Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19 th 2014 Jean-Christophe Gayde EN/MEF-SU Guillaume Kautzmann EN/MEF-SU 1 Special Linac WG meeting Assembly of the ISOLDE Cryomodules March 19 th 2014 HIE-ISOLDE Survey and Alignment

Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19 th 2014 Jean-Christophe GaydeEN/MEF-SU Guillaume

Embed Size (px)

Citation preview

Page 1: Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19 th 2014 Jean-Christophe GaydeEN/MEF-SU Guillaume

Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19th 2014

Jean-Christophe Gayde EN/MEF-SUGuillaume Kautzmann EN/MEF-SU

1

Special Linac WG meetingAssembly of the ISOLDE Cryomodules

March 19th 2014

HIE-ISOLDE

Survey and Alignment

Page 2: Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19 th 2014 Jean-Christophe GaydeEN/MEF-SU Guillaume

Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19th 2014 2

Main Survey Tasks for CM Assembly

• Geometrical quality controls

• Assembly follow up and adjustments

• Preparatory work for installation in the tunnel

Page 3: Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19 th 2014 Jean-Christophe GaydeEN/MEF-SU Guillaume

Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19th 2014 3

Survey Infrastructure

Survey socket

• Reference for all survey work in clean room• Installation of the geodetic network (done)• Network measurements• Periodical controls

Page 4: Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19 th 2014 Jean-Christophe GaydeEN/MEF-SU Guillaume

Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19th 2014 4

Geometrical Controls

Operation done outside of the Clean Room

Laser tracker

• Top plate• Helium Tank (Flange positions,…)• Trolley• …

Page 5: Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19 th 2014 Jean-Christophe GaydeEN/MEF-SU Guillaume

Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19th 2014 5

Tooling assembly follow up

• Rails adjustment and control• Gantry Structure adjustment• Gantry Lifting movement control• Trolley movement control• …

Rails

Gantry Structure

Trolley movement control

Lifting movement

control

Page 6: Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19 th 2014 Jean-Christophe GaydeEN/MEF-SU Guillaume

Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19th 2014 6

CM assembly follow up and adjustment

• At each important step of the assembly• Top plate• Helium tank• Frame• Cavities and solenoid adjustment / precise alignment• ….

Page 7: Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19 th 2014 Jean-Christophe GaydeEN/MEF-SU Guillaume

Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19th 2014 7

Preparatory work for installation

• To prepare the positioning and alignment in HIE-ISOLDE area• Fiducialisation of the CM• Iterative process• Check by MATHILDE* System• To be completed by measurements under vacuum and cryogenic

conditions

Etc…Laser tracker in class 10000

Cryomodule suspended on the Gantry

Laser tracker in class 10000 or 100

Cryomodule in class 100 area(still clean or not)

Metrological table equipped with HBCAMs

* Monitoring and Alignment Tracking for Hie-IsoLDE

Page 8: Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19 th 2014 Jean-Christophe GaydeEN/MEF-SU Guillaume

Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19th 2014 8

Resources

• For each in-field task, a team of 2 surveyors needed

• Budget for industrial support planned (SU Contract) for HIE-ISOLDE Survey (LINAC, HEBT, Installation,…)

• Flexibility Minimum of 3 surveyors to be trained to work in Class 100 (To face LS1 priorities, Non-LHC Experiments survey work, …)

• Basic training of clean room technicians to survey Minimization of people in Class 100

• But… End of Marie Curie Fellowship in October 2014

Page 9: Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19 th 2014 Jean-Christophe GaydeEN/MEF-SU Guillaume

Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19th 2014 9

Summary

• Survey work all along the process

• A lot of short tasks (typically 1 or 2 days each)

• Tasks identified and discussed

• Integrated (or being integrated) in the assembly procedures by Lloyd’s team

• Integrated (or being integrated) in the assembly planning

• SU Flexibility needed to follow the assembly step by step

• Co-activity possible but to be discussed case by case

• Time and resource for data analysis and reporting not to be forgotten

• Worrying: End of Marie Curie Fellowship in October 2014 …

Page 10: Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19 th 2014 Jean-Christophe GaydeEN/MEF-SU Guillaume

Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19th 2014 10

Thanks for your attention 

Page 11: Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19 th 2014 Jean-Christophe GaydeEN/MEF-SU Guillaume

Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19th 2014

Procurement Schedule

• Equipment:

• Laser Tracker: Delivered• Laser Tracker tooling: Off the shelves• Adaptor design: On going• Survey Sockets: Installed• HBCAM: Delivered• Metrological tables In Design