70
Spill Prevention Control Countermeasure Regulation 40 CFR 112 Presented by Martin Bonnell, PE January 25, 2013

Spill Prevention Control Countermeasure Regulation 40 CFR 112

  • Upload
    blaine

  • View
    61

  • Download
    0

Embed Size (px)

DESCRIPTION

Spill Prevention Control Countermeasure Regulation 40 CFR 112. Presented by Martin Bonnell, PE January 25, 2013. PRESENTATION OVERVIEW. Introductions Who needs a SPCC Plan & what is covered? State and Federal Regulations How is a SPCC Plan used and maintained? - PowerPoint PPT Presentation

Citation preview

Page 1: Spill Prevention Control Countermeasure Regulation 40 CFR 112

Spill Prevention Control Countermeasure

Regulation 40 CFR 112Presented by Martin Bonnell, PE

January 25, 2013

Page 2: Spill Prevention Control Countermeasure Regulation 40 CFR 112

PRESENTATION OVERVIEW

• Introductions

• Who needs a SPCC Plan & what is covered?

• State and Federal Regulations

• How is a SPCC Plan used and maintained?

• What to do in the event of a product spill

• Questions & Discussion

Page 3: Spill Prevention Control Countermeasure Regulation 40 CFR 112

Who Needs a SPCC Plan

• Owners or operators of petroleum facilities that have discharged or, due to their location, could reasonably be expected to discharge oil in harmful quantities into or upon the navigable waters of the United States or adjoining shorelines to prepare, in writing, an SPCC Plan.

Page 4: Spill Prevention Control Countermeasure Regulation 40 CFR 112

SPCC REQUIREMENTS• If the facility total aboveground storage in tanks

or containers is > 1,320 gallons and/or > 42K gal underground storage (not 280/281 exempt)

• It’s a non-transportation related facility (see 40 CFR Part 112 Appendices A & B)

• And there is a reasonable chance of a discharge to waters of the U.S. or adjoining shorelines

Page 5: Spill Prevention Control Countermeasure Regulation 40 CFR 112

DEFINITIONS• Oil

– Includes oil of any kind or in any form including, but not limited to:

• Petroleum and fuel oils (gasoline, diesel, lube oils, aviation gasoline, naphtha, mineral spirits, etc.)

• Sludge• Synthetic oils

– Created by chemical synthesis

Page 6: Spill Prevention Control Countermeasure Regulation 40 CFR 112

DEFINITIONS• Oil (cont’d)

– Oil refuse– Oil mixed with wastes other than dredged spoil– Animal fats, oils & greases– Vegetable oils– Mineral oils

Page 7: Spill Prevention Control Countermeasure Regulation 40 CFR 112

DENATURED ETHANOL• Denatured ethanol tanks are considered oil

storage containers if the denaturant is an oil such as refined gasoline or natural gasoline

• Shell capacity of tank used as storage capacity

• These facilities may be subject to the SPCC & FRP requirements

Page 8: Spill Prevention Control Countermeasure Regulation 40 CFR 112

NON-TRANSPORTATION-RELATED FACILITIES

• Industrial, commercial, agricultural, or public facilities which use, store, drill for, produce, gather, process, refine or consumer oil or oil products

• Waste treatment facilities or part thereof

• Pipeline systems, highway vehicles & railroad cars used to transport oil exclusively within a facility

Page 9: Spill Prevention Control Countermeasure Regulation 40 CFR 112

EPA Regulates:• Railroad cars after the transportation process ends

and when they are operated as non-transportation-related storage at an SPCC regulated facility

DOT Regulates:

• Railroad cars from the time the oil is offered for transportation to a carrier until the time it reaches its destination and is accepted by the consignee

Page 10: Spill Prevention Control Countermeasure Regulation 40 CFR 112

“REASONAL EXPECTATION” OF DISCHARGE

• The determination must be based solely upon consideration of the geographical & locational aspects of the facility

• Exclude manmade features such as dikes, equipment or other features which would restrain, hinder, contain or otherwise prevent a discharge as described in §112.1(b)

Page 11: Spill Prevention Control Countermeasure Regulation 40 CFR 112

“REASONAL EXPECTATION” (CONT.)

