING STATUS
SCALE UNITS U.N.O. SHEET SIZE
PROJECTION
TITLE
CUSTOMER
PROJECT
FRIEDLANDER INDUSTRIE CONGO
MOHO NORD
INSULATION SEQUENCE STAGE 2 - WJ126
PRODUCTION WELL JUMPER - Z SHAPE - POST METROLOGY
DBT REVIEW
W13737 STA-014648 WIP
SHEET 4 OF 6
THIS DOCUMENT CONTAINS CONFIDENTIAL INFORMATION. ALL RIGHTS (INCLUDING COPYRIGHT,
CONFIDENTIAL INFORMATION , TRADE SECRETS AND DESIGN RIGHTS) ARE OWNED BY
TRELLEBORG OFFSHORE UK LTD. NO USE OR DISCLOSURE IS TO BE MADE WITHOUT PRIOR
WRITTEN PERMISSION OF TRELLEBORG OFFSHORE UK LTD. COPYRIGHT 2018 TRELLEBORG
OFFSHORE UK LIMITED. ALL RIGHTS RESERVED.
1 : 50
mm/[in]
A1
www.trelleborg.com/offshore
TOOLING STAGE 2B
NOTES:
1. FOR NOTES SEE SHEET 1.
2. SEE SHEET 6 FOR TYPICAL JOINT DETAILS.
(900)(1500)
(4450)(2500)
(900) (1500)
(1876)(2250)
MANIFOLD SIDE
XMT SIDE
MANIFOLD SIDE
XMT SIDE
16
17
18
19
19
17
9810
9 8 10
1718 1919
17
16
9 8 109810 9810 9
8
10
9
8
10
9 8 10
1
3
2
SECTION AB-AB
SCALE 1 : 10
AB
AB
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
A A
B B
C C
D D
E E
F F
G G
H H
TRELLEBORG OFFSHORE
PROJECT NUMBER DRAWING NUMBER ISSUE
IF IN DOUBT ASK.
DO NOT MANUALLY
DIMENSION OR ALTER.
MODELLED BY DRAWING STATUS
SCALE UNITS U.N.O. SHEET SIZE
PROJECTION
TITLE
CUSTOMER
PROJECT
FRIEDLANDER INDUSTRIE CONGO
MOHO NORD
INSULATION SEQUENCE STAGE 2 - WJ126
PRODUCTION WELL JUMPER - Z SHAPE - POST METROLOGY
DBT REVIEW
W13737 STA-014648 WIP
SHEET 5 OF 6
THIS DOCUMENT CONTAINS CONFIDENTIAL INFORMATION. ALL RIGHTS (INCLUDING COPYRIGHT,
CONFIDENTIAL INFORMATION , TRADE SECRETS AND DESIGN RIGHTS) ARE OWNED BY
TRELLEBORG OFFSHORE UK LTD. NO USE OR DISCLOSURE IS TO BE MADE WITHOUT PRIOR
WRITTEN PERMISSION OF TRELLEBORG OFFSHORE UK LTD. COPYRIGHT 2018 TRELLEBORG
OFFSHORE UK LIMITED. ALL RIGHTS RESERVED.
1 : 50
mm/[in]
A1
www.trelleborg.com/offshore
INSULATION STAGE 2B
NOTES:
1. FOR NOTES SEE SHEET 1.
2. SEE SHEET 6 FOR TYPICAL JOINT DETAILS.
1650
1500 900
44502500
1650
1500900
18762250
608 4
11
12
4
13 12
4
4
12
13
4
12
11
MANIFOLD SIDE
XMT SIDE
XMT SIDE
MANIFOLD SIDE
5700
TYPICAL JOINT
SCALE 1 : 12.5
SECTION AC-AC
TYPICAL TOOLING PANELS
SCALE 1 : 12.5
SECTION AD-AD
TYPICAL INSULATION SECTION
SCALE 1 : 12.5
AC AC
AD AD
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
A A
B B
C C
D D
E E
F F
G G
H H
TRELLEBORG OFFSHORE
PROJECT NUMBER DRAWING NUMBER ISSUE
IF IN DOUBT ASK.
DO NOT MANUALLY
DIMENSION OR ALTER.
MODELLED BY DRAWING STATUS
SCALE UNITS U.N.O. SHEET SIZE
PROJECTION
TITLE
CUSTOMER
PROJECT
FRIEDLANDER INDUSTRIE CONGO
MOHO NORD
INSULATION SEQUENCE STAGE 2 - WJ126
PRODUCTION WELL JUMPER - Z SHAPE - POST METROLOGY
DBT REVIEW
W13737 STA-014648 WIP
SHEET 6 OF 6
THIS DOCUMENT CONTAINS CONFIDENTIAL INFORMATION. ALL RIGHTS (INCLUDING COPYRIGHT,
CONFIDENTIAL INFORMATION , TRADE SECRETS AND DESIGN RIGHTS) ARE OWNED BY
TRELLEBORG OFFSHORE UK LTD. NO USE OR DISCLOSURE IS TO BE MADE WITHOUT PRIOR
WRITTEN PERMISSION OF TRELLEBORG OFFSHORE UK LTD. COPYRIGHT 2016 TRELLEBORG
OFFSHORE UK LIMITED. ALL RIGHTS RESERVED.
1 : 50
mm/[in]
A1
www.trelleborg.com/offshore
TYPICAL JOINT LENGTH
(55) (55)
(100)
TYPICAL JOINT LENGTH
(100)
TYPICAL TOOL LENGTH
STEP 1
POSITION TOOL MOUNTING SPACERS
IN 2 NO. POSITIONS. AXIAL SPACING AS SHOWN.
SEAL ALL GAPS AND JOINTS USING DOW CORNING
732 SEALANT/ADHESIVE. STRAP TOGETHER AROUND
OUTSIDE USING TEMPORARY RATCHET LASHING
WHILST DOW CORNING 732 CURES.
STEP 2
REMOVE ANY EXCESS CURED DOW CORNING 732.
CLEAN ABRADE AND PRIME PU INSERT SURFACES.
REMOVE TEMPORARY RATCHET LASHING.
ASSEMBLE MOULD TOOL ON TO SPACERS.
CENTRE BOTTOM FILL PORT MAY BE CONNECTED
WITH A HOSE TO BE USED AS A MANOMETER TO
GAUGE FILL LEVEL OF FIRST LIFT.
STEP 3
COMPLETE MOULDING OPERATION.
DEMOULD LEAVING SACRIFICIAL TOOL MOUNTING
SPACERS IN PLACE.
FINISHED MOULDING DIMENSIONS AS SHOWN.
NOTE: JOINT LENGTH MAY VARY DEPENDENT
ON LOCAL REQUIREMENTS.
PRESENCE OF INSERTS WILL LEAD TO LESS
SHRINKAGE LOCALLY. TAKE DIAMETER
MEASUREMENT AWAY FROM ENDS.
DIMENSIONS ON THIS DRAWING WILL BE TO THE
FOLLOWING TOLERANCES UNLESS NOTED OTHERWISE.
DIMENSION RANGE TOLERANCE
0 - 499mm
500mm - 999mm
1000mm - 1999mm
2000mm - 2999mm
OVER 3000mm
2mm
3mm
4mm
5mm
8mm
608 4
9
10
9
11
9
575
395
438
NOTES:
1. FOR NOTES SEE SHEET 1.
2. SEE SHEET 6 FOR TYPICAL JOINT DETAILS.