26
Reducing THM via Aeration: A Case Study November 21, 2013 by Gary Williams, P.E. Jones & Henry Engineers Southeast AWWA District Meeting 1

Southeast AWWA District Meeting

  • Upload
    nerina

  • View
    19

  • Download
    0

Embed Size (px)

DESCRIPTION

Reducing THM via Aeration: A Case Study November 21, 2013 by Gary Williams, P.E. Jones & Henry Engineers. Southeast AWWA District Meeting. Agenda. Location History Pilot Implementation Take Away Information. Location Map. Distribution System Map. Water Quality 2008. THM 2008. - PowerPoint PPT Presentation

Citation preview

Page 1: Southeast AWWA District Meeting

1

Reducing THM via Aeration: A Case StudyNovember 21, 2013

by Gary Williams, P.E.Jones & Henry Engineers

Southeast AWWA District Meeting

Page 2: Southeast AWWA District Meeting

2

Agenda

Location History Pilot Implementation Take Away Information

Page 3: Southeast AWWA District Meeting

3

Location Map

Page 4: Southeast AWWA District Meeting

Distribution System Map

Page 5: Southeast AWWA District Meeting
Page 6: Southeast AWWA District Meeting

6

Water Quality 2008

Raw WaterTotal Hardness 285 mg/L as CaCO3

Total Alkalinity 133 mg/L as CaCO3

pH 8.2

Turbidity 3.2

Total Organic Carbon 4.5 mg/L

Finished WaterTotal Hardness 150 mg/L as CaCO3

Total Alkalinity 36 mg/L as CaCO3

pH 9.2

Total Organic Carbon (average) 2.1 mg/L

TOC Removal (average) 51%

Page 7: Southeast AWWA District Meeting

7

THM 2008

Date of Sample

Sample Location Second Quarter 2007 Average RAA

MR002 LRAA

HAA5Average RAA

5/24/2007 RD002 38.9 13.4RD003 40.8 14.4MR002 50.2 43.3 47.8 59.3 11.8 13.2 17.8

7/10/2007 RD002 82.3 16.6RD003 85.3 15.2MR002 102.0 89.9 50.4 60.6 16.7 16.2 14.4

10/11/2007 RD002 54.1 17.3RD003 58.3 16.4MR002 81.7 64.7 58.1 69.3 22.0 18.6 15.9

1/16/2008 RD002 40.6 19.3RD003 40.7 20.8MR002 54.9 45.4 60.8 72.2 20.4 20.2 17.0

4/2/2008 RD002 40.5 13.6RD003 40.6 13.1MR002 60.3 47.1 61.8 74.7 14.2 13.6 17.1

7/8/2008 RD002 85.1 33.1RD003 85.3 32.1MR002 131.0 100.5 64.4 82.0 34.7 33.3 21.4

10/9/2008 RD002 52.0 28.8RD003 55.7 28.8MR002 80.6 62.8 63.9 81.7 33.3 30.3 24.4

Fourth Quarter 2008

Total Trihalomethane & HAA5 2007/2008

Thrid Quarter 2007

Fourth Quarter 2007

First Quarter 2008

Second Quarter 2008

Third Quarter 2008

Page 8: Southeast AWWA District Meeting

8

Water History

1972 Water Treatment Plant, Low Head Dam, and Reservoir Constructed

1993 Water Treatment Plant Study 1996 Reservoir Study 1999-2000 Water Treatment Plant Expansion $3,000,000 2002 Second Reservoir $2,300,000 2004 Water Distribution System DBP Reduction Study 2005 Chlorine Dioxide Benchtop Study 2005 MIEX Benchtop Study 2006 RSSCT for GAC Benchtop Study 2008 THM Reduction via Aeration Opflow Article

Page 9: Southeast AWWA District Meeting

9

2008 THM Reduction via Aeration Opflow Article

Page 10: Southeast AWWA District Meeting

10

Research

Limited Research Available for Dynamic System One Company Marketed a System $$$$$$$$ Air : Water Ratios (cfm : gpm) 5 to 60 If A:W = 40 and processing water @ 700 gpm =

28,000 cfm blower Approximately 200 hp Blower

Page 11: Southeast AWWA District Meeting

11

Pilot

Assumed 20:1 A:W ratio or 14,000 cfm Determined Approximate Area Diffusors for 14,000 cfm in

Clearwell 2 Assumed One/half Depth of Clearwell or 7 feet Calculated the Volume over the Diffusors Developed the Detention Times in the Three Celled Clearwell

Influent Cell 60 minutes Aeration Cell75 minutes Effluent Cell 60 minutes

Scaled down the flows of air and water to match a 4-inch PVC pipe

Page 12: Southeast AWWA District Meeting

12

Pilot

Page 13: Southeast AWWA District Meeting

13

Test Pipe Arrangement

Pilot Air Requirements

Air: Water Ratio Required (cfm) Total Air (cf)