• Factors to consider:– Whether a past discharge of oil reached a

navigable water or adjoining shoreline;

– Whether the facility is adjacent to navigable waters or adjoining shoreline;

– On-site conduits, such as sewer lines, storm sewers, certain underground features (e.g., power or cable lines, or groundwater);

Page 12: Spill Prevention Control Countermeasure Regulation 40 CFR 112

“REASONAL EXPECTATION” (CONT.)

• Factors to consider:– Unique geological or geographic features;

– Whether the facility is near a watercourse & intervening natural drainage;

– Whether precipitation runoff could transport oil into navigable waters;

– The quantity & nature of oil stored

Page 13: Spill Prevention Control Countermeasure Regulation 40 CFR 112

STORAGE CAPACITY THRESHOLDS

• IF it meets the other applicable criteria set forth in §112.1, the SPCC rule applies to a facility with:

– > 1,320 gallons of aggregate aboveground oil storage capacity, or

– > 42,000 gallons of completely buried oil storage capacity

Page 14: Spill Prevention Control Countermeasure Regulation 40 CFR 112

STORAGE CAPACITY

Included in storage capacity• Capacity of containers (e.g., bulk

storage containers, oil-filled equipment, mobile/portable containers, etc.) with a capacity of 55 gallons or greater

Excluded from storage capacity• Capacity of completely buried tanks

& associated underground piping, ancillary equipment & containment systems that are subject to all technical requirements of 40 CFR part 280 or 281

• Capacity of tanks used exclusively for wastewater treatment

• Capacity of containers that are permanently closed

• Motive power containers

Page 15: Spill Prevention Control Countermeasure Regulation 40 CFR 112

DEFINITION OF STORAGE CAPACITY

• “Storage capacity” is defined in §112.2 as the shell capacity of a container

• Generally, the shell capacity is the rated design capacity rather than the working/operational capacity

Page 16: Spill Prevention Control Countermeasure Regulation 40 CFR 112

DEFINITION OF “PERMANENTLY CLOSED”

• For a tank to be “permanently closed”, the facility must do the following:– Remove all liquid & sludge from each container &

connecting line– Disconnect & blank off all connecting lines & piping– Close & lock all valves (except ventilation valves)– Pose a conspicuous sign on each container stating it is

permanently closed with the date of closing

• Tanks can remain on site, but they are not included in the total storage capacity

Page 17: Spill Prevention Control Countermeasure Regulation 40 CFR 112

SPCC Plan Basics

Page 18: Spill Prevention Control Countermeasure Regulation 40 CFR 112

SECONDARY CONTAINMENT REQUIREMENTS

• Tank secondary containment requires 110 percent of the volume of the largest tank contained within the dike with the displacement volumes of the tanks accounted for.

• Secondary containment needs to allows for additional freeboard for containment of precipitation in the containment dikes.

Page 19: Spill Prevention Control Countermeasure Regulation 40 CFR 112

Secondary Containment

Page 20: Spill Prevention Control Countermeasure Regulation 40 CFR 112

Secondary Containment

Page 21: Spill Prevention Control Countermeasure Regulation 40 CFR 112

Drum Containment

Page 22: Spill Prevention Control Countermeasure Regulation 40 CFR 112

RACK SPILL PAD CONTAINMENT• If transport truck makes hard connect to tank –

the tank has a “Rack” and must have spill pad containment.

• Spill Pad containment must be large enough to contain the largest compartment of the truck unloading at the petroleum facility.

