SR 9/I-95 Interchange at 45th StreetProject Development and Environment (PD&E) Study
Palm Beach County, FloridaFPID No.: 436519-1-22-01 | FAP No.: 0951-682-1 | ETDM No.: 14225
Public Kick-Off MeetingSeptember 13, 2016
FPID No.: 436519-1-22-01 | FAP No.: 0951-682-1 | ETDM No.: 14225
SR 9/I-95 Interchange at 45th Street PD&E Study
Today’s Agenda
• Introduction
• Project Development & Environment (PD&E) Study Process
• Project Description
• Key Project Issues
Engineering Issues
Environmental Issues
• Summary Schedule
• Closing
2
FPID No.: 436519-1-22-01 | FAP No.: 0951-682-1 | ETDM No.: 14225
SR 9/I-95 Interchange at 45th Street PD&E Study
Introduction • What is a Project Development and Environment
(PD&E) Study?
o A process followed by FDOT to evaluate:
Engineering Alternatives
Environmental Impacts
Social, Cultural and Economic impacts associated with a planned transportation project
o Mandatory by the National Environmental Policy Act (NEPA)
o Required when Federal Funds are Involved
3
PLANNING
FINAL DESIGN &ENGINEERING
RIGHT-OF-WAYACQUISITION
PROJECT DEVELOPMENT& ENVIRONMENT
(PD&E) STUDY
CONSTRUCTION
MAINTENANCE
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
Phase 6
PUBL
IC IN
VOLV
EMEN
T
FPID No.: 436519-1-22-01 | FAP No.: 0951-682-1 | ETDM No.: 14225
SR 9/I-95 Interchange at 45th Street PD&E Study
PD&E Study Process
4
Phase 1
DATACOLLECTION
PRELIMINARYCONCEPTANALYSIS
ENGINEERING ANALYSIS &
DESIGNENVIRONMENTAL
ANALYSISFINAL
DOCUMENTS
Engineering Data Needs Analysis Engineering Analysis
Environmental Studies
Preliminary Engineering Report
Environmental Data Initial Concept Developments
Preliminary Engineering Screening
EnvironmentalDocuments Categorical
Exclusion Type II
Other Information Preliminary Concept
Screening
FHWA Issues Location and
Design Concept Acceptance
(LDCA)
FHWA Review ofFinal Documents
Phase 2 – PD&E Study
Value Engineering
PLANNING
FINAL DESIGN &ENGINEERING
RIGHT-OF-WAYACQUISITION
PROJECT DEVELOPMENT& ENVIRONMENT
(PD&E) STUDY
CONSTRUCTION
MAINTENANCE
Phase 2
Phase 3
Phase 4
Phase 5
Phase 6
PUBL
IC IN
VOLV
EMEN
T
FPID No.: 436519-1-22-01 | FAP No.: 0951-682-1 | ETDM No.: 14225
SR 9/I-95 Interchange at 45th Street PD&E Study
Project Description• SR 9/I-95 – from S of 45th Street to N of 45th Street• 45th Street – From Village Boulevard to Congress Avenue
5
FPID No.: 436519-1-22-01 | FAP No.: 0951-682-1 | ETDM No.: 14225
SR 9/I-95 Interchange at 45th Street PD&E Study
Background• SR 9/I-95 Interchange at 45th Street
Interchange Concept Development ReportFlorida Department of Transportation – District FourAugust 2014
• I-95 Master Plan StudyFlorida Department of Transportation – District Four2003
6
FPID No.: 436519-1-22-01 | FAP No.: 0951-682-1 | ETDM No.: 14225
SR 9/I-95 Interchange at 45th Street PD&E Study
Purpose and Need • Project Purpose: The purpose of the study is to identify the short-term
and long term needs of I-95 and develop design concepts to address traffic spillback onto I-95, improve interchange operations, reduce congestion, and increase safety at the study interchange. This study will also consider Strategic Intermodal System (SIS) connector improvements needed within the project area and is consistent with plans for the I-95 mainline, including the potential extension of I-95 Express lanes through Palm Beach County.