2:1 0.1 9.5

5:1 0.25 23.8

10:1 0.5 47.5

20:1 1.0 95

Page 14: Southeast AWWA District Meeting

14

Pilot Protocol

Two Pilot Steps First Step Test Entire

A:W Range Second Step Optimize

Results of the First Step

Goal was to Optimize Air Required

Parameters Tested TOC THM HAA5 Chlorine Residual Stability

pH Total Alkalinity Total Hardness Calcium Hardness TDS Chlorides Sulphates

Page 15: Southeast AWWA District Meeting

15

Pilot Results

Air: Water Air RateTrihalomethane Results

(ug/L)Ratio (scfm) October 14 November 11

Control N/A 47.1 38.02:1 0.10 16.9 16.75:1 0.25 5.7 9.07:1 0.35 N/A 6.710:1 0.50 2.1 5.720:1 1.00 2.7  30:1 1.50 2.6  40:1 2.00 3.0  50:1 2.50 2.1  

Page 16: Southeast AWWA District Meeting

16

Pilot Results

0 5 10 15 20 25 30 35 40 45 50 550.0

5.0

10.0

15.0

October 14November 11

Air to Water Ratio

Tri

halo

met

hane

s (ug

/L)

Page 17: Southeast AWWA District Meeting

17

Other Pilot Results

Temperature October 16 deg C November 12 deg C

Control Sample (no aeration) TTHM

Initial – 52.6 ug/L Finish – 47.1 ug/L

pH Initial – 9.3 Aerated – 7.9

Cl2 Free mg/L Initial – 2.13 Aerated – 1.96

Cl2 Total mg/L Initial – 2.45 Aerated – 1.19

@ A:W ratio > 10:1 CHBrCl2, CHBr2Cl, CHB3 below Detectable Limit

Page 18: Southeast AWWA District Meeting

18

Project Costs

Aeration System 5:1 A:W ratio 3,500 scfm Blower Stainless Steel Diffusors Caustic Soda Feed System to increase pH to 8.9 12-inch Air Piping to Clearwell Diffusors Electric and Controls

Project Cost - $401,700 Annual O&M - $73,000

GAC System Project Cost - $1,225,600 Annual O&M - $145,000

Page 19: Southeast AWWA District Meeting

19

Brand X 2011 SolarBee Aeration System Proposal

Two 15 HP Blowers 580 scfm Each Three Submersible Mixers 86 Diffusor Assemblies Caustic Soda Feed System to increase pH to 8.9 8-inch Air Piping to Clearwell Diffusors Electric and Controls

Project Cost - $571,700 Annual O&M - $21,000

SolarBee Offer Install Clearwell Equipment Provide Temporary Blower and Piping 6-month Trial If Satisfied, Purchase Price $360,000

Page 20: Southeast AWWA District Meeting
Page 21: Southeast AWWA District Meeting

21

Second Thoughts April 1, 2012 SolarBee Oops

Further Testing Showed Spray Aeration Preferable Highly Recommended Spray System

One GS-12 Submersible Mixer in Clearwell 1 Two SN-15 Floating 15 HP Pump/Mixer/Spray Systems Two Ventilation 2HP Blowers 750 scfm Each Caustic Soda Feed System to increase pH to 8.9 12-inch Air Piping to Clearwell Electric and Controls

Project Cost - $369,900 Annual O&M - $22,000

SolarBee Offer Provide In-Clearwell Equipment and Two Blowers Install Clearwell Equipment 6-month Trial If Satisfied, Purchase Price $168,000

Page 22: Southeast AWWA District Meeting
Page 23: Southeast AWWA District Meeting

23

Schedule

Bid – October 2012 Preconstruction Meeting – November 2012 Substantial Completion – March 2013 Total Completion – June 2013

Page 24: Southeast AWWA District Meeting

24

TTHM Summary

Sample Date

Water Temp (deg C)

Clearwell 1 Effluent

Clearwell 2 Effluent

DS202 (Max

TTHM)% Removal In Clearwell #2

Regrowth in System

4/3/2013 7 29.6 18.4 31.8 38% 13.4

5/6/2013 15 47.2 20.4 43.4 57% 23.0

5/20/2013 18 56.2 24.8 64.7 56% 39.9

6/17/2013 22 62.7 21.2 62.3 66% 41.1

7/1/2013 24 63.2 30.7 64.7 51% 34.0

8/13/2013 23 53.3 20.3 52.1 62% 31.8

9/9/2013 20 56.0 20.5 52.6 63% 32.1

Note: Baffle wall opening sealed on 4/12/2013

(all values TTHM in ppb, except where noted)

Page 25: Southeast AWWA District Meeting

25

Maximum Residence Time Running Annual Average

First Second Third Fourth First Second Third Fourth First Second Third Fourth2011 2012 2013

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

TTHM (ppb)HAA5 (ppb)

Page 26: Southeast AWWA District Meeting

26

Take Away Information

1. THMs Have to be Formed Aeration Does Not Reduce Formation Potential

2. Chloroform is Typical Target THM3. Powered Air Supply for Ventilation Probably

Required4. Check pH/Stability5. Check Chlorine Residual