2013/1/3 Page 1 MTR Corporation 南港島綫(東段)鐵路系統 South Island Line (East) Railway Systems 二○一三年一月四日 (4 January 2013) 2013/1/3 Page 2 MTR Corporation 路基本資料 路基本資料 (Line Information) (Line Information) 事項 (Item) 參數 (Parameters) 綫路 Alignment ~7 公里(km), 5 車站 (Station) 架空天橋 / 隧道 Overhead Viaduct/Tunnel 初期行車間隔 Initial Headway 3 4 全程行車時間 End-to-End Journey Time 11分鐘 (minute) 列車組合 Configuration 最高行車速度 Max Speed 80 km/h 模式 Mode 全自動操作 FAO 南港島線(東段) SIL(E) 金鐘Admiralty 海洋公園 Ocean Park 黃竹坑 Wong Chuk Hang 海怡 South Horizons 利東 Lei Tung 沙中線 Shatin Central Link 隧道 Tunnel Section 天橋Viaduct Section Island Line CB(1)379/12-13(01)

South Island Line (East) Railway Systems

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Microsoft PowerPoint - FAO LegCo (ver 1d) (with English) revised_distribution.pptx (4 January 2013)
2013/1/3 Page 2MTR Corporation
(Line Information)(Line Information)
(Item) (Parameters)
Overhead Viaduct/Tunnel
Initial
End-to-End
Configuration
Construction ProgressConstruction Progress (2012(20121111))
Wong Chuk Hang Depot
Hong Kong Park Ventilation Building
Construction Progress (2012Construction Progress (20121111))
2013/1/3MTR Corporation Page 5
Train Exterior Design
2013/1/3MTR Corporation Page 6
General specification •
Similar to urban lines
• Sofa-like seat design
• Based on ergonomic design & passenger feedbacks
(Design Concept) -
(Super Capacitor Storage System)
Energy storage
Solid Conductor Rail
- Reduce energy loss and improve reliability – Solid Conductor Rail
Solid Conductor Rail reduce the resistance between the pantograph and supply conductor and hence reduce the power loss (rigid and reliable, reduce associated incident)
2013/1/3 Page 12MTR Corporation
(Remote train monitoring/diagnosis)
Fully Automatic Operation
2013/1/3 Page 14MTR Corporation
Train movement safety guarantee by ATP Signalling System
- Overspeed Protection Collision Protection
Train operation responsible by ATO Signalling System
- Trackside automatic operation Automatic Train stop
- Automatic door open/close Automatic Train Start
Automatic Turnback
Highly AutomaticHighly Automatic
––
Metro Metro -- FAOFAO
/ Make PA Boardcast to passenger
Communicate with passenger
PAD PAD
PAD PAD
Europe France
Asia
Japan
Airport
Kobe
Osaka
Daily Patronage Photo
1
725,000
Daily Patronage
91,000
Bundang Line
110,000

MTR work closely with other railways to keep abreast on the State-Of-Art technology and Operational experience
Disneyland Resort Line Alignment
Camera Locations
Camera Locations
enhance remote monitoring/diagnosis/control
flexible train regulation to satisfy demand
• More accurate, timely, reliable train services
Improve System Reliability • System
Redundancy • Auto-recovery • Reduce human
error
prevent unauthorized access to automatic area
Main Line
Segregate depot automatic and non automatic area
Security Access Management System
Strict monitor & control for train enter maintenance track area
Necessary Facilities for Necessary Facilities for FAO ImplementationFAO Implementation
prevent unauthorized access to automatic area
2013/1/3 Page 23MTR Corporation
MTR has proven experience in automatic train control technology and operation
, System will undergo stringent system assurance, test and commissioning before opening
Enhance communication with the public