POWER FEED AND PRIMARY SWITCHGEAR UPGRADES (SEP 032) CIVIC DESIGN REVIEW - PHASE 2 - JUNE 19, 2017 SOUTHEAST WATER POLLUTION CONTROL PLANT

SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

POWER FEED AND PRIMARY SWITCHGEAR UPGRADES (SEP 032)CIVIC DESIGN REVIEW - PHASE 2 - JUNE 19, 2017

SOUTHEAST WATER POLLUTION CONTROL PLANT

Page 2: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 2

Existing Site Plan

SODIUM HYPOCHLORITE TANKS

SECONDARY SEDIMENTATION TANKS

SECONDARY SLUDGE CONTROL BUILDING

SEDIMENTATION BUILDING

AERATION TANKS

PRETREATMENT FACILITY

EVA

NS

AVEN

UE

SECURITY WALL

O 16’ 32’ 64’

ACCESS ROAD

PROJECT SITE: SEP 032

SUBSTATIONAREA

n

Page 3: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 3

SEP 032 - Existing Conditions

Page 4: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 4

Southeast Plant - Surrounding Buildings

Page 5: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 5

Project Site

1,000250 500

PHELPS ST.JERROLD

AVE.

EVAN

S AVE.

3RD ST.

CALTRAIN

PROJECT LOCATION

PROCESS BUILDINGS

PROJECT SITE

PUBLIC TOUR ROUTE

SEP CAMPUS PERIMETER

1,000250 500

PHELPS ST.JERROLD

AVE.

EVAN

S AVE.

3RD ST.

CALTRAIN

n

PROPOSED QUAD

Page 6: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 6

Quint Lane Green Spine

ENERGY RECOVERY

M1

HEADWORKS

(PRE-TREATMENT FACILITY)

M2

032

SLUDGE CONTROL

ENTRY COURT

BLDG 600BIOSOLIDS

AERATION TANKS

SEDIMENTATION TANKS

SEDIMENTATION BLDGS

SEDIMENTATION BLDGS

Page 7: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 7

Site PlanO 15’ 30’ 60’

SODIUM HYPOCHLORITE

TANKS

SECONDARY SEDIMENTATION TANKS

SECONDARY SLUDGE CONTROL BUILDING

SEDIMENTATION BUILDING

PRETREATMENT FACILITY

EVA

NS

AVEN

UE

SECURITY WALL

ACCESS ROAD

SEP 032

n

Page 8: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 8

Planting Plan

MOCK ORANGE

LEGEND

BLUE SAGE

STAR JASMINE

UPRIGHT ENGLISH OAK

PROPOSED STAIR LOCATION

Building Design & Construction

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 7

First Floor Plan

A

A

MECHANICALROOM

SODIUM HYPOCHLORITE TANKS

O 4’ 8’ 16’

N

N

BATTERYROOM

SUBSTATION AREA

B B

SEE LANDSCAPE PLAN

Page 9: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 9

Planting Palette

Building Design & Construction

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 1 | 11.14.2016 | Page 7

Second Floor Plan

AA

B

B

MECHANICALROOM

SWITCHGEARROOM

BATTERYROOM

SUBSTATION AREA

SODIUM HYPOCHLORITE TANKS

O 5’ 10’ 20’ First Floor Plan

UP

DN

DN

DN UP

SCENTED

LONDON PLANE TREEPLATANUS X ACERFOLIA ‘YARWOOD’

UPRIGHT ENGLISH OAKQUERCUS ROBUR ‘FASTIGIATA’

