Specification & Design of Real-time Systems
FA_07_SE_545: ERAU TEAM BLUE
Software Test Plan Automatic Production Environment
Christopher Griffis
Steve Harvey
Leonardo Matos
Jason McGuire
Sean Pfeifer
Caylyne Shelton
Software Test Plan: Automatic Production Environment Version: 2.0
FA_07_SE_545: ERAU TEAM BLUE Date: 12/11/07
ii
Document Information Category Information
Document ID Software Test Plan: Automatic Production Environment
Document Owner FA_07_SE_545: ERAU TEAM BLUE
Revision History Date Version Description Author
10/30/07 0.1 Initial document template Leonardo Matos
11/05/07 0.2 Initial test cases Leonardo Matos
11/14/07 0.9 Updated test cases
Added new test cases
Leonardo Matos
11/15/07 1.0 Test Plan version 1 release TEAM BLUE
12/11/07 2.0 Test Plan Completed
Test Plan version 2 release
Sean Pfeifer
TEAM BLUE
Document Approvals Role Name Signature Date
Project Sponsor A. Kornecki 12/11/07
Project Review Group FA_07_SE_545 12/11/07
Project Lead Christopher Griffis 12/11/07
Requirements Lead Sean Pfeifer 12/11/07
Hardware Lead Jason McGuire 12/11/07
Design Lead Caylyne Shelton 12/11/07
Programming Lead Steve Harvey 12/11/07
Quality Manager Leonardo Matos 12/11/07
Preface
This Software Test Plan loosely follows the layout suggested by IEEE Std. 829-1998, “IEEE Recommended
Practice for Software Test Documentation.” However, certain liberties have been taken with the compliance of the
format suggested in IEEE Std. 829-1998; the material provided herein is presented to best fit the needs of Software
Test Plan as a project communication tool and reference document.
Software Test Plan: Automatic Production Environment Version: 2.0
FA_07_SE_545: ERAU TEAM BLUE Date: 12/11/07
iii
Table of Contents
TITLE PAGE .................................................................................................................................................................ii
SIGNATURE PAGE......................................................................................................................................................ii
CHANGE HISTORY.....................................................................................................................................................ii
PREFACE ......................................................................................................................................................................ii
1. INTRODUCTION ................................................................................................................................................1
1.1 DOCUMENT PURPOSE .................................................................................................................................1 1.2 STAKEHOLDERS..........................................................................................................................................1 1.3 SCOPE.........................................................................................................................................................1 1.4 DEFINITIONS, ACRONYMS, AND ABBREVIATIONS .......................................................................................1 1.5 REFERENCES...............................................................................................................................................3 1.6 OVERVIEW..................................................................................................................................................3
2. TEST ITEMS........................................................................................................................................................3
3. SOFTWARE RISK ISSUES.................................................................................................................................3
4. FEATURES TO BE TESTED BY TEST CASE ..................................................................................................3
5. FEATURES TO BE TESTED BY CHECKLIST.................................................................................................4
6. APPROACH .........................................................................................................................................................6
7. ITEM PASS/FAIL CRITERIA.............................................................................................................................6
8. ENTRY & EXIT CRITERIA................................................................................................................................6
9. SUSPENSION CRITERIA AND RESUMPTION REQUIREMENTS ...............................................................6
10. TEST DELIVERABLES..............................................................................................................................6
11. REMAINING TEST TASKS .......................................................................................................................6
12. ENVIRONMENTAL NEEDS......................................................................................................................6
13. STAFFING AND TRAINING NEEDS .......................................................................................................6
14. RESPONSIBILITIES...................................................................................................................................6
15. PLANNING RISKS AND CONTINGENCIES...........................................................................................6
16. APPENDIX ..................................................................................................................................................7
16.1 TEST CASE SCENARIOS...........................................................................................................................7 16.2 REQUIREMENTS TRACEABILITY MATRIX..............................................................................................15
Software Test Plan: Automatic Production Environment Version: 2.0
FA_07_SE_545: ERAU TEAM BLUE Date: 12/11/07
Page 1
Software Test Plan
Automatic Production Environment
1. Introduction
1.1 Document Purpose
This document is to act as a project communication tool and reference document, outlining the intended test plan to
be conducted after implementation.
1.2 Stakeholders
• Sponsor: Dr. Andrew J. Kornecki, Embry-Riddle Aeronautical University
• Members of TEAM BLUE
o Christopher Griffis (Project Lead)
o Steve Harvey (Programming Lead)
o Leo Matos (Quality Lead)
o Jason McGuire (Hardware Lead)
o Sean Pfeifer (Requirements Lead)
o Caylyne Shelton (Design Lead)
1.3 Scope
The diagrams, definitions, test cases, and related material in this document address how the system should behave as
a whole. This document intends to provide a guideline on how testing of the system should occur and the functions
to be tested. Only the main functions of the system as specified by the user needs and the system’s SRS will tested at
this time.
