    SA-2 (Rev.1)

    The scope of work comprises the following:-

    230kV New Substation and Extension/Renovation of Existing 132kV Substation at

    Fenchuganj:

    SECTION-I: NEW 230KV SUBSTATION

    245 kV Outdoor Switchgear for 1 Breaker System

    245kV outdoor switchgear comprising four (4) diameters of 1 circuit breaker system with two

    2000A three phase busbars. Two (2) diameters (all fully equipped) for the connection of two (2)

    230kV overhead line circuits to Comilla (North), one 235/132/33kV auto-transformer circuit bay

    and one 235/132/33kV auto-transformer circuit bay for future provision with necessary 245kV

    switchgear and materials.

    235/133/33 kV Auto-transformers

    One set of 225/300(ONAN/ONAF) MVA, 235/132/33kV, three phase auto-transformer. The three

    phase transformer unit shall be equipped with winding of tertiary delta at 33kV, the connectionsbetween the tertiary delta winding and associated earthing/auxiliary transformers by means of

    33kV arrangement.

    33/0.4 kV Earthing/Auxiliary Transformers

    The delta connected tertiary windings of each 3-phase auto-transformers shall supply a 33/0.4 kV,

    auxiliary Zig-Zag transformer (one set in total) for the purpose of supplying the substation

    400/230V auxiliary power requirements.

    Control and Protection for 230kV System

    Control, protection equipment and substation automation system (SAS) for one 235/132/33kV

    auto-transformers feeder bays, two overhead line bays and one future auto-transformer bay.

    Tariff metering for 230kV System

    Tariff metering panel for one 235/132/33kV auto-transformers feeder bay and two (2) overhead

    line bays.

    Civil Works for new 230kV substation

    Complete foundations necessary for the above 230kV equipment and gantries.

    Complete 230kV switchyard areas including cable ducts, internal service roads, surface treatment,

    drainage, site finishing works, boundary fence, guardhouse and outdoor lighting system. Included

    are the 235/132/33 kV auto transformer and 33 kV earthing compounds, 245 kV switchgear area,

    and new two storied control building with cable basement. The building will include control and

    relay room, Communication room, battery room, office/records room, toilet, pantry, interior

    lighting, ventilation, air-conditioning, lightning protection and deep tube well for supplying

    drinking water.

  • 8/6/2019 SOW & Addendum 1 VOl3OF3 Attachment Corr

    2/13

    SA-14 (Rev.1)

    SECTION-II: EXTENSION AND RENOVATION OF EXISTING 132 KV

    SUBSTATION AT FENCHUGANJ

    The equipment to be supplied, installed and commissioned is shown on Bid Drawings :-

    Item Description

    2B 145 kV Switchgear, equipment connection and steel structures

    The 145 kV switchgear shall comply with the particular requirements as

    detailed in the Schedule of Technical Requirements included as Appendix A1

    to this section and shall comprise the following:-

    2B1 One (1) set of 145 kV, 2000A, 31.5kA, 50Hz, 650kVp BIL, live tank type,

    gang operated, SF6 gas circuit breakers with spring-stored energy operating

    mechanism.

    2B2 Seven (7) sets of 145 kV, 1600A (for transformer bay) & 1250A (for linebays), 31.5kA, 50Hz, 650kVp BIL, live tank type, single-pole operation, SF6

    gas circuit breakers with spring-stored energy operating mechanism.

    2B3 Nine (9) sets of 145kV, 1600A, 31.5kA, 50Hz, 650 BIL, single throw double

    air break, center rotating post type, motor operated normal disconnectors with

    motor-operated earthing switches.

    2B4 Nine (9) sets of 145kV, 1600A, 31.5kA, 50Hz, 650 BIL, single throw double

    air break, center rotating post type, motor operated normal disconnectors with

    out earthing switches.

    2B5 Nine (9) sets of 145kV, 1600A, 31.5kA, 50Hz, 650 BIL, single throw double

    air break, center rotating post type, motor operated tandem(series) type

    disconnectors with out earthing switches.

    2B6 Two (2) sets of 145kV, 2000A, 31.5kA, 50Hz, 650 BIL, single throw double air

    break, center rotating post type, motor operated normal type disconnectors for

    bus-coupler bay

    2B7 Twenty one (21) nos. of single-phase, 4-core, multi ratio, 145kV, 50Hz, 650

    BIL post type current transformer.

