Software Quality Assurance
Lecture #2By: Faraz Ahmed
Contents
0 Personnel Requirements0 SQA Tasks0 Improving SQA
What qualities should an SQA engineer have???
What is an SQA Engineer?
An SQA engineer is a software engineer trained in the disciplines of SQA.
Traits
0 Approximately 3 to 5 years developing software;
0 Experienced software engineer who has seen it all and has survived the software battles;
0 Individual seeking to advance to management or a program manager’s position;
0 Good communication skills;
0 Computer science academic background;
0 Willingness to meet and accept new challenges.
0 Why would an experienced software engineer be a good candidate?
0 Someone who believes he/she has had a limited role.
0 Wants to get in touch with the management more often.
0 Is not in love with technology and does not crave challenges.
0 Should be a good communication-ist.
0 Must be willing to EVOLVE the methodology depending on the needs of the organization. A research-oriented individual.
0 Objectivity in assessments.
SQA Process
1. Establish SQA Organization
2. Select SQA Tasks
3. Create/Maintain SQA Plan
4. Implement SQA Plan
SQA Process (contd.)
5. Create/Maintain SQA Procedures
6. Identify SQA Training
7. Identify/Select SQA Tools
8. Improve Project SQA Processes.
SQAactivitiesidentified:1.2.
SELECT SQATASKS
Section 3
PAR
Paragraph2.1QUALITYPPROGRAMQUALITYPROGRAM
CREATE/MAINTAINSQA PLAN
Section 4
PARAGParagraph
CREATE/MAINTAINSQA PROCEDURES
Section 6
IDENTIFY SQATRAININGSection 7
IDENTIFY/SELECTSQA TOOLS
Section 8
IMPROVE PROJECTSQA PROCESSES
Section 9
Select the SQA Tasks that SQA willperform - Identified SQA tasks are inputsto the SQA Plan.
SQA PROCESS ACTIVITY SQA PROCESS DESCRIPTION
Document the procedures for performingSQA activities - Repeatability ofperforming a specific task
Identify required trainingto perform the SQA tasks -inputs to training budget
Identify tools to ensure quality -compatibility with the softwareengineering environment
Look for efficiencies and areasfor improvement - changes to SQA policy,plan, processes, and procedures
SQA PROCESS OUTPUTS
Trained Personnel
Purchase Tool
ProjectSQAPlan
SQAProcedures
Improved process,policy, procedures
ESTABLISH SQAORGANIZATION
Section 2
Define and establish the SQAorganization
IMPLEMENTSQA PLANSection 5
PARAGParagraph
Plan the SQA activities inphase with the software development lifecycle
Implement the SQA tasks as definedin the approved Project SQA Plan
SQA tasks beingimplemented
Project Organization
Establish SQA Organization
0 A Level of independence for the team.
0 Reporting possible to report higher.
SQA Tasks
0 Review of Software Products, tools and facilities. 0Outline standards with which to compare softwares0Outline review process. 0E.g informal Walkthrough and Formal Inspections.
0 Evaluation of Software Tools
0 Evaluation of facilities.
Process Audits- SQA Tasks
0 Software Process Audits 0Scope of the Audit0Compliance 0Non-Compliance
Software ProcessAudits
Section 3.2
PAR
Paragraph2.1QUALITYPPROGRAMQUALITYPROGRAM
SQA TASK SQA TASKS - SoftwareDevelopment Processes
SQA TASKS - SEI SW-CMM KPAs
Evaluate Software Product Review Process
Evaluate Project Planning and OversightProcess
Evaluate System Requirements AnalysisProcess
Evaluate System Design Process
Evaluate Sofware Requirements AnalysisProcess
Evaluate Software Design Process
Evaluate Coding and Unit Testing Process
Evaluate Unit Integration and Testing, CSCIQualification Testing, CSCI/HWCI Integrationand Testing, and System Qualification TestingProcess
Evaluate End-item Delivery Process
Evaluate the Corrective Action Process
Media Certification
Nondeliverable Software Certification
Evaluate Storage and Handling Process
Evaluate Subcontractor Control Process
Evaluate Deviations and Waivers Process
Evaluate Configuration Management Process
Evaluate Software Development LibraryControl Process
Evaluate Non-Developmental Software Process
Perform Configuration AuditsVerify Implementation - RequirementsManagement
Verify Implementation - Software ProjectPlanning
Verify Implementation - Software ProjectTracking and Oversight
Verify Implementation - SoftwareSubcontract Management
Verify Implementation - SoftwareConfiguration Management
Verify Implementation - OrgranizationProcess Definition
Verify Implementation - Training
Verify Implementation - IntegratedSoftware Management
Verify Implementation - Software ProjectEngineering
Verify Implementation - IntergroupCoordination
Verify Implementation - Peer Reviews
Verify Implementation – QuantitativeProcess Management
Verify Implementation – Software QualityManagement
Verify Implementation – Defect Prevention
Verify Implementation – TechnologyChange Management
Verify Implementation – Process ChangeManagement
SQAP
0 Quality objectives, expressed in measurable terms whenever possible.
0 Identification of types of test, verification and validation activities to be carried out on product specification, plans and test specifications together with the methods and tools to be employed.
0 Defined entry and exit criteria for each development phase.
SQAP
0 Detailed planning of test verification and validation activities to be carried out, including schedules, resources and approval authorities.
0 Specific responsibilities for quality activities such as inspections, reviews and tests,
0 configuration management and change control, measurement and reporting, defect control and corrective action.
SQAP
0 Responsibilities and authority of the SQA group.
0 Resource requirements for the SQA group (including staff, tools, and facilities).
0 Schedule and funding of the project’s SQA group activities.
SQAP
0 The SQA group’s participation in establishing the software development plan, standards, and procedures for the project.
0 Evaluations to be performed by the SQA group.
0 Audits and reviews to be conducted by the SQA group.
SQAP
0 Project standards and procedures used as the basis for the SQA group’s reviews and audits.
0 Procedures for documenting and tracking noncompliance issues to closure.
SQAP
0 Documentation that the SQA group is required to produce.
0 Method and frequency of providing feedback to the software engineering group and other software-related groups on SQA activities.
SQA improving
0 Understanding project and SQA processes
0 Determining where inefficiencies or defects occur (root causes of defects)
0 Recommending changes to project processes to improve efficiency or reduce defects
SQA Improving
0 Recommending improvements to eliminate the root causes of defects
0 Recommending training courses for the project team