CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
OTHER AFFILIATES:
I-90 - SNOQUALMIE PASS EAST- HYAK TO KEECHELUS DAM
Max J Kuney Company
King County, WA
Summer 2010 – Fall 2012
Washington Department of Transportation,
Federal Highway Administration
WSDOT will improve approximately five miles of I-90 between Hyak and Keechelus Dam. Improvements include adding an additional lane in each direction between milepost
55.1 and 59.9, extending chain on and off areas, expanding the snow shed, building new bridges, and adding oversized culverts. WSDOT will also improve safety along I-90
by reducing sharp curves, repairing deteriorated pavement, stabilizing unstable slopes, installing avalanche fences, and connecting wildlife habitats over and under the highway.
CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
OTHER AFFILIATES:
CRANE RAIL SURVEYS
Various
The Inland Northwest and Southern States
Ongoing
Army Corp of Engineers, Dix Corporation,
Kaiser Aluminum
As-Built Survey of the overhead crane rails before they are removed and after they are re- installed to ensure that they meet CMAA requirements of less than 0.01’ of tolerance.
CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
OTHER AFFILIATES:
ROUNDE BUTTE DAM
Dix Corporation
Madras, OR
March 2008 – July 2008
A one of a kind Selective Water Withdrawal System. The system consisted of a 750-ton structure that will be placed on the bottom of Lake Billy Chinook 270 feet below
the water surface, a 1500-ton floating top structure that will be used as a fish collection facil ity.
Portland General Electric, Confederated Tribes of Warm Springs
8880 N HESS, SUITE 2, HAYDEN, ID 83835 | PH (208) 772-6600 | FX (208) 772-6619 | WWW.H2SURVEY.COM
PAGE 1
2010/20118880 N HESS, SUITE 2, HAYDEN, ID 83835 | PH (208) 772-6600 | FX (208) 772-6619 | WWW.H2SURVEY.COM
Surveying Projects
CLIENT:
PROJECT LOCATION:
OTHER AFFILIATES:
ICE HARBOR REMOVABLE SPILLWAY WEIR
Dix Corporation
Ice Harbor Lock and Dam, WA
Army Corp of Engineers
Located on the Snake River in Washington State for the Corp of Engineers. Ice Harbor Lock and Dam the RSW is a 1,000-ton floating structure that is attached with
massive hinges 100 feet under water on the upstream side of spil lway No.1 Heath Hartwig performed the survey tasks associated with completion of this project within
very strict tolerances.
CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
OTHER AFFILIATES:
LOWER MONUMENTAL MITRE GATE REPLACEMENT
Dix Corporation
Walla Walla, WA
December 2010 - April 2011
Army Corp of Engineers, Thompson Metal Fabrication
H2 is contracted by Dix Corporation for the Surveying to aid in the installation of the new lock miter gate. The survey plan consists of an as-built of existing gate and the lock floor and walls; layout of new
pintle joints, sill plates, and gudgeon pins; as-built of new gate prior to transporting it to the site; and survey aid for final installation. This project specification has a tolerance of 3/16”. The lock and gate
as-built requires CIF submittals for review and final approval of installation. During this project we will coordinate with the Army Corp of Engineers, Dix Corporation and Thompson Metal Fabrication.
CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
OTHER AFFILIATES:
THE DALLES MITRE GATE REPLACEMENT
Dix Corporation
The Dalles, OR
December 2010 - April 2011
H2 is contracted by Dix Corporation for the Surveying to aid in the installation of the new lock miter gate. The survey plan consists of an as-built of existing gate and the lock floor and walls; layout of new
pintle joints, sill plates, and gudgeon pins; as-built of new gate prior to transporting it to the site; and survey aid for final installation. This project specification has a tolerance of 3/16”. The lock and gate
as-built requires CIF submittals for review and final approval of installation. During this project we will coordinate with the Army Corp of Engineers, Dix Corporation and Thompson Metal Fabrication.
Army Corp of Engineers, Thompson Metal Fabrication
8880 N HESS, SUITE 2, HAYDEN, ID 83835 | PH (208) 772-6600 | FX (208) 772-6619 | WWW.H2SURVEY.COM
PAGE 2
2010/20118880 N HESS, SUITE 2, HAYDEN, ID 83835 | PH (208) 772-6600 | FX (208) 772-6619 | WWW.H2SURVEY.COM
Surveying Projects
US 2, DOVER BRIDGE
CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
OTHER AFFILIATES:
Sletten Construction Company
Bonner County, ID
August 2009 – September 2011
Idaho Department Of Transportation
The existing 72-year-old trestle bridge will be replaced with a new steel bridge. The new structure will be 1,200 feet long and 72 feet wide. Five traffic lanes will
accommodate future expansion of U.S. 2.
CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
OTHER AFFILIATES:
US 2 TO WANDERMERE
Graham Construction Management, Inc.
Spokane, WA
August 2009 – September 2011
Washington Department of Transportation
This project will complete a drivable link between US 2 and Wandermere through the construction of paving and two bridges. The two bridges are over Wandermere Road,
the southbound bridge is 975 feet and the northbound bridge is 1,050 feet in length.
CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
OTHER AFFILIATES:
REBUILD WEST END BRIDGE
Advanced American Construction, Inc.
Sandpoint, ID
July 2009 – September 2009
Burlington Northern Santa Fe
AAC has started construction to replace approximately 800 feet of bridge. This work involves driving new steel pile piers, install ing new pre-cast pile caps,
and setting 17 new bridge spans. All of this construction must be performed in a manner that allows BNSF to continue normal train traffic across the
bridge.
8880 N HESS, SUITE 2, HAYDEN, ID 83835 | PH (208) 772-6600 | FX (208) 772-6619 | WWW.H2SURVEY.COM
PAGE 3
2010/20118880 N HESS, SUITE 2, HAYDEN, ID 83835 | PH (208) 772-6600 | FX (208) 772-6619 | WWW.H2SURVEY.COM
Surveying Projects
8880 N HESS, SUITE 2, HAYDEN, ID 83835 | PH (208) 772-6600 | FX (208) 772-6619 | WWW.H2SURVEY.COM
PAGE 4
2010/20118880 N HESS, SUITE 2, HAYDEN, ID 83835 | PH (208) 772-6600 | FX (208) 772-6619 | WWW.H2SURVEY.COM
Surveying Projects
CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
OTHER AFFILIATES:
SPOKANE INTERNATIONAL AIRPORT
Wormer Engineering
Spokane, WA
December 2008
Spokane International Airport
As-Built Survey of the overhead crane rails before they are removed and after they are re- installed to ensure that they meet CMAA requirements of less than 0.01’ of tolerance.
CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
OTHER AFFILIATES:
POND 4 PROJECT
Zanetti Bros, Inc.
Lucky Friday Mine, Mullan, ID
April 2009 – October 2009
Perform and provide topographic survey to support pay quantities on a bi-monthly schedule. h2 generates surfaces from these field surveys to calculate past two week
differences in quantity measurements. We also provide project control and staking necessary to construct per project design, and generate 3D models for client.
Hecla Mining
CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
OTHER AFFILIATES:
EPHRATA AIRPORT
Reid Middleton
Ephrata, WA
December 2007 – February 2008
Aero Metrics, Port of Ephrata
Topographic survey to assist in the design and re-alignment of 3 runways.
CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
OTHER AFFILIATES:
LOLO CREEK
HDR Engineering
Nez Perce County, ID
November 2010 - January 2011
This purpose of this project was to perform a topographic survey of approximately 1,600 feet of the Lolo Creek, in Nez Perce County, ID. To complete this project we had
to locate several USPLS corners, establish vertical control on the NAVD 88 datum along with cross sections of the creek and adjacent banks every 25 feet. During this
project we had to coordinate with Nez Perce County, HDR Engineering and the Nez Perce Indian Tribe.
Nez Perce County, and Nez Perce Indian Tribe
CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
OTHER AFFILIATES:
CELLULAR SITE PROJECTS
Verizon Wireless, AT&T Wireless,Cingular Wireless, Nextel, Crown Castle
Western United States
June 2007 - Present
Topographic and Boundary Surveys on both raw land and co-locate lease areas. h2 also prepares 1A and 2C letters to submit to the FAA along with the required legal
descriptions for the lease areas.
Geoline, Bock & Clark, Proland
CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
OTHER AFFILIATES:
HAYDEN LAKE COUNTRY CLUB
Hayden Lake Country Club (HLCC)
Hayden, ID
January 2008 – March 2008
Topographic survey to serve as a base map for the improvements that will take place at HLCC
in the future.
G.D. Longwell Architects,
Coleman Engineering
8880 N HESS, SUITE 2, HAYDEN, ID 83835 | PH (208) 772-6600 | FX (208) 772-6619 | WWW.H2SURVEY.COM
PAGE 5
2010/20118880 N HESS, SUITE 2, HAYDEN, ID 83835 | PH (208) 772-6600 | FX (208) 772-6619 | WWW.H2SURVEY.COM
Surveying Projects
CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
OTHER AFFILIATES:
TRI-PRO CEDAR PRODUCTS
Tri-Pro Cedar Products
Oldtown, ID
February 2008 - Current
Idaho Department of Lands, Union Pacific Rail Road, Bonner
County, City of Oldtown, Idaho Department of Transportation,
Sewell and Associates, Avista Utilities
Boundary Line Adjustment and an ALTA Survey on a 280 acre mill site.
CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
AEHI BOUNDARY SURVEY
Alternate Energy Holdings, Inc.
Payette County
XXXXXXX
This contract required a boundary (cadastral) survey of 17 sections of land in Payette
County, ID. This property is the future site of AEHI’s nuclear power plant. The property
retracements required recovering monuments set by the GLO. As there was no previous
survey work completed since the original survey had been done. The research, survey note
reduction, monument recovery and perpetuation forms, and record of survey are all of the
tasks outlined in the contract. The delineation of county roads and state highways also were
a large part of the boundary survey. The additional survey tasks are re-zone exhibits and
acreages, line stakes along boundary and topographic surveys for site design.
CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
OTHER AFFILIATES:
HOUCK BOUNDARY SURVEY
Judy Houck
Worley, ID
November 2010 - February 2011
The purpose of this project was to perform a boundary survey of section of land in Kootenai County on the Coeur D Alene Indian Reservation. To complete the project we
had to locate the USPLS corners on the section that our project was located in along with corners in 2 adjacent sections. These corners were used to calculate the boundary
of our clients property and subdivide it according to percentage of ownership. During this project we had to coordinate with Kootenai County, Coeur D Alene Tribe of Indians,
and the Bureau of Indian Affairs.
Kootenai County, Coeur D Alene Tribe of Indians, and the Bureau of
Indian Affairs
8880 N HESS, SUITE 2, HAYDEN, ID 83835 | PH (208) 772-6600 | FX (208) 772-6619 | WWW.H2SURVEY.COM
PAGE 6
2010/20118880 N HESS, SUITE 2, HAYDEN, ID 83835 | PH (208) 772-6600 | FX (208) 772-6619 | WWW.H2SURVEY.COM
Surveying Projects
CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
OTHER AFFILIATES:
FERNAN LAKE ROAD
MA Deatley Construction, Inc.
Coeur d’Alene, ID
October 2008 - Present
Harcon, Inc.,U.S. Department of Transportation, Allwest,
ABCO Recycling
A 13-mile road improvement project will widen and re-align a dangerous stretch of road along Fernan Lake.
CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
OTHER AFFILIATES:
FORT LAWTON BOUNDARY SURVEY
Brannan Land Surveying
King County, WA
July 2010 - October 2010
The purpose of this project was to perform a boundary survey and topographic survey of the Fort Lawton, a 100 year old military base in King County, WA. To complete
this project we had to survey multiple sections and resolve many adjoining boundary conflict. The end result of the project, we set exterior boundary corners at Fort Lawton,
we set monuments for a newly created parcel for the Veterans Administration, and we created several legal descriptions. During the project we had to coordinate with the
King County, the Veterans Administration, and the Army Corp. of Engineers.
King County, the Veterans Administration, and
the Army Corp. of Engineers
CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
OTHER AFFILIATES:
CO-AG OAKESDALE FACILITY
HDR Engineering, Inc.
Whitmen County, WA
October 2010 - February 2011
The purpose of this project was to perform a boundary and topographic survey located within
multiple sections for the future site of a rail road loop track and grain silo, in Whitman
County, WA. To complete this project we had to locate the USPLS corners to calculate several
boundary lines along with the determination of the rail road and highway right of ways. During
this project we had to coordinate with Whitman County, HDR Engineering, Washington
Department of Transportation and Washington and Idaho Railway Inc.
Whitman County, Washington Department of Transportation and
Washington and Idaho Railway Inc.
8880 N HESS, SUITE 2, HAYDEN, ID 83835 | PH (208) 772-6600 | FX (208) 772-6619 | WWW.H2SURVEY.COM
PAGE 7
2010/20118880 N HESS, SUITE 2, HAYDEN, ID 83835 | PH (208) 772-6600 | FX (208) 772-6619 | WWW.H2SURVEY.COM
Surveying Projects
U.S. 95, WYOMING AVENUE TO JCT OF IDAHO 53
Interstate Concrete and Asphalt
Kootenai County, ID
April 2010 – October 2010
Idaho Department of Transportation
The project will widen a two-lane section of U.S. 95, between Wyoming Avenue and the Idaho 53 junction to connect with four-lane segments on both sides. Widening the
small segment of highway will create four continuous lanes from Coeur d'Alene to north of Garwood when construction is completed.
CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
OTHER AFFILIATES:
CLIENT:
PROJECT LOCATION:
PROJECT TIME LINE:
OTHER AFFILIATES:
US 95 WORLEY NORTH
MA Deatley Construction, Inc.
Worley, ID
June 2007 – October 2009
A 4-mile re-alignment of US 95 and 1 mile of US Highway 58 with the associated ramps, and the construction of 4 multiple span bridges, 1 box culvert and 1 barrier wall.
Coeur d’Alene Tribe of Indians,
Idaho Transportation Department, Connecting Idaho Partners,
Graham Construction and Management, Inc.
8880 N HESS, SUITE 2, HAYDEN, ID 83835 | PH (208) 772-6600 | FX (208) 772-6619 | WWW.H2SURVEY.COM
2010/20118880 N HESS, SUITE 2, HAYDEN, ID 83835 | PH (208) 772-6600 | FX (208) 772-6619 | WWW.H2SURVEY.COM
Surveying Projects
PAGE 8