    2B8 Six (6) nos. of single-phase, 4-core, multi ratio, 145kV, 50Hz, 650 BIL post

    type current transformer for bus-coupler bay.

    2B9 Fifteen (15) nos. of single-phase, 145kV, 2-core, 50Hz, 650 BIL, inductive

    type voltage transformers for line bay & busbar.

    2B10 Twelve (12) nos. of single-phase, 145kV, 2-core, 50Hz, 650 BIL, capacitor

    type voltage transformers.

  • 8/6/2019 SOW & Addendum 1 VOl3OF3 Attachment Corr

    3/13

    SCHEDULE A

    SA-15 (Rev.1)

    2B11 Twenty seven (27) nos. of 120kV continuous operating voltage, 10kA nominal

    discharge current, 50Hz, station class, gapless metal oxide type, single phase

    surge arresters.

    2B12 One (1) lot of busbar conductors (2 x 795MCM TACSR), jack bus and jumper

    conductors (2 x ACSR Mallard) as required for connection of 145kV

    switchgear in the technical specifications and bid drawings.

    2B13 One (1) lot of insulators and fittings including all necessary clamps and

    connectors required to complete 145kV switchgear extension and renovation

    as specified in the technical specifications and bid drawings.

    2B14 One (1) lot of gantry steel structures and equipment supports required to

    complete 145kV switchgear extension and renovation as specified in the

    technical specifications and bid drawings.

    2B15 Sixteen (16) nos of 145kV post type support insulators.

    2B16 Shifting of two (2) sets (each set per circuit) of existing switchgears, circuit

    breaker & power transformer (132/33kV) with equipment support and.

    Included are all necessary associated reconnection works.

    2B17 Shifting of four (4) sets (each set per circuit) overhead slack span for existing

    four overhead line circuits. Included are all necessary associated reconnection

    works.

    2F Control, Protection, Substation Automation and Metering

    Protection and metering panels for all new 132kV bays are to be installed in

    the existing control building. The interface panels to adapt Substationautomation system (SAS) for connection of existing and new feeders shall also

    be installed in the old control room building.

    The sequence of the control panels and protection panels shall mirror the

    actual switchyard layout.

    132 kV Circuits

    The equipment to be supplied, installed and commissioned is shown on Bid

    Drawings comprising the following.

    2F1 Control, protection and SAS for two (2) sets of 132kV new overhead Linecircuits to Fenchuganj Power Station Substation.

    2F2 Adopting new SAS for existing four overhead line bays.

    2F3 Control, protection and SAS for one (1) set of 235/132/33kV AutoTransformer

    circuit and associated Earthing/Auxiliary Transformer circuits. Out of two

    235/132kV AutoTransformer circuit bay, one shall be kept as future provision.

    2F4 Control, protection, SAS for one (1) set of Bus coupler circuit bay.

  • 8/6/2019 SOW & Addendum 1 VOl3OF3 Attachment Corr

    4/13

    SA-16 (Rev.1)

    2F5 Adopting new SAS for existing two 132/33kV transformer bays in one (1) lot.

    2F6 Busbar protection panels for Complete switchyard.

    2F7 Tariff Metering panel in one (1) lot to accommodate programmable &

    recordable digital 3-phase, 4-wire import and export MWh and MVarh meters

    (accuracy class 0.2) for each existing and new 132kV line and transformerfeeder. For each feeder minimum two(2) meters(main-1 & main-2) are to be

    provided.

    2F8 Communication interface marshalling cubicle in one (1) lot as specified in

    Section-10, Volume 2 of 3 for establishment of SCADA system for NLDC

    through multiplexer equipment.

    2G Overhead Connection between 132kV side of the 235/132kV Power

    Transformer in new 230kV Substation to Existing 132kV Substation

    132 kV Circuit

    2G1 Connection of the 132kV side of the 235/132kV Autotransformer in the new

    230kV substation to the existing 132kV switchyard by overhead conductor.

    All necessary gantry structure, conductors, insulators, fittings etc. are

    requested to be supplied and installed under this scope.

    2H Multicore Low Volateg Power and Control Cables

    One (1) lot complete set of multicore low voltage auxiliary power and control

    cables between all items of equipment supplied under the Contract shall be

    supplied, installed with necessary gland, terminated, and identified by colours

    & tags. The overall substation cable routing and core schedules shall also beprovided.