Page 23: Spill Prevention Control Countermeasure Regulation 40 CFR 112

Spill Pad Containment

Page 24: Spill Prevention Control Countermeasure Regulation 40 CFR 112

§112.3 PREPARE &IMPLEMENT A PLAN

• The facility owner/operator must prepare a SPCC Plan:

– In writing

– In accordance with §112.7 & any other applicable sections of 40 CFR part 112

Page 25: Spill Prevention Control Countermeasure Regulation 40 CFR 112

§112.3(c) MOBILE FACILITIES

• Onshore & offshore mobile facilities must prepare, implement & maintain a Plan as required by the rule

– Amend & implement a Plan, if necessary to ensure compliance with the rule, on or before 11/20/09

– Can be a general Plan; a new Plan is not required each time a facilities moves to a new site

Page 26: Spill Prevention Control Countermeasure Regulation 40 CFR 112

§112.3(d) PE CERTIFICATION

• A licensed PE must review & certify a Plan & technical amendments

• The certification does not relieve the owner/operator of his duty to prepare & fully implement a Plan

Page 27: Spill Prevention Control Countermeasure Regulation 40 CFR 112

PE “ATTESTATION”• With certification, the PE attests that:

– PE is familiar with the rule requirements– PE or his agent visited & examined the facility– The Plan has been prepared in accordance with good

engineering practice, including the consideration of applicable industry standards, & with the requirements of 40 CFR part 112

– PE allow flexibility in meeting many rules provisions by providing equivalent environmental protection or developing contingency plans.

– Procedures for required inspections & testing have been established

– The Plan is adequate for the facility

Page 28: Spill Prevention Control Countermeasure Regulation 40 CFR 112

§112.3(e)(1) PLAN REQUIREMENTS

• Maintain a complete copy of the Plan:– At the facility if it is attended at least 4 hours

per day– At the nearest field office if the facility is

attended for less than 4 hours per day

• Have the Plan available to the RA for onsite review during normal working hours

Page 29: Spill Prevention Control Countermeasure Regulation 40 CFR 112

PLAN REVIEW & EVALUATION

• Complete once every 5 years from the date facility becomes subject to the rule– If a facility was in operation on or before 8/16/2002, 5

years from the date of your last review required by the rule

• Amend Plan within 6 months to include more effective prevention & control technology

• Implement ASAP, but no later than 6 months of amendment

Page 30: Spill Prevention Control Countermeasure Regulation 40 CFR 112

DOCUMENTING PLAN REVIEW

• Must document Plan review & evaluation

• Sign statement at beginning or end of Plan or in a log or an appendix– “I have completed review & evaluation of the SPCC

Plan for (name of facility) on (date), and will (will not) amend the Plan as a result.”

• PE must certify any technical amendment to Plan– Qualified Facilities exception

Page 31: Spill Prevention Control Countermeasure Regulation 40 CFR 112

Smaller Oil Storage Facilities

Page 32: Spill Prevention Control Countermeasure Regulation 40 CFR 112

§112.6 QUALIFIED FACILITY PLAN REQUIREMENTS

• Smaller oil storage facility that is eligible for streamlined regulatory requirements– Self-certified SPCC Plan instead of one reviewed & certified by a

Professional Engineer– Streamlined integrity testing & facility security requirements

• Must meet eligibility criteria to use alternative option

• EPA’s recent amendment would divide this group of facilities into tiers– Requirements described here would apply to “Tier I” facilities

Page 33: Spill Prevention Control Countermeasure Regulation 40 CFR 112

§112.6 QUALIFIED FACILITY PLAN REQUIREMENTS

(CONT.)• EPA’s recent amendment would divide this group

of facilities into tiers– Requirements described here would apply to “Tier II”

facilities– Additional relief would be provided to “Tier I”

Page 34: Spill Prevention Control Countermeasure Regulation 40 CFR 112

SELF-CERTIFICATION OPTIONFOR QUALIFIED FACILITIES

• Allow facility owners that store <=10K oil & meet other “qualifying” criteria to self-certify their SPCC Plans, in lieu of review & certification by a PE

• “Qualifying” criteria –– NO discharges for 3 years prior or since becoming subject to

the requirements

• Under this approach, owners may not deviate from any requirements under §112.7(a)(2) (can’t use EE) & may not make impracticability determinations under §112.7(d)

Page 35: Spill Prevention Control Countermeasure Regulation 40 CFR 112

REPORTABLE DISCHARGE HISTORY

• A single discharge of oil to navigable water or adjoining shorelines exceeding 1,000 gallons OR,

• Two discharges to navigable water or adjoining shorelines each exceeding 42 gallons within any 12 month period

• Count only the amount that reaches navigable water or adjoining shorelines

Page 36: Spill Prevention Control Countermeasure Regulation 40 CFR 112

REPORTABLE DISCHARGE HISTORY (CONT.)

