5
CANOPY SCREWS (2) FIXTURE POWER CORD CANOPY (STYLE MAY VARY) 1) See Page 4 for installation of Heavy Duty Mounting Yoke* to building structure. 2) Fasten Mounting Cross-Bar Assembly to Heavy Duty Mounting Yoke* with screws provided. 2) Making sure Stainless Steel Cable and power cord are passing through their respective holes in the canopy, lift Fixture up and insert Stainless Steel Cable into Cable Gripper at top of Fixture Body. (See detail at right) 3) At the mounting Cross-Bar Assembly, insert Fixture Power Cord. 4) Make final adjustments to the fixture height and secure the Power Cord with strain relief and secure Stainless Steel Cable at Cable Gripper by tightening Jam Nut. 5) Make all wire connections per local and national codes. (see page 3 for typical wire color scheme) 6) Lift canopy in place and secure with screws provided. 7) If your installation requires the DMX control cable, it must be routed outside the junction box due to the low voltage class of the cable. Instructions - Standard shipment with cord attached to fixture. CEILING MATERIAL 4" X 2-1/8" DEEP OCTAGONAL ELECTRICAL JUNCTION BOX (BY OTHERS) 1/4-20 MOUNTING SCREWS (2) SPECIAL NOTE: INSTRUCTION PACKET HAS MULTIPLE PAGES, READ CAREFULLY AS INSTRUCTIONS MAY DIFFER DEPENDING ON OPTIONS ORDERED Pg 1 - Standard shipment with power cord attached to fixture. Pg 2 - Sail Installation Pg 3 - General Maintenance features - access to internal components. Pg 4 - If mounting hardware is shipped ahead for installation before fixture arrives. Pg 5 - Heavy Duty Mounting Yoke Installation DMX CONTROL CABLE (ONLY FOR FIXTURES WITH RGB LAMPING BUT WITHOUT THE RMB OPTION) MOUNTING CROSS- BAR ASSEMBLY POWER CORD STRAIN RELIEF STAINLESS STEEL SUPPORT CABLE HEAVY DUTY MOUNTING YOKE* TOP OF FIXTURE BODY STAINLESS STEEL CABLE POWER CORD GRIPPER JAM NUT DMX CONTROL CABLE *HEAVY DUTY MOUNTING YOKE ONLY NEEDED IF FIXTURE LENGTH IS GREATER THAN 5FT 1717 West Civic Drive Milwaukee, WI 53209 414-354-6600 Design Modification Rights Reserved © Visa Lighting 2015 INSTALLATION INSTRUCTIONS: CP2074 Fixture family name: Sequence Sail LED 12" Dia Body Description: FIELD INSTALLATION INSTRUCTIONS Cable Hung Fixtures Drawing : 762038XX Page 1 of 5 Rev: B Eng: AJM Date drawn: 7/20/2012 Drawing : 762038XX Rev: B Page 1 of 5 When using electrical equipment, basic safety precautions should always be followed, including the following: 1) Read all instructions carefully before installing and save for future use. Make sure all connections are in accordance with the National Electrical Code and local regulations. 2) To avoid possible electric shock, be sure the power supply is turned off before servicing or installing the fixture. Service should be performed by qualified personnel. 3) These instructions may not cover all details or variations. If additional information is needed, please contact Visa Lighting. !

SPECIAL NOTE: INSTRUCTION PACKET HAS MULTIPLE PAGES, … · 4) Slide Power Cord thru Cord Grip. 5) Leaving enough cord for splices, trim Power Cord if needed. 6) Strip Power Cord

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SPECIAL NOTE: INSTRUCTION PACKET HAS MULTIPLE PAGES, … · 4) Slide Power Cord thru Cord Grip. 5) Leaving enough cord for splices, trim Power Cord if needed. 6) Strip Power Cord

CANOPY SCREWS (2)

FIXTURE POWER CORD

CANOPY (STYLE MAY VARY)

