Solar street light installation instructions Solar street light installation instructions First,knowleage solar street light solar street light components and working principle Solar street light was composed mainly by solar module, intelligent controller, maintenance-free batteries, light source, such as light poles and structural components. The working principle of solar street light are solar cell components of solar radiation during the day will be converted into electrical energy, maintenance-free batteries to charge the battery to the evening by the light source to provide electricity load, the light source automatically when in the dark. Intelligent controller for storage battery over-charge and over-discharge, had put the protection, and the open time and switch time of the light source for control.

Solar Street Light Installation

Embed Size (px)

DESCRIPTION

Electrical Engineering

Citation preview

Page 1: Solar Street Light Installation

Solar street light installation instructionsSolar street light installation instructions

First,knowleage solar street light

solar street light components and working principle Solar street light was composed mainly by solar

module, intelligent controller, maintenance-free batteries, light source, such as light poles and structural

components. The working principle of solar street light are solar cell components of solar radiation during

the day will be converted into electrical energy, maintenance-free batteries to charge the battery to the

evening by the light source to provide electricity load, the light source automatically when in the dark.

Intelligent controller for storage battery over-charge and over-discharge, had put the protection, and the

open time and switch time of the light source for control.

Page 2: Solar Street Light Installation

Two, foundation pouring

1).To determine the location of floor lamp; reconnaissance geological conditions, if one meter of surface

are soft soil, it should deepen the depth of excavation; At the same time, the location of the following

excavation to confirm there are no other facilities (such as cables, pipes, etc.).There is no long time

shading objects at the top of street lamps, or want to replace the location appropriately.

2). In the legislature reserved the location of the lamp (excavation) in line with the standard one cubic

meter pit ; for pouring position to the embedded parts. Embedded parts placed in the pit to the middle,

PVC pipe threading on the end pieces are embedded between the other end on the storage battery (as

shown). Embedded parts to keep the foundation and the original ground surface at the same level (or

screw the top and at the same level as the original ground surface, according to the venue may be

necessary), there is the side parallel with the road; so the poles were erected in order to ensure that after

the correct without deviation. Then fixed in C20 concrete pouring, pouring out the process of vibration or

shock stick to ensure that the overall compactness, solidity.

3). Construction completed and timely clean-up position on the board of residual mud residue and

impurities in waste oil cleaning bolt on.

4).Concrete solidification process, it is necessary to conserve water from time to time; to be completely

concrete solidification (typically more than 72 hours), in order to install the chandelier.

Third, the installation of solar panel

1).battery positive and negative output components connected to the solar regulator at the former have to

take measures to avoid short-access;

2). solar cell components with support to connect to a solid and reliable;

3).components of the output line should avoid exposure, and firmly tie bar;

4). the battery components to be heading towards the south in order to compass point to prevail.

Fourth, the battery is installed

1).When the battery box under the control of light using light have to take to prevent the damaged control

box;.

2). Between the battery cable bolt pressure must be at the terminal on the battery and the use of copper

pad to enhance the conductivity.

Page 3: Solar Street Light Installation

3). Output line connected to the battery under any circumstances after the ban on short then, to avoid

damage to the battery.

4).The output line of batteries and the controller poles must be linked through the PVC pipe threading.

5). The above is completed, check the controller side of the wiring to prevent short circuit. Well after the

normal clearance of the door control box.

Fifth, lamp installation

1). For each part of the fixed components: solar panels at solar panels fixed on bracket, lamp holder fixed

to the pick arm, and then pick stent arm and fixed to the main bar, and cable into control box to wear

(battery box).

2) Lifting the poles before to check whether the strong parts of fasteners, lamp installation is correct,

whether it is normal for light work. And in the simple normal debugging system; release controller cable

on solar panels, light work; cable connected to solar panels, lights out; controllers simultaneously on

careful observation of changes in the indicator; all belong to the normal before lifting installation.

3). Lifting the main poles, the attention to safety precautions; screws fastening the absolute

good,components angle towards the sun such as the wrong point of view, end up required to adjust its

direction towards south.

4) The battery into the battery boxes will be in accordance with the technical requirements of connecting

lines connected to the controller; to access the battery, making the load, and then take the solar panels;

cable operator must pay attention to when the connection with the controller on each of the terminals

marked Then should not mistake, positive and negative poles of the collision should not, should not take

anti-; otherwise, the controller will be damaged.

5) Normal debugging system; release controller cable on solar panels, lights; cable connected to solar

panels, lights out; controllers simultaneously on careful observation of changes in the indicator; all belong

to the normal, well before closure control box.

Sixth,Solar street light Notes

Page 4: Solar Street Light Installation

Star solar responsible to provide users with the installation of street light and solar power to provide

technical services and advice. If the user to install light at the ground, paying attention to the matter as

follows:

1,.Solar street lights to solar radiation energy, radiation in the optical components on the battery if

sufficient sun lamps light a direct impact on results, so the installation of light at select locations, the

battery components at any time be able to have exposure to sunlight, and shelter materials, such as non-

leaves.

2.When threading wire must not pay attention to the folder of the connection at the poles. Wire

connections should be firmly connected and entangled with PVC adhesive tape.

3.When used, in order to ensure the appearance and the battery components to better reception of solar

radiation, you clean a battery every six months on the dust components, but not bottom-up rinse water.