• Oil discharges resulting from natural disasters, acts of war, or terrorism are not included

• Sabotage & vandalism are not beyond facilities control

• Self-certifying facilities do not automatically lose eligibility if they have a reportable spill, the RA has the authority to require a Plan amendment

Page 37: Spill Prevention Control Countermeasure Regulation 40 CFR 112

SELF-CERTIFICATION• Owner/operator attests they are familiar with the

rule & have visited & examined the facility

• The Plan has been prepared in accordance with accepted & sound industry practices & standards

• Procedures for required inspections & testing have been established

• The facility meets the qualifying criteria

Page 38: Spill Prevention Control Countermeasure Regulation 40 CFR 112

SELF-CERTIFICATION (CONT.)

• The Plan does not deviate from rule requirements except as allowed & as certified by a PE

• The Plan & staff responsible for implementing it have the full approval of management & the o/o has committed the necessary resources to fully implement the Plan

• The Plan is being fully implemented

Page 39: Spill Prevention Control Countermeasure Regulation 40 CFR 112

TECHNICAL AMENDMENTS

• May self-certify technical amendments as long as a PE has not certified the portion being changed

• If a PE certified the affected portion of the Plan, then a PE must certify the technical amendment

Page 40: Spill Prevention Control Countermeasure Regulation 40 CFR 112

Drum Containment

Page 41: Spill Prevention Control Countermeasure Regulation 40 CFR 112

Tank Containment

Page 42: Spill Prevention Control Countermeasure Regulation 40 CFR 112

TIER I SUMMARYAnd a facility… Then the owner/operator of the facility…If a facility…

…has 10,000 gallons or less in aggregate aboveground oil storage capacity

…meets the oil discharge history criteria

…may prepare a self-certified SPCC Plan instead of one reviewed & certified by a Professional Engineer (PE)

…may meet tailored facility security & tank integrity inspection requirements without PE certification

…may prepare a Plan which includes PE-certified environmentally equivalent measures or impracticability determinations that would require PE certifications for only the portions dealing with environmental equivalence & impracticability determinations. The remaining portions of the Plan could be self-certified by the facility owner/operator

Page 43: Spill Prevention Control Countermeasure Regulation 40 CFR 112

ASSISTANCE, SERVICES & PRODUCTS

• Brams Engineering Services– Assistance drafting SPCC plans– Inspects and Prepares SPCC Plans– Prepares Tier I SPCC Plans for Owner/Operator Self Certification– Prepares Tier II SPCC Plans for Owner/Operators– Designs Tank Containment Basins– Responses to EPA Violation Letters

Page 44: Spill Prevention Control Countermeasure Regulation 40 CFR 112

U.S. EPA – Penalties & Fines

Page 45: Spill Prevention Control Countermeasure Regulation 40 CFR 112

What Does it take to fill out the Tier 1 Plan?

Page 46: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 47: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 48: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 49: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 50: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 51: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 52: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 53: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 54: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 55: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 56: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 57: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 58: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 59: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 60: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 61: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 62: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 63: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 64: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 65: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 66: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 67: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 68: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 69: Spill Prevention Control Countermeasure Regulation 40 CFR 112
Page 70: Spill Prevention Control Countermeasure Regulation 40 CFR 112

QUESTIONS & CONTACT INFO

Martin Bonnell, PESenior Civil Engineer

Brams Engineering, LLC172 Spruce Drive

Apple Valley, MN 55124952-261-9351

[email protected]