Project Type General Description Location Estimated Budget Ed. Spec Update (ES/MS/HS) $500,000 Overcrowding Relief $1,550,000 District Wide ES, MS, HS Mobiles $1,000,000 District Wide ES, MS, HS Remodel $300,000 District Wide ES, MS, HS MTYR Startup costs $250,000 Support Facilites $1,600,000 Facility Upgrades Nutrition Services SF Phase 1 & 2 Facility Upgrades $1,600,000 Educational Options $250,000 OSP Driven Project District Wide ES, MS, HS OSP Prioritized $250,000 Safety/Security Projects $1,000,000 Security Upgrades District Wide ES, MS, HS District Prioritized (PD/CP/SHSC) $1,000,000 Site & Field Improvments $1,400,000 Athletic Surfaces Reed HS Replace Track $250,000 Spanish Springs HS Replace Track $250,000 Hug HS Replace Baseball Field $150,000 Spanish Springs HS Replace Baseball Field $150,000 Playgrounds Booth ES Replace Steel Playground Equip $50,000 Veterans ES Replace Steel Playground Equip $50,000 Drainage Peavine ES Drainage Improvements $135,000 Drake ES Drainage Improvements $200,000 Verdi ES Drainage Improvements $65,000 Turf Modifications Wooster HS Main/Lateral Irr Replacement $100,000 IT Infrastructure $1,000,000 Equipment Refresh Shaw MS IT Equipment Refresh $450,000 Hall ES IT Equipment Refresh $275,000 Sepulveda ES IT Equipment Refresh $275,000 General Capital Renewal $1,400,000 HVAC O'Brien MS Boiler Replacement $700,000 Pine MS Boiler Replacement $700,000 Program Contingency 2.5% of Capital Program $217,500 Program Administration $1,075,000 Additional Staffing Brown Center Capital Projects Planning/Const $650,000 Vehicles (5) Brown Center Capital Projects Planning/Const $125,000 Portable Brown Center SF Additional Office Space $300,000 $9,992,500 Specific Project Description 2017 Bond Allocations $9,992,500 Total FY2016 =

Spending plan for $35M bond

Embed Size (px)

DESCRIPTION

The Washoe County School District plans to focus spending on improving its existing facilities and not add seats to relieve school overcrowding.

Citation preview

Page 1: Spending plan for $35M bond

Project Type General Description Location Estimated BudgetEd. Spec Update (ES/MS/HS) $500,000Overcrowding Relief $1,550,000

District Wide ES, MS, HS Mobiles $1,000,000District Wide ES, MS, HS Remodel $300,000District Wide ES, MS, HS MTYR Startup costs $250,000

Support Facilites $1,600,000Facility Upgrades Nutrition Services SF Phase 1 & 2 Facility Upgrades $1,600,000

Educational Options $250,000OSP Driven Project District Wide ES, MS, HS OSP Prioritized $250,000

Safety/Security Projects $1,000,000Security Upgrades District Wide ES, MS, HS District Prioritized (PD/CP/SHSC) $1,000,000

Site & Field Improvments $1,400,000Athletic Surfaces Reed HS Replace Track $250,000

Spanish Springs HS Replace Track $250,000Hug HS Replace Baseball Field $150,000Spanish Springs HS Replace Baseball Field $150,000

Playgrounds Booth ES Replace Steel Playground Equip $50,000Veterans ES Replace Steel Playground Equip $50,000

Drainage Peavine ES Drainage Improvements $135,000Drake ES Drainage Improvements $200,000Verdi ES Drainage Improvements $65,000

Turf Modifications Wooster HS Main/Lateral Irr Replacement $100,000IT Infrastructure $1,000,000

Equipment Refresh Shaw MS IT Equipment Refresh $450,000Hall ES IT Equipment Refresh $275,000Sepulveda ES IT Equipment Refresh $275,000

General Capital Renewal $1,400,000HVAC O'Brien MS Boiler Replacement $700,000

Pine MS Boiler Replacement $700,000Program Contingency 2.5% of Capital Program $217,500Program Administration $1,075,000

Additional Staffing Brown Center Capital Projects Planning/Const $650,000Vehicles (5) Brown Center Capital Projects Planning/Const $125,000Portable Brown Center SF Additional Office Space $300,000

$9,992,500

Specific Project Description2017 Bond  Allocations ‐ $9,992,500

Total FY2016 = 

Page 2: Spending plan for $35M bond

Project Type General Description Location Estimated BudgetEd. Spec Update (ES/MS/HS) $500,000Overcrowding Relief $1,550,000

District Wide ES, MS, HS Mobiles $1,000,000District Wide ES, MS, HS Remodel $300,000District Wide ES, MS, HS MTYR Startup costs $250,000

Support Facilites $1,000,000Facility Upgrades Nutrition Services SF Phase 3 Facility Upgrades $800,000Other Sites District Wide SF Expansion/Land/Upgrade/Etc. $200,000

Educational Options $250,000OSP Driven Project District Wide ES, MS, HS OSP Prioritized $250,000

Safety/Security Projects $1,000,000Security Upgrades District Wide ES, MS, HS District Prioritized (PD/CP/SHSC) $1,000,000

Site & Field Improvments $1,700,000Athletic Surfaces District Wide ES, MS, HS FCIS determined $1,000,000Playgrounds District Wide ES, MS, HS FCIS determined $200,000Drainage District Wide ES, MS, HS FCIS determined $300,000Turf Modifications District Wide ES, MS, HS FCIS determined $200,000

IT Infrastructure $1,000,000Equipment Refresh District Wide ES, MS, HS FCIS determined $1,000,000

General Capital Renewal $3,000,000Capital Renewal District Wide ES, MS, HS FCIS determined $3,000,000

Program Contingency 2.5% of Capital Program $250,000Program Administration 5% of Capital Program $500,000

$10,750,000

2018 Bond  Allocations ‐ $10,750,000 Specific Project Description