Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
POWER FEED AND PRIMARY SWITCHGEAR UPGRADES (SEP 032)CIVIC DESIGN REVIEW - PHASE 2 - JUNE 19, 2017
SOUTHEAST WATER POLLUTION CONTROL PLANT
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 2
Existing Site Plan
SODIUM HYPOCHLORITE TANKS
SECONDARY SEDIMENTATION TANKS
SECONDARY SLUDGE CONTROL BUILDING
SEDIMENTATION BUILDING
AERATION TANKS
PRETREATMENT FACILITY
EVA
NS
AVEN
UE
SECURITY WALL
O 16’ 32’ 64’
ACCESS ROAD
PROJECT SITE: SEP 032
SUBSTATIONAREA
n
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 3
SEP 032 - Existing Conditions
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 4
Southeast Plant - Surrounding Buildings
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 5
Project Site
1,000250 500
PHELPS ST.JERROLD
AVE.
EVAN
S AVE.
3RD ST.
CALTRAIN
PROJECT LOCATION
PROCESS BUILDINGS
PROJECT SITE
PUBLIC TOUR ROUTE
SEP CAMPUS PERIMETER
1,000250 500
PHELPS ST.JERROLD
AVE.
EVAN
S AVE.
3RD ST.
CALTRAIN
n
PROPOSED QUAD
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 6
Quint Lane Green Spine
ENERGY RECOVERY
M1
HEADWORKS
(PRE-TREATMENT FACILITY)
M2
032
SLUDGE CONTROL
ENTRY COURT
BLDG 600BIOSOLIDS
AERATION TANKS
SEDIMENTATION TANKS
SEDIMENTATION BLDGS
SEDIMENTATION BLDGS
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 7
Site PlanO 15’ 30’ 60’
SODIUM HYPOCHLORITE
TANKS
SECONDARY SEDIMENTATION TANKS
SECONDARY SLUDGE CONTROL BUILDING
SEDIMENTATION BUILDING
PRETREATMENT FACILITY
EVA
NS
AVEN
UE
SECURITY WALL
ACCESS ROAD
SEP 032
n
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 8
Planting Plan
MOCK ORANGE
LEGEND
BLUE SAGE
STAR JASMINE
UPRIGHT ENGLISH OAK
PROPOSED STAIR LOCATION
Building Design & Construction
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 7
First Floor Plan
A
A
MECHANICALROOM
SODIUM HYPOCHLORITE TANKS
O 4’ 8’ 16’
N
N
BATTERYROOM
SUBSTATION AREA
B B
SEE LANDSCAPE PLAN
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 9
Planting Palette
Building Design & Construction
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 1 | 11.14.2016 | Page 7
Second Floor Plan
AA
B
B
MECHANICALROOM
SWITCHGEARROOM
BATTERYROOM
SUBSTATION AREA
SODIUM HYPOCHLORITE TANKS
O 5’ 10’ 20’ First Floor Plan
UP
DN
DN
DN UP
SCENTED
LONDON PLANE TREEPLATANUS X ACERFOLIA ‘YARWOOD’
UPRIGHT ENGLISH OAKQUERCUS ROBUR ‘FASTIGIATA’
ITALIAN POPLARPOPULUS NIGRA ‘ITALICA’40-50 FT 30-40 FT 30-40 FT
MOCK ORANGEPHILADELPHUS LEWISII
STAR JASMINETRACHELOSPERMUM JASMINOIDES
1-2 FTSPRING THRU SUMMER
5-10 FT
LATE SPRING THRU MIDSUMMER
BLUE SAGESALVIA CLEVELANDII ‘WINNIFRED GILMAN’3-4 FT
LATE SPRING THRU SUMMER
QU
INT L
AN
E S
TR
EE
T T
RE
ES
CE
NT
ED
EXIST ING STREET TREE PALETTE
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 10
First Floor Plan
A
A
MECHANICALROOM
SODIUM HYPOCHLORITE TANKS
O 4’ 8’ 16’
n
n
BATTERYROOM
SUBSTATION AREA
B B
SEE LANDSCAPE PLAN
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 11
Second Floor Plan
SWITCHGEARROOM
O 4’ 8’ 16’n n
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 12
SECTION A-ASECTION B-B
Building Sections
MECHANICALROOM
SWITCHGEARROOM
MECHANICALROOM
SWITCHGEARROOM
BATTERYROOM
FIRST FLOOR0’-0”
SECOND FLOOR15’-6”
ROOF31’-6”
O 4’ 8’ 16’
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 13
Imagery
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 14
Birdseye View
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 15
View from Southeast
Building Design & Construction
SEP 032 - Powerfeed and Primary Switchgear Upgrades
CDR Phase 1 Draft| XX.XX.2016 | Page 4
View 2
Previous Design(Phase 1 Nov 2016)
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 16
View from Northeast
Building Design & Construction
SEP 032 - Powerfeed and Primary Switchgear Upgrades
CDR Phase 1 Draft| XX.XX.2016 | Page 3
View 1
Previous Design(Phase 1 Nov 2016)
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 17
View from Northwest - Stair Enclosure Opt 1
Building Design & Construction
SEP 032 - Powerfeed and Primary Switchgear Upgrades
CDR Phase 1 Draft| XX.XX.2016 | Page 5
View 3
Previous Design(Phase 1 Nov 2016)
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 18
View from Northwest - Stair Enclosure Opt 2
Building Design & Construction
SEP 032 - Powerfeed and Primary Switchgear Upgrades
CDR Phase 1 Draft| XX.XX.2016 | Page 5
View 3
Previous Design(Phase 1 Nov 2016)
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 19
Exterior Elevations - Stair Enclosure Opt 1
EAST ELEVATION
O 4’ 8’ 16’
FIRST FLOOR0’-0”
SECOND FLOOR15’-6”
ROOF31’-6”
SOUTH ELEVATIONWEST ELEVATION
NORTH ELEVATION
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 20
Exterior Elevations - Stair Enclosure Opt 2
EAST ELEVATION
O 4’ 8’ 16’
FIRST FLOOR0’-0”
SECOND FLOOR15’-6”
ROOF31’-6”
SOUTH ELEVATIONWEST ELEVATION
NORTH ELEVATION
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 21
Utilities DiagramO 4’ 8’ 16’
n
n
BUILDING FOOTPRINT
DUCT BANK ROUTES
SETTLEMENT BOXES
DUCT BANKS
STAIR OUTLINE
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 22
Material Palette
CONCRETEMETAL 2THE GARLAND COMPANY, INC. PEWTER
(DOORS, LOUVERS, STAIR, RAILING)
CHANNEL GLASSBENDHEIM 504 ROUGH CAST
METAL 1UNITED ZINC ONYX BLACK
(STAIR ENCLOSURE)
METAL 3THE GARLAND COMPANY, INC. TERRA COTTA CRDIMENSIONAL METAL SIGNAGE
SEE CAMPUS GRAPHICS PACKAGE
LIGHT FIXTURE 1UNA UA
SEP Power Feed and Primary Switchgear Upgrades
Civic Design Review - Phase 2 | 06.19.2017| Page 23
SEP Design Elements