Staff Report Date of Meeting: To: City Council From: Neil Soltis, Administrator Re: Consolidated Telecommunications fiber to the home Feasibility study Background: Councilmember Steve Kronmiller and I met with Joe Buttweiler of CTC to review the draft of the study results. As shown on the following the estimated cost to provide fiber to the home including the connection at the home is estimated to cost $13,377,782. OF this cost roughly $5,800,000 is the estimated cost from the drops from the main lines to the houses. A chart of the costs, the estimated cost based on the % of users, and a map of the network follow this report.

Staff Report Date of Meeting: To: From: Rescandiainternet.com/documents/10. Discussion on CTC fiber... · 2019. 1. 23. · Staff Report Date of Meeting: To: City Council From: Neil

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • Staff Report

    Date of Meeting: To: City Council From: Neil Soltis, Administrator Re: Consolidated Telecommunications fiber to the home Feasibility study

    Background: Councilmember Steve Kronmiller and I met with Joe Buttweiler of CTC to review the

    draft of the study results. As shown on the following the estimated cost to provide fiber to the

    home including the connection at the home is estimated to cost $13,377,782. OF this cost roughly

    $5,800,000 is the estimated cost from the drops from the main lines to the houses. A chart of the

    costs, the estimated cost based on the % of users, and a map of the network follow this report.