1.4 Definitions, Acronyms, and Abbreviations
Active – a motor is active if the motor is powered and turning
APE – Automatic Production Environment
Auto Control Mode – This is the default software mode in which control of the system occurs automatically and
without user intervention.
BELT1 – see
Figure 1; the conveyer belt driven by Motor1.
BELT2 – see
Figure 1; the conveyer belt driven by Motor2.
Detect – the sensor "detects" an object if the light path is occluded such that the sensor does not detect light,
therefore detecting an occluding object instead.
END PLACE – see
Figure 1; the last logically detectable position the package can be in.
Extended - the pusher moves to "extended" when it pushes the object away from SCAN PLACE towards the
TRANSITION PLACE.
Software Test Plan: Automatic Production Environment Version: 2.0
FA_07_SE_545: ERAU TEAM BLUE Date: 12/11/07
Page 2
Home – a scanner in the home position is the most retracted position as detectable by the position switch such that
the package can enter the scanning area. The pusher in the home position is in the furthest most position from the
transition area as detectable by the position switch and is such that the package can enter the scanning area.
Inactive – when the motor is not moving because it is not being powered, it is considered inactive
M1 – see
Figure 1; Motor1, drives BELT1
M2 – see
Figure 1; Motor2, drives BELT2
M3 – see
Figure 1; Motor3, drives the scanner
M4 – see
Figure 1; Motor4, drives the pusher
No detect - the sensor does not detect an object if the light path is not occluded such that the sensor does detect
light, therefore not detecting an occluding object.
Package – the object used to model the payload that is acted upon in the APE system.
Pusher – the apparatus used to move a package from the SCAN PLACE to the TRANSITION PLACE
S1 – see
Figure 1; line sensor1
S2 – see
Figure 1; line sensor2
S3 – see
Figure 1; line sensor3
S4 – see
Figure 1; line sensor4
SCAN PLACE – see
Figure 1; the next sequentially and logically detectable position a package can have in the system after being moved
by BELT1 away from START PLACE. A package can be scanned only if it is detected in the SCAN PLACE.
Scanner – the apparatus used to model the systems ability to scan a package.
Scanning - the scanner is in its lowered position such that it triggers the position switch to detect such a position.
START PLACE – see
Figure 1; the first sequentially and logically detectable position a package can have in or when being introduced into
the system
TRANSITION PLACE – see
Figure 1; the next sequentially and logically detectable position the package can be in after it has been scanned and
pushed onto BELT2.
User Control Mode – This is the alternate software mode in which automatic control of the system is suspended to
Software Test Plan: Automatic Production Environment Version: 2.0
FA_07_SE_545: ERAU TEAM BLUE Date: 12/11/07
Page 3
allow the user direct control over the system motors.
Figure 1: Automatic Production Environment - Logical Component Layout
1.5 References
[1] Kornecki, Dr. A.J., “Embry-Riddle Real Time Class Resource: Description of the SE545 Project.” SE545
Project System Description 8/10/2007, Version 01 - draft 1. Fall 2007.
[2] Software Engineering Standards Committee of the IEEE Computer Society, “Recommended Practice for
Software Test Documentation,” IEEE Std 829-1998.
[3] TEAM BLUE, “Software Requirement Specification: Automatic Production Environment.” SE545 10/24/07,
Version 2.0.
1.6 Overview
This document loosely follows the layout suggested by IEEE Std. 829-1998, “IEEE Recommended Practice for
Software Test Documentation.” Areas that do not apply or are not addressed are described as such. The
documentation provides a guideline on how to conduct testing of the system and what functions will be tested. Test
cases (scenarios) are provided in the appendix section.
2. Test Items
All main functions of the system will be tested in accordance with the user needs and SRS. Special attention will be
given to the automatic functioning of the system (e.g. prioritization of package movement based on location of the
package), the reporting capabilities of the system to a user at a remote station, and the capability of allowing a user
to toggle between auto control mode and user control mode.
3. Software Risk Issues
Not addressed at this time.
