4
G1000099-v1 Squeezer Update February 10, 2010 H1 Squeezer Experiment ANU, AEI, MIT, CIT and LHO collaboration

Squeezer Update

  • Upload
    pelham

  • View
    36

  • Download
    0

Embed Size (px)

DESCRIPTION

Squeezer Update. February 10, 2010 H1 Squeezer Experiment ANU, AEI, MIT, CIT and LHO collaboration. Progress. On budget & no major roadblocks so far No major schedule setback (maybe ~2 month behind with optics procurement ) 2nd update review was held on February 9 New postdoc (Lisa B.) - PowerPoint PPT Presentation

Citation preview

Page 1: Squeezer Update

G1000099-v1

Squeezer Update

February 10, 2010H1 Squeezer Experiment

ANU, AEI, MIT, CIT and LHO collaboration

Page 2: Squeezer Update

G1000099-v1

On budget & no major roadblocks so far No major schedule setback (maybe ~2 month behind with optics

procurement) 2nd update review was held on February 9

New postdoc (Lisa B.) Lasers ready at MIT; locked together OPO ready at ANU with 5-6dB of squeezing

Ready to ship in March, required in early May Electronics is 80% complete; will be done by May Developed a noise and servo model Next: Set up the AEI SHG at MIT

Progress

2H1 Squeezer Status

Page 3: Squeezer Update

G1000099-v1 H1 Squeezer Status 3

Page 4: Squeezer Update

G1000099-v1

ANU Traveling wave OPO

H1 Squeezer Status 4