1) See Page 4 for installation of Heavy Duty Mounting Yoke* to building structure.2) Fasten Mounting Cross-Bar Assembly to Heavy Duty Mounting Yoke* with screws provided.2) Making sure Stainless Steel Cable and power cord are passing through their respective holes in the canopy, lift Fixture up and insert Stainless Steel Cable into Cable Gripper at top of Fixture Body. (See detail at right)3) At the mounting Cross-Bar Assembly, insert Fixture Power Cord.4) Make final adjustments to the fixture height and secure the Power Cord with strain relief and secure Stainless Steel Cable at Cable Gripper by tightening Jam Nut.5) Make all wire connections per local and national codes. (see page 3 for typical wire color scheme)6) Lift canopy in place and secure with screws provided.7) If your installation requires the DMX control cable, it must be routed outside the junction box due to the low voltage class of the cable.

Instructions - Standard shipment with cord attached to fixture.

CEILING MATERIAL

4" X 2-1/8" DEEP OCTAGONALELECTRICAL JUNCTIONBOX (BY OTHERS)

1/4-20 MOUNTING SCREWS (2)

SPECIAL NOTE: INSTRUCTION PACKET HAS MULTIPLE PAGES, READ CAREFULLY ASINSTRUCTIONS MAY DIFFER DEPENDING ON OPTIONS ORDERED

Pg 1 - Standard shipment with power cord attached to fixture.Pg 2 - Sail InstallationPg 3 - General Maintenance features - access to internal components.Pg 4 - If mounting hardware is shipped ahead for installation before fixture arrives.Pg 5 - Heavy Duty Mounting Yoke Installation

DMX CONTROL CABLE(ONLY FOR FIXTURES WITHRGB LAMPING BUTWITHOUT THE RMB OPTION)

MOUNTING CROSS-BAR ASSEMBLY

POWER CORDSTRAIN RELIEF

STAINLESS STEELSUPPORT CABLE

HEAVY DUTYMOUNTING YOKE*

TOP OF FIXTURE BODY

STAINLESSSTEEL

CABLEPOWERCORD

GRIPPERJAM NUT

DMXCONTROL

CABLE

*HEAVY DUTY MOUNTING YOKE ONLY NEEDED IF FIXTURE LENGTH IS GREATER THAN 5FT

1717 West Civic Drive Milwaukee, WI 53209414-354-6600

Design Modification Rights Reserved © Visa Lighting 2015

INSTALLATION INSTRUCTIONS: CP2074Fixture family name: Sequence Sail LED 12" Dia Body

Description: FIELD INSTALLATION INSTRUCTIONS Cable Hung Fixtures

Drawing : 762038XX Page 1 of 5Rev: B Eng: AJM Date drawn: 7/20/2012

Draw

ing : 762038XX R

ev: B Page 1 of 5

Whe

n us

ing

elec

trica

l equ

ipm

ent,

basi

c sa

fety

pre

caut

ions

sho

uld

alw

ays

be fo

llow

ed, i

nclu

ding

the

follo

win

g:1)

Rea

d al

l ins

truct

ions

car

eful

ly b

efor

e in

stal

ling

and

save

for f

utur

e us

e. M

ake

sure

all

conn

ectio

ns a

re in

acc

orda

nce

with

the

Nat

iona

l Ele

ctric

al C

ode

and

loca

l reg

ulat

ions

.2)

To

avoi

d po

ssib

le e

lect

ric s

hock

, be

sure

the

pow

er s

uppl

y is

turn

ed o

ff be

fore

ser

vici

ng o

r ins

tallin

g th

e fix

ture

. Se

rvic

e sh

ould

be

perfo

rmed

by

qual

ified

per

sonn

el.

3) T

hese

inst

ruct

ions

may

not

cov

er a

ll de

tails

or v

aria

tions

. If

addi

tiona

l inf

orm

atio

n is

nee

ded,

ple

ase

cont

act V

isa

Ligh

ting.

!