    2I Earthing and Lightning Protectionn

    2I.1 One(1) lot complete design, supply and installation required for Extension and

    renovation of existing earthing system and lightning protection screen

    including conductors, connections, connectors and clamps to suit the

    substation overall arrangement and provide supporting design calculations.

    2J Batteries, Chargers and DC Distribution

    2J1 Replacement of existing two(2) sets 110V alkaline batteries and chargers bynew two(2) sets 110V Ni-Cad batteries complete with chargers.

    The system shall generally be as shown in Bid Drawings and shall include the

    following.

    (a) Two(2) sets 100% Ni-cad batteries complete, each capacity shall not be

    less than 400 Ah at the 5-hour rate of discharge.

    (b) Two(2) sets battery chargers complete, each float charge shall not be

    less than 75A rating.

  • 8/6/2019 SOW & Addendum 1 VOl3OF3 Attachment Corr

    5/13

    SCHEDULE A

    SA-17 (Rev.1)

    2K LV AC Distribution

    2K1 Deleted

    2L Civil Works and Foundations

    132kV Substation

    2L1 One(1) lot complete design, supply and construction of all civil items required

    for the extension and renovation of existing 132kV switchyard outdoor works,

    including switchyard foundations, internal service roads, cable trenches,

    surfacing, drainage, boundary fence.

    2N Switchyard Lighting

    One(1) lot complete design and calculations, supply, installation and

    commissioning of equipment to provide lighting (sodium light) for security,

    roadway and switchyard and emergency DC lighting at strategic locations forequipment operations and inspections.

    2P Fibre Optic Multiplexer Equipment for Teleprotection and

    Communication

    2P1 Fibre Optic Multiplexer Equipment

    Extensions of existing AREVA, France make DIP5000 type teleprotection

    equipment and MSE 5010 type Fiber Optic Multiplexer Equipment equipment

    2P2 One(1) lot of optical fibre (24 cores) cables from terminal box at 132kV gantry

    structure to MDF (Main distribution Frame) to be installed in communicationroom. The Contract includes supply and installation of MDF and pigtail cables

    with adequate length.

    2P3 Shifting, re-installation, re-testing and re-commissioning of existing wave trap,

    line matching unit (LMU), PLC equipment, cable etc required for existing

    four(4) nos. overhead line circuits.

  • 8/6/2019 SOW & Addendum 1 VOl3OF3 Attachment Corr

    6/13

    SA-20 (Rev.1)

    3J1 220V DC sources are available at the existing substation. Necessary MCBs

    are required to be installed under the contract for the new line bays.

    3J2 48V DC sources are available at the existing substation. Necessary MCBs are

    required to be installed under the contract for the new line bays.

    3K LV AC Distribution

    3K1 LV AC are available in the AC Distribution board. Necessary MCBs are

    required to be installed under the contract for the new line bays.

    3L Civil Works, Control Building and Foundations

    230kV Substation

    3L1 One (1) lot complete design, supply and construction of all civil items required

    for the outdoor works, including switchyard foundations, access roads, internal

    service roads, cable trenches, concrete culvert, surfacing, drainage etc..

    3L2 Dismantling of approximately 70m boundary wall and re-construction of the

    above boundary wall in the property line..

    3N Switchyard Lighting

    One (1) lot complete design and calculations, supply, installation and

    commissioning of equipment to provide lighting for switchyard and

    emergency DC lighting at strategic locations for equipment operations and

    inspections for the new line bays.

    3P Fibre Optic Multiplexer Equipment for Teleprotection and

    Communication

    3P1 Fibre Optic Multiplexer Equipment

    Extensions of existing Fiber Optic Multiplexer Equipment to accommodate

    two nos. overhead lines.

  • 8/6/2019 SOW & Addendum 1 VOl3OF3 Attachment Corr

    7/13

    SA-26 (Rev.1)

    Sl. No. Description Unit Requirement

    16 Whether automatic control

    required and referenced voltage

    Yes, 110V,

    50Hz

    17 Whether separate remote control

    panel required Yes

    18 Estimated distance between remote control point and

    transformer m See drawings

    19 DC supply:

    Nominal

    Maximum float voltage,

    V

    V

    110

    125

    20 Whether provision for supervisory control required,

    including AVR setting

    Yes

    21 Whether marshalling kiosk

    required

    Tankside

    Cubicle

    22 Number of transformers for which automatic control

    is to be suitable

    2 (and

    provision for

    future 3rd)

    23 TERMINATIONS

    Bushing insulators or cable boxes

    on line and neutral terminals:

    i) HV line

    ii) Neutral

    iii) LV line

    iv) Tertiary winding

    Bushings

    Bushings

    Bushings

    Bushings

    24 BCT PARTICULARS

    i) HV (235kV) Side:Core 1 & Core 2:

    1600-800-

    400/1A, 30VA,

    5P20.

