2010 COMMON PURPOSE FACILITIES CAPEX SCOPE OF WORKS PROJECT: Rehabilitate Ipo domestic electric supply system & Rehabilitate electric supply system at Bicti BUDGETARY ESTIMATE: PhP 000,000.00 DESCRIPTION: The work includes Supply and Installation of lighting post at Ipo Dam Compound and Installation of new electrical post at Bicti De- silting Basin. OBJECTIVES: 1. Repair and Rehabilitation of existing dam facilities. 2. The existing lighting fixtures of the dam was too old and needed for replacement. 3. The street light will be use for security purposes. SCOPE: A) REHABILITATE IPO DOMESTIC ELECTRIC SUPPLY SYSTEM 1. Installation of 24 new street light post in the Ipo Dam compound area. (with common switch) Galvanized Steel Pole, Luminaire with 150Watts HPS lamp IES Type (see attached details) 2. Replace set assembly dilapidated light bulb and rewiring at Dam proper - 16 electric/street post unit (with common switch) Mercury Reflector with glass bowl 250 Watts with mercury lamp high power factor ballast 220 V 60 Hz (based from existing) 3. Installation of 2 spot/flood lights on both ends of dam’s gate. 1000W High Pressure Sodium Lamp GE P1000 C Powerflood Flood light

SOW Electric System

Embed Size (px)

Citation preview

Page 1: SOW Electric System

2010 COMMON PURPOSE FACILITIES CAPEXSCOPE OF WORKS

PROJECT: Rehabilitate Ipo domestic electric supply system & Rehabilitate electric supply system at Bicti

BUDGETARY ESTIMATE: PhP 000,000.00

DESCRIPTION: The work includes Supply and Installation of lighting post at Ipo Dam Compound and Installation of new electrical post at Bicti De-silting Basin.

OBJECTIVES:1. Repair and Rehabilitation of existing dam facilities.2. The existing lighting fixtures of the dam was too old and needed for replacement.3. The street light will be use for security purposes.

SCOPE:

A) REHABILITATE IPO DOMESTIC ELECTRIC SUPPLY SYSTEM

1. Installation of 24 new street light post in the Ipo Dam compound area. (with common switch)

Galvanized Steel Pole, Luminaire with 150Watts HPS lamp IES Type (see attached details)

2. Replace set assembly dilapidated light bulb and rewiring at Dam proper - 16 electric/street post unit (with common switch)

Mercury Reflector with glass bowl 250 Watts with mercury lamp high power factor ballast 220 V 60 Hz (based from existing)

3. Installation of 2 spot/flood lights on both ends of dam’s gate. 1000W High Pressure Sodium Lamp GE P1000 C Powerflood Flood light

B) REHABILITATE ELECTRIC SUPPLY SYSTEM AT BICTI

1. Installation of six (6) new electrical concrete post in Bicti compound area Complete with electrical line wire With street lights (150Watts HPS lamp IES Type with common switch)