7
DETAILS OF CONNECTED LOAD/MAX. DEMAND RATING-AMPS PVC/ CABLE SIZE CONNECTED LOAD - kW PROPOSED TYPE & NO. OF CIRCUIT/ SP / FAULT XLPE ECC kWh METERS FEEDER TP DUTY SIZE- LV/HV REMARKS DB No. F/S / ACB MCCB kA SWA/ 2/4 X 2/3/4C IC, R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH CT ISO A PVC kW kW kW kW (1) (2) (3) (4) INCOMER TP 400 50 XLPE/SWA 4C x 300 1C x 150 39.20 39.20 39.20 117.60 OUTGOING: FP - 2.1.1 TP 80 35 MDPE/SWA 4C x 240 1C x 120 39.20 39.20 39.20 117.60 1 Spare TP 0 25 0.00 0.00 0.00 0.00 Spare TP 0 25 0.00 0.00 0.00 0.00 Spare TP 0 25 0.00 0.00 0.00 0.00 TOTAL CONNECTED LOAD PER PHASE 39.20 39.20 39.20 117.60 1 162.55 DIVERSITY = 1.38 TOTAL CONNECTED LOAD (3PH): 117.60 kW CONSULTANT : Khatib & Alami TEL:06 - 5722444 FAX: 06 - 5722224 Type of Meter (Rating of Incomer): (1) Upto 60 A (2) Upto 100 A (3) 125-160 A (4) LV CT ..…........ / ….......... HV CT ................ / ............ A (1 Phase) (3 Phase) . PROJECT: Infrastructure Works for Dubai Parks (Phase 1) AREA: Saih Shuaib PLANNED COMPLETION DATE: 2015 OWNER : Meraas Estates LLC PLOT NO.: 513-105 TOTAL SUMMARY SHEET: FP-2.1 CONSULTANT : KHATIB & ALAMI (CEC) LOCATION OF MDB: Beside PS-2 IC mm 2 mm 2 mm 2 MAX DEMAND 3PH:

SS Load Summary Sheets-R3

Embed Size (px)

DESCRIPTION

Load summary

Citation preview

Page 1: SS Load Summary Sheets-R3

Khatib & Alami (CEC) November 2014 1 of 7

DETAILS OF CONNECTED LOAD/MAX. DEMAND

RATING-AMPS PVC/ CABLE SIZE CONNECTED LOAD - kW PROPOSED TYPE & NO. OF

CIRCUIT/ SP / FAULT XLPE ECC kWh METERS

FEEDER TP DUTY SIZE- LV/HV REMARKS

DB No. F/S / ACB MCCB kA SWA/ 2/4 X 2/3/4C IC, R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH CT

ISO A PVC kW kW kW kW (1) (2) (3) (4)

INCOMER TP 400 50 XLPE/SWA 4C x 300 1C x 150 39.20 39.20 39.20 117.60

OUTGOING:FP - 2.1.1 TP 80 35 MDPE/SWA 4C x 240 1C x 120 39.20 39.20 39.20 117.60 1

Spare TP 0 25 0.00 0.00 0.00 0.00

Spare TP 0 25 0.00 0.00 0.00 0.00

Spare TP 0 25 0.00 0.00 0.00 0.00

TOTAL CONNECTED LOAD PER PHASE 39.20 39.20 39.20 117.60 1

162.55 DIVERSITY = 1.38 TOTAL CONNECTED LOAD (3PH): 117.60 kW

CONSULTANT : Khatib & Alami TEL:06 - 5722444 FAX: 06 - 5722224

Type of Meter (Rating of Incomer): (1) Upto 60 A (2) Upto 100 A (3) 125-160 A (4) LV CT ..…........ / …..........A HV CT ................ / ............ A

(1 Phase) (3 Phase)

.