ITALIAN POPLARPOPULUS NIGRA ‘ITALICA’40-50 FT 30-40 FT 30-40 FT

MOCK ORANGEPHILADELPHUS LEWISII

STAR JASMINETRACHELOSPERMUM JASMINOIDES

1-2 FTSPRING THRU SUMMER

5-10 FT

LATE SPRING THRU MIDSUMMER

BLUE SAGESALVIA CLEVELANDII ‘WINNIFRED GILMAN’3-4 FT

LATE SPRING THRU SUMMER

QU

INT L

AN

E S

TR

EE

T T

RE

ES

CE

NT

ED

EXIST ING STREET TREE PALETTE

Page 10: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 10

First Floor Plan

A

A

MECHANICALROOM

SODIUM HYPOCHLORITE TANKS

O 4’ 8’ 16’

n

n

BATTERYROOM

SUBSTATION AREA

B B

SEE LANDSCAPE PLAN

Page 11: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 11

Second Floor Plan

SWITCHGEARROOM

O 4’ 8’ 16’n n

Page 12: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 12

SECTION A-ASECTION B-B

Building Sections

MECHANICALROOM

SWITCHGEARROOM

MECHANICALROOM

SWITCHGEARROOM

BATTERYROOM

FIRST FLOOR0’-0”

SECOND FLOOR15’-6”

ROOF31’-6”

O 4’ 8’ 16’

Page 13: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 13

Imagery

Page 14: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 14

Birdseye View

Page 15: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 15

View from Southeast

Building Design & Construction

SEP 032 - Powerfeed and Primary Switchgear Upgrades

CDR Phase 1 Draft| XX.XX.2016 | Page 4

View 2

Previous Design(Phase 1 Nov 2016)

Page 16: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 16

View from Northeast

Building Design & Construction

SEP 032 - Powerfeed and Primary Switchgear Upgrades

CDR Phase 1 Draft| XX.XX.2016 | Page 3

View 1

Previous Design(Phase 1 Nov 2016)

Page 17: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 17

View from Northwest - Stair Enclosure Opt 1

Building Design & Construction

SEP 032 - Powerfeed and Primary Switchgear Upgrades

CDR Phase 1 Draft| XX.XX.2016 | Page 5

View 3

Previous Design(Phase 1 Nov 2016)

Page 18: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 18

View from Northwest - Stair Enclosure Opt 2

Building Design & Construction

SEP 032 - Powerfeed and Primary Switchgear Upgrades

CDR Phase 1 Draft| XX.XX.2016 | Page 5

View 3

Previous Design(Phase 1 Nov 2016)

Page 19: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 19

Exterior Elevations - Stair Enclosure Opt 1

EAST ELEVATION

O 4’ 8’ 16’

FIRST FLOOR0’-0”

SECOND FLOOR15’-6”

ROOF31’-6”

SOUTH ELEVATIONWEST ELEVATION

NORTH ELEVATION

Page 20: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 20

Exterior Elevations - Stair Enclosure Opt 2

EAST ELEVATION

O 4’ 8’ 16’

FIRST FLOOR0’-0”

SECOND FLOOR15’-6”

ROOF31’-6”

SOUTH ELEVATIONWEST ELEVATION

NORTH ELEVATION

Page 21: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 21

Utilities DiagramO 4’ 8’ 16’

n

n

BUILDING FOOTPRINT

DUCT BANK ROUTES

SETTLEMENT BOXES

DUCT BANKS

STAIR OUTLINE

Page 22: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 22

Material Palette

CONCRETEMETAL 2THE GARLAND COMPANY, INC. PEWTER

(DOORS, LOUVERS, STAIR, RAILING)

CHANNEL GLASSBENDHEIM 504 ROUGH CAST

METAL 1UNITED ZINC ONYX BLACK

(STAIR ENCLOSURE)

METAL 3THE GARLAND COMPANY, INC. TERRA COTTA CRDIMENSIONAL METAL SIGNAGE

SEE CAMPUS GRAPHICS PACKAGE

LIGHT FIXTURE 1UNA UA

Page 23: SOUTHEAST WATER POLLUTION CONTROL PLANT POWER FEED … · SEP CAMPUS PERIMETER 250 500 1,000 PHELPS ST. JERROLD AVE. EVANS AVE.. TRAIN n PROPOSED QUAD. SEP Power Feed and Primary

SEP Power Feed and Primary Switchgear Upgrades

Civic Design Review - Phase 2 | 06.19.2017| Page 23

SEP Design Elements