60
South Central Railway Carriage Workshop Lallaguda Brochure - 2020

South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

South Central Railway

Carriage Workshop

Lallaguda

Brochure - 2020

Page 2: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 1 of 60

1.0 General

1.1 सकषिपतइकषिहास Brief History:

The Carriage Workshop / Lallaguda was established in 1893 as the Locomotive,

Carriage and Wagon Workshop of the Nizam State Railway (NSR). The Government

of Hyderabad took over direct control of the Railways in 1930 and renamed it as the

Nizam Guaranteed State Railways (NGSR).

It is one of the oldest surviving examples of modern Industrial Architecture in the Twin

Cities. It signaled the beginning of major industry in the state. A few structures in use

today date from the time of the workshop’s initial commissioning.

The precinct provides us with a glimpse of not only the industrial advances made over

more than a century but is also a repository of heritages from a bygone era. Restored

wagons, coaches and a variety of artifacts relating to railway history have been

preserved and quite a few are displayed at the site. Notable among these one finds a

meticulously restored coach of 1886 vintage.

South Central Railway was carved out on 2nd October 1966, and Lallaguda Workshop

went on to become a major workshop of the zone. It continued to be a composite

workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos,

the Workshop took up POH of all types of BG coaches and hence rechristened as

“Carriage Workshop” during 1997.

Page 3: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 2 of 60

1.2 परमखउपलकषधिया Major milestones:

1893 Established as Loco, Carriage and Wagon workshops under “NIZAM’S GUARANTEED STATE RAILWAY”.

1951 Brought under Central Railway. 1966 Carved out as South Central Railway. 1975 POH of BG steam cranes. 1981 POH of AC coach. 1997 Rechristened as CARRIAGE WORKSHOP. 2000 Awarded ISO-9002: 1994 Certification. 2003 Commenced POH of DHMUs trailer cars. 2006 Commenced POH of EMU TCs and Tower wagons. 2007 Awarded ISO-9001: 2000 Certification. 2007 Commenced 18 months POH. 2008 Commenced IOH of bogies (9 months). 2009 Commenced Refurbishment of coaches. 2009 Commenced modernization of workshop (from Nov’09). 2011 Commenced POH of power cars of DHMU and DEMU. 2012 Awarded ISO 9001:2008 Certification. 2012 Commenced LHB Coach SS1 Schedule. 2013 Commenced LHB Coach SS2 Schedule. 2015 Commenced POH of EMU & MEMU Motor coach. 2015 Commenced SS1 of Double Decker coaches. 2015 Implemented WISE-II. 2016 Commencement of LHB Coach SS3 Schedule. 2016 Implemented IPAS. 2016 Accredited with 5S Workplace Management System (WMS). 2016 Accredited with IMS, Containing QMS (ISO 9001:2015); EMS (ISO 14001:2015); OSHAS (180001:2007) & EnMS (ISO 50001:2011). 2017 Awarded Green-Co Silver Rating by CII/Hyderabad. 2017 Accreditation of NABL certificate to CMT Laboratory. 2017 Received best innovation award for “Automated single car test rig”. 2018 Received Railway Minister Shield (sharing) for “Best Workshop

over IR”. 2019 Received “Best Establishment Award” for imparting training to 550

Trade Apprentices for the year 2018-19. 2019 Received “Gold Prize” for Energy conservation in 2018-19

from “Her Excellency Tamilisai Soundararjan , Honorable Governor of Telangana on 20-12-19.

2020 Received Certificate of “Best Energy Efficient unit” from Confederation of Indian Industry in August 2020.

Page 4: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 3 of 60

1.3 मखयकषिशषिाए Salient features:

2. Total area of Workshop 13.97 hectares

3. Covered area 4.25 hectares

Rail track length 8.25 kms

4. M&P 549 nos.

5. Railway quarters 584 nos.

6. WMS budget Grant 2020-21 Credits –322 Crores (Mech- 256.14 ; Elec – 65.86crores) Debits – 301.72crores (Mech – 240.67 ; Elec – 61.05)

7. Avg Monthly Target 2020-21 a) POH –133.64 VUs (RB) b) IOH of bogies – 230 nos c) IOH of Fiat Bogies (SS1)- 58 nos

8. Average power consumption/month 2020-21.

1.60 lakh units.(including Solar)

9. Manpower as on 01.01.2021. (Mech + Elec)

Sanctioned Actual Vacancies

3256 2660 596

1.4 काययशालाकीिियमानगकषिकषिकषिया Present activities of the Workshop:

• POH of AC & Non AC BG ICF/RCF/BEML coaches.

• POH of LHB Coaches i.e. SS-II and SS-III schedules

• POH of Duronto (Hybrid) coaches

• POH of DEMU Power &Trailer cars & SPART coaches

• POH of EMU/MEMU coaches

• POH of Tower cars

• IOH of ICF conventional bogies for divisions.

• IOH of FIAT bogies for SS-I schedule of LHB coaches

• POH of Defence owned coaches.

• Supply of wheel sets to divisions.

• Fitment of Bio-toilet tanks on coaches.

• Over hauling of DVs, BMBCs & other air brake components for division.

• Nodal workshop for implementation of WISE-II

• Chemical and Metallurgical testing/analysis of components.

• Manufacturing of all types of locomotive filters at LOFP/SC.

• Rail Bogie Karkhana/Yadgir : Manufacturing of FIAT bogie frames

• Basic Training Centre offers a) Refresher courses to Artisan Staff

b) Imparting training to Apprentices engaged against Apprentice Act, 1961

c) Skill development programmes.

Page 5: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 4 of 60

1.5 सगठनचारयOrganization chart:

S. Rabindranath Sabar

Sr.DEN

S. Dakshna Murthy

AEME/LOFP

Prasun Chakraborty

CWM

[Vacant]

PE/LGDS

Prashant Kumar

Dy.CME/LGDS

N. Ganga Raju

Dy. CEE/LGDS

Ch. Eswaraiah

Dy. CMM

Y. V. S. Prakash Rao

WAO

G. Seshadri

AWM-II

K. Krishna

Chaitanya

AWM-III

Sk. Salauddin

AWM-I

K. Srinivasa Rao

ADEE

K. Thavare Naik

SMM/M&E

K.K. Subramani AWAO

R. Papa Rao ACMT

S. Laxman Rao

WPO

S. V. S. Raju

AWM/RBK/YG

B. S. Sarswati

IPF/RPF

Sandeep Kumar

WM/LGDS

Page 6: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 5 of 60

1.6 लालागडाकारखानकालआउर Layout of LGD Workshop.

Page 7: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 6 of 60

1.7 परमाणनCertifications Achieved:

• 5S – Workplace Management System (WPS): 5S recertification done on Feb’20. Validity up to Feb’2023.

• Integrated Management System (IMS): (Four International standards).

Awarded to M/s.IR Class/ Secunderabad on 31.05.2020.

Agreement to be signed, delayed due to COVID-19 pandemic.

Firm yet to respond.

• Green-Co rating system “Silver”Certificate awarded on 26.04.2017. Valid upto March’2020. Revaluation under process.