• Project Need: Capacity Transportation Demand Safety Planning Consistency Social Demands/Economic Development Modal Interrelationships System Linkage
7
FPID No.: 436519-1-22-01 | FAP No.: 0951-682-1 | ETDM No.: 14225
SR 9/I-95 Interchange at 45th Street PD&E Study
5 Year Crash History • Crash data from January 2010 to December 2014• 6 Fatal Crashes• Predominant crash types: Along I-95: Rear End: 40% Along 45th Street: Rear End: 33% and Head On: 33%
8
0
20
40
60
80
100
120
140
Villa
ge B
lvd
Nor
thpo
int B
lvd
I-95
SB R
amps
I-95
NB
Ram
ps
Corp
orat
e W
ay
Cong
ress
Ave
Crash Summary along 45th Street1 1
0
50
100
150
200
250
300
SB O
ff Ra
mp
SB O
n Ra
mp
I-95
at 4
5thSt
NB
Off
Ram
p
NB
On
Ram
p
Crash Summary along I-95
1
3
2010 2011 2012 2013 2014FATAL CRASHES
FPID No.: 436519-1-22-01 | FAP No.: 0951-682-1 | ETDM No.: 14225
SR 9/I-95 Interchange at 45th Street PD&E Study
What is Level of Service? • Level of Service (LOS)
A standard measurement, based on vehicle delay and speed, which reflects the relative ease of traffic flow on a scale of A to F
• LOS “A”: free-flow traffic
• LOS “F”: highly congested traffic conditions
9
ABCDEF
Optimal
Acceptable
Below Standard
FPID No.: 436519-1-22-01 | FAP No.: 0951-682-1 | ETDM No.: 14225
SR 9/I-95 Interchange at 45th Street PD&E Study
Existing ConditionsExisting 2015 Traffic Conditions
10
I-95
SB R
amps
Villa
ge B
lvd
Nor
thpo
int
Blvd
I-95
NB
Ram
ps
Cong
ress
Ave
Corp
orat
e W
ay
45th StreetD (E) D (D) C (B) C (C) B (B) C (C)
C (C)
AM Peak Hour LOSPM Peak Hour LOS
Source: I-95 (SR 9) Interchange at 45th Street Palm BeachInterchange Concept Development ReportHCM 2000 LOS
FPID No.: 436519-1-22-01 | FAP No.: 0951-682-1 | ETDM No.: 14225
SR 9/I-95 Interchange at 45th Street PD&E Study
Future No-Build ConditionsOpening Year 2025 No-Build
11
I-95
SB R
amps
Villa
ge B
lvd
Nor
thpo
int
Blvd
I-95
NB
Ram
ps
Cong
ress
Ave
Corp
orat
e W
ay
45th StreetD (E) D (D) D (C) C (D) C (D) D (E)
C (C)
AM Peak Hour LOSPM Peak Hour LOS
Source: I-95 (SR 9) Interchange at 45th Street Palm BeachInterchange Concept Development ReportHCM 2000 LOS
FPID No.: 436519-1-22-01 | FAP No.: 0951-682-1 | ETDM No.: 14225
SR 9/I-95 Interchange at 45th Street PD&E Study
Future No-Build ConditionsDesign Year 2045 No-Build
12
I-95
SB R
amps
Villa
ge B
lvd
Nor
thpo
int
Blvd
I-95
NB
Ram
ps
Cong
ress
Ave
Corp
orat
e W
ay
45th StreetE (E) F (F) F (E) E (E) D (F) F (F)
C (C)
AM Peak Hour LOSPM Peak Hour LOS
Source: I-95 (SR 9) Interchange at 45th Street Palm BeachInterchange Concept Development ReportHCM 2000 LOS
FPID No.: 436519-1-22-01 | FAP No.: 0951-682-1 | ETDM No.: 14225
SR 9/I-95 Interchange at 45th Street PD&E Study
Environmental Analysis • Efficient Transportation Decision Making (ETDM) #14225
• Effective/timely decision making without compromising environmental quality
• Enables agencies and public to provide early input about the potential effects of proposed transportation projects
• Anticipated Class of Action – Categorical Exclusion Type II
• For more ETDM information regarding this project please visit: https://etdmpub.fla-etat.org
13
N/A No InvolvementEnhancedMinimal to NoneModerateSubstantialDispute Resolution
N/A
2345
1
FPID No.: 436519-1-22-01 | FAP No.: 0951-682-1 | ETDM No.: 14225
SR 9/I-95 Interchange at 45th Street PD&E Study
Environmental Analysis
14