    Core 3: Ratio, burden

    and accuracy

    class shall be

    matched with

    WTI meter.

    ii) LV (132kV) Side:Core 1, Core 2 :

    2000-1000-

    500/1A, 30VA,

    5P20.

    Core 3: For WTI

    Core 4: For tap changer

    iii)Tertiary , Core 1 & 2 800/1A, 30VA,5P20

  • 8/6/2019 SOW & Addendum 1 VOl3OF3 Attachment Corr

    8/13

    SCHEDULE A

    SA-27 (Rev.1)

    Sl. No. Description Unit Requirement

    iv)Neutral Core 1: 2000-1000-500/1A, 30VA,

    5P20

    25 Accommodation on tank for

    outdoor weatherproof HVneutral current transformers Yes

    26 Pollution category of outdoor

    bushing insulators

    25 mm/kV

    of system rated

    (highest)

    voltage

    27 COOLING

    Number of cooler banks required

    per transformer

    To suit

    transformer

    design28 Rating of each cooler bank as

    percentage of total loss at CMR % % 50

    29 Standby cooling requirement One fan in each

    group

    30

    GENERAL

    Type of oil preservation system Air Cell

    31 Maximum acceptable noise level 78 dBA

  • 8/6/2019 SOW & Addendum 1 VOl3OF3 Attachment Corr

    9/13

    Schedule B: Bid prices SB-30 (Rev.1)

    CONTRACT NO. PGCB/FEN/SS/01

    SCHEDULE B7

    FOR GOODS AND SERVICES SUPPLIED FROM OUTSIDE EMPLOYERS CO

    7.1 BREAKDOWN OF COSTS FOR CIVIL WORKS

    New 230kV Substation and Extension

    of 132kV Substation at Fenchuganj

    and o 230 kV Substation at Comilla(N)

    Foreign Currency (F/C) Price

    Sl.No.

    Description of Works Unit PriceFOB

    TotalPrice FOB

    Insurance Freight TotalPrice CIP

    Erection Total F/CCost

    Localtranspo

    handling

    1 Outdoor Foundations

    2 Transformer Bases

    3 Control Building:-

    3.1 Foundations

    3.2 Piling

    3.3 Superstructure

    3.4 Brickwork

    3.5 Flooring/Roofing

    3.6 Doors Windows etc.

    3.7 Services and Finishes

    4 Cable Trenches

    5 Boundary Walls & Gates

    6 Surfacing and Drains

    7 Septic Tank and Water Supply

    8 Guard House

    9 Access Road

    Sub Total Price carried forward

    Sub Total Price in words.........................................................................................................................................

  • 8/6/2019 SOW & Addendum 1 VOl3OF3 Attachment Corr

    10/13

    Schedule B: Bid prices SB-31 (Rev.1)

    CONTRACT NO. PGCB/FEN/SS/01

    SCHEDULE B7

    FOR GOODS AND SERVICES SUPPLIED WITHIN EMPLOYERS COUNT

    7.1 BREAKDOWN OF COSTS FOR CIVIL WORKS

    New 230kV Substation and Extension

    of 132kV Substation at Fenchuganj

    and o 230 kV Substation at Comilla

    (N)

    Local Currency (L/C) Price

    Bangladesh Taka :

    Item Description of Works Unit Price

    EXW

    Total Price

    EXW

    transport &

    handling

    Erection Insurance Total price

    1 Outdoor Foundations

    2 Transformer Bases

    3 Control Building:-

    3.1 Foundations

    3.2 Piling

    3.3 Superstructure

    3.4 Brickwork

    3.5 Flooring/Roofing

    3.6 Doors Windows etc.

    3.7 Services and Finishes

    4 Cable Trenches

    5 Boundary Walls & Gates

    6 Surfacing and Drains

    7 Septic Tank and Water Supply

    8 Guard House

    9 Access Road

    Sub Total Price carried forward

    Sub Total Price in words.........................................................................................................................................

