SPRSA Excess Capacity Panel Carol P. Welsch Orbital Sciences Corporation June 10, 2014. Over 800 Space Missions Since 1982*. 77 Commercial Satellites. 72 Government Satellites. 40 Space Payloads . 77 Space Launch Vehicles. 201 Interceptor & Target Vehicles . 340 Sounding Rockets . - PowerPoint PPT Presentation
Citation preview
1
© 2014 Orbital Sciences Corporation. All Rights Reserved.
SPRSAExcess Capacity Panel
Carol P. WelschOrbital Sciences Corporation
June 10, 2014
Welsch June2014
© 2014 Orbital Sciences Corporation. All Rights Reserved.*April 1982-March 2014
Over 800 Space Missions Since 1982*
77 Commercial Satellites
201 Interceptor & Target Vehicles
40 Space Payloads
77 Space Launch Vehicles 340 Sounding Rockets
72 Government Satellites
© 2014 Orbital Sciences Corporation. All Rights Reserved.
Access to Space Options
© 2014 Orbital Sciences Corporation. All Rights Reserved.
Hosted Payloads on ISS Resupply Missions
Launchfrom
Wallops
Rendezvous with ISS• Hosted payload inactive• Survival heater power provided
Departfrom ISS
ControlledDeorbit
USNGround Stations
Orbital MCC Payload Ops Center
Hosted Payload Mission• Up to 1 year duration • Data downlink via USN• +X pointed at Sun, excursions supported• Data delivered to science team
• Payload Mass up to 100 kg• Payload Power up to 500 W (OAP)• Payload Volume up to 1 m3• Downlink Data Rates up to 3.5 mbps• Pointing Control 0.1°• 51.6º Orbit Between 200 and 400 km
• Complete End-to-end Mission Service: I&T, Flight Operations, Data Delivery
• Hosted on Cygnus spacecraft• Three Successful Cygnus Flights to Date• Up to 1 Year Lifetime• 18-24 Month ATP-to-Launch Schedules
4
5
© 2014 Orbital Sciences Corporation. All Rights Reserved.
Addressing the Challenges
“What is the most politically acceptable, efficient, and cost effective approach to accessing excess launch capacity?” No single approach meets every user needs
Steps could be taken to improve efficiency and cost effectiveness of rideshare Need to reconcile lengthy gov’t launch planning timelines with smallsat timelines Develop flexible, standardized interfaces and adapters (eg. EAGLE) Fully utilize DoD Space Test Program to identify rideshare opportunities for all users
− Should be on a regular and recurring basis− Make community aware of opportunities
Develop policy to enable commercial payloads to rideshare on gov’t launches Implement contracting mechanism to procure commercial rideshare services
Welsch June2014