4. Features to be Tested by Test Case
The following table indicates which main features will be tested through the use of test cases (See 16.1) and their
Software Test Plan: Automatic Production Environment Version: 2.0
FA_07_SE_545: ERAU TEAM BLUE Date: 12/11/07
Page 4
level of risk:
Table 1: Features to be tested
Feature Level of Risk (H, M, L)
Auto Mode Control High
User Mode Control Medium
Reporting Capabilities Medium
Timing Requirements High
User Interface Medium
5. Features to be Tested by Checklist
The following table indicates the requirements that are not covered in the test cases and will be tested by
examination of requirements and marked off in the following checklist:
Table 2: Requirements Coverage Checklist (RCC)
Requirement met? Requirements not covered in Test
Cases YES NO
[SYS_CNST1] OK
[SYS_CNST2] OK
[SYS_CNST3] OK
[SYS_CNST4] OK
[SYS_CNST5] OK
[SYS_CNST6] OK
[SYS_CNST7] OK
[SYS_CNST8] OK
[SYS_CNST9] OK
[SYS_CNST10] OK
[SYS_CNST11] OK
[SYS_CNST12] OK
[SYS_STRD1] OK
[SYS_STRD2] OK
[SYS_STRD3] OK
[ASMP4] OK
[SYS_FUNC8.1] OK
[SYS_FUNC8.2] OK
[SYS_FUNC8.3] OK
[SYS_FUNC9] OK
[INT_SYS1] OK
[INT_SYS2] OK
[SYS_CNST11] OK
[SYS_CNST12] OK
[HW_CNST1] OK
[HW_CNST2] OK
[HW_CNST3] OK
[HW_CNST4] OK
[HW_NONF1] OK
[HW_NONF2] OK
[HW_NONF3] OK
[HW_NONF4] OK
Software Test Plan: Automatic Production Environment Version: 2.0
FA_07_SE_545: ERAU TEAM BLUE Date: 12/11/07
Page 5
[HW_NONF5] OK
[HW_NONF6] OK
[HW_NONF7] OK
[HW_NONF8] OK
[HW_NONF9] OK
[HW_NONF10] OK
[HW_FUNC1] OK
[HW_FUNC2] OK
[HW_FUNC3] OK
[HW_FUNC4] OK
[HW_FUNC5] OK
[HW_FUNC6] OK
[HW_FUNC7] OK
[HW_FUNC8] OK
[HW_FUNC9] OK
[HW_FUNC10] OK
[INT_USER1] OK
[INT_USER1.1] OK
[INT_USER2.2] OK
[INT_USER2.2.1] OK
[INT_USER2.2.2] OK
[INT_USER2.2.3] OK
[INT_USER2.2.4] OK
[INT_USER2.2.5] OK
[INT_USER2.2.6] OK
[INT_USER2.3] OK
[INT_USER2.4] OK
[INT_USER2.5] OK
[INT_USER2.6] OK
[INT_USER2.7] OK
[INT_USER2.8] OK
[INT_USER2.9] OK
[INT_USER2.10] OK
[INT_USER3.3] OK
[INT_USER3.4] OK
[INT_USER3.5] OK
[INT_USER3.6] OK
[INT_USER3.7] OK
[INT_USER3.8] OK
[INT_USER3.9] OK
[INT_USER3.10] OK
[INT_COMM1] OK
[INT_COMM2] OK
[SW_FUNC1] OK
[SW_FUNC2] OK
[SW_FUNC2.1] OK
[SW_FUNC3] OK
[SW_FUNC4] OK
[SW_FUNC5] OK
[SW_FUNC6.1] OK
[SW_FUNC6.1.1] OK
Software Test Plan: Automatic Production Environment Version: 2.0
FA_07_SE_545: ERAU TEAM BLUE Date: 12/11/07
Page 6
[SW_FUNC6.2] OK
[SW_FUNC6.2.1] OK
[SW_FUNC6.4] OK
[SW_PERF1] OK
[SW_PERF2] OK
6. Approach
Happy path testing method will be used when testing the APE. In this approach the test cases will only test the
default main features of the system, using known inputs, executing without exception, and producing expected
outputs.
7. Item Pass/Fail Criteria
If a particular item does not behave as expected both the item and the test case are considered to have failed. In that
case the developer shall return to the implementation of the code and fix the problem.
8. Entry & Exit Criteria
Entry criteria are defined as preconditions in each test case. Exit criteria are defined as the successful completion of
the test case.
9. Suspension Criteria and Resumption Requirements
Not addressed at this time.
10. Test Deliverables
The completed test cases and items not to be tested checklist will be delivered to the team members via blackboard
once testing is completed.
11. Remaining Test Tasks
Testing will be conducted in one phase. There will be no need to schedule secondary phases to complete testing
unless failures are encountered, in which case, after the developer has fixed the issues found during testing, the
failed test(s) will be conducted in the same manner as before.
12. Environmental Needs
Not addressed at this time.
13. Staffing and Training Needs
Not addressed at this time.