  • 8/6/2019 SOW & Addendum 1 VOl3OF3 Attachment Corr

    11/13

    SA-40 (Rev.1)

    APPENDIX A9

    SCHEDULE OF TECHNICAL REQUIREMENTS

    CONDUCTORS AND INSULATORS

    No. Descriptions Unit Requirement

    1. Busbar conductor for 245kV SwitchgearConductor Type TACSR

    Designation 795MCM (Mallardequivalent)

    Number of Conductor per phase 2

    Number and Diameter of strands:

    Al.

    St.

    Nos. x mm

    Nos. x mm

    -

    Overall diameter mm -

    Weight kg/m -

    Guaranteed ultimate tensile strength kN -DC resistance at 20

    oC Ohm/km -

    2. Jack Bus & Jumper conductor for 245kVSwitchgear

    Conductor Type ACSR

    Designation Mallard

    Number of Conductor per phase 2

    Number and Diameter of strands:

    Al.

    St.

    Nos. x mm

    Nos. x mm

    30/4.135

    19/2.482

    Overall diameter mm 28.95

    Weight kg/m 1.839

    Guaranteed ultimate tensile strength kN 170

    DC resistance at 20oC Ohm/km 0.07186

    3. Slack span, Jackbus & jumper conductorreplacement for 132kV Switchgear

    Conductor Type ACSR

    Designation Mallard

    Number of Conductor per phase 2

    Number and Diameter of strands:

    Al.

    St.

    Nos. x mm

    Nos. x mm

    30/4.135

    19/2.482

    Overall diameter mm 28.95

    Weight kg/m 1.839

    Guaranteed ultimate tensile strength kN 170

    DC resistance at 20oC Ohm/km 0.07186

  • 8/6/2019 SOW & Addendum 1 VOl3OF3 Attachment Corr

    12/13

    Technical particulars & Guarantees SE-50

    Sl.

    No.Description Unit Bidders Data

    Separate Bay controller unit provided for each bay & feeder

    Type of bay controller offered HV/MV

    Select Before Operate with Open Execute & Close Execute

    Single bit dependence

    Interlocking, bay & Station wide

    Synchrocheck function:

    - Maximum Voltage difference

    - Maximum Frequency difference

    - Maximum Phase difference

    Double command blocking

    Independent settable parameter groups

    Local Display Unit

    Sequence of event recorder:

    - Events

    - Time resolution

    Disturbance recorder function

    Comprehensive self-supervision

    Battery free backup of events and disturbance records

    Insulation tests

    Fast disturbance tests

    MTBF

    MTTR

    Temperature range: IEDs- Operation

    - Transport and storage

    Relative humidity:

    - Operating max./min.

    - Transport and storage

    %

    %

    Back up control mimic -HV

    Manufacturer

    Name and type of product in suppliers catalogue

    Origin of manufacturer

    Control functionality:

    Control of breaker as well as all isolators/earthing switch

    (Control functionality should not be affected if bay controller fails)

    Key-Locked

    Interlock override function

    12

    Separate backup control mimic provided for each bay & feeder

    13 Bay Control Unit - MV

  • 8/6/2019 SOW & Addendum 1 VOl3OF3 Attachment Corr

    13/13

    Schedule I: Drawings

    SI-2

    (c) Short circuit test (special test) / Calculation.(ii) Circuit Breaker

    (a)Lightning impulse voltage withstand dry test.(b)Power frequency voltage withstand dry test.(c)Out of phase switching test.(d)Short time withstand current test.

    (iii) Disconnector(a)Lightning Impulse voltage withstand dry test.(b)Power frequency voltage withstand dry test.(c)Short time withstand current test.

    (iv) Current Transformer(a)

    Short time current test.(b)Impulse voltages withstand tests for current transformers for service inexposed installation.

    (c)Power frequency voltage withstand test.(d)Temperature rise test.

    (v) Voltage Transformer(a)Temperature rise test.(b)Impulse voltages withstand tests for voltage transformers for service in

    exposed installation.

    (c)Short circuit test(d)Short time over voltage test

    (vi) Lightning arrester(a)Power frequency voltage withstand and lightning impulse voltage withstand

    tests on complete arrester housing.

    (b)Operating duty test.(c)Long duration current impulse withstand test.(d)Residual voltage test.(e)Pressure relief test.(f) Artificial pollution test.

    (vii) Power Cable(a) Bending test followed by partial discharge test(b) Tan Delta measurement(c) Heating cycle voltage test(d) Impulse withstand test