Page 2: SPECIAL NOTE: INSTRUCTION PACKET HAS MULTIPLE PAGES, … · 4) Slide Power Cord thru Cord Grip. 5) Leaving enough cord for splices, trim Power Cord if needed. 6) Strip Power Cord

3.0"

13.0"

512 CADDY CLIP

A

SAIL

DETAIL A

FIGURE 4

TRIM WASHER

GRIPLOCK

1/4-20 STUDS

FIGURE 3

SAIL INSTALLATION

INSTRUCTIONS

FIGURE 1

SUSPENDED

FIGURE 2

1/16 STAINLESS STEEL CABLE

TOGGLE BOLT

DRYWALL

The sail requires two mounting locations next to the junction box as dimensioned in figure 1.1.Suspended ceilings: Install 512 HD Caddy Clip (by others), install mounting kit as shown in figure 2. 2.Drywall ceilings: install mounting kit as shown in figure 3. (keep trimwasher to the ceiling side)With the 1/16" dia cables installed in the sail (figure 4), lift the sail up to the Griplocks and insert cable. 3.Center the position of the sail on the fixture and trim off the excess cable near the ceiling. 4.

1717 West Civic Drive Milwaukee, WI 53209414-354-6600

Design Modification Rights Reserved © Visa Lighting 2015

INSTALLATION INSTRUCTIONS: CP2074Fixture family name: Sequence Sail LED 12" Dia Body

Description: FIELD INSTALLATION INSTRUCTIONS Cable Hung Fixtures

Drawing : 762038XX Page 2 of 5Rev: B Eng: AJM Date drawn: 7/20/2012

Draw

ing : 762038XX R

ev: B Page 2 of 5

Whe

n us

ing

elec

trica

l equ

ipm

ent,

basi

c sa

fety

pre

caut

ions

sho

uld

alw

ays

be fo

llow

ed, i

nclu

ding

the

follo

win

g:1)

Rea

d al

l ins

truct

ions

car

eful

ly b

efor

e in

stal

ling

and

save

for f

utur

e us

e. M

ake

sure

all

conn

ectio

ns a

re in

acc

orda

nce

with

the

Nat

iona

l Ele

ctric

al C

ode

and

loca

l reg

ulat

ions

.2)

To

avoi

d po

ssib

le e

lect

ric s

hock

, be

sure

the

pow

er s

uppl

y is

turn

ed o

ff be

fore

ser

vici

ng o

r ins

tallin

g th

e fix

ture

. Se

rvic

e sh

ould

be

perfo

rmed

by

qual

ified

per

sonn

el.

3) T

hese

inst

ruct

ions

may

not

cov

er a

ll de

tails

or v

aria

tions

. If

addi

tiona

l inf

orm

atio

n is

nee

ded,

ple

ase

cont

act V

isa

Ligh

ting.

!

Page 3: SPECIAL NOTE: INSTRUCTION PACKET HAS MULTIPLE PAGES, … · 4) Slide Power Cord thru Cord Grip. 5) Leaving enough cord for splices, trim Power Cord if needed. 6) Strip Power Cord

THUMBSCREWS

(2)

MAINTENANCE FEATURES

DOWNLIGHT BEZEL(FLAT DISK IF NO DOWNLIGHT)

ACRYLIC TUBE

TUBE HOOK / DMX PORTTo support the Acrylic Tube for maintenancelift the Acrylic Tube to access the Tube Hook.Swing the Tube Hook up and rest the AcrylicTube on the Hook.