14. Responsibilities
Testing will be conducted by the quality manager and observed by the programming lead, and any other member
required by the project lead, so that assistant can be provided when needed.
15. Planning Risks and Contingencies
This is considered to be a low risk test; therefore, this is not addressed at this time.
Software Test Plan: Automatic Production Environment Version: 2.0
FA_07_SE_545: ERAU TEAM BLUE Date: 12/11/07
Page 7
16. Appendix
16.1 Test Case Scenarios
OST Developer Leonardo Matos Tester Name Sean Pfeifer
Date November 11, 2007 Date December 11, 2007
Scenario # TC 1 Scenario Objective Package placed at sensor 1, system moves package to sensor
4
Use Cases Covered: 1, 2, 3, and 4
Preconditions: System is turned on and inactive
No packages detected on conveyer belt (sensors 2, 3, and 4 and scanner and pusher in home
positions)
No packages being moved about the conveyer belt
Step Source Action Actual Behavior
1 User Places package at sensor 1 OK
2 System Detects package at sensor 1 OK
3 System Ensures there are no packages at sensors 2, 3, and 4 OK
4 System Turns Belt 1 on OK
5 System Detects package at sensor 2 OK
6 System Turns Belt 1 off OK
7 System Ensures sensors 3 and 4 do not detect packages OK
8 System Waits 2 seconds OK
9 System Moves scanner to extended (down) position OK
10 System Waits 10 seconds OK
11 System Moves scanner to home (up) position OK
12 System Waits 5 seconds OK
13 System Moves pusher to extended position OK
14 System Detects pusher at extended position OK
15 System Returns pusher to home position OK
16 System Detects package at sensor 3 OK
17 System Ensures sensor 4 does not detect package OK
18 System Turns Belt 2 on OK
19 System Detects package at sensor 4 OK
20 System Turns Belt 2 off OK
21 System System stopped until package is removed from sensor 4 *System will move packages as
far as it can until there's a package
in the way, including scanning
and waiting to push.
Software Test Plan: Automatic Production Environment Version: 2.0
FA_07_SE_545: ERAU TEAM BLUE Date: 12/11/07
Page 8
OST Developer Leonardo Matos Tester Name Sean Pfeifer
Date November 11, 2007 Date December 11, 2007
Scenario # TC 2 Scenario Objective User wishes to observe system status from remote location
Use Cases Covered: 5
Preconditions: System is turned on
Step Source Action Actual Behavior
1 User Opens status page OK
2 System Reports status of sensors and motors, and system activity to
web server
OK
3 System Displays status page OK
4 System Refreshes status page every 2 seconds Every 1 second
5 User Clicks on appropriate button to refresh earlier then 2 seconds Every 1 second
6 User Closes status page OK
7 System Continues automatic operation OK
Software Test Plan: Automatic Production Environment Version: 2.0
FA_07_SE_545: ERAU TEAM BLUE Date: 12/11/07
Page 9
OST Developer Leonardo Matos Tester Name Sean Pfeifer
Date November 11, 2007 Date December 11, 2007
Scenario # TC 3 Scenario Objective User wishes to activate manual control mode
Use Cases Covered: 6
Preconditions: System is turned on
Step Source Action Actual Behavior
1 User Opens control webpage OK
2 System Displays control webpage OK
3 User Chooses to activate manual control mode OK
4 System Disables automatic control mode OK
5 System Activates manual control mode OK
6 User Chooses a control toggle from webpage OK
7 System Activates specified motor in specified manner OK
8 User Chooses to resume automatic mode OK
9 System Deactivates manual control mode OK
10 System Activates automatic control mode OK
11 System Resumes automatic operations OK
Software Test Plan: Automatic Production Environment Version: 2.0
FA_07_SE_545: ERAU TEAM BLUE Date: 12/11/07
Page 10
OST Developer Leonardo Matos Tester Name Sean Pfeifer
Date November 14, 2007 Date December 11, 2007
Scenario # TC 4 Scenario Objective Packages placed at sensor 1 and 2, system moves packages
to sensor 4
Use Cases Covered: 1, 2, 3, and 4
Preconditions: System is turned on and inactive
No packages detected at sensors 3 and 4 and scanner and pusher in home positions
No packages being moved about the conveyer belt
Step Source Action Actual Behavior
1 User Places packages at sensor 1 and 2 OK
2 System Detects package at sensor 2 OK
3 System Ensures sensors 3 and 4 do not detect packages OK
4 System Waits 2 seconds OK
5 System Moves scanner to extend (down) position OK
6 System Waits 10 seconds OK
7 System Moves scanner to home (up) position OK
8 System Waits 5 seconds OK
9 System Moves pusher to extended position OK
10 System Detects pusher at extended position OK
11 System Returns pusher to home position OK
12 System Detects package at sensor 3 OK
13 System Ensures sensor 4 does not detect package OK
14 System Turns Belt 2 on OK
15 System Detects package at sensor 4 OK
16 System Turns Belt 2 off OK
17 System System stopped until package is removed from sensor 4 *System will move packages as
far as it can until there's a package
in the way, including scanning
and waiting to push.