Land Use Changes Social Relocation Potential Farmlands Aesthetic Effect Economic Mobility
Section 4(f) potential Historic and Archeological Sites Recreation Areas
Social and Economic Effects
Cultural Effects
FPID No.: 436519-1-22-01 | FAP No.: 0951-682-1 | ETDM No.: 14225
SR 9/I-95 Interchange at 45th Street PD&E Study
Wetlands Water Quality and Quantity Floodplains Wildlife and Habitat Coastal and Marine
Noise Air Quality Contamination Infrastructure
Natural Resources
Physical Effects
Environmental Analysis
15
FPID No.: 436519-1-22-01 | FAP No.: 0951-682-1 | ETDM No.: 14225
SR 9/I-95 Interchange at 45th Street PD&E Study
Alternatives to be Considered • No-Build
• Transportation System Management & Operations (TSM&O)
• Build Alternatives
Improvements to the I-95 and 45th
Street Interchange
Improvements to Arterial Street Intersections along 45th Street
16
Alternatives Evaluation Process
NB
No Build Build Alternatives
1 2 3
ALTERNATIVES SCREENING
EVALUATION MATRIX
Traffic OperationsSafetyFreightAccess ManagementUtilitiesCanal ImpactsConstructabilityMOT
Historic & ArcheologicalWetlandsNoise ImpactsPermittingR/W ImpactsAesthetic FeaturesCommunity Services
AlternativesPublic Workshop
Recommended Alternative
A
TSM&O
FPID No.: 436519-1-22-01 | FAP No.: 0951-682-1 | ETDM No.: 14225
SR 9/I-95 Interchange at 45th Street PD&E Study
Agency Coordination Coordination
• Palm Beach Metropolitan Planning Association (MPO)• Palm Beach County Engineering and Public Works• Palm Tran • Florida Department of Environmental Protection (FDEP)• Florida Department of State Historical Resources • South Florida Water Management District (SFWMD)• US Fish and Wildlife Service • Federal Highway Administration • City of West Palm Beach• Town of Mangonia Park• City of Riviera Beach
17
FPID No.: 436519-1-22-01 | FAP No.: 0951-682-1 | ETDM No.: 14225
SR 9/I-95 Interchange at 45th Street PD&E Study
Summary Schedule Project Kick-Off Meeting: September 13th, 2016Alternatives Workshop: Spring 2017Public Hearing: Fall 2017
18
ACTIVITY2016 2017 2018
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M JNotice to ProceedFact Sheet/NewsletterElected Officials/Agency Kick-Off MeetingPublic Kick-Off MeetingEngineering Data CollectionEngineering AnalysisEnvironmental Data CollectionEnvironmental AnalysisDevelop and Evaluate AlternativesAlternatives Public WorkshopEngineering ReportsEnvironmental ReportsPublic HearingFederal Highway Administration (FHWA) ReviewLocation and Design Concept Acceptance (LDCA)Continuous Public Involvement
FPID No.: 436519-1-22-01 | FAP No.: 0951-682-1 | ETDM No.: 14225
SR 9/I-95 Interchange at 45th Street PD&E Study
Public Involvement • 2 Public Meetings
• Public Hearing
• Coordination with local communities
• Coordination with major stakeholders
• Many opportunities for public comments:
Complete a Comment Form today
Mail, e-mail, or fax your comments
Visit the project’s website: www.95at45Street.com
19
FPID No.: 436519-1-22-01 | FAP No.: 0951-682-1 | ETDM No.: 14225
SR 9/I-95 Interchange at 45th Street PD&E Study
20
For more information, please call, email or write to:
Robert Lopes, PEProject Manager Florida Department of Transportation – District Four 3400 West Commercial BoulevardFort Lauderdale, FL 33309 Phone: (954) 777- 4425 Toll free: (866) 336-8435, ext. 4425E-mail: [email protected]