DOOR OFWIRE BODY

DOWNLIGHTREFLECTOR

HEX NUTS (4)

PHILLIPSSCREWS

(2)

INSTRUCTIONS TO ACCESS INTERNAL COMPONENTS

1) See Tube Hook detail for supporting Acrylic Tube2) Remove Thumb Screws to remove Downlight Bezel3) Twist Downlight Reflector counter clockwise to remove it4) Remove (4) Hex Nuts to remove Tube Support5) Remove (2) Phillips Screws attaching the door of

wire body and pivot it open

TUBE HOOK

TUBESUPPORT

DMX512 INTERFACECHANNEL SETTINGDIALS (RGB ONLY)

1717 West Civic Drive Milwaukee, WI 53209414-354-6600

Design Modification Rights Reserved © Visa Lighting 2015

INSTALLATION INSTRUCTIONS: CP2074Fixture family name: Sequence Sail LED 12" Dia Body

Description: FIELD INSTALLATION INSTRUCTIONS Cable Hung Fixtures

Drawing : 762038XX Page 3 of 5Rev: B Eng: AJM Date drawn: 7/20/2012

Draw

ing : 762038XX R

ev: B Page 3 of 5

Whe

n us

ing

elec

trica

l equ

ipm

ent,

basi

c sa

fety

pre

caut

ions

sho

uld

alw

ays

be fo

llow

ed, i

nclu

ding

the

follo

win

g:1)

Rea

d al

l ins

truct

ions

car

eful

ly b

efor

e in

stal

ling

and

save

for f

utur

e us

e. M

ake

sure

all

conn

ectio

ns a

re in

acc

orda

nce

with

the

Nat

iona

l Ele

ctric

al C

ode

and

loca

l reg

ulat

ions

.2)

To

avoi

d po

ssib

le e

lect

ric s

hock

, be

sure

the

pow

er s

uppl

y is

turn

ed o

ff be

fore

ser

vici

ng o

r ins

tallin

g th

e fix

ture

. Se

rvic

e sh

ould

be

perfo

rmed

by

qual

ified

per

sonn

el.

3) T

hese

inst

ruct

ions

may

not

cov

er a

ll de

tails

or v

aria

tions

. If

addi

tiona

l inf

orm

atio

n is

nee

ded,

ple

ase

cont

act V

isa

Ligh

ting.

!

Page 4: SPECIAL NOTE: INSTRUCTION PACKET HAS MULTIPLE PAGES, … · 4) Slide Power Cord thru Cord Grip. 5) Leaving enough cord for splices, trim Power Cord if needed. 6) Strip Power Cord

POWERCORD

STAINLESSSTEEL

CABLE

DMX CABLE(RGB ONLY)

GRIPPERJAM NUT

CORDGRIP

WIRE BODYDOOR ASSEMBLY

ELECTRICALCONNECTION

PANEL

PRE-INSTALLED CABLE AND CORDS

Power Cord Connections

GREEN: GROUND LeadWHITE: COMMON Line Voltage LeadBLACK: HOT Line Voltage Lead for White LED Body LightBLACK/WHITE: HOT Line Voltage Lead for Optional DownlightBROWN: HOT Line Voltage Lead for Optional RGB LED Body LightVIOLET: 0-10V DIM for Body LightGREY: 0-10V DIM for Body LightVIOLET/WHITE: 0-10V DIM for DownlightGREY/WHITE: 0-10V DIM for Downlight

INSTRUCTIONS

1) Preparation: Determine the height the Fixture will hang by holding Fixture along side Stainless Steel Cable. Stainless Steel Cable may be inserted into Cable Gripper up to 12", cut excess if needed. The cut end must not have stray-strands, tin the cut end.2) Follow instructions on page 2 to gain access to the interior components.3) Instert the Stainless Steel Cable so Fixture hangs at the intended height. Secure with Gripper Jam Nut.4) Slide Power Cord thru Cord Grip.5) Leaving enough cord for splices, trim Power Cord if needed.6) Strip Power Cord and make appropriate splice connections.7) If your installation requires the DMX Control Cable, it must be routed outside the junction box due to the voltage class of the cable.8) Test, then replace all parts.