• ISO 3834 – 2: 2005: (Quality requirements for fusion Welding of metallic materials)

Certificate awarded on 26.04.2017 and valid upto 25-4-2020. Agreement for recertifcation to be issued to Firm. Firm yet to respond.

• NABL Accreditation for CMT Lab: Certificate awarded on 06.10.2017 and recertified for another

two years in Sept’19. Valid upto 5-10-2021

• LEAN SIX SIGMA Certification Certificate awarded on 30.01.2019

A one time certification.

Page 8: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 7 of 60

2.0 कषनषपादन Performance:

2.1 POH Outturn - Target/Actuals (VUs):

Note: a)Target for 2020–21 is 1583 coaches as per HQrs and 1605 as per RB.

b) In 20-21, actual outturn less due to lock down in April’20 and May’20.

2.2 Type wise outturn –last 3 years in (VUs)

Type wise 2018-19 2019-20 2020-21 (up to Dec’20)

Tar Actual Target Actual Annual Target (RB)

HQ Annual target as

per arising

Target (upto

Dec’20)

Actual (upto

Dec’20)

AC coaches 300 326 324 312 288 288 200 200

Non AC 1008 1019 1080 1085 996 994 739 739

LHB 44 53 45 44 108 86 45 45

EMU/MEMU ( incl of PC)

65 76 82 74 101 101 54 54

DEMU ( incl of PC)

220

175 216 194 97 97 60 60

SPART ( incl of PC)

04 17 13 09 09 05 05

Tower car 16 12 12 06 08 08 08

Total 1637 1669 1776 1734 1605 1583 1111 1111

16371733

15831669 1734

11111247 1331

1111

2018-19 2019-20 2020-21 (up to Dec'20)

Target Actual Prop actual up to Oct'20

Page 9: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 8 of 60

2.3 Outturn of Power cars:

Year EMU/

MEMU DEMU SPART

2017-18 26 47 6

2018-19 21 37 3

2019-20 21 40 7

2020-21

(up to Dec) 54 60 5

2.4 Ineffective Avg. Holding of coaches:

Year Avg.holdings

2017-18 74.42

2018-19 79.98

2019-20 74.97

2020-21

(up to Dec)

57.39

2.5 Average Cycle Time (in working days):

2.6 Average POH Cost/VU ( in Lakhs):

9.91

19.15

10.81 11.7912.14

18.95

13.93 14.52

11.27

23.15

14.3212.18

Non-AC AC EMU DEMU

18-19 19-20 20-21 (Q.E.Dec'20)

8.28

14.5413.64

12.511.67

9.16

11.610.01

15.2913.06

8.05

17.12

10.69

14.5112.35

Non-AC AC LHB EMU DEMU

18-19 19-20 20-21(up to Dec)

Page 10: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 9 of 60

2.7 Average NTXR initial advice (in % age):

2.8 Fitment of New Bio-Toilet tanks (No.of tanks):

Note: Bio toilets have been provided on all eligible PCV coaches.

1.811.90

2.04

1.50

17-18 18-19 19-20 20-21(up to Dec)

% In

itia

l ad

vise

17-18 18-19 19-20 20-21(up to Dec)

2339

1525

920

20

17-18 18-19 19-20 20-21 ( up toDec)

No

.of

tan

ks

17-18 18-19 19-20 20-21 ( up to Dec)

Page 11: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 10 of 60

2.9 Scrap Disposal (in MT) (Mech. + Elect.):

in MT

2.10 Support to Divisions (in nos)

6124

5003

13151374593 337

18-19 19-20 2020-21(up to Dec)

Ferrous Non-Ferrous & others

2442

110

421

22412460

258 354

19531794

430

147

564

IOHed Bogie Fiat Bogies BMBC Wheels

18-19 19-20 20-21 ( up to Dec)

Page 12: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 11 of 60

2.11 Important modifications undertaken on coaches:

S.N Item Cumulative so far

(upto Dec’20)

1. Conversion from ‘P’ trap to ‘S’ trap (no .of coaches)

938

2. Controlled discharge flushing valve for Bio toilet coaches

2490

3. SLR coaches modified to bogie bracket and chain with trunions block in hand brake arrangement.

470

4

Retro fitment of coaches with threaded joints in lieu of ferrule joints near cut off angle cock in the FP & BP pipe arrangement of ICF conventional mainline coaches.

735

5 Coaches modified from single pack to BDG in CBC coaches. ICF coaches.

158

6 LHB toilet side window modification - AC 72

7 Retrofitment of LED lights in TL & AC coaches 544

8 AC Coaches modified with WRA Mono block type compressor type during this month to improve reliability

26

9 Provision of Exhaust fans in Bio Toilet AC coaches (each coach consists of 04 No’s)

194

Page 13: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 12 of 60

3.0 उतकषटिा का क दर Centre of excellence:

3.1 Air brake shop (2017-18):

Housekeeping Test benches

BMBC-Overhauling section Air brake shop sub stores

3.2 CBC shop

Page 14: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 13 of 60

3.3 Roller Bearing section:

3.4 Welding laboratory (BTC) (2019-20)

Pneumatic Balancer for

handling Axle Box Pneumatic Balancer for

handling roller bearing

Air Gauge to measure Inside

Diameter of Roller Bearing Automatic Grease dispensing

machine

Page 15: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 14 of 60

3.5 RMPU Section (19-20)

Digital intelligent microprocessor inverter based synergic pulse MIG/MAG welding systemWith down draft fume extraction system

Welding laboratory equipped with digital intelligent microprocessor

inverter based synergic pulse MIG/MAG, and TIG welding systems.

AC-Stores

Dispatch section Motors Overhauling

Assembling section Cleaning section.

RMPU - Layout

Page 16: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 15 of 60

4.0 Innovations

4.1 Innovations done by the Workshop in 2017-18

S.no. Description Photograph

1.

Automatic single car test rig for LHB: Automatic Single Car Test Rig is used to perform Air Brake testing on LHB coaches to ensure proper functioning of Air Brake System. This testing procedure is generally done during the POH of LHB coaches or change of any Air Brake sub-assembly.The Automatic Single car test rig minimizes the time for testing, avoids human errors, and records the tested parameters and stores the data in database. And it gives saving of 2 employees per shift and assures accuracy in the job.

2.

Automatic Grease dispensing machine:

Automatic filling of grease into the roller bearing

directly from the grease drum. Quantity to be filled is

controlled by PLC embedded in the circuitry

3.

Integrated Test Bench for WSP & brake equipment of LHB Coaches )Knorr Make: Integrated test bench with real time simulation of train speed, designed and developed in-house on 02-08-2017, is a replica of Complete Disc Brake System of Knorr make fitted in LHB Coaches .This integrated test bench can check the functional test of complete disc brake equipment and WSP equipment of a LHB coach as a complete coach set .

Page 17: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 16 of 60

4.

Air spring test stand: The Air Spring Test bench is developed to check any air leakages /rubber burst/ O-ring damages of the air bellow during POH. The Air bellow is tested with air pressure of 10kg/Cm2. It helps in reducing the laborious work of finding out leakages/damages in air bellow, so that air bellow can be rectified or replaced with new spares

5.

Automated Electro pneumatic Brake test stand. This EP brake system provided in EMU, DEMU, MEMU PCs is for brake application, works in conjunction of Electrical and pneumatic brake control application

6.

