Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
ROSS RD
RAMPMAIN ST
I-405 FWY
BEARDSLEE BLVD
NE 185TH ST
NE 187TH STNE 189TH ST
NE 195TH ST
NE 183RD ST
104T
H AVE
NE
101S
T AVE
NE
NE 190TH ST
NORT
H CRE
EK PK
WY
98TH
AVE N
E
NE 180TH ST
NE 186TH ST
103R
D AVE
NE
110T
H AVE
NE
102N
D AVE
NE
WOODINVILLE DR SUNRISE DR
107T
H AVE
NE
VALLEY VIEW RD
KAYSNER WAY
108T
H AVE
NE
NE 182ND ST
BOTHELL WAY NE
REDER WAY
107T
H PL N
E
NE 194TH DR
96TH
AVE N
E
105T
H AVE
NE
111TH PL NE
101S
T PL N
E
106T
H AVE
NE
CAMPUS WAY NE
BEARDSLEE PL
112TH AVE NE
NE 183RD CT
97TH
AVE N
E
NE 186TH ST
RAMP
105T
H AVE
NE
NE 189TH ST
108T
H AVE
NE
NE 185TH ST
NE 187TH ST
103R
D AVE
NE
I-405 FWY
NE 185TH ST
108T
H AVE
NE
108T
H AVE
NE
Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI,Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, © OpenStreetMap contributors,and the GIS User Community
µ 0 1 2 3 40.5Miles October 2018
SR 522/NE 145TH BRT
1 inch = 80 ft
0 80 160 240 32040Feet
µCity Limits
Tax Parcels
BRT Route
Refinement BRT Route
Sound Transit RepresentativeStationsSound Transit RepresentativeParkingSound Transit RepresentativeTransit Center
Sound Transit RefinementStationsSound Transit RefinementParkingSound Transit RefinementTransit Center
Landscape Buffer
Sidewalk
Data Sources: King County, DEAThis map was created by David Evans and Associates, Inc. (DEA) for Sound Transit. Accuracy and currency depend upon the source data at the time it is acquired. DEA makes no representation or warranty as to the correctness of the information depicted on this map. It is intended for limited planning purposes as agreed to between DEA and its client and is not suitable for design, survey, construction, or other uses or for other projects. It is strictly forbidden to modify, sell, distribute or reproduce this map for any reason without the written consent of DEA.
Area B
STATION FORNON-WOODINVILLE
BOUND BUSES
PROPOSED SIGNAL
PROPOSEDTWO-WAY STOP
REFINEMENTPARKING OPTION
REFINEMENT STATION/TRANSIT CENTER OPTION
REFINEMENTSTATION OPTION
REPRESENTATIVE STATION LOCATIONSARE NOT COMPATIBLE WITH I405 BRT'SPOTENTIAL USE OF EXPRESS TOLL LANESREPRESENTATIVE STATION LOCATIONSARE NOT COMPATIBLE WITH I-405 BRT'SPOTENTIAL USE OF EXPRESS TOLL LANES
REFINEMENTSTATION OPTION
REFINEMENT STATION/TRANSIT CENTER OPTION
SR 522
MAIN ST
RAMP
NE 185TH ST
NE 183RD ST
CAMP
US W
AY N
E
I-405
FWY
101ST AVE NE
VALLEY VIEW RD
96TH AVE NE
CIRCLE DR
98TH AVE NE
BOTHELL WAY NE
110TH AVE NE
NE 180TH ST
NE 186TH ST
BEARDSLEE BLVD
102ND AVE NE
SUNRISE DR
WOODINVILLE DR
104TH AVE NE
108TH AVE NE
103RD AVE NE
NE 182ND ST
E RIVE
RSID
E DR
KAYSNER WAY
113TH AVE NE
REDER WAY
ROSS
RD
97TH AVE NE
NE 183RD CT
NE 182ND CT
BEARDSLEE PL
120TH AVE NE
95TH PL NE
ORMBREK ST
113T
H AVE
NE
NE 180TH ST
I-405
FWY
108TH AVE NE
SR 522
WOODINVILLE DR
I-405
FWY
NE 185TH ST
NE 180TH ST
NE 186TH ST
RAMP
WOODINVILLE DR
103RD AVE NE
Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI,Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, © OpenStreetMap contributors,and the GIS User Community
µ 0 1 2 3 40.5Miles October 2018
SR 522/NE 145TH BRT
1 inch = 80 ft
0 80 160 240 32040Feet
µCity Limits
Tax Parcels
BRT Route
Refinement BRT Route
Sound Transit RepresentativeStationsSound Transit RepresentativeParkingWSDOT's I-405_SR 522 to SR 257Capacity Improvements Project
Data Sources: King County, DEAThis map was created by David Evans and Associates, Inc. (DEA) for Sound Transit. Accuracy and currency depend upon the source data at the time it is acquired. DEA makes no representation or warranty as to the correctness of the information depicted on this map. It is intended for limited planning purposes as agreed to between DEA and its client and is not suitable for design, survey, construction, or other uses or for other projects. It is strictly forbidden to modify, sell, distribute or reproduce this map for any reason without the written consent of DEA.
