Department of Public Works Support for Business Program
$9,500
South 60th Street: W. Cold Spring Road to W. Morgan Avenue
Anticipated Start: July 17, 2017 • Anticipated Completion: August 3, 2018
The project is funded and managed by the Wisconsin Department of Transportation in conjunction with the City of Milwaukee Department of Public Works.
Project Overview:
South 60th Street from West Cold Spring Road to West Morgan Av-enue will be replaced one half of the roadway at a time. The proj-ect will consist of reconstructing South 60th Street from a 4-lane divided roadway to a 2-lane divided roadway with bike lanes and parking. The reconstruction will include grading, base aggregate, concrete pavement, curbs and gutters, and pavement marking. Concrete sidewalks will be replaced in necessary areas.
City services, including garbage pick-up and emergency vehicle access, will be maintained at all times. Deliveries and pedestrian access to businesses will be maintained during construction.
Project Timeline:
The project will be completed over a two-year period.
Year 1 (July 17, 2017- September 29, 2017):
South 60th Street will be reconstructed from West Forest Home Avenue to West Morgan Avenue.
• Phase 1 - The southbound lanes will be constructed with two-
• Phase 2 - The northbound lanes will be constructed with two-
Year 2 (April 16, 2018-August 3, 2018):
South 60th Street will be reconstructed from West Cold Spring Road to West Forest Home Avenue.
• Phase 3 - The southbound lanes will be constructed with two-
• Phase 4 - The northbound lanes will be constructed with two-
Parking, Pedestrian, and Driveway Access:
On-street parking will not be allowed during construction. Pedestrian
will be placed prior to sidewalk construction. Access to business and residential properties will be maintained during construction.
Working Hours:
Work is allowed from 7:00 a.m. to 9:00 p.m., in accordance with City of Milwaukee noise requirements. The contractor cannot work outside those hours without prior approval from the Department of Public Works.
Bus Route Information:
Bus route #64 will remain in service throughout construction. Tem-porary bus stops and walkways will be provided in areas where the existing bus stops are located in the work zone. Milwaukee County Transit will install temporary bus stop signs as necessary.
Communication and Contact Information
the work:
• Construction Management Engineer: Will address contractor concerns.
• Construction Project Engineer: Will be on-site full time to oversee the contractor’s work and ensure that the concerns of the public and businesses are being addressed.
• Support for Business Liaison (SBL): Will provide information about the construction project, and share timelines and proce-dures via construction updates with businesses and other key organizations. The SLB also coordinates with the Construction Management Engineer and Project Inspectors to resolve con-cerns from Businesses and residents.
For additional information please contact:
Roger Reed Construction Management Engineer [email protected] 414-708-5108Dan Wimmer Construction Project Engineer [email protected] 414-708-3822Cecilia Gilbert Support for Business Liaison [email protected] 414-708-2295
Please see next page for Project Timeline maps.
S 6
0TH
ST
S 5
8TH
ST
W HOWARD AVE
S 5
1ST
ST
W FOREST HOME AVE
S 5
3RD
ST S 5
2ND
ST
S 6
1ST
ST
S 5
6TH
ST
W MORGAN AVE
S 5
5TH
ST
S 5
4TH
ST
W EDEN PL
S 5
7TH
ST
W HOLT AVE
W WARNIMONT AVE
S 6
6TH
ST
S 5
0TH
ST
W VERONA CT
W DODGE PL
W CRAWFORD AVE
W MIDLAND DR
W NEBRASKA AVE
S 5
0TH
PLS 6
5TH
ST S
63RD
ST
S 64
TH S
T
S 62
ND S
T
S MAR
CY ST
W WILBUR AVE
W NORWICH ST
S S
UN
SE
T S
Q
S UTAH AVE
W COLONIAL CT
W WILBUR AVE
S 6
0TH
ST
S 5
6TH
ST
S 63
RD
ST
S 54TH ST
S 5
7TH
ST
S 5
2ND
STW VERONA CT
W MORGAN AVE
S 5
5TH
ST
W HOWARD AVE
W FOREST HOME AVE
W CRAWFORD AVE
S 6
0TH
ST
City of MilwaukeeInfrastructure ServicesCentral Drafting - ML
4/12/2017
±
S. 60TH ST. PROJECT OVERVIEW MAP
210 0 210105 Feet
PROJECT OVERVIEW (YEAR 1)
S 5
1ST
ST
S 6
0TH
ST
W COLDSPRING RD
S 5
5TH
ST
S 5
8TH
ST
S 6
8TH
ST
W FOREST HOME AVE S 5
6TH
ST
W MORGAN AVE
S 5
3RD
ST
S 5
2ND
ST
W BOTTSFORD AVE
W EDEN PL
S 4
6TH
ST
S 6
1ST
ST
S 5
4TH
ST
W WARNIMONT AVE
W LEROY AVE
S 4
7TH
ST
S 4
8TH
ST
W TESCH AVE
W VAN BECK AVE
S 5
0TH
ST
S 4
9TH
ST
W DODGE PL
S 6
9TH
ST
W HOWARD AVE
W TRIPOLI AVE
W MIDLAND DR
S S
UN
SE
T DR
W NORWICH ST
S 5
7TH
ST
W ST FRANCIS AVE
S 4
4TH
ST
S PLACID DR
S 6
3RD
ST
W NEBRASKA AVE
S 6
4TH
ST
S 6
7TH
ST
W PLAINFIELD AVE
S 4
5TH
ST
W NORWICH AVE
W WATERFORD AVE
S 6
5TH
ST
S 6
6TH
ST
S HO
NEY C
REEK
DR
S 5
9TH
ST
S 6
2ND
ST
W WHITAKER AVE
S 46TH PL
S MAR
CY ST
W ALLERTON AVE
W COLONIAL CT
W WILBUR AVE
S S
UN
SE
T S
Q
S 70
TH S
T
W MAPLE LEAF CIR
W LYNNDALE AVE
S T
AR
A H
ILL
DR
W NORWICH CT
W CRAWFORD AVE
W BOTTSFORD AVE
S 63
RD
ST
S 5
0TH
ST
W PLAINFIELD AVE
S 6
4TH
ST
S 4
7TH
ST
S 5
4TH
ST S 4
4TH
ST
S 5
2ND
ST
S 5
6TH
ST
S 6
3RD
ST
W HOWARD AVE
S 6
7TH
ST
S 4
6TH
ST
W ALLERTON AVE
S 4
4TH
ST
S 5
2ND
ST
S 5
4TH
ST
W WILBUR AVE
W ALLERTON AVE
S 6
9TH
ST
W MORGAN AVE
S 4
8TH
ST
S 58
TH S
T
S 4
5TH
ST
S 6
5TH
ST
S 6
1ST
ST
S 6
1ST
ST
S 48TH ST
S 57TH
ST
W NORWICH ST
S 4
5TH
ST
W LEROY AVE
S 5
7TH
ST
S 48
TH S
T
S 6
7TH
ST
S 5
2ND
ST
S 6
0TH
ST
S 68
TH S
T
S 60
TH S
T
W MORGAN AV
W HOWARD AV
W FOREST HOME AV
W COLD SPRING RD
W FOREST HOME AV
City of MilwaukeeInfrastructure ServicesCentral Drafting - ML
4/12/2017
±
S. 60TH ST. PROJECT OVERVIEW MAP
350 0 350175 Feet
PROJECT OVERVIEW (YEAR 2)