Hydraulic press fixture for Scragging of Draft Gear of Faively make Hydraulic press fixture for Scragging of Draft Gear developed in-house for scragging of draft gear equipment during POH repairs. The main features of the equipment is to compress the draft gear to 430mm by using hydraulic press fixture and release the draft gear to 512mm,by releasing the hydraulic pressure. Recording serial number of assembly and corresponding period value for future reference.

7.

Automatic Integrated test bench for Air Spring control equipment. Automatic Integrated test bench for Air Spring control equipment developed in house, for testing Air spring Levelling valve & Duplex valves which are used for controlling secondary Air suspension of DEMU/EMU DPC and TC coaches. This test ensures quality of above valves for air suspension, before fitment on coach, thus ensuring coach reliability

Page 18: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 17 of 60

8.

Horizontal Tensile Testing Machine for screw

coupling and draw hook

The software programming for horizontal tensile testing machine have the advantages of hydraulic power pack for controlling the pressures, measurement of elongation to the respective load applied measurement of load, sensing of the pressures, auto cut off of hydraulic pressure item tested, recording of elongation, load applied, pressures, date tested and name of the staff tested with print out.

9.

Sunk in type Hydraulic Jack commissioned:

Sunk in type Hydraulic Jack commissioned at

Corrosion shop to aid in precise lifting of coach

bodies during the corrosion repairs.

10.

De-clamping and Re-clamping device

De-clamping and Re-clamping device

Commissioned for lifting and lowering of FIAT

bogie during POH of secondary suspension.

Page 19: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 18 of 60

4.2 Innovations done by the Workshop in 2018-19

S.no. Description Photograph

1.

Pre-cleaning machine for Roller Bearing of

Coach wheels:

Pre-cleaning machine for roller bearing of wheels is developed In-house by Millwright staff of LGDS. It works on the centrifugal force, on rotating the roller bearing, an air pressure of 8kg/cm2 is applied on the roller bearing. The grease on the roller bearing is thrown out of bearing. For manual cleaning of Roller bearing, it takes around 2 to 3 minutes/Roller bearing. By this machine, we can clean two roller bearing in 2 minutes; 15-20 sec for loading, 15-20 sec for unloading, 1 minute for cleaning.

2.

Computerized Automatic DV test bench for

testing Distributive valves of Faiveley make in

LHB coach Distributor

Valve Testing is performed whenever during

SS-II and SS-III of coach to ensure proper

functioning Automatic DV test bench is utilised

to test each distributor valve as per test

procedure/parameters of OEM manuals

3.

Software on wheel shop Data recording

system

software on wheel shop Data recording system

has been developed in house with various

parameters like Receipt of wheels, wheel tread

profile, Roller bearing inspection, ultrasonic test

of wheel assembly, Wheel and Axle press-in

and press out particulars

Page 20: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 19 of 60

4.

Exhaust Muffler Cleaner – DEMU

Dust chamber for cleaning of exhaust mufflers,

exhaust pipes and panel filters of DEMU

coaches is developed in-house at power car

shed

5.

Press-in and Press-out Fixture for Silent

block of Control arm for FIAT Bogies

Special Team of LGDS Developed Press-in

and Press-out Fixture for Silent block of

Control arm for FIAT Bogies. Earlier, the

fixture available at LHB bogie section served

the purpose of only press-in operation of silent

block of Control arm of FIAT bogie. It was very

challenging to press-out silent block from

control arm. To overcome this problem, Fixture

for press-in and press-out the silent block from

control arm was developed in-house, which is

very useful.

6. Primary Spring clamping & De-clamping

machine- LHB Coaches

7.

CBC functional test fixture

A CBC functional test fixture was commissioned in the CBC shop which is inaugurated by PCME on 04-01-19. According to RDSO quality audit check sheet, overhauled CBCs are to be checked for Functional test. This was demonstrated to PCME.

Page 21: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 20 of 60

4.3 Innovations done by the Workshop in 2019-20

S.no. Month Description Photograph

1. April’19 A Helical Spring muck cleaning

machine:

A Helical Spring muck cleaning

machine:

i.Semi-automatic machine.

ii.Fabricated in house.

iii.Human effort has come down and

effective.

iv.4 springs are cleaned in one cycle i.e

degreasing and cleaning in a cycle of

6 to 7 minutes.

2. Jun’19 A Kiosk was developed in house and

installed in wheel shop for Self-

learning:

A Kiosk was developed in house and

installed in wheel shop for Self-learning

and Performance evaluation of Wheel &

RB Sections. This enhances the

technical knowledge of the workforce.

3. Aug’19 Automatic Grease Dispensing Unit :

Automatic Grease Dispensing Unit for

direct mounted roller bearings at both

ends of wheel set simultaneously.

4. Aug’19 Development of Wheel Data Base Management System: A Wheel shop Data base management system was developed in house Details of roller bearings & axles mounted on wheels sets are computerized, thereby facilitating easy traceability

Page 22: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 21 of 60

S.no. Month Description Photograph

5. Aug’19 Kiosk for self-learning and

performance evaluation application

for welding training.`

6. Aug’19 Website of BTC under

scr.indianrailways.gov.in

7. Aug’19 Centre of Excellence in RMPU.

Computerized RMPU cooling test

facility.

8. Dec’19 CBC lifting gadget (500kg).

Facilitates lifting and transportation of

CBCs.

9. Jan’20 LHB bogie work station with

Manipulator for LHB coaches

LHB bogie work station with Manipulator

for LHB coaches Disassembly and

assembly of LHB bogie components by

moving up/down and rotating the bogie

frame to 1800 for attention.

10. Jan’20 Dynamic wheel balancing machine

for LHB wheel sets.

It is Used for correction of unbalanced

new LHB wheel sets.

Page 23: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 22 of 60

11. Jan’20 Industry 4.0 in roller bearing section.

▪ 9 machines connected against 11 ordered. Report generation under development.

▪ 2 machines under break down .i.e. One VTL and one AJTB.

12. Jan’20

LHB shock absorber testing machine

Testing of yaw damper and other

dampers of LHB coaches

13. Jan’20

Helical spring load deflection testing

machine for LHB coaches

14. Jan’20

Computer Controlled Direct Reading

Optical Emission Spectrometer for

Analysis of Metal & Alloy

Compositions

15. Jan’20

Computerized Universal Testing

Machine (CUTM) a CMT Lab.

Page 24: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 23 of 60

4.4 Innovation during 2020-21

S.no. Month Description Photograph

1 July Testing gadget for DEMU ventilation

pump - In order to ensure the proper

functioning of the ventilation pump before

fitment on coach, this test gadget was

developed in house to test the

performance of the pump. If any

malfunction of the hydraulic motor is

detected, it would be attended

immediately. Grouping of new ‘C’ groove

belts is also possible with this gadget

2 July Mobile test gadget for radiators/ heat

exchangers.

A Hydraulic mobile pressure testing gadget was fabricated in-house for testing of radiators and transmission oil heat exchangers. This mobile gadget has facilitated pressure testing of radiators and heat exchangers at site, which hitherto was not available

3 Oct Automatic thermal scanner cum

sanitizer Dispenser machine was

developed in an eye-catching robot

shaped design and other sanitising

machines of 10 nos. also provided for the

use of staff.

4 Oct Virtual Welding Simulator is procured to

impart virtual training at BTC to welders

to experience efficient welding techniques

on a simulation environment to feel a real

welding process before attempting on a

real welding machine.

Page 25: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 24 of 60

5 Nov Winch With Pulley Arrangement: this arrangement is developed at D1 & D2 lines in new DEMU shed for smooth movement and exact placement of coaches. This arrangement enhances safe working environment and also helps the staff in saving time.

6 Dec Laser Engraving Machine - It is used to engrave the POH date and Station on Roller bearing in standard pattern and all the data is stored in computer.

Page 26: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 25 of 60

5.0 Good Works

5.1 Good works done 2019-20

S.no Description Photograph

1

To reduce the gap between backrest in

DEMU coaches.

• Modification is under trial.

• Use of LP sheet to secure and fill-up the

gap between two seats in DEMU coaches.

Before After

2

Jute Felt on Corners of Berths:

Providing Felt on side surfaces of seats and

berth metal frames to give cushioning effect at

sides also. This will prevent tearing of rexine

at sharp edges of seats and berth Frames

3

PVC Soft Sleeve:

Providing PVC soft sleeve for all berth chains

which will give soft feel and aesthetic look

4

Spring pallets for handling LHB Springs:

A new pallet has been made for transporting

LHB Springs between shops and also to

prevent damage to them.

5

Rexine Moulding:

Bed cum backrest, where staples were

provided previously now is being provided with

a rexine

moulding to prevent giving up of rexine and

improve aesthetics

Page 27: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 26 of 60

6

Pasting Rexine before Stapling:

Pasting rexine on back side of seats and

berths

compreg sheet before securing with staples

to give extra strength

7 Reducing the length of flap from 14 “ to 8”

Before After

8 TC Backrests provided with metal strip

back side to prevent rexine giving up

9

Fitment of Fire-Extinguisher:

Workshop has started fitment by using bolt &

nut instead of screws. Work started since 4-2-

20. Divisions are advised to watch the

performance.Fitted in 112 coaches as on date.

10

Repair of Body Bolster at location away from

Centre pivot and side bearer of Coach

No.12063

Page 28: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 27 of 60

11

Isolation coaches:

One Isolation coach prototype (coach no.SC

GSCN 00205) was made ready on 31-3-20

which was inspected by PCME on 31-3-20.

The second Cabin at each end of the coach

i.e. 2 nos were converted for keeping COVID-

19 patients under isolation/ quarantine (Details

at PPT enclosed).

12

A set of new synchronised lifting Jacks were

collected from Jamalpur workshop These are

utilised in corrosion shop line no.6 for

facilitating lifting of coaches and keeping them

on trestles for undertaking heavy corrosion.

Lowering of the coach on overhauled bogies is

done here itself, thus avoiding multiple

movements of coaches to Lift lower shop

crossing the two traverser lines. This is found

very helpful as it has reduced considerable

time on shunting of coaches also.

13

A Central Railway coach no. CR LWCZ 18632

was received for special repairs. This was

found with all the window frames missing. This

was made good in addition to the Special

repairs attended on the coach. A total of 9 nos

of new full body window frame arrangement

were provided by taking material assistance

from RCF.

15

Provision of 8 additional window bars at 2nd

window from main doors in GSCN coaches is

ensured. Work commenced from May’19. 100

% provision ensured during POH.

Page 29: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 28 of 60

17

Improving bio toilet ventilation system to avoid

bad odour

18 Exhaust bellow in 1600 HP DPC fitted in DPC

No. 15083. Designed and supplied by OEM as

per LGDS advise

19

Exhaust Mufflers were getting cracked. Same

were replaced in 6 DPCs duly claiming

warranty and also made a trail of

Manufacturing exhaust muffler with

available SS: 301 which is being used for

trough floor manufacturing which was done

in-house fabrication. Same was fitted in

DPC No. 15083

20

Developed in-house.Eliminate the spreading

of dust during cleaning of Traction motor

using pressurized air.

Environment friendly

21 A safety ladder for coach Roof painting was

developed in house

22

Corrosion Attentionof outer head stock in 2017

built ICF coaches:

Five coaches (2017 built) which were received

for first POH had corrosion of outer head stock

thickness below the permissioble level.these

coaches ICF had sent representative for

inspection.as the firms have not attended.

LGDS has given strenghthing arrangement

along with ribs for the head stock and turned

them out with due intimation to ICF.

Page 30: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 29 of 60

23

13th International Railway Equipment

exhibition (IREE) was held from 22.10.19 to

24.10.19 at AERO city/NDLS. This was led by

Shri. Prasanth Kumar Dy.CME/LGDS along

with Supervisors and staff were represented

SCR for the exhibition. .

24 Inauguration of Bio toilet maintenance shed

for POH on 07.06.2019 by PCME/SC.

25 A Contractors performance review meeting

was conducted on 16.05.2019

26

Mock Drills/Civil Defence Demo/Elect Shop

Drill Demo by CR & SCR Civil Defence

Team on-Rescue Management Fire

Fitting/First Aid &Evacuation from High-rise

Buildings during Emergencies

27

World Environment Day was celebrated on

06/06/2019 Theme was ‘Air Pollution’. An

awareness program was conducted on the

Causes & Effects of Air Pollution with an

audio/visual presentation. Banners and

posters were displayed across the workshop

for spreading awareness

28

A water balance study was conducted in

workshop through outside agency for the

following:

1. Improve ground water level by rain harvesting pits at 5 locations.

2. Recycling of sewage water by means of constructing wet land of feasible capacity at low lying area.

Page 31: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 30 of 60

29 Cornicorpus plantation

Total plants: 200 nos were planted near Bio-

tank Maintenance Shed.

30 Miyawaki plantation

Total Plants: 475 nos were planted near Sand

Blasting Machine

31 Green toilets for women employees:

• Developed In-house.

32

E-toilet as a part of Green-Co initiative is

under commissioning

• IT Enabled toilet.

• Automatic self-cleaning,

washing/flushing mechanism.

• Procured through GeM.

• Water tank Capacity: 225 Ltrs

33

Model toilet.

Sensor based flushing system for toilets.

Proper Ventilation and Natural light is

developed to reduce energy consumption.

34

Effluent Treatment Plant (ETP).

Power car shop-20KL/day.

For treating the effluents released from

Cleaning of Power car components and

cleaning of IOH bogie frames

Wheel shop-10KL/day. For treating the

effluents released from Roller Bearing

Cleaning Plant.And also, Effluents released

from nearby Shops are diverted to these ETPs

for treatment.

Page 32: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 31 of 60

35

“BEST ESTABLISHMENT AWARD” was

given to BTC/Lallaguda by Sri.Ch Malla

Reddy, Hon’ble Minister for labour,

Employment, Women & Child Development

Government of Telangana for imparting

training to 550 Trade Apprentices for the year

2018-19 on 15.10.19.

36

“JOHN MORRIS FIRE ENGINE-1914 built”

has won the “53rd Statesman Vintage and

Classic car rally” held at Delhi on 10th

Feb’2019. The Fire Engine is maintained by

LGDS staff at NRM/NDLS.

37

Buffing of all stainless steel items like wash

basins, toilet pans & wall protectors are

carried out to improve aesthetics

38

To improve general appearance of berth

upholstery fitment:Stiff and tight fitment

ensured. Jute felt along the corners provided

Double stitching of rexine to avoid wrinkles.

39

Window curtains are stitched with six frills and

twelve rings to maintain uniform height when

hung so as to avoid sunlight ingress, and

when curtain is closed it enormously improved

the internal aesthetics in POH of AC coaches.

229 coaches provided in current year

Page 33: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 32 of 60

40

Provision of Emergency lights:

All AC coaches are provided with LED

emergency lights and in all non-AC coaches

with more than 10 years residual life have

been provided with emergency lights.

41

Provision of mobile charging sockets:

All AC and CN coaches are provided with

mobile charging facility. As per the directives

of Railway Board, CN, GS, CZ & SLR

coaches are provided with 18 mobile charging

sockets.

42

Berth Indication Light & Night Lamp:

All AC coaches are provided with berth

indication light & night lamp for easy

identification of bay and berth. All coaches are

provided with 100% LED night lights

Page 34: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 33 of 60

5.2 Good work done during 2020-21

S.No. Month Description Photograph

1 Isolation coaches: 76 coaches were converted to COVID-19 Isolation wards as per Railway Board instructions during April & May’20. The second Cabin at each end of the coach i.e. 2 nos were converted for keeping COVID-19 patients under isolation. One toilet was converted to bath room at one end. Middle berths were removed.

2 2000 nos of Coverall were

manufactured and supplied to Central Hospital / LGDS on 20-5-20 as part of PPE manufacture for COVID-19 pandemic.

3 17295 face masks were

manufactured and distributed to

HQrs, Divisions and LGDS staff.

4 Project Utkristh phase II 202-21:

• Target 23 rakes.

• 14 Rakes turned out.(upto Dec’20)

• Bal – 9 rakes

5. May’20 Coach No. SC VPH 99843 of Train

No. 07258 special express of HYB

Division was taken for special

repairs “Near Body sole bar crack at

SC End Trolley” at LGDS in view of

demand for parcel vans for

transportation of essentials during

lockdown period

6. May’20 LGDS has taken a step forward for

welfare of contract staff by providing

groceries during COVID-19

pandemic crisis. Staff of LGDS

contributed voluntarily an amount of

Page 35: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 34 of 60

Rs 1,17,000/- . Groceries i.e. Wheat

powder, Tur Dal, Sugar, Upma rava,

Tea powder, Tooth paste, Toilet

soap, Vim liquid, Rin washing

powder were packed in suitable

bags and then distributed to 252

contract staff at the canteen on 30-

5-20.

37. Aug’20 LGDS secured “Energy efficient

Unit award” at 21st CII National

award for Excellence in Energy

Management 2020: Virtual event

held on 25th-28th Aug 2020.

8. Aug’20 First e-pass issued through HRMS

by the Workshop on 27-8-20.

9. Sept’20 Mass covid-19 RT-PCR testing was

organized for employees of LGDS,

EWS/LGD, Scrap depot & FBWP/Mly

at New Car parking area of the

workshop from 22.09.2020 to

26.09.2020. All staff, supervisors and

officers had undergone the testing at

the centre. A total of 3300 staff have

undergone the COVID test. 151 staff

of LGDS have been tested positive.

These staff have been advised to

consult the Four nominated Doctors

of Railway Hospital / LGD for further

treatment.

Page 36: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 35 of 60

10. Sept’20 Thavare Naik Karmathota,

SMM/M&E/LGD has been GOLD

CERTIFIED for completing the

online assessment that covered

ADVANCED functionality of the

Government e-Marketplace (GeM)

portal.

11. Nov’20 As per Railway Board instructions vide lr.no.2002/M©/137/7 dt.07.10.2020, LGDS planned to convert four VPRs into NMGs. In this regard one VPR is converted into VPU and shop out done on 30.11.2020.

12. Dec’20 As per modification the material

required and operation involved was

managed in –house to complete the

modification job.

By implementing lock pin

arrangement on Dellner Coupler,

lock lift safety can be ensured.

Page 37: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 36 of 60

5.3 कषडधबोमसरिासकषनकषििकरनकीपरणाली Systems to ensure safety in

coaches:

Grit blasting of bogies are undertaken to clean the bogies to the bare metal to detect damages/cracks, if any.

Cleaned bogies after grit blasting are subjected to chalk testing to detect damage/cracks in bogies. About 8.0 % is the rejection.

Tests on springs: Springs are subjected to shot blasting for thorough cleaning and detection of crack followed by Magna-flux test to detect sub-crack, if any and finally tested for tensile strength on computerized load testing machine.

Digital bore gauge for measuring bore of Wheel disc: Digital bore gauge is used to accurately measure the bore diameters of Wheel discs

Zyglow& DPT tests of critical components: Axle box, LHB brake discs, bogie frames & roller bearings are subjected to Zyglow & DPT tests to detect cracks.

Overhauling and testing of Alarm-chain: Alarm chain setting is certified by NTXR for all the coaches under POH.

MAGNAFLUX testing to detect sub cracks

Shot blasting for thorough cleaning

Computerized load testing

Page 38: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 37 of 60

6.0 सिचालनपरकरियािीन Automation under process.

S.No Innovations Details

1. Industry 4.0 • Being installed by M/s Parivartan Automation – RaiBareli UP.

• Total 11 machines are covered.

2. LHB Manipulator. Machine commissioned on 29.07.2020

3. Automation of Spring shop

• Ultra-Model Facilities at Spring Shop (Centre of Excellence of Spring Shop): o Load deflection testing machine with lateral

measurement for flexi coil springs o Renovation of existing conveyor system of springs

shop proposed under umbrella works o Automation of Spring Testing Machine o Magnetic Crack detector for coil spring for LHB

coaches

4 Integrated Station for LHB FIAT Bogie Assembly and Disassembly

o Umbrella Works 2019-20 sanction: Cost Rs. 15,15,25,000/- o Automation in working, inspection, record keeping & record

transmission in workshops” for both Lallaguda &Tirupati workshops. Allocation for SC Rly under Umbrella Work PB No. 660 of 2020-21.

o Detailed Estimate vetted by unit finance for Rs.

15,39,83,895 and the same along with Technical specification/Scope of work is sent to HQRS on 09.10.2020 for onward submission to COFMOW for procurement

Page 39: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 38 of 60

7.0 एम&पी, काययऔरआिकषनकीकरण M&P, works & modernization:

7.1 Works Programme (2020-21):

(Rs. in crores)

Name of work &

Sanctioned Cost

Expenditure (upto 19-20)

Revised Grant 2020-21

Expenditure 2020-21 (Upto

27.01.2021)

LHB Shed (19.1crores) sanctioned : 12-13

7.16 3.03 1.7206

Special Coaching Stock Shed (11.91crores) sanctioned : 12-13

2.03 2.32 1.4737

7.2. Modernization:

Objectives :

a) Augmentation of POH capacity viz., from 100 to 120 coaches/month

b) Improve the layout leading to decongestion of Workshop and

c) Provide infrastructure for expansion activities.

(Rs. in Crores)

Departments Sanctioned cost

Grant Expenditure (Upto 27.01.2021)

Civil 42.23 48.54 43.15

Mechanical 40.39 20.41 18.76

Electrical 8.23 7.89 9.40

S&T 0.69 0.70 0.21

Total 91.54 77.53 71.52

Page 40: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 39 of 60

7.3 Modernization works under Progress:

Description of the work

Cost (lakhs)

Status

Pre-inspection shop

163.35

a) Location - Infront of existing Lift & Lower shop b) 31m X16.16 m covered shed completed. Laying of

Surface track completed and pitline work completed

c) For 34mx8m Shed completed and pit line work completed

d) Final stage of completion e) PDC – Feb, 2021

7.4 Umbrella Works:

S.no. Name of Work and Sanction Year Sanc. Cost Status of Work

Sanction of 2018-19 : Up gradation of Critical Work Centres of Rolling Stock Works Shops, PB No. 655 of 2020-21

1.

Renovation of existing

conveyor system of spring

shop at LGDS

2.26Cr Indent forwarded by HQRS to COFMOW on 15.06.2020. Specification under finalization at COFMOW

Sanction of 2019-20: Up gradation/Improvement in Infrastructure and Augmentation of Maintenance and Manufacturing Capacity (PB No. 661 of 2020-21)

1

Augmentation CCTV

surveillance system in LGD

shop 0.39Cr

a) Specification and drawing

finalized at LGDS.

b) Proposal for processing

the work through works

tender is with unit finance.

c) Reply awaited.

2

Bogie Frame Painting shed

1.6Cr

Detailed Estimate under vetting at

unit finance

3 Construction of new shed for stacking stores items

2.0Cr Work dropped

Sanction of 2019-20: Automation in working, Inspection, record keeping and record transmission in

Page 41: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 40 of 60

workshops (PB No. 660 of 2020-21)

1.

Integrated bogie assembly line and disassembly line

15.39 Cr

i. Item under procurement at COFMOW. Draft COFMOW specification for item has been received for comments/confirmation on 07.12.2020, the same is scrutinized and sent to COFMOW on 11.01.2021.

2.

Real time feeding and backup of shop level data with hand held devices through mobile app/web/cloud

i. Item is returned by

COFMOW for

procurement at LGDS.

CRIS consent regarding

this item has been

received on 05.12.2020

and is under scrutiny at

SSE/IT.

Page 42: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 41 of 60

8.0 गह वयिसथा Housekeeping:

03 (three) contracts exist for housekeeping:

1. Daily Housekeeping, Canteen Cleaning, Roads Cleaning, Toilets Cleaning and Scrap Disposal at nominated place at Carriage Workshop, Lallaguda, Secunderabad.

2. Collection, Segregation and disposal of Hazardous waste accumulation.

3. Disposal through sale of non-metallic scrap mixed with embedded metallic contents.

9.0 सामगरी परबिन Material management:

i. Every year AACs are reviewed by three member committee of JAG grade

officers comprising of Dy.CME, DY.CMM && DY.FA&CAO/WAO.

S.No. Year Saving Achieved

1 2015-16 Rs. 99,69,064/-

2 2016-17 Rs. 7,18,71,106/

3 2017-18 Rs. 1,55,75,642/-

4 2018-19 Rs 3,20,759/- increase in AAC value

5 2019-20 Rs 3,42,72,619/-

6 2020-21 Rs 2,10,60,097/-

Page 43: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 42 of 60

10.0 कषिदयि Electrical:

Dy. CEE/S/LGDS Electrical Department is assisted by ADEE to look after POH

works of AC, TL, DEMU, EMU/MMTS Power cars, ART, SPART, SPIC, TRCs,

Inspection carriages , etc.. and the Electrical Maintenance of Four workshops

viz., CWS/LGD, EWS /LGD, FBWP/MLY and S&T Workshop /G&S/MFT and

STC/SC.

10.1 Electrical energy consumption of CWS/LGD V/S Vehicle

units (VUs):

S.No Description 2018-19 2019-20 2020-21 (up to Dec)

1. Electrical Energy consumption(KWh)

2257699 2367557 1441232

2. Connected load(KW) 11996 11996 11996

3. VUs (Nos) 1804.4 1853 1222

4. Consumption/VUs (SEC)

1251 1278 1179

10.2 Electrical Assets of LGDS:

S/No Workshop Capacity Qty

1 CMD 1000 KVA -

2 Major Sub-Stations(11KV) 3

3 Transformers 1000 KVA 6

4 DG sets 250 KVA 2

320 KVA 1

5 Solar Power Capacity 566.7 KWp 9 locations

Page 44: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 43 of 60

A. Solar Power plants installed at different locations:

Capacity Installed location

Units generated till date

Remarks

60 kWP CMT 152554

530 KW solar power plants installed on 16.03.18

150 kWP Ward-7 365035

200 KWP Ward-11 424309

60 KWp ESTC 131844

60 Kwp ASB ward -9 157803

4 KWp A sub - station 25668 Commissioned on Nov -14

4.5 KWp RPF out post 17274 Commissioned on Sep-16

10 KWp CMT/LGD roof top

33719 Commissioned on18.04.17

18.2 KWp Main sub-station

34840 Commissioned on 28.02.18

TOTAL 1343046

A. Solar power generated 2019-20: 782190 KWH.

(Average /month =65182.2units)

Page 45: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 44 of 60

10.3 Good works done (Electrical):

S No Description Photograph

01 Carriage Workshop Lallaguda received GoldPrize from Telangana State for Energy Conservation for the year 2019 from Honorable Governor of Telangana on 20.12.19:

02 Provision of energy meters for air compressors

to monitor energy consumption pattern resulted energy Savings: 2180 units/month

03 Commissioning of ring main system resulted in savings of energy Savings: 4365 units/month

04 Installation of Solar day light pipe system in M&E Stores and CMT lab Savings: 1060 units/month

05 Installation of Solar Street lights with timers Savings: 650 units/month

06 Provision of Star rated BLDC fans resulted in 50% power saving.

07 Provision of Energy savers to all welding plants Savings: 8500 units/month

Page 46: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 45 of 60

S No Description Photograph

08 1000LPD solar water heater at Canteen Savings: 1500 units/month

09 Installation and commissioning of new

Charge/Discharge Panel: for saving of power during testing of POHed/IOHed Alternators and RRUs/ERRUs. Earlier resistive loading arrangement was being used. New Smart Energy savers were installed on 22.06.2019. The units saved are 6199 (June 19-Dec,19)

10 Automated test bench for testing of RBCR, EBCR & SBCR: A new automated test bench for testing of RBCR, EBCR and SBCR of LBH AC coaches was procured and commissioned on 03.10.18 for testing the equipment as per the required parameters and the test results are compiled minute to minute and is saved in the in built computer. Till date 24 nos. of RBCRs, 135 nos. of EBCRs and 18 nos. of SBCRs have been tested on the panel since the date of commissioning

11 Fabrication and installation of new test bench for testing of ventilator fan motors: A new testing stand was developed for testing of various ventilation fan motors of EOG type Power Cars During POH

12 Provision of meta aramid fabric with silica

rubber coating duct canvas in LHB coaches

13 Modified Anti-rotating clamps: To avoid the rotation of Suspension Hanger Pins of 25KW Alternators. It was developed by ER Shop/LGD and later approved by recently held MSG meeting as per drawing no. RDSO/PE/SK/AC/0164-2016 (Rev.1)

Page 47: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 46 of 60

S No Description Photograph

14 Belt transmission alignment tool: Axle Pulley to Alternator Pulley alignment is being tested using Belt transmission alignment tool during POH to avoid the dropping of V Belt.

15 Provision of 36mobile chargers in GS/CN/CZ coaches:

16 Retrofitment of LED Lights: LED lights are providing in place of CFL lights for better illumination and power saving.

17 Robotic Duct Cleaning of AC coaches: 134 Coaches are completed Upto Dec 2019

18 Testing and fixing of Axle pulleys of TL and AC Coaches with suitable gadgets.

Page 48: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 47 of 60

11.0 परकषशिणिबीरीसीकीगकषिकषिकषिया Training & BTC activities

11.1 Courses Conducted at BTC/LGDS:

▪ Refresher Course for Technicians ▪ Welder Gradation ▪ Welding Basic Course for Beginners ▪ TIG Welding for Artisans ▪ Selection of Welding Consumables ▪ Welding Power Sources and its Selection ▪ Stainless Steel Welding for Welders ▪ Induction to skilled (RRB & CG) ▪ Special Courses on LHB ▪ APP JE &SSE (RRB) ▪ Pre promotional courses for Group D to Group C staff and JE Ranker ▪ Safety awareness for contract employees. ▪ Project Saksham training. ▪ Act apprentice ▪ Apprentice Graduates & Diploma ▪ Skill Development Program (Internship Mini and Major projects for B.tech

students) ▪ Seminars

11.2. Project Saksham: Concentrated Capsule of Training for All employees Vide letter

no.M.673/Pers/TrgMtg/42 dated 26/04/2019.

Category Total STC BTC Completed Due

Technicians 1817 0 1817 1817 0

Supervisors 202 0 202 202 0

11.3. Capacity Utilization:

Year Total Trainee

capacity

Total Trainee days

given

% Utilization*

2017-18 36604 79863 218.18

2018-19 36704 136847 372.80

2019-20

32398 123169 380.17

2020-21

(up to Dec’20)

14472 57375 396.45

*Note Total trainee days given/ Total trainee days capacity x 100 is % utilization.

Page 49: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 48 of 60

11.4. Staff Training:

S.No Courses 2018-19 2019-20

20-21 (upto Dec)

1 Act Apprentices 871 550 267

2 Apprentice Graduates 1 0 402

3 Apprentice Diploma 6 0 0

4 Skilled Artisans (W/S + Divn.)

63 170 0

5 Apprentice SSE’s & JE’s 32 48 11

6 Refresher Course for

Technicians 293 509

25

7 Promotional Courses - 40 0

8 Pre-Selection for JE rankers

25% quota 14 0

0

9 Skill Development for Group-

D staff 1009 742

493

10 Special Courses for shop

floor technicians 0 170

117

12 Initial industrial training for

contract employees 151 48

16

13 Seminars (DEMU, Vacuum

Toilet, Roller Bearing) 0 138

0

TOTAL 2440 2415 1331

11.5. Gradation of welders

S.No Courses 2018-19

2019-2020

1 Welder Gradation 70 84

Page 50: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 49 of 60

11.6. Model Room

11.6.1. Existing Models

• Working Model of Twin Pipe Air Brake System with PEASD.

• AC Emergency window of WGACCZ.

• Demonstration model of LHB Bogie.

• Working Model of BMBC For Demonstration.

• BMBC Exploded View Model For Demonstration.

• Bio Toilet Model For Demonstration.

• ICF Wheel & Axel Model for Demonstration.

• ‘H’ Type CBC Cut Model For Demonstration.

• Shaku coupler

• CTRB exploded view for demonstration.

• Spherical Roller Bearing Exploded View For Demonstration.

• EP Brake System Demonstration Model.

• Vacuum bio toilet.

• Different types of welding joints.

• LHB coach miniature model.

• Welding position demonstration model.

• LHB bogie for demonstration.

11.6.2. Proposed Models

A. Digital Models 3D Animation.

• Working of Disc Brake and Wheel Slide Protection System of LHB Coach.

• Working of Conventional Twin Pipe Air Brake System of ICF coach.

• Working system of DEMU Diesel engine.

• Working of Air spring suspension with FIBA device.

• Working of electro pneumatic system.

• Use of safety equipment in welding shop.

B. Physical Models

• Exploded view of AXLE MOUNTED DISC BRAKE CYLINDER with acrylic

enclosure and LED lighting.

• Exploded view of BOGIE MOUNTED DISC BRAKE CYLINDER with acrylic

enclosure and LED lighting.

• Exploded view of C3W of ICF AND KEO OF LHB DISTRIBUTOR VALVES of

coaches with acrylic enclosure and LED lighting.

• WATER FILLING AND PLUMBING ARRANGEMENT OF AC AND NON-AC

(ICF&LHB) coaches with Acrylic enclosure and LED lighting.

Page 51: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 50 of 60

12.0 औदयोकषगकसरिा Industrial safety:

12.1. No. of Accidents/IOD cases:

12.2. Man days lost:

12.3. Steps taken to enhance safety of workmen: ● Ladders for EOT cranes - flat steps & ring cage provided.

● Rotating machinery parts -wire mesh guard / Fencing provided.

● Battery operated forklifts and trucks to control air pollution introduced.

● Periodic supply of soaps and cleaning agents (REINOL).

● Periodic supply of personal protective equipment.

● Safety jacket for shunting staff.

● Fire buckets with stands in all the shops.

● Safety nose mask during painting.

● Safety belt for working at heights.

● Safety mat at electrical mains.

3

5

1

IOD Cases

IOD Cases

2018 20192 2020 (upto Dec)

134.5168

23

2018 2019 2020(up to Dec)

2018 2019 2020(up to Dec)

Page 52: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 51 of 60

13.00 कारमयक Personnel branch Organization:

13.1 Staff Strength (All Departments)

Department Sanction Actual Vacancy

Mechanical (Sup, Artisans) 2419 2018 401

Electrical (Sup, Artisans, Group- D) 606 493 113

Total 3025 2511 514

CMT Staff 36 22 14

Personnel 63 54 9

Mechanical – Others (non-Personnel, Group-D, Drawing, canteen, computer centre)

110 90 20

Electrical- Others (non-Personnel, Group-D, Drawing)

26 13 13

Stores 121 92 29

Accounts 100 63 37

Engineering 28 7 21

Total others 484 341 143

Grand Total 3509 2852 657

13.2 Grievance redressal: Year Received Disposed Balance

17-18 39 39 0

18-19 81 81 0

19-20 26 26 0

20-21 No camp was conducted due to COVID-19

13.3 Health camps:

Sl Year Month No.of staff screened

1.

2018-19

July 2018 268

2. Aug 2018 1138

3. Oct’2018 36

4.

2019-20

June’ 2019 17.06.19 to 28.06.2019

1279

5. 01.07.19 to 10.07.19 529

6 2020-21 No camp was conducted due to COVID-19

Page 53: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 52 of 60

14.0 कमयचारी कलयाणstaff welfare amenities

RO plant 3000 Ltrs Scooter parking

Water coolers provided in each shop Subsidized canteen

Reservation terminal Ladies rest /change room in

each shop

Gents rest /change room in each shop

Page 54: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 53 of 60

15.0 लयबिलकरिलररपलार Lube oil filter plant:

Brief History:

Lube Oil Filter Plant (LOFP) commissioned

during 1978 and the 1st filter was manufactured

on 17.05.1978. Till recently, LOPF was only one

of its kind on Indian Railways for manufacture of

“Pleated Paper Type Long Life Lube Oil”, Fuel Oil

and EMD Filter Elements required for

DLW/ALCO/GM type diesel locomotives of Indian

Railways.

15.1 Staff position of Lube oil filter plant/ Secunderabad

(As on 30.09.20)

Sanc. Actual Vacancies.

1 Supervisors 02 02 -

2 Laboratory 02 02 --

3 Ministerial

(Mech) 03 02 01

4 Liaison Inspector 01 01 --

5 Technicians 18 17 01

6 Semi Skilled/

Unskilled 22 08 14

Total 48 32 16

Activities of the Plant:

● Manufacture and supply of Long Life Lube Oil, Fuel Oil and EMD Filters to Diesel sheds of Indian Railways as per RDSO Specifications.

● LOFP is equipped with laboratory with all the testing facilities required for testing filter paper, finished filters and other metallurgical properties of other components.

● Supply of filters to other than Indian Railways units like NTPC, IRCON, RITES etc. for diesel Locos operated for their sidings.

Page 55: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 54 of 60

● 100% requirement of Long Life Lube oil filters & Low mean-pore size fuel oil filters like Large Primary, Large Secondary, Conventional Primary and Conventional Secondary for Indian Railways are being met by LOFP/SC.

● Manufacturing of 10” X 30” Long Life Lube Oil/Fuel Oil for EMD Locomotives commenced in January, 2011. As per Railway Board directives, 2/3rd requirement of EMD filters to be met by LOFP/SC.

15.2 Performance (Targets and Achievements):

Type/Year

2018-19 2019-20 20-21

Target (Rly Bd.)

Actual Target

(Rly Bd.) Actual

Target 2020-

21

Actual (upto

Sept-20)

122 Days Lube Oil filter

49417 47338 50000 43671 22482 13700

EMD Filters 10000 11582 16000 11908 11961 9950

Large Primary (Fuel Oil)

3200 2953 4000 3396 2178 538

Large Secondary (Fuel Oil)

3200 2921 3700 2764 747 0

Conventional Primary (Fuel Oil)

11789 12455 8000 5116 0 0

Conventional Secondary (Fuel Oil)

9000 10024 6000 3948 0 50

86606 87273 87700 70803 37368 24238

Page 56: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 55 of 60

16.0 रल बोगी कारखानाRAIL BOGIE KARKHANA, YADGIR:

(Under Administrative control of CWM/LGD)

16.1 Introduction:

Railway Board has taken a decision to completely switch over to LHB

coaches to ensure safe travel and higher passenger capacity with operating

speed up to 160 km/hr. With the change in Scenario Railway Board

sanctioned two projects for manufacture of Fiat Bogie frames at Budge Budge

& Yadgir.

The Plant is headed by an AWM.

S.No Category Staff on Roll

1 Supervisors 05

2 Artisans 20

Total 25

16.2 Salient Features of Rail Bogie Karkhana, Yadgir:

➢ Year of Sanction : 2013-14 ➢ Executing Agency : RVNL ➢ Sanctioned Cost : Rs. 75 Cr. ➢ Detailed Estimate cost : Rs. 80.92 Cr. ➢ Capacity : 600 FIAT Bogie Frames per annum ➢ Land : Located near Yadgir in Karnataka ➢ Inauguration of unit : On 18th August 2017.

16.3 Status of Production:

Sl Item Status

1 No. of Bogies made ready till Dec ’20 1171

2 No. of bogies dispatched 1104

3 Bogies ready at RBK for dispatch as on 29.01.2021

70

4 From August-2019 RBK has switched over to manufacture of ASR Bogie frames suitable for Air Spring in Secondary Suspension.

510 (ASR Bogies have been

completed. till Dec’20)

Page 57: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 56 of 60

16.4 Year wise fabrication & Machining:

(Target 20-21 : Fabrication 500 Nos. Machining 500 Nos.) In nos.

Year Fabrication Machining Despatched

17-18 138 91 83

18-19 385 379 322

19-20 343 405 411

20-21 (upto Jan-2021)

285 276 294

Page 58: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 57 of 60

17.0 सरिण Heritage preservation:

17.1 This Workshop was bestowed with the prestigious

Heritage Award of Indian National Trust for Art and Cultural Heritage (INTACH), Hyderabad Chapter on the occasion of the World Heritage Day celebrations held at SalarjungMusuem, Hyderabad on 18th April, 2015. The award was presented to the Carriage Workshop under the Modern Industrial Heritage category.

17.2 NIZAM’S SALOON-1886 built -NGSRly

Restored 1886 builtNizam’s Guaranteed

State Railway’s wooden bodied 4-wheeler

inspection carriage (Saloon) during

December 2006.

17.3 1920 BUILT WAGON: Restored 1920 built wagon, by Birmingham Railway Carriage & Wagon Company (BRC&W), Smethwick, England, during May 2007.

17.4 HERITAGE MG AC SALOON

(SC CTAC-150):

Restored dilapidated 1970 ICF built meter

gauge coach (saloon) stabled at“Purna”and

hitherto utilized by General Manager, South

Central Railway.

Page 59: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 58 of 60

17.5 HERITAGE MG STEAM

CRANE 35 TONNES:

Restored 1976 North Eastern Railway

Workshop, Izzatnagar manufactured 35 ton

MG Steam Crane (SCR – S-3508), with a

tare weight of 70 ton and equivalent to

match truck of 15 ton, during August 2010.

17.6 FIRE EXTINGUISHER – NIZAM STATE RAILWAY:

Restored Nizamera’s Vintage fire

extinguisher.

17.7 JOHN MORRIS FIRE ENGINE (1914 MAKE): John Morris Fire engine, housed at

National Rail Museum/ New Delhi, is

maintained by Carriage Workshop,

Lallaguda.

17.8 MAHATMA GANDHI STATUE (BRONZE):

Restored Bronze Mahatma Gandhi Statue manufactured by foundry staff of Lallaguda during 1955 and placed adjacent to the main gate (inside).

17.9 FIRE ALARM BELL – 1925: Bronze bell 1925 manufactured and weighing 83 Kg used as mass alert during exigencies.

Page 60: South Central Railway Carriage Workshop Lallaguda Brochure - 2020 · 2021. 2. 15. · workshop for MG/BG rolling stock till 1973. As a result of phasing out of steam locos, the Workshop

Page 59 of 60

17.10 RESTORATION OF LIBRARY COACH – (WPCTLAC- NWR -91565 – 1991 built used in Palace on wheels). Restored 1991 ICF built library coach used on Palace on wheels.