Area C
PROPOSED SIGNAL
PROPOSEDTWO-WAY STOP
REFINEMENTPARKING OPTION
REFINEMENTPARKING OPTION
REFINEMENTSTATION OPTION
REFINEMENT STATION/TRANSIT CENTER OPTION
REFER TO WSDOT AND I-405BRT PLANS AND CONCEPTS
REFINEMENTSTATION OPTION
Sound Transit RefinementStationsSound Transit RefinementParkingSound Transit RefinementTransit Center
Landscape Buffer
Sidewalk
Fall 2018
Project Refinements Considered in Bothell and Woodinville
GOALS ROADWAY AND TRANSIT OPTIONS
The ideal refined project meets these goals:
Representative Project Alignment (North Campus)
(Areas A, B, C, D)
Area A Refinement 1 - Adds
eastbound SR 522 BAT lane
between Wayne Curve and NE
180th St
Area A Refinement 2 - Add eastbound left turn bus lane
Area A Refinement 3 - Extend
proposed SR 522 westbound BAT lane to 98th Ave
NE
Area B Refinement 1 - Transit only along a section
of NE 185th St between
Beardslee Blvd and Bothell Way
NE
Area B Refinement 2 - Intersection
control changes in downtown Bothell
Area C Refinement 1 - Route south from Downtown via Kaysner and Bothell P&R and
connect with I-405 BRT at
South Campus
Area C Refinement 2 - Route north from Downtown and connect with
I-405 BRT at new I-405/SR
522 interchange (WSDOT project; construction not
funded)
Area C Refinement 3 - Route from
Downtown potentially on or close to Main St
to North Campus; walk connection to I-405 BRT north of Bothell P&R
Area C Refinement 4 - Approach to campus via
Beardslee Blvd and 110th Ave NE through existing
bus routing instead of via
185th cut-through
Area D Refinement 1 - Alternative Woodinville
service options
1) Deliver the SR 522 BRT project on time and within the assigned budget
TBD
2) Expand fast, frequent and reliable BRT service to the communities along the corridor, enhancing overall transit service for these communities and the region
TBD
3 ) Increase transit capacity and enhance connectivity to meet growing demand
TBD
4) Make recommendations that are technically and financially feasible and sustainable
TBD
5) Maximize ridership, improve mobility and provide access for multiple modes and users
TBD
6) Promote a healthy and sustainable environment
TBD
7) Consider input from stakeholders, communities along the corridor, and the public
TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD
8) Make recommendations that are consistent with local plans
TBD
Based on feedback that we gathered during our May 2018 outreach period and further technical analyses, we developed eight potential parking and station project refinements to the representative project within Bothell and Woodinville, and 10 potential roadway/transit refinements to the representative project. The table below shows preliminary scores for each refinement in relation to project goals.
Visit the maps station to learn more about each of these potential project refinements!
Meets goal Partially meets goal Does not meet goal
Scoring based on analysis to date; analysis is continuing. Community and partner agency input will be taken into consideration during additional analysis.
Fall 2018
Project Refinements Considered in Bothell and Woodinville
GOALS PARKING OPTIONS STATION OPTIONS
The ideal refined project meets these goals:
Representative Parking - Lot P South, Bothell
Parking Refinement 1 - Expand existing parking at Pop
Keeney
Parking Refinement 2 - Expand existing
Bothell P&R
Representative Station - 98th Ave NE/NE
183rd St
Representative Station - 101st
Ave NE/NE 185th St
Representative Station -
Existing UW Bothell/
Cascadia College Transit
Center
Representative Station (I-405
BRT) - NE 195th St/I-405 (station
pair on I-405 ramps)
Refinement 1 - One station on Beardslee Blvd west of southbound I-405 on-
ramp for non-Woodinville-bound buses
Refinement Station 2 -
UW Bothell/Cascadia
College Transit Center on
Beardslee Blvd
Refinement Station 3 -
UW Bothell/Cascadia
College Transit Center at South
Campus
Refinement Station 4 - Main St/Kaysner Way
near existing Bothell P&R
Refinement Station 5 -
NE 185th St/Hohmann St
Refinement Station 6 -
UW Bothell/Cascadia
College Transit Center on NE 185th St near UW Bothell
housing
Representative Station
(no capital improvements)
- Existing Woodinville P&R
1) Deliver the SR 522 BRT project on time and within the assigned budget
2) Expand fast, frequent and reliable BRT service to the communities along the corridor, enhancing overall transit service for these communities and the region
3 ) Increase transit capacity and enhance connectivity to meet growing demand
4) Make recommendations that are technically and financially feasible and sustainable
5) Maximize ridership, improve mobility and provide access for multiple modes and users
6) Promote a healthy and sustainable environment
7) Consider input from stakeholders, communities along the corridor, and the public
TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD
8) Make recommendations that are consistent with local plans
Meets goal Partially meets goal Does not meet goal
Based on feedback that we gathered during our May 2018 outreach period and further technical analyses, we developed eight potential parking and station project refinements to the representative project within Bothell and Woodinville, and 10 potential roadway/transit refinements to the representative project. The table below shows preliminary scores for each refinement in relation to project goals.
Visit the maps station to learn more about each of these potential project refinements!
Scoring based on analysis to date; analysis is continuing. Community and partner agency input will be taken into consideration during additional analysis.