South Africa Cities Network/ PPIAF/World Bank Municipal Finance Project Presentation Ekurhuleni Municipal Council Chambers, Kempton park 25 May 2011

South Africa Cities Network/ PPIAF/World Bank Municipal Finance Project

Embed Size (px)

DESCRIPTION

South Africa Cities Network/ PPIAF/World Bank Municipal Finance Project. Presentation Ekurhuleni Municipal Council Chambers, Kempton park 25 May 2011. The Mandate of the SACN. Network of SA cities and partners information generation information exchange Non-profit voluntary organisation - PowerPoint PPT Presentation

Citation preview

Page 1: South Africa Cities Network/ PPIAF/World Bank Municipal Finance Project

South Africa Cities Network/ PPIAF/World Bank Municipal

Finance Project

Presentation Ekurhuleni Municipal Council Chambers, Kempton park

25 May 2011

Page 2: South Africa Cities Network/ PPIAF/World Bank Municipal Finance Project

The Mandate of the SACN

• Network of SA cities and partners– information generation

– information exchange • Non-profit voluntary organisation • Initiative of COGTA, nine city municipalities,

and SALGA • Thematic program areas: City

Development; Productive Cities; Inclusive Cities; Well Governed Cities; Sustainable Cities

2

Page 3: South Africa Cities Network/ PPIAF/World Bank Municipal Finance Project

Initial Project Concept • Credit Assessments – knowledge demand for

financing for infrastructure can partly benefit from borrowing – Good financial understanding of cities (basis of report)

• Capacity Building: attain impact through a focussed capacity building programme– Lead to improved credit-worthiness and borrowing– Based on infrastructure needs assessment – Design suitable loan instrument

• The latter quickly gained in significance – Creditworthiness is systems, processes, people,

policies – Need to create the capacity to deal with them

3

Page 4: South Africa Cities Network/ PPIAF/World Bank Municipal Finance Project

Choice of location

• Tempted to interact with as many cities

• Lilongwe chosen on basis of – Looked close to creditworthiness– Chief Executive confronted some financial

challenges with positive results– Other assistance programmes ongoing

provided (twinning Joburg City Could have carried it out in any of the cities

• Time and budgetary constraints

4

Page 5: South Africa Cities Network/ PPIAF/World Bank Municipal Finance Project

Structuring program for the future

• The results

–Lilongwe will tell

–Sense that good level of participation

–High level buy in crucial

–It can be too much ...

5

Page 6: South Africa Cities Network/ PPIAF/World Bank Municipal Finance Project

Thanks!