Project Update
The construction document phase of the project continues to progress,
which will result in the completion of design documents at the end of the
month. The design team submitted a set of 50% construction
documents to Spectrum Health for review earlier this week. Prior to
bidding out this work, Spectrum will assess the final set of construction
documents. To expedite this process, the design team will meet with
Spectrum’s facility team to address any major concerns.
There have been some major developments onsite since our last
newsletter. Our biggest accomplishment is structural steel that has been
erected. Builders Iron mobilized on the job site on June 3 and has almost
40% of the steel in the air. Builders Iron also has a crew onsite detailing
the erected steel so that we can start pouring the elevated slabs. Before
Builders Iron could start setting steel, TL Masonry and Kent Companies
had to get a significant amount of work completed. TL Masonry
completed the installation of the CMU north stairwell, double elevator
and single elevator. While TL Masonry was working on the shaft walls,
Kent Companies was continuing with the concrete foundations on the
southern part of the building. Kent has put in a lot of hours over the past
two weeks to stay ahead of the steel erection schedule, which included
making large concrete pours on Saturday. The team we have assembled
for this project is working very collaboratively. We have a number of
large hurdles coming up, but I am certain there is no hurdle we cannot
overcome.
Volume 1, Issue 26
June 14, 2013
Created By:
Dustin Kuzee, Project Manager
Father’s Day Fun
Facts
There is an estimated 70.1 million
fathers in the United States.
24.4 million fathers are a part of a
married-couple raising children
under the age of 18.
21% of the 24.4 million are raising
3 or more children under 18.
1.96 million of fathers in the
United States are single fathers.
If you are still looking for a gift for
Father’s Day there are: 7,368
men’s clothing stores, 15,542
hardware stores and 21,418
sporting goods stores in the United
States.
189,000 U.S. fathers are stay at
home dads.
$3.5 billion in child support was
due to Fathers last year. In
contrast, there was $31.7 billion
due to mothers.
Page 2
Project Photos
Builders Iron progress through 4
days on the job!
Builders Iron setting beams in phase 1 Dykema backfilling around the
double elevator shaft
TL Masonry working on the single
elevator shaft
Builders Iron moving into phase 2 of
the steel structure Kent prepping the K line foundation
wall pour
Contractors of the Week
Kent Companies, TL Masonry and Builders Iron all deserve the contractor of the week spotlight in this
issue of The Cornerstone. Each one of these companies has been working together diligently in an effort
to get the project ahead of schedule. Kent Companies has been working overtime, including Saturdays,
to stay ahead of the steel erection. They even made a 180-yard wall pour last Saturday. TL Masonry has
increased manpower to get all the steel bearing plates in place. TL Masonry has only been onsite a little
over three weeks, and they have almost all the CMU shafts erected. Builders Iron has not disappointed in
the amount of steel they have erected. They have been onsite for 10 days and 40% of the steel is
standing. Their fabrication shop has also been turning masonry embeds around in less than 24 hours
from receiving shop drawings. Everyone on this project has been great to work with, and they all have
can-do attitudes. Elzinga & Volkers would like to recognize the effort that these companies are putting
forth. It is greatly appreciated!
Project Forecast
The project design will be approaching completion in the next two weeks. After Integrated Architecture finishes the interior build-out drawings, we will perform an internal audit of the documents. We will then submit them to Spectrum Health for an internal review, and we will obtain a building permit upon approval. This process will be completed by the end of the month. Elzinga & Volkers is working on the upcoming bid package scopes of work so we can go out for bid to the remaining trades right after we receive final approval from Spectrum. The design has been in the planning stages for over a year, and we are approaching the finish line. We will finish just as strong as we started! Steel erection will be proceeding onsite from phase 2 (center third of the building) to phase 3 (southern third of the building), and Builders Iron will be close to pulling offsite by our next update. Kent Companies will start to shift crews from the foundations to flatwork in the coming weeks. The crews will begin on the 3rd floor of phase one, moving to the next phase of steel after completion. We are going to start pouring floors as early as next week, and this will continue for the next month. A number of these pours will start as early as 3:00am. Elzinga & Volkers will send out a letter to all of the surrounding neighbors informing them of this temporary inconvenience. Kent Companies will also pour the retaining walls along the south side of the building, which will open up the remaining site grading for Dykema. We have built up good momentum onsite, and we are on track for completion!
Page 3
Programming Basis of Design/SD Design Documents Construction Documents
+
Track the Project’s Progress as the Forest Grows!