18 User Removes package from sensor 4 OK
19 System Detects package at sensor 1 OK
20 System Ensures there are no packages at sensors 2, 3, and 4 OK
21 System Turns Belt 1 on OK
22 System Detects package at sensor 2 OK
23 System Turns Belt 1 off OK
24 System Ensures sensors 3 and 4 do not detect packages OK
25 System Waits 2 seconds OK
26 System Moves scanner to extended (down) position OK
27 System Waits 10 seconds OK
28 System Moves scanner to home (up) position OK
29 System Waits 5 seconds OK
30 System Moves pusher to extended position OK
31 System Detects pusher at extended position OK
32 System Returns pusher to home position OK
33 System Detects package at sensor 3 OK
34 System Ensures sensor 4 does not detect package OK
35 System Turns Belt 2 on OK
36 System Detects package at sensor 4 OK
37 System Turns Belt 2 off OK
38 System System stopped until package is removed from sensor 4 OK
Software Test Plan: Automatic Production Environment Version: 2.0
FA_07_SE_545: ERAU TEAM BLUE Date: 12/11/07
Page 11
OST Developer Leonardo Matos Tester Name Sean Pfeifer
Date November 14, 2007 Date December 11, 2007
Scenario # TC 5 Scenario Objective Packages placed at sensor 1, 2, and 3. System moves
packages to sensor 4
Use Cases Covered: 1, 2, 3, and 4
Preconditions: System is turned on and inactive
No packages detected at sensor 4 and scanner and pusher in home positions
No packages being moved about the conveyer belt
Step Source Action Actual Behavior
1 User Places packages at sensors 1, 2, and 3 OK
2 System Detects package at sensor 3 OK
3 System Ensures sensor 4 does not detect package OK
4 System Turns Belt 2 on OK
5 System Detects package at sensor 4 OK
6 System Turns Belt 2 off OK
7 System System stopped until package is removed from sensor 4 *System will move packages as
far as it can until there's a package
in the way, including scanning
and waiting to push.
8 User Removes package from sensor 4 OK
9 System Detects package at sensor 2 OK
10 System Ensures sensors 3 and 4 do not detect packages OK
11 System Waits 2 seconds OK
12 System Moves scanner to extend (down) position OK
13 System Waits 10 seconds OK
14 System Moves scanner to home (up) position OK
15 System Waits 5 seconds OK
16 System Moves pusher to extended position OK
17 System Detects pusher at extended position OK
18 System Returns pusher to home position OK
19 System Detects package at sensor 3 OK
20 System Ensures sensor 4 does not detect package OK
21 System Turns Belt 2 on OK
22 System Detects package at sensor 4 OK
23 System Turns Belt 2 off OK
24 System System stopped until package is removed from sensor 4 *System will move packages as
far as it can until there's a package
in the way, including scanning
and waiting to push.
25 User Removes package from sensor 4 OK
26 System Detects package at sensor 1 OK
27 System Ensures there are no packages at sensors 2, 3, and 4 OK
28 System Turns Belt 1 on OK
29 System Detects package at sensor 2 OK
30 System Turns Belt 1 off OK
31 System Ensures sensors 3 and 4 do not detect packages OK
32 System Waits 2 seconds OK
33 System Moves scanner to extended (down) position OK
34 System Waits 10 seconds OK
35 System Moves scanner to home (up) position OK
Software Test Plan: Automatic Production Environment Version: 2.0
FA_07_SE_545: ERAU TEAM BLUE Date: 12/11/07
Page 12
36 System Waits 5 seconds OK
37 System Moves pusher to extended position OK
38 System Detects pusher at extended position OK
39 System Returns pusher to home position OK
40 System Detects package at sensor 3 OK
41 System Ensures sensor 4 does not detect package OK
42 System Turns Belt 2 on OK
43 System Detects package at sensor 4 OK
44 System Turns Belt 2 off OK
45 System System stopped until package is removed from sensor 4 *System will move packages as
far as it can until there's a package
in the way, including scanning
and waiting to push.