PROJECT: Infrastructure Works for Dubai Parks (Phase 1) AREA: Saih Shuaib

PLANNED COMPLETION DATE: 2015 OWNER : Meraas Estates LLC PLOT NO.: 513-105

TOTAL SUMMARY SHEET: FP-2.1 CONSULTANT : KHATIB & ALAMI (CEC) LOCATION OF MDB: Beside PS-2

IC mm2 mm2 mm2

MAX DEMAND 3PH:

Page 2: SS Load Summary Sheets-R3

Khatib & Alami (CEC) November 2014 2 of 7

DETAILS OF CONNECTED LOAD/MAX. DEMAND

RATING-AMPS PVC/ CABLE SIZE CONNECTED LOAD - kW PROPOSED TYPE & NO. OF

CIRCUIT/ SP / FAULT XLPE ECC kWh METERS

FEEDER TP DUTY SIZE- LV/HV REMARKS

DB No. F/S / ACB MCCB kA SWA/ 2/4 X 2/3/4C IC, R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH CT

ISO A PVC kW kW kW kW (1) (2) (3) (4)

INCOMER TP 80 35 XLPE/SWA 4C x 240 1C x 120 28.20 28.20 28.20 117.60 1

OUTGOING:Street Lighting FP1 TP 63 25 MDPE/SWA 4C x 150 1C x 95 10.33 10.33 10.33 31.00

Street Lighting FP2 TP 63 25 MDPE/SWA 4C x 150 1C x 95 9.75 9.75 9.75 29.25

Street Lighting FP3 TP 63 25 MDPE/SWA 4C x 70 1C x 35 8.12 8.12 8.12 24.35

spare TP 63 25 11.00 11.00 11.00 33.00

TOTAL CONNECTED LOAD PER PHASE 39.20 39.20 39.20 117.60

117.60 DIVERSITY = 1.00 TOTAL CONNECTED LOAD (3PH): 117.60 kW

CONSULTANT : Khatib & Alami TEL:06 - 5722444 FAX: 06 - 5722224

Type of Meter (Rating of Incomer): (1) Upto 60 A (2) Upto 100 A (3) 125-160 A (4) LV CT ..…........ / …..........A HV CT ................ / ............ A

(1 Phase) (3 Phase)

.

PROJECT: Infrastructure Works for Dubai Parks (Phase 1) AREA: Saih Shuaib

PLANNED COMPLETION DATE: 2015 OWNER : Meraas Estates LLC PLOT NO.: 513-105

TOTAL SUMMARY SHEET: FP-2.1.1 CONSULTANT : KHATIB & ALAMI (CEC) LOCATION OF MDB: Beside PS-2

IC mm2 mm2 mm2

MAX DEMAND 3PH:

Page 3: SS Load Summary Sheets-R3

Khatib & Alami (CEC) November 2014 3 of 7

DETAILS OF CONNECTED LOAD/MAX. DEMAND

RATING-AMPS PVC/ CABLE SIZE CONNECTED LOAD - kW PROPOSED TYPE & NO. OF

CIRCUIT/ SP / FAULT XLPE ECC kWh METERS

FEEDER TP DUTY SIZE- LV/HV REMARKS

DB No. F/S / ACB MCCB kA SWA/ 2/4 X 2/3/4C IC, R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH CT

ISO A PVC kW kW kW kW (1) (2) (3) (4)

INCOMER TP 400 50 XLPE/SWA 4C x 300 1C x 150 41.03 41.03 41.03 123.10

OUTGOING:FP - 3.1.1 TP 100 35 MDPE/SWA 4C x 240 1C x 120 41.03 41.03 41.03 123.10 1

GSM Tower TP 0 25 0.00 0.00 0.00 0.00

Spare TP 0 25 0.00 0.00 0.00 0.00

Spare TP 0 25 0.00 0.00 0.00 0.00

TOTAL CONNECTED LOAD PER PHASE 41.03 41.03 41.03 123.10 1

183.00 DIVERSITY = 1.49 TOTAL CONNECTED LOAD (3PH): 123.10 kW

CONSULTANT : Khatib & Alami TEL:06 - 5722444 FAX: 06 - 5722224

Type of Meter (Rating of Incomer): (1) Upto 60 A (2) Upto 100 A (3) 125-160 A (4) LV CT ..…........ / …..........A HV CT ................ / ............ A

(1 Phase) (3 Phase)

.