1717 West Civic Drive Milwaukee, WI 53209414-354-6600

Design Modification Rights Reserved © Visa Lighting 2015

INSTALLATION INSTRUCTIONS: CP2074Fixture family name: Sequence Sail LED 12" Dia Body

Description: FIELD INSTALLATION INSTRUCTIONS Cable Hung Fixtures

Drawing : 762038XX Page 4 of 5Rev: B Eng: AJM Date drawn: 7/20/2012

Draw

ing : 762038XX R

ev: B Page 4 of 5

Whe

n us

ing

elec

trica

l equ

ipm

ent,

basi

c sa

fety

pre

caut

ions

sho

uld

alw

ays

be fo

llow

ed, i

nclu

ding

the

follo

win

g:1)

Rea

d al

l ins

truct

ions

car

eful

ly b

efor

e in

stal

ling

and

save

for f

utur

e us

e. M

ake

sure

all

conn

ectio

ns a

re in

acc

orda

nce

with

the

Nat

iona

l Ele

ctric

al C

ode

and

loca

l reg

ulat

ions

.2)

To

avoi

d po

ssib

le e

lect

ric s

hock

, be

sure

the

pow

er s

uppl

y is

turn

ed o

ff be

fore

ser

vici

ng o

r ins

tallin

g th

e fix

ture

. Se

rvic

e sh

ould

be

perfo

rmed

by

qual

ified

per

sonn

el.

3) T

hese

inst

ruct

ions

may

not

cov

er a

ll de

tails

or v

aria

tions

. If

addi

tiona

l inf

orm

atio

n is

nee

ded,

ple

ase

cont

act V

isa

Ligh

ting.

!

Page 5: SPECIAL NOTE: INSTRUCTION PACKET HAS MULTIPLE PAGES, … · 4) Slide Power Cord thru Cord Grip. 5) Leaving enough cord for splices, trim Power Cord if needed. 6) Strip Power Cord

Junction box tabsremoved to makeroom for support yoke.

Auxiliary mountinghole to temporarilyfasten yoke to box.Yoke must be independentlysupported from above.

Remove knockoutsto provide access forstructural mounting.

Yoke hascenter holeclearancefor 3/8 bolt

Yoke has (2)tapped holesfor 5/16-18

3/8 bolt (by others)fastensthrough support yoke into B-line channel (or similar structural support) - by others.

Structural channel (by others) securedas necessary to ceiling structureabove for weight required.

EXAMPLE #1

EXAMPLE #2

Attach (2) 5/16-18 support rods(by others) to yoke and secureas necessary to ceiling structureabove for weight required.

Heavy Duty Mounting Yoke Installation(ONLY IF FIXTURE LENGTH IS GREATER THAN 5FT)

1717 West Civic Drive Milwaukee, WI 53209414-354-6600

Design Modification Rights Reserved © Visa Lighting 2015

INSTALLATION INSTRUCTIONS: CP2074Fixture family name: Sequence Sail LED 12" Dia Body

Description: FIELD INSTALLATION INSTRUCTIONS Cable Hung Fixtures

Drawing : 762038XX Page 5 of 5Rev: B Eng: AJM Date drawn: 7/20/2012

Draw

ing : 762038XX R

ev: B Page 5 of 5

Whe

n us

ing

elec

trica

l equ

ipm

ent,

basi

c sa

fety

pre

caut

ions

sho

uld

alw

ays

be fo

llow

ed, i

nclu

ding

the

follo

win

g:1)

Rea

d al

l ins

truct

ions

car

eful

ly b

efor

e in

stal

ling

and

save

for f

utur

e us

e. M

ake

sure

all

conn

ectio

ns a

re in

acc

orda

nce

with

the

Nat

iona

l Ele

ctric

al C

ode

and

loca

l reg

ulat

ions

.2)

To

avoi

d po

ssib

le e

lect

ric s

hock

, be

sure

the

pow

er s

uppl

y is

turn

ed o

ff be

fore

ser

vici

ng o

r ins

tallin

g th

e fix

ture

. Se

rvic

e sh

ould

be

perfo

rmed

by

qual

ified

per

sonn

el.

3) T

hese

inst

ruct

ions

may

not

cov

er a

ll de

tails

or v

aria

tions

. If

addi

tiona

l inf

orm

atio

n is

nee

ded,

ple

ase

cont

act V

isa

Ligh

ting.

!