Software Test Plan: Automatic Production Environment Version: 2.0
FA_07_SE_545: ERAU TEAM BLUE Date: 12/11/07
Page 13
OST Developer Leonardo Matos Tester Name Sean Pfeifer
Date November 14, 2007 Date December 11, 2007
Scenario # TC 6 Scenario Objective Packages placed at sensor 1, 2, 3, and 4. System moves
packages to sensor 4
Use Cases Covered: 1, 2, 3, and 4
Preconditions: System is turned on and inactive
Scanner and pusher in home positions
No packages being moved about the conveyer belt
Step Source Action Actual Behavior
1 User Places package at sensors 1, 2, 3, and 4 OK
2 System Detects package at sensor 4 OK
3 System System stopped until package is removed from sensor 4 OK
4 User Removes package from sensor 4 OK
5 System Detects package at sensor 3 OK
6 System Ensures sensor 4 does not detect package OK
7 System Turns Belt 2 on OK
8 System Detects package at sensor 4 OK
9 System Turns Belt 2 off OK
10 System System stopped until package is removed from sensor 4 *System will move packages as
far as it can until there's a package
in the way, including scanning
and waiting to push.
11 User Removes package from sensor 4 OK
12 System Detects package at sensor 2 OK
13 System Ensures sensors 3 and 4 do not detect packages OK
14 System Waits 2 seconds OK
15 System Moves scanner to extend (down) position OK
16 System Waits 10 seconds OK
17 System Moves scanner to home (up) position OK
18 System Waits 5 seconds OK
19 System Moves pusher to extended position OK
20 System Detects pusher at extended position OK
21 System Returns pusher to home position OK
22 System Detects package at sensor 3 OK
23 System Ensures sensor 4 does not detect package OK
24 System Turns Belt 2 on OK
25 System Detects package at sensor 4 OK
26 System Turns Belt 2 off OK
27 System System stopped until package is removed from sensor 4 *System will move packages as
far as it can until there's a package
in the way, including scanning
and waiting to push.
28 User Removes package from sensor 4 OK
29 System Detects package at sensor 1 OK
30 System Ensures there are no packages at sensors 2, 3, and 4 OK
31 System Turns Belt 1 on OK
32 System Detects package at sensor 2 OK
33 System Turns Belt 1 off OK
34 System Ensures sensors 3 and 4 do not detect packages OK
35 System Waits 2 seconds OK
Software Test Plan: Automatic Production Environment Version: 2.0
FA_07_SE_545: ERAU TEAM BLUE Date: 12/11/07
Page 14
36 System Moves scanner to extended (down) position OK
37 System Waits 10 seconds OK
38 System Moves scanner to home (up) position OK
39 System Waits 5 seconds OK
40 System Moves pusher to extended position OK
41 System Detects pusher at extended position OK
42 System Returns pusher to home position OK
43 System Detects package at sensor 3 OK
44 System Ensures sensor 4 does not detect package OK
45 System Turns Belt 2 on OK
46 System Detects package at sensor 4 OK
47 System Turns Belt 2 off OK
48 System System stopped until package is removed from sensor 4 *System will move packages as
far as it can until there's a package
in the way, including scanning
and waiting to push.
Software Test Plan: Automatic Production Environment Version: 2.0
FA_07_SE_545: ERAU TEAM BLUE Date: 12/11/07
Page 15
16.2 Requirements Traceability Matrix
Requirements Traceability Matrix
Name BLUE Date 10/8/2007 Version 3
Project APE Course SE545 Instructor Kornecki
Class/Method/ Process/
Entry# Req # Owner Priority
Use Case #
Use Case Design Section
Test Case
Edit/ Change
1
[SYS_USER1]
Griffis webPage TC 1, 4, 5, 6
2
[SYS_USER1.1]
Griffis webPage TC 1, 4, 5, 6
3
[SYS_USER1.2]
Griffis webPage TC 1, 4, 5, 6
4
[SYS_USER1.3]
Griffis webPage TC 1, 4, 5, 6
5
[SYS_USER1.4]
Griffis webPage TC 1, 4, 5, 6
6
[SYS_USER2]
Griffis webPage TC 1, 4, 5, 6
7 [SYS_USER3]
Griffis webPage TC 2
8 [SYS_USER4]
Griffis webPage TC 3
9 [SYS_USER5]
Griffis webPage TC 3
10 [SYS_CNST1]
Pfeifer Section 1.1 RCC
11 [SYS_CNST2]
Pfeifer Section 1.1 RCC
12 [SYS_CNST3]
Pfeifer Section 1.2 RCC
13 [SYS_CNST4]
Pfeifer Section 2.1 RCC
14 [SYS_CNST5]
Pfeifer Deleted RCC
15
[SYS_CNST6]
Pfeifer PROC1, PROC2, PROC3, PROC4,
PROC5
RCC
16
[SYS_CNST7]
Pfeifer PROC1, PROC2, PROC3, PROC4, PROC5, PROC6
RCC
17 [SYS_CNST8]
Pfeifer Deleted RCC
18 [SYS_CNST9]
Pfeifer Section 1.2 RCC
19 [SYS_CNST10]
Pfeifer Section 1.1 RCC
20 [SYS_CNST11]
Pfeifer Section 1.1 RCC
21 [SYS_CNST12]
Pfeifer Section 1.1 RCC
22 [SYS_STRD1]
Pfeifer Section 1.1 RCC
23 [SYS_STRD2]
Pfeifer Section 1.1 RCC
24 [SYS_STRD3]
Pfeifer Section 1.3 RCC
25
[ASMP1]
Griffis Section 1.1 TC 1, 4, 5, 6
26
[ASMP5]
Griffis Section 1.2 TC 1, 4, 5, 6
27
[ASMP2]
Griffis Section 1.2 TC 1, 4, 5, 6
Software Test Plan: Automatic Production Environment Version: 2.0
FA_07_SE_545: ERAU TEAM BLUE Date: 12/11/07
Page 16
28
[ASMP3]
Griffis Section 1.2 TC 1, 4, 5, 6
29 [ASMP4]
Griffis Section 1.2
30
[SYS_FUNC1]
Pfeifer sensorPoll, autoControl or userControl,
statusManager, webPage,
motorControl
TC 1, 4, 5, 6
31
[SYS_FUNC2]
Pfeifer sensorPoll, autoControl or userControl,
statusManager, webPage,
motorControl
TC 1, 4, 5, 6
32
[SYS_FUNC3]
Pfeifer motorControl TC 1, 4, 5, 6
33
[SYS_FUNC4]
Pfeifer motorControl TC 1, 4, 5, 6
34
[SYS_FUNC5]
Pfeifer sensorPoll, autoControl or userControl,
statusManager, webPage,
motorControl
TC 1, 4, 5, 6
35
[SYS_FUNC6]
Pfeifer sensorPoll, autoControl or userControl,
statusManager, webPage,
motorControl
TC 1, 4, 5, 6
36
[SYS_FUNC7]
Pfeifer sensorPoll, autoControl or userControl,
statusManager, webPage,
motorControl
TC 1, 4, 5, 6
37 [SYS_FUNC8]
Pfeifer statusManager RCC
38 [SYS_FUNC9]
Pfeifer webPage RCC
39
[SYS_FUNC11]
Pfeifer sensorPoll, autoControl or userControl,
statusManager, webPage,
motorControl
TC 1, 4, 5, 6
40 [INT_SYS1]
Griffis webPage RCC
41 [INT_SYS2]
Griffis Section 1.2 RCC
42
[SYS_CNST11]
Pfeifer sensorPoll, autoControl, userControl, motorControl
RCC
42
[SYS_CNST12]
Pfeifer sensorPoll, autoControl, userControl, motorControl
RCC
43 [HW_CNST1]
McGuire
Section 1.2 RCC
44 [HW_CNST2]
McGuire
Deleted deleted
45 [HW_CNST3]
McGuire
Figure 1 RCC
46 [HW_CNST4]
McGuire
Figure 1 RCC
Software Test Plan: Automatic Production Environment Version: 2.0
FA_07_SE_545: ERAU TEAM BLUE Date: 12/11/07
Page 17
47 [HW_NONF1]
McGuire
Section 1.2 RCC
48 [HW_NONF2]
McGuire
Section 1.2 RCC
49 [HW_NONF3]
McGuire
Section 1.2 RCC
50 [HW_NONF4]
McGuire
Figure 1, Section 1.2 RCC
51 [HW_NONF5]
McGuire
Figure 1, Section 1.2 RCC
52 [HW_NONF6]
McGuire
Figure 1, Section 1.2 RCC
53 [HW_NONF7]
McGuire
Figure 1, Section 1.2 RCC
54 [HW_NONF8]
McGuire
Figure 1, Section 1.2 RCC
55 [HW_NONF9]
McGuire
Figure 1, Section 1.2 RCC
56 [HW_NONF10]
McGuire
Figure 1, Section 1.2 RCC
57 [HW_FUNC1]
McGuire
Figure 1, Section 1.2 RCC
58 [HW_FUNC2]
McGuire
Figure 1, Section 1.2 RCC
59 [HW_FUNC3]
McGuire
Figure 1, Section 1.2 RCC
60 [HW_FUNC4]
McGuire
Figure 1, Section 1.2 RCC
61 [HW_FUNC5]
McGuire
Figure 1, Section 1.2 RCC
62 [HW_FUNC6]
McGuire
Figure 1, Section 1.2 RCC
63 [HW_FUNC7]
McGuire
Figure 1, Section 1.2
RCC
64 [HW_FUNC8]
McGuire
Figure 1, Section 1.2
RCC
65 [HW_FUNC9]
McGuire
Figure 1, Section 1.2
RCC
66 [HW_FUNC10]
McGuire
Figure 1, Section 1.2
RCC
67
[INT_USER1]
McGuire
webPage RCC Griffis 10/08/07
68
[INT_USER1.1]
McGuire
webPage RCC Griffis 10/08/07
69
[INT_USER2]
McGuire
webPage TC 2 Griffis 10/08/07
70
[INT_USER2.1]
McGuire
webPage TC 2 Griffis 10/08/07
71 [INT_USER2.1.
1]
McGuire
webPage TC 2 Griffis 10/08/07
72
[INT_USER2.2]
McGuire
Deleted RCC Griffis 10/08/07
73 [INT_USER2.2.
1]
McGuire
webPage RCC Griffis 10/08/07
74 [INT_USER2.2.
2]
McGuire
webPage RCC Griffis 10/08/07
75 [INT_USER2.2.
3]
McGuire
webPage RCC Griffis 10/08/07
Software Test Plan: Automatic Production Environment Version: 2.0
FA_07_SE_545: ERAU TEAM BLUE Date: 12/11/07
Page 18
76 [INT_USER2.2.
4]
McGuire
webPage RCC Griffis 10/08/07
77 [INT_USER2.2.5]
McGuire
webPage RCC Griffis 10/08/07
78 [INT_USER2.2.6]
McGuire
webPage RCC Griffis 10/08/07
79
[INT_USER2.3]
McGuire
webPage RCC Griffis 10/08/07
80
[INT_USER2.4]
McGuire
webPage RCC Griffis 10/08/07
81
[INT_USER2.5]
McGuire
webPage RCC Griffis 10/08/07
82
[INT_USER2.6]
McGuire
webPage RCC Griffis 10/08/07
83
[INT_USER2.7]
McGuire
webPage RCC Griffis 10/08/07
84
[INT_USER2.8]
McGuire
webPage RCC Griffis 10/08/07
85
[INT_USER2.9]
McGuire
webPage RCC Griffis 10/08/07
86 [INT_USER2.10
]
McGuire
webPage RCC Griffis 10/08/07
87
[INT_USER3]
McGuire
webPage TC 3 Griffis 10/08/07
88
[INT_USER3.1]
McGuire
webPage TC 3 Griffis 10/08/07
89
[INT_USER3.2]
McGuire
webPage TC 3 Griffis 10/08/07
90
[INT_USER3.3]
McGuire
webPage RCC Griffis 10/08/07
91
[INT_USER3.4]
McGuire
webPage RCC Griffis 10/08/07
92
[INT_USER3.5]
McGuire
webPage RCC Griffis 10/08/07
93
[INT_USER3.6]
McGuire
webPage RCC Griffis 10/08/07
94
[INT_USER3.7]
McGuire
webPage RCC Griffis 10/08/07
95
[INT_USER3.8]
McGuire
webPage RCC Griffis 10/08/07
96
[INT_USER3.9]
McGuire
webPage RCC Griffis 10/08/07
97 [INT_USER3.10
]
McGuire
webPage RCC Griffis 10/08/07
98 [INT_COMM1]
Griffis Section 1.2 RCC
99 [INT_COMM2]
Griffis Section 1.2 RCC
100 [SW_FUNC1]
Griffis PROC1 RCC
Software Test Plan: Automatic Production Environment Version: 2.0
FA_07_SE_545: ERAU TEAM BLUE Date: 12/11/07
Page 19
101 [SW_FUNC2]
Griffis PROC2 RCC
102 [SW_FUNC2.1]
Griffis PROC2 RCC
103 [SW_FUNC3]
Griffis PROC3 RCC
104 [SW_FUNC4]
Griffis PROC4 RCC
105 [SW_FUNC5]
Griffis PROC5 RCC
106
[SW_FUNC6]
Griffis autoControl, userControl, webPage
TC 3
107 [SW_FUNC6.1]
Griffis autoControl, motorControl
RCC
108 [SW_FUNC6.1.1]
Griffis motorControl RCC
109 [SW_FUNC6.2]
Griffis userControl, motorControl
RCC
110 [SW_FUNC6.2.
1] Griffis motorControl RCC
111 [SW_FUNC6.3]
Griffis autoControl TC 3
112 [SW_FUNC6.4]
Griffis Section 1.2 RCC
113 [SW_PERF1]
Griffis Deleted RCC
114 [SW_PERF2]
Griffis Deleted RCC