PROJECT: Infrastructure Works for Dubai Parks (Phase 1) AREA: Saih Shuaib

PLANNED COMPLETION DATE: 2015 OWNER : Meraas Estates LLC PLOT NO.: 513-105

TOTAL SUMMARY SHEET: FP-3.1 CONSULTANT : KHATIB & ALAMI (CEC) LOCATION OF MDB: Beside PS-3

IC mm2 mm2 mm2

MAX DEMAND 3PH:

Page 4: SS Load Summary Sheets-R3

Khatib & Alami (CEC) November 2014 4 of 7

DETAILS OF CONNECTED LOAD/MAX. DEMAND

RATING-AMPS PVC/ CABLE SIZE CONNECTED LOAD - kW PROPOSED TYPE & NO. OF

CIRCUIT/ SP / FAULT XLPE ECC kWh METERS

FEEDER TP DUTY SIZE- LV/HV REMARKS

DB No. F/S / ACB MCCB kA SWA/ 2/4 X 2/3/4C IC, R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH CT

ISO A PVC kW kW kW kW (1) (2) (3) (4)

INCOMER TP 100 35 XLPE/SWA 4C x 240 1C x 120 19.03 19.03 19.03 123.10 1

OUTGOING:Street Lighting FP4 TP 63 25 MDPE/SWA 4C x 150 1C x 95 7.97 7.97 7.97 23.90

Street Lighting FP5 TP 63 25 MDPE/SWA 4C x 120 1C x 70 11.07 11.07 11.07 33.20

spare TP 63 25 11.00 11.00 11.00 33.00

spare TP 63 25 11.00 11.00 11.00 33.00

TOTAL CONNECTED LOAD PER PHASE 41.03 41.03 41.03 123.10

183.00 DIVERSITY = 1.49 TOTAL CONNECTED LOAD (3PH): 123.10 kW

CONSULTANT : Khatib & Alami TEL:06 - 5722444 FAX: 06 - 5722224

Type of Meter (Rating of Incomer): (1) Upto 60 A (2) Upto 100 A (3) 125-160 A (4) LV CT ..…........ / …..........A HV CT ................ / ............ A

(1 Phase) (3 Phase)

.

PROJECT: Infrastructure Works for Dubai Parks (Phase 1) AREA: Saih Shuaib

PLANNED COMPLETION DATE: 2015 OWNER : Meraas Estates LLC PLOT NO.: 513-105

TOTAL SUMMARY SHEET: FP-3.1.1 CONSULTANT : KHATIB & ALAMI (CEC) LOCATION OF MDB: Beside PS-3

IC mm2 mm2 mm2

MAX DEMAND 3PH:

Page 5: SS Load Summary Sheets-R3

Khatib & Alami (CEC) November 2014 5 of 7

DETAILS OF CONNECTED LOAD/MAX. DEMAND

RATING-AMPS PVC/ CABLE SIZE CONNECTED LOAD - kW PROPOSED TYPE & NO. OF

CIRCUIT/ SP / FAULT XLPE ECC kWh METERS

FEEDER TP DUTY SIZE- LV/HV REMARKS

DB No. F/S / ACB MCCB kA SWA/ 2/4 X 2/3/4C IC, R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH CT

ISO A PVC kW kW kW kW (1) (2) (3) (4)

INCOMER TP 400 50 XLPE/SWA 4C x 300 1C x 150 49.12 49.12 49.12 147.35

OUTGOING:FP - 4.1.1 TP 100 35 MDPE/SWA 4C x 240 1C x 120 49.12 49.12 49.12 147.35 1

Spare TP 0 25 0.00 0.00 0.00

Spare TP 0 25 0.00 0.00 0.00

Spare TP 0 25 0.00 0.00 0.00

TOTAL CONNECTED LOAD PER PHASE 49.12 49.12 49.12 147.35 1

177.30 DIVERSITY = 1.20 TOTAL CONNECTED LOAD (3PH): 147.35 kW

CONSULTANT : Khatib & Alami TEL:06 - 5722444 FAX: 06 - 5722224

Type of Meter (Rating of Incomer): (1) Upto 60 A (2) Upto 100 A (3) 125-160 A (4) LV CT ..…........ / …..........A HV CT ................ / ............ A

(1 Phase) (3 Phase)

.

PROJECT: Infrastructure Works for Dubai Parks (Phase 1) AREA: Saih Shuaib

PLANNED COMPLETION DATE: 2015 OWNER : Meraas Estates LLC PLOT NO.: 513-105

TOTAL SUMMARY SHEET: FP-4.1 CONSULTANT : KHATIB & ALAMI (CEC) LOCATION OF MDB: Beside PS-4

IC mm2 mm2 mm2

MAX DEMAND 3PH:

Page 6: SS Load Summary Sheets-R3

Khatib & Alami (CEC) November 2014 6 of 7

DETAILS OF CONNECTED LOAD/MAX. DEMAND

RATING-AMPS PVC/ CABLE SIZE CONNECTED LOAD - kW PROPOSED TYPE & NO. OF

CIRCUIT/ SP / FAULT XLPE ECC kWh METERS

FEEDER TP DUTY SIZE- LV/HV REMARKS

DB No. F/S / ACB MCCB kA SWA/ 2/4 X 2/3/4C IC, R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH CT

ISO A PVC kW kW kW kW (1) (2) (3) (4)

INCOMER TP 100 50 XLPE/SWA 4C x 240 1C x 120 27.38 27.38 27.38 147.35 1

OUTGOING:Street Lighting FP6 TP 63 25 MDPE/SWA 4C x 120 1C x 70 8.02 8.02 8.02 24.05

Street Lighting FP7 TP 63 25 MDPE/SWA 4C x 120 1C x 70 9.12 9.12 9.12 27.35

Street Lighting FP8 TP 63 25 MDPE/SWA 4C x 120 1C x 70 10.25 10.25 10.25 30.75

Street Lighting FP10 TP 63 25 MDPE/SWA 4C x 185 1C x 95 10.73 10.73 10.73 32.20

SPARE TP 63 25 11.00 11.00 11.00 33.00

TOTAL CONNECTED LOAD PER PHASE 49.12 49.12 49.12 147.35

177.30 DIVERSITY = 1.20 TOTAL CONNECTED LOAD (3PH): 147.35 kW

CONSULTANT : Khatib & Alami TEL:06 - 5722444 FAX: 06 - 5722224

Type of Meter (Rating of Incomer): (1) Upto 60 A (2) Upto 100 A (3) 125-160 A (4) LV CT ..…........ / …..........A HV CT ................ / ............ A

(1 Phase) (3 Phase)

.

PROJECT: Infrastructure Works for Dubai Parks (Phase 1) AREA: Saih Shuaib

PLANNED COMPLETION DATE: 2015 OWNER : Meraas Estates LLC PLOT NO.: 513-105

TOTAL SUMMARY SHEET: FP-4.1.1 CONSULTANT : KHATIB & ALAMI (CEC) LOCATION OF MDB: Beside PS-4

IC mm2 mm2 mm2

MAX DEMAND 3PH:

Page 7: SS Load Summary Sheets-R3

Khatib & Alami (CEC) November 2014 7 of 7

DETAILS OF CONNECTED LOAD/MAX. DEMAND

RATING-AMPS PVC/ CABLE SIZE CONNECTED LOAD - kW PROPOSED TYPE & NO. OF

CIRCUIT/ SP / FAULT XLPE ECC kWh METERS

FEEDER TP DUTY SIZE- LV/HV REMARKS

DB No. F/S / ACB MCCB kA SWA/ 2/4 X 2/3/4C IC, R - PH Y - PH B - PH TOTAL 1 - PH 3 - PH 3 - PH CT

ISO A PVC kW kW kW kW (1) (2) (3) (4)

INCOMER TP 400 50 XLPE/SWA 4C x 300 1C x 150 11.47 11.47 11.47 34.40

OUTGOING:Street Lighting FP09 TP 63 25 XLPE/SWA 4C X 120 1C x 95 11.47 11.47 11.47 34.40 1

LIFTING STATION-1(SMDB-LS-1) TP 0 25 0.00 0.00 0.00 0

GSM Tower TP 0 25 0.00 0.00 0.00 0

GSM Tower TP 0 25 0.00 0.00 0.00 0

TOTAL CONNECTED LOAD PER PHASE 11.47 11.47 11.47 34.40

176.50 DIVERSITY = 5.13 TOTAL CONNECTED LOAD (3PH): 34.40 kW

CONSULTANT : Khatib & Alami TEL:06 - 5722444 FAX: 06 - 5722224

Type of Meter (Rating of Incomer): (1) Upto 60 A (2) Upto 100 A (3) 125-160 A (4) LV CT ..…........ / …..........A HV CT ................ / ............ A

(1 Phase) (3 Phase)

.

PROJECT: Infrastructure Works for Dubai Parks (Phase 1) AREA: Saih Shuaib

PLANNED COMPLETION DATE: 2015 OWNER : Meraas Estates LLC PLOT NO.: 513-105

TOTAL SUMMARY SHEET: FP-5.1 CONSULTANT : KHATIB & ALAMI (CEC) LOCATION OF MDB: Beside PS-5

IC mm2 mm2 mm2

MAX DEMAND 3PH: