SPS LS2 Planning meeting (No.44) 04/03/20 D. MCFARLANE EN-ACE-OSS

SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

SPS LS2Planning meeting (No.44)

04/03/20

D. MCFARLANE EN-ACE-OSS

Page 2: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

Presentations this week

18/03/2020 D. MCFARLANE

• Main slides

• Beamline activities and access restrictions

• Planning execution BA1 to BA7

• A.O.B

2

Page 3: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

The Future!!!!!!!

18/03/2020 D. MCFARLANE 3

Page 4: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

Lift & Monte-charge maintenance Apr/May/Jun

18/03/2020 D. MCFARLANE 4

Page 5: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

Tirage pendentif

18/03/2020 D. MCFARLANE 5

Lift location Date of stop Day of the week

BA1 6th April Monday

BA2 30th March Monday

BA3 3rd April Friday

BA4 16th March Monday

BA5 18th March Wednesday

BA6 19th March Thursday

In order to carry out this works safely. Each lift must be stopped for one

day. The dates are shown in the table below

Page 6: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

Electrical Procedures

18/03/2020 D. MCFARLANE

• Mise hors tension partielle du SPS lors des YETS, EYETS et LS

https://edms.cern.ch/document/2058234/1.0 Released

• Demande de « SEPARATION DU RESEAU » par le Facility coordinateur

https://edms.cern.ch/document/2049809/1 Released

• De-cabling – SPS5 lock-out procedure for De-Cabling during LS2

https://edms.cern.ch/document/1983418/1.0 Released

• De-cabling – SPS3 lock-out procedure for De-Cabling during LS2

https://edms.cern.ch/document/1991126/1.0 Released

• De-cabling – Identification, labelling and disconnection procedure for obsolete cables

SPS1 and SPS3 during LS2

https://edms.cern.ch/document/2052872/1.0 Released

It is the responsibility of the Equipment owner to consign any equipment that they will be

working on.

Do not assume something is consigned. Check first.

6

Page 7: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

COVID-19 crisis

18/03/2020 D. MCFARLANE

Dear all,

Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until further notice.

All IMPACTs have been interrupted and will be resumed after the COVID-19 crisis.

Please note that if you still have material stored on SPS sites, outside buildings, there is a risk of theft.

In case of activities to be performed from 17th March on, the procedure to follow is the followingDuring normal working hours:

Contact the Facility coordinator (D.Mcfarlane 164247 / piquet coordination 161735)

Create an impact which will be approved

The Facility Coordinator will contact BE-OP-TI (phone 022.767.2201) to give instructions about the works required and arrange the access onsite.

Outside normal working hours:

you can contact TI (phone 022.767.2201) to arrange the access. TI will create the impact, approve it and arrange the access with the CSA if needed.

7

Page 8: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

How to open the SPS planning

18/03/2020 D. MCFARLANE

https://cern.sharepoint.com/sites/Projects-Accelerator-Complex-Schedules/Projects.aspx

* You will need the latest version of Microsoft Project installed on your computer

8

Click here

Page 9: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

Gantt Viewer

18/03/2020 D. MCFARLANE 9

This application provides a read-only view of the

schedules for the different projects / facilities.

Accessible through the following link:

• https://oss-coordination.web.cern.ch/gantt/latest

Page 10: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

General Schedule https://edms.cern.ch/document/1892837/2.1

18/03/2020 D. MCFARLANE 10

Page 11: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

Important Contacts

• Useful Contact Numbers

• SPS Coordination Team (161735)

• David MCFARLANE- 164247

• Jonathan Pascal Meignan – 164026

• Antonio Grande Mallavia - 162721

• Franck BAIS – 165467

• Control Room

• TI CCC – 72201

• CSA - 78877

• RP

• Angelito Herve – 163168

• Christophe Tromel – 163199

• Christelle Saury (BA1 Sextant 1) - 162238

• Florent Philippon (aspects RP du Fire Safety Project.) - 167992

• Dosimétrie Service

• Building 55 - 72155

• EROS Engineering Referent for Operational Safety

• Emmanuel Paulat – 163870

• John Etheridge - 164647

D. MCFARLANE 1118/03/2020

Page 12: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

A.O.B

18/03/2020 D. MCFARLANE 12

Page 13: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

Useful websites

18/03/2020 D. MCFARLANE

Link to SPS planning meetings on INDICO

https://indico.cern.ch/category/9263/

Link to the SPS planning (SharePoint)

https://cern.sharepoint.com/sites/Projects-Accelerator-Complex-Schedules/Projects.aspx

Link to the SPS planning (Gannt Viewer)

https://oss-coordination.web.cern.ch/gantt/latest

Next General Planning meeting To Be Announced

30-7-010

13

Page 14: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

Any questions?

Page 15: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

Back up slides

Page 16: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

Group contact persons. (1)

D. MCFARLANE 16

Group Contact Persons Comments

EN/EL

Guillaume Gros (FC-cabling)

Jeremy Blanc ( FC-FO)

Marcin Szewczyk (EIC)

Gerardo Velazquez (projet rénovation BA3 +

goulotte / éclairage sécurité)

Dimitrios Katsanikos (projet rénovation BA1-2-4-6)

Denis Ribiollet (OP)

Davide Bozzini (coordination EL)

EN/CV

Bill Bannister (Water, ventilation, air, puisards)

Hassane Sabri (Water, ventilation, air, puisards)

Jani Lehtinen (Water, ventilation, air, puisards)

EN/STI

Walter Scandale (UA9)

Francesca Galluccio (UA9)

Sven De Man

TE/MSCJeremie Bauche

Philip Schwarz

TE/EPC

Karsten Kahle (High power)

Gilles Le Godec (Medium power)

Loic de Oliveira

Alan Troller

TE/VSC

Chiara Pasquino

Anthony Harrison

Jarmo Kortesmaa

Wilhelmus Vollenberg (aC coating)

Viktor Badin(COLDEX)

Vincent Baglin (COLDEX)

18/03/2020

Page 17: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

Group contact persons. (2)

D. MCFARLANE 17

Group Contact Person Comments

BE/BIRaymond Veness

Morad Hamani

BE/CO Mickael Azevedo

IT/CS

Maryse Da Costa

Marc-Antoine Denis

Stefano Agosta (GSM)

BE/ICS

Didier Vaxelaire (Access)

Vitor Martins De Sousa Dos Rios (Access)

Tomasz Ladzinski (New access system)

Denis Raffourt (Fire detection)

Michael Dole (Fire Safety)

Anna Suwalska (Sprinklers)

Eva Sanchez-Corral Mena (Planning)

HSE/RP

Angelito Herve

Christophe Tromel

Christelle Saury (BA1 Sextant 1)

Florent Philippon (aspects RP du Fire Safety Project.

EN/ACE

Sonia Bartolomé (E.C.R / S.R.R)

Fred Galleazzi (Intergration)

Scharif Mehanneche (Intergration)

Daniel del Alamo (Intergration)

Emmanuel Paulat (Safety)

EN/HE

Pascal Brunero (Handling Operations)

Sylvain Fumey (Handling Operations)

Bruno Feral (Crane Maintenance)

Gilles Roche (Lifts Maintenance)

Jean-Louis Grenard18/03/2020

Page 18: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

Group contact persons. (3)

D. MCFARLANE 18

Group Contact Person Comments

BE/OPJames Ridewood

Stephane Cettour Cave

BE/RF

Eric Montesinos (RF upgrade)

Simon Rains

Gino Cipolla

Charles Julie

SMB/SE

Alejandro Martinez Selles

Remi Noel

Renzo Salustro

Stewart Alexander Mcilwraith (Beam Dump)

TE/ABT

Gael Bellotto (Kickers)

Peter Burkel (Kickers)

Cedric Baud (Septa)

Etienne Carlier (New Beam Dump)

EN/SMM

Patrick Bestmann (Survey)

Camille Vendeuvre (Survey)

Jerome Lendaro (BIDs controls / RADMONs)

TE/MPERichard Mompo (WIC)

Ivan Romera Ramirez (BIS)

SMB/SIS

(Cleaning)

Paulo Alexandre Fonseca Da Costa

David Joseph Rene Chameaux

Laetitia Lejeune

Veronique Sogno

18/03/2020

Page 19: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

Group contact persons. (4)

D. MCFARLANE 19

The E-group for the SPS Planning and coordination is:

SPS-Coordination-meeting (SPS Technical Coordination) SPS-Coordination-

[email protected]

You can add or remove your name for this E-group. Please check that the correct

people from your group are on this this E-group.

18/03/2020

Page 20: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

Access rights and safety equipmentEVERYONE who enters the SPS MUST have the following:

Completed the correct courses. (sir.cern.ch)

• CERN Safety Introduction.

• Electrical Safety Awareness.

• CERN – Beam Facilities.

• SPS – Machine.

• AWAKE (to access TAG41) (Required since the 1st June 2018)

• Self Rescue Mask Training. (Classroom training)

• RP Controlled Area

The correct access authorisation (via EDH). CHECK YOUR ACCESS RIGHTS HAVE NOT EXPIRED!!!!

• Zone Code “SPS” for access into the SPS

• Zone Code “TAG41 - AWAKE (ex-CNGS) (TAG41)” for access into the old CNGS areas

• Zone Code “SPS-KN-000” for “Autorisation conduite RTL” (Contractors must complete a training)

• Zone Code “SPS-KN-001” for “SPS Shutdown Padlock” (only used during Long Shutdowns)

The Correct Personal Protective Equipment

• Safety shoes.

• Self rescue mask.

• Electronic dosimeter.

• Passive dosimeter. (All contractors must have an additional company passive dosimeter!!)

• Helmet plus Light. (The light on your phone is NOT sufficient)

A valid approved IMPACT. (with their name included on this IMPACT)

• They must know the number of this IMPACT!!!!

Please note that personnel are not allowed to work in the tunnel alone!!

D. MCFARLANE 2018/03/2020

Page 21: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

External Visitors

21

• If you have any external personnel needing to

access the SPS for visits before starting

works then you need to read the following

document:

"Etapes à suivre pour organiser des visites

professionnelles dans les installations du

CERN" by CHRISTELLE GAIGNANT

• Link:

https://edms.cern.ch/document/1281098/LAST_RELEASED

D. MCFARLANE18/03/2020

Page 22: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

Who are the TSOs around the SPS?

Building number TSO Deputy TSO

814 (SPS ring & transfer

tunnels)Franck BAIS David MCFARLANE

868 (BA1 surface) Gael BELLOTTO Antoine PROST

869 (BA2 surface) Antoine PROST Gael BELLOTTO

870 (BA3 surface) Christophe RENAUD Charles JULIE

871 (BA4 surface) Loic DE OLIVEIRA Hafid KADIR

872 (BA5 surface) Frederic DALIGAULT Hafid KADIR

873 (BA6 surface) Gael BELLOTTO Antoine PROST

876 (BA7 surface) Aymeric BOUVARD Stephane Bernard REIGNIER

806 (TT10 ventilation hut) Bill BANNISTER Hassane SABRI

898 (TT20 ventilation hut) Hassane SABRI Aziz AMAMOU

D. MCFARLANE 2218/03/2020

Page 23: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

Fire Safety

• Fire compartments

• Fires safety systems

• Manual fire fithing systems

• Automatic fixed fire fihting systems

LS2 activitiesSPS

Fire Safety Project

New PPS Project

Consolidations

Maintenance

Upgrade

New access systems

• New personnal access devices PAD

• New material access Devices MAD

• New emergency exite doors

D. MCFARLANE

• New beam loss monitors

• De-cabling Project

• New UA9 cristal and goniometer pair

• New emergency lighting systems

• New safety cable tray

• Consolidation of the B-train

• WIC and BIS deployment

• Refurbishment of the lift (BA3, BA6)

• Electrical sub-station consolidation(BA1,2,4,6)

Extraction protection devices:

• Replacement of TPSC4 (LSS4)

• Replacement of TPSG6 (LSS6)

• 200 MHz RF power upgrade(LSS3, BA3, BAF3)

• 200 MHz low level RF upgrade• Consolidation of BB3 cooling plant• New modern static var compensator

(BEQ1)

Reconfiguration of LSS1 (LSS1, BA1)

- New beam loss monitors

- New upgraded scraper

- Replace one injection kicker MKP

- Reconfiguration of the enlarged

quadrupoles(11610, 11710, 11810)

• New rotational Wire

Scanners BWSRE• (LSS4, LSS5)

• Change all the electrostatic septum ZS(LSS2)

LHC injection lines TI2 and TI8 (see LHC coordination)

• New collimators TCDIs

• New beam loss monitors

• New vacuum valves

• aC coating (QF SSS, MBB 5+ 6-, LSS drifts all)

• New flanges for the impedance reduction

LIU Project

• Replacement MOPOS electronics(Sextants 1,2,3,4,5,6)

• Add a vacuum valve(sector 210)

Reconfiguration of LSS5 (ECA5, ECX5, LSS5)

• New Beam Dump• New beam loss monitors• Replace beam gas ionisation profile monitor (BGI)• Replace the synchrotron light monitor (BSRT)• New kicker magnet with vertical deflection for

dumping MKDV (and generator)• Reconfiguration of the enlarged quadrupoles

(51610, 51810)

2318/03/2020

Page 24: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

D. MCFARLANE 2418/03/2020

Page 25: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

Master Schedule (Version 1.3)

D. MCFARLANE 2518/03/2020

Page 26: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

Master Schedule (Version 1.3)IST Period for SPS

D. MCFARLANE 26

/!\ Shutdown Period does not mean work/access possible

• Start of the cleaning campaign in July

• Global New Access System Tests

• Etc…

SPS

• 6 weeks of Individual System Tests (access restriction)

List of known tests that need to start before the IST period:

• New 200 MHz RF System from June 2020

• New Beam Dump System and reliability run to be defined

No works/installations scheduled later than June 2020

18/03/2020

Page 27: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

The Coordination team

• David Mcfarlane– SPS Facility Coordinator

– Overall planning and coordination

• Julie Coupard– Deputy SPS Facility Coordinator

– Deputy overall planning and coordination

• Jonathan Pascal Meignan– Planning and coordination of the LIU beam dump installation at BA5 and

reconfiguration of BA1.

• Antonio Grande Mallavia– Planning and coordination of all beamline affected activities.

D. MCFARLANE 2718/03/2020

Page 28: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

The Coordination team

• Franck Bais– TSO

– Onsite supervision

• Romuald Bihery– Onsite supervision

• Cedric Halbert– Space management of the surface areas of the SPS points during LS2.

D. MCFARLANE 2818/03/2020

Page 29: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

EROS Team and Organization

SPSEmmanuel Paulat

[email protected]

Telephone: 00 41 75 411 38 70

Points: 3, 4, 5 and 7

Backup John Robert Etheridge

John Robert Etheridge

[email protected]

Telephone: 00 41 75 411 46 47

Points 1, 2 and 6

Backup Emmanuel Paulat

Cyrille Patrick Bedel

[email protected]

Telephone: 00 41 75 411 08 04

Back Up for John Robert Etheridge and Emmanuel Paulat

D. MCFARLANE 2918/03/2020

Page 30: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

Procedure to request Project Online Professional Licenses

• Who? CERN users who need professional access to EN/ACE coordination schedules for CERN accelerator complex

• How? https://cern.service-now.com/service-portal/article.do?n=KB0005844

D. MCFARLANE 3018/03/2020

Page 31: SPS LS2 Planning meeting (No.39) 08/01/20€¦ · COVID-19 crisis 18/03/2020 D. MCFARLANE Dear all, Please be aware that from Tuesday (17/03/2020) 1:45 p.m the SPS is closed until

SRRs and ECRs: reminder

• All changes to the machine that will impact the beam shall be documented by SRRs/ECRs:

• SRR: Space Reservation Request (“light ECR”)

• ECR: Engineering Change Request

• Templates available on:

• https://quality.web.cern.ch/templates-requests

• To be sent to the SPS configuration manager:

[email protected] or

[email protected]

The process of approval takes time and that this year the IEFC committees are lessfrequent (since the beginning of the year only the one last week; the next one will be inApril). Moreover, Fred Galleazzi should be contacted well in advance in order for him tomake the studies and prepare the differential drawings.

D. MCFARLANE 